15th street north to 38 street north · 2016. 9. 23. · august 03, 2016. welcome and...
TRANSCRIPT
-
River DriveCorridor Study
15th Street North to 38th Street NorthInformational Meeting #2
August 03, 2016
-
Welcome and
Introductions
-
River DriveCorridor
StudySlide: 3
This meeting is held pursuant to Title VI of the 1964 Civil Rights Act which ensures that no person shall be excluded from participation in, denied the benefits of, or otherwise be subjected to discrimination on the basis of a protected status during any MDT project.
Title
VI C
onsid
erat
ions
-
River DriveCorridor
StudySlide: 4
Presentation• What is a Corridor Study?• Areas of Concern
• Transportation System• Environmental Considerations
• Needs and Objectives• Recommended
Improvement Options• Next Steps
Discussion Period
Mee
ting
Agen
da
-
What is a Corridor Study?
-
River DriveCorridor
StudySlide: 6
Wha
t is
a Co
rrid
or S
tudy
?
Planning
Project Development/NEPA Design
ConstructionMaintenanceOperations
Transportation Agencies
Resource Agencies
Public
A corridor study is conducted before design, right-of-way acquisition, environmental compliance, and construction.
-
River DriveCorridor
StudySlide: 7
BEGINRP 3.4
ENDRP 5.4
4
5
Missouri River
1 4TH
ST
N
1 5T H
ST
N15
TH S
T N
E
RIVER DR
N
SMELTER AVE NE
25TH
ST
N
25TH AVE NE
38TH
ST
N
2 6T H
ST
N
8TH AVE N
N RIVER RD
GIANT
SPRING
S RD
7TH AVE N
CHICAGO AVE
29TH
ST
N
28TH
ST
N
27TH
ST
N
N RIVER RD
BUTTE AVE
17TH
ST
NE
3 4TH
ST
N
2 4TH
ST
N
19TH
ST
NE
3 0TH
ST
N
MONTANA AVE NE
19TH
ST
N
6TH AVE N
23RD
ST
NE12 ST
21ST
ST
NE
1 7TH
ST
N
19TH
ST
N
16TH
ST
N
23RD
ST
N
18T H
ST
N
14TH
ST
NE
21S T
ST
N
2 2ND
ST
N
20TH
ST
N
32N D
ST
N
33RD
ST
N
35T H
ST
N
3 1ST
ST
N
36TH
ST
N
37TH
ST
N
13TH
ST
N
10TH AVE N
13TH
ST
NE
3RD AVE N
9TH AVE N
WIRE M
ILL RD
12TH
ST
NE
5TH AVE N
4TH AVE N
COLORADO AVE NE
10TH AVE N
9TH AVE N 9TH AVE N
FAIRWAY DR
N STAR BLVD
VIGILANTE DR
MONTANA AVE NE
10TH AVE N
WIRE M
ILL RD
12TH AVE N
18TH AV
E N
N RIVE
R RD
3R
Map Legend
0 500 1,000 1,500250Feet
Study Area
Study Corridor
Railroad
City Boundary
Reference Post
River Drive N
Great Falls
226
228
225
227
200
2003
87
89
8789
315
15
BEGINRP 3.4
ENDRP 5.4
4
5
Missouri River
1 4TH
ST
N
1 5T H
ST
N15
TH S
T N
E
RIVER DR
N
SMELTER AVE NE
25TH
ST
N
25TH AVE NE
38TH
ST
N
2 6T H
ST
N
8TH AVE N
N RIVER RD
GIANT
SPRING
S RD
7TH AVE N
CHICAGO AVE
29TH
ST
N
28TH
ST
N
27TH
ST
N
N RIVER RD
BUTTE AVE
17TH
ST
NE
3 4TH
ST
N
2 4TH
ST
N
19TH
ST
NE
3 0TH
ST
N
MONTANA AVE NE
19TH
ST
N
6TH AVE N
23RD
ST
NE12 ST
21ST
ST
NE
1 7TH
ST
N
19TH
ST
N
16TH
ST
N
23RD
ST
N
18T H
ST
N
14TH
ST
NE
21S T
ST
N
2 2ND
ST
N
20TH
ST
N
32N D
ST
N
33RD
ST
N
35T H
ST
N
3 1ST
ST
N
36TH
ST
N
37TH
ST
N
13TH
ST
N
10TH AVE N
13TH
ST
NE
3RD AVE N
9TH AVE N
WIRE M
ILL RD
12TH
ST
NE
5TH AVE N
4TH AVE N
COLORADO AVE NE
10TH AVE N
9TH AVE N 9TH AVE N
FAIRWAY DR
N STAR BLVD
VIGILANTE DR
MONTANA AVE NE
10TH AVE N
WIRE M
ILL RD
12TH AVE N
18TH AV
E N
N RIVE
R RD
3R
Map Legend
0 500 1,000 1,500250Feet
Study Area
Study Corridor
Railroad
City Boundary
Reference Post
River Drive N
Great Falls
226
228
225
227
200
2003
87
89
8789
315
15
River Drive North (2 miles)• 15th Street North (RP 3.4)• 38th Street North (RP 5.4)
Stud
y Ar
ea
-
River DriveCorridor
StudySlide: 8
Past Planning• Past LRTPs• Feasibility Study
completed in 2009• 2014 LRTP
• Conduct a Corridor Study
Existing Concerns• Congestion• Intersections• Safety
Future Concerns• Growth• Development
Back
grou
nd
-
River DriveCorridor
StudySlide: 9
Goal
s an
d Pu
rpos
e of
Stu
dy • Identify needs and objectives• Identify potential impacts
and constraints
• Identify short- and long-range improvements
• Develop planning level cost estimates
• Develop information and data to be forwarded into the environmental process if a project moves forward from the study (dependent on available funds)
-
Areas of Concern
-
River DriveCorridor
StudySlide: 11
Principal arterial roadway
• National Highway System• Designated truck route
Part of US Hwy 87 Bypass
• Connects 10th Ave S to 15th St N
Existing constraints• Missouri River• River’s Edge Trail• Park and recreational land• Development
Two travel lanes• Generally 4’ shoulders• Fair pavement condition
35 to 45 mph speed limit
Phys
ical
Cha
ract
erist
ics
-
River DriveCorridor
StudySlide: 12
Geom
etric
s Steep slope
Steep grade
Looking West Near Trailhead
-
River DriveCorridor
StudySlide: 13
Businesses between 15th St N and 19th St N
• 7 approaches
Caboose Trailhead
Big Stack Mobile Home Court approach
• On a hill• Difficult to see
Business access west of 25thSt N
• Businesses closely front roadway
• No defined parking or access
Scenic pull-outs
Acce
ss a
nd R
/W
-
River DriveCorridor
StudySlide: 14
Rail• At-grade crossing• New development
Freight• Designated truck route• 7.2% heavy vehicle traffic
Frei
ght a
nd R
ail
-
River DriveCorridor
StudySlide: 15
River’s Edge Trail• North side of roadway
• Between 15th St N and Giant Springs Rd
• Shared use path
19th St N crossing• Trail spur terminates at
19th St N intersection• No crossing treatments
Caboose Trailhead• Parking area and access
for River’s Edge Trail
East of Giant Springs Road
• Shared use path• Connects River’s Edge
Trail to 38th St N
Non
-mot
oriz
ed
-
River DriveCorridor
StudySlide: 16
Traf
fic O
pera
tions
14,400
12,580
10,770
Existing Conditions
D | C | C
D | C | F
A | A | A
-
River DriveCorridor
StudySlide: 17
Traf
fic O
pera
tions
19,690
17,200
14,720
Projected Conditions
E | C | E
F | F | F
B | A | B
-
River DriveCorridor
StudySlide: 18
5 years of data*• No fatal• Two incapacitating
injury• Six non-
incapacitating injury
113 total reported crashes• 79% multi-vehicle• 48% rear-end• No environmental
trends noted
Safe
ty
Crash Type Statistics
48%
13%10% 8% 10% 9% 2% 1%
Perc
ent o
f all
Cras
hes
Multi-vehicle Crashes Single vehicle Crashes
*Jan 01, 2010 to Dec 31, 2014
-
River DriveCorridor
StudySlide: 19
Safe
ty
Noted clusters:• 15th Street North• Big Stack Mobile
Home Court
• 25th Street North• Scenic Pull-out• Giant Springs Rd
4
5
Missouri River
14TH
ST
N
15TH
ST
N15
TH S
T N
E
RIVER DR
N
SMELTER AVE NE
25TH
ST
N
25TH AVE NE
38TH
ST
N
2 6TH
ST
N
8TH AVE N
N RIVER RD
GIANT
SPRING
S RD
7TH AVE N
CHICAGO AVE
29TH
ST
N
28T H
ST
N
27TH
ST
N
N RIVER RD
BUTTE AVE
17TH
ST
NE
34TH
ST
N
24TH
ST
N
19TH
ST
NE
30TH
ST
N
MONTANA AVE NE
19TH
ST
N
6TH AVE N
23RD
ST
NE
16TH
12TH
ST N
E
21ST
ST
NE
17TH
ST
N
19TH
ST
N
16T H
ST
N
2 3RD
ST
N
18TH
ST
N
14TH
ST
NE
21ST
ST
N
22ND
ST
N
20T H
ST
N
32ND
ST
N
33R D
ST
N
35T H
ST
N
31ST
ST
N
36TH
ST
N
37TH
ST
N
13T H
ST
N
10TH AVE N
13TH
ST
NE
3RD AVE N
9TH AVE N
WIRE M
ILL RD
12TH
ST
NE
5TH AVE N
4TH AVE N
COLORADO AVE NE
10TH AVE N
9TH AVE N 9TH AVE N
FAIRWAY DR
N STAR BLVD
VIGILANTE DR
MONTANA AVE NE
10TH AVE N
WIRE M
ILL RD
12TH AVE N
18TH AV
E N
N RIVE
R RD
3RD
41 631
19 111
1
1
71
7 4 11 5
1
2
*January 01, 2010 to December 31, 2014
Map Legend
0 500 1,000 1,500250Feet
Study Area
Study Corridor
Railroad
City Boundary
Reference Post Crashes*1
5
10
4
5
Missouri River
14TH
ST
N
15TH
ST
N15
TH S
T N
E
RIVER DR
N
SMELTER AVE NE
25TH
ST
N
25TH AVE NE
38TH
ST
N
2 6TH
ST
N
8TH AVE N
N RIVER RD
GIANT
SPRING
S RD
7TH AVE N
CHICAGO AVE
29TH
ST
N
28T H
ST
N
27TH
ST
N
N RIVER RD
BUTTE AVE
17TH
ST
NE
34TH
ST
N
24TH
ST
N
19TH
ST
NE
30TH
ST
N
MONTANA AVE NE
19TH
ST
N
6TH AVE N
23RD
ST
NE
16TH
12TH
ST N
E
21ST
ST
NE
17TH
ST
N
19TH
ST
N
16T H
ST
N
2 3RD
ST
N
18TH
ST
N
14TH
ST
NE
21ST
ST
N
22ND
ST
N
20T H
ST
N
32ND
ST
N
33R D
ST
N
35T H
ST
N
31ST
ST
N
36TH
ST
N
37TH
ST
N
13T H
ST
N
10TH AVE N
13TH
ST
NE
3RD AVE N
9TH AVE N
WIRE M
ILL RD
12TH
ST
NE
5TH AVE N
4TH AVE N
COLORADO AVE NE
10TH AVE N
9TH AVE N 9TH AVE N
FAIRWAY DR
N STAR BLVD
VIGILANTE DR
MONTANA AVE NE
10TH AVE N
WIRE M
ILL RD
12TH AVE N
18TH AV
E N
N RIVE
R RD
3RD
41 631
19 111
1
1
71
7 4 11 5
1
2
*January 01, 2010 to December 31, 2014
Map Legend
0 500 1,000 1,500250Feet
Study Area
Study Corridor
Railroad
City Boundary
Reference Post Crashes*1
5
10
-
River DriveCorridor
StudySlide: 20
Envi
ronm
enta
l Res
ourc
es Physical Environment• Soil Resources and Prime Farmland• Geologic Resources• Water Resources• Air Quality• Hazardous Substances
Biological Environment• Vegetation• General Wildlife• Threatened and Endangered Species• Species of Concern
Social and Cultural Environment• Population Demographics and Economics• Land Ownership• Recreational Resources• Cultural Resources• Noise• Visual Resources
-
Needs andObjectives
-
River DriveCorridor
StudySlide: 22
Nee
ds a
nd O
bjec
tives Need 1: Improve the Safety
of the CorridorObjectives (To the Extent Practicable)
• Reduce the frequency and severity of crashes.
• Improve roadway elements to current design criteria.
• Reduce vehicle conflicts.
-
River DriveCorridor
StudySlide: 23
Nee
ds a
nd O
bjec
tives Need 2: Accommodate
Existing and Future DemandsObjectives (To the Extent Practicable)
• Reduce corridor congestion.• Improve operations to achieve LOS
standards.• Accommodate large vehicles and
freight movements.• Accommodate non-motorized use.
-
River DriveCorridor
StudySlide: 24
Nee
ds a
nd O
bjec
tives Need 3: Minimize Adverse
Impacts to the Environmental Characteristics of the Study AreaObjectives (To the Extent Practicable)
• Minimize adverse impacts to the Missouri River and surrounding wetlands.
• Avoid or minimize adverse impacts to historic, cultural, archaeological, and recreational resources.
• Preserve the scenic character of the corridor.
-
River DriveCorridor
StudySlide: 25
Nee
ds a
nd O
bjec
tives Other Considerations
• Local and regional planning efforts• Funding availability• Construction feasibility and physical
constraints• Impacts to existing residents and
businesses in the area
-
RecommendedImprovement
Options
-
River DriveCorridor
StudySlide: 27
1. 15th Street North Intersection
• Extend WB right-turn lane
2. 19th Street North Intersection
• Enhanced non-motorized crossing treatment(s)S
pot I
mpr
ovem
ents
-
River DriveCorridor
StudySlide: 28
3. Big Stack Mobile Home Court Approach
• Reconstruct or relocate
4. Business District Access
• Reconstruct roadwaySpot
Impr
ovem
ents
-
River DriveCorridor
StudySlide: 29
5. 25th Street North Intersection
• Traffic signal or roundabout
Spot
Impr
ovem
ents Service Layer Credits: Source: Esri,
DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo,and the GIS User Community
0 100 200 30050Feet
Service Layer Credits: Source: Esri,DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo,and the GIS User Community
0 100 200 30050Feet
Service Layer Credits: Source: Esri,DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo,and the GIS User Community
0 100 200 30050Feet
Service Layer Credits: Source: Esri,DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo,and the GIS User Community
0 100 200 30050Feet
For conceptual purposes only
-
River DriveCorridor
StudySlide: 30
6. Eagle Falls Golf Club Access
• New access along River Drive
7. Railroad Crossing• Diagnostics review of
crossing
Spot
Impr
ovem
ents
-
River DriveCorridor
StudySlide: 31
8. River Drive North Reconstruction
• One travel lane in each direction
• Center left-turn lane (where appropriate)
• Non-motorized accommodations
Spot
Impr
ovem
ents
Segment 1 (15th Street North to 25th Street North)
Segment 2 (25th Street North to 38th Street North)
-
River DriveCorridor
StudySlide: 32
1. Segment 1 (15th Street North to 25th Street North)
• 15th Street North – Extend WB right-turn lane
• 19th Street North – enhanced non-motorized crossing treatment
• Big Stack Mobile Home Court Approach – reconstruct or realign
• Business District Access –reconstruct
• 25th Street North – traffic signal or roundabout
• River Drive North Reconstruction
Com
bine
d O
ptio
ns
-
River DriveCorridor
StudySlide: 33
2. Segment 2 (25th Street North to 38th Street North)
• Eagle Falls Golf Club Access –new access
• River Drive North Reconstruction
Com
bine
d O
ptio
ns
-
Conclusion andNext Steps
-
River DriveCorridor
StudySlide: 35
Nex
t Ste
ps• Receive and consider comments on draft
corridor study report from:• Public
• Stakeholders
• Resource agencies
• Review with study planning team• Prepare final corridor study report• Post to study website, distribute, and
conclude process
Comment period runs from July 29, 2016 through August 31, 2016
-
River DriveCorridor
StudySlide: 36
Impl
emen
tatio
n• Depends on availability of funds.
• Required steps:• Identify and secure a funding source(s)• Follow MDT guidelines for project nomination
and developmentor
• Coordinate with MDT via the System Impact Action Process (SIAP)
36
-
River DriveCorridor
StudySlide: 37
• Comment sheets
• Study website:www.mdt.mt.gov/pubinvolve/riverdrive
• Study Contacts:Corrina CollinsMDT Project Manager(406) [email protected]
• Info on newsletter
Subm
it Co
mm
ents
Dave HandMDT Great FallsDistrict Administrator(406) [email protected]