Chapter 15: Failure modes and optimisation
ct5308 Breakwaters and Closure Dams
H.J. Verhagen
Faculty of Civil Engineering and GeosciencesSection Hydraulic Engineering
Sri Lanka, Kudawella Tsunami damage of breakwater
2004
![Page 2: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/2.jpg)
April 8, 2023 2
What is the most important element of a breakwater or closure dam ??• the element which is the most expensive one• the section which is the most costly one• the element which is the most unreliable one• the element which is the most sensitive to
variations in the boundary conditions
![Page 3: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/3.jpg)
April 8, 2023 3
failure modes for dike-type structures
Failure of breakwater by earthquake
![Page 4: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/4.jpg)
April 8, 2023 4
failure modes for a rubble mound (Burcharth, 1992)
![Page 5: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/5.jpg)
April 8, 2023 5
Failure modes for a monolithic breakwater
![Page 6: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/6.jpg)
April 8, 2023 6
rock fill overflow dam failure modes
![Page 7: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/7.jpg)
April 8, 2023 7
fault tree
![Page 8: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/8.jpg)
April 8, 2023 8
fault tree for closure dam (cross section)
![Page 9: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/9.jpg)
April 8, 2023 9
fault tree for closure dam (equipment)
![Page 10: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/10.jpg)
April 8, 2023 10
fault tree for construction planning
![Page 11: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/11.jpg)
April 8, 2023 11
equipment utilisation in relation to fault tree
![Page 12: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/12.jpg)
April 8, 2023 12
The Dilemma
• A strong and heavy breakwater does not require maintenance … but is very expensive to construct
• A light breakwater is much cheaper to construct … but requires a lot of maintenance
![Page 13: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/13.jpg)
April 8, 2023 13
Wave climate
wave exceedance
0
2
4
6
8
10
0.00010.0010.010.11
exceedance (times per year)
wa
ve h
eig
ht
(m)
![Page 14: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/14.jpg)
April 8, 2023 14
development of damage
![Page 15: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/15.jpg)
April 8, 2023 15
Cost of construction
Initial cost for armour units: € 1320 * Hd
for core: € 8620
![Page 16: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/16.jpg)
April 8, 2023 16
annual risk
1 < H < 1.3 Hnd
n = 4% damage
1.3 Hnd < H < 1.45 Hnd
n = 8% damage
H > 1.45 Hnd
Collapse
Hnd
p w p.w p w p.w p w p.w
(m) (1/year) (€) (€/year) (1/year) (€) (€/year) (1/year) (€) (€/year)
4 1.02 420 430 4.6 10-2 860 40 3.8 10-2 13900 530
5 1.5 10-1 530 80 4.7 10-3 1060 5 2.6 10-3 15220 40
5.5 7.4 10-2 580 40 2.2 10-3 1160 - 8 10-4 15900 10
6 2.4 10-2 630 15 7.5 10-4 1260 - 1.5 10-4 16540 3
p probability of occurrence of the wave heightw cost of repair of the armour layer (2nA)
respectively cost of replacement (C)
![Page 17: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/17.jpg)
April 8, 2023 17
average annual risk
![Page 18: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/18.jpg)
April 8, 2023 18
capitalised maintenance cost
lifetime of 100 years; rate of interest 3.33%
![Page 19: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/19.jpg)
April 8, 2023 19
total cost
Adding up initial cost plus capitalised maintenance cost
![Page 20: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/20.jpg)
April 8, 2023 20
total cost for various strategies
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
50000
3.5 4 4.5 5 5.5 6 6.5
H-design
cost
full repair
partly repair
no repair
initial cost
![Page 21: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/21.jpg)
April 8, 2023 21
Conclusions for Rubble Mound Breakwaters• There is an optimum design wave height• Accepting regular maintenance is the best
option• This implies that the design also should allow a
“repairable” breakwater
![Page 22: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/22.jpg)
April 8, 2023 22
differences in breakwater type
• In case of overload a Rubble mound breakwater will suffer from some damage, which can be repaired.
• In general for Rubble mounds:the amount of repair costs increase linear with the amount of overload:
cost = B * (Hstorm - Hdesign)
• In general for Vertical wall breakwaters:you have always a given fixed amount of damage, not depending on the amount of overload:
cost = A + B (Hstorm - Hdesign)
![Page 23: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/23.jpg)
April 8, 2023 23
Vertical wall breakwater
0
50000100000
150000200000
250000
300000350000
400000
5 7 9 11
Hs (design wave)
tota
l co
st p
er m
eter
building cost
yearly repair
capitalised repair
total
damage cost = 4000 + 1500*Hs
![Page 24: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/24.jpg)
April 8, 2023 24
Conclusions
0
10000
20000
30000
40000
50000
5 7 9 11
Hs (design wave)
tota
l co
st p
er m
eter
0
10000
20000
30000
40000
50000
5 7 9 11
Hs (design wave)
tota
l co
st p
er m
eter
Rubble mound breakwater Vertical wall breakwater
total
repair
![Page 25: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/25.jpg)
April 8, 2023 25
Conclusions (2)
• Rubble mound breakwaters are less sensitive to uncertainties in wave data
• If there is no overload, a Vertical wall breakwater requires less maintenance
• If there is overload, Vertical wall breakwaters cause much more problems
![Page 26: 15: Failure Modes and Optimization](https://reader035.vdocuments.site/reader035/viewer/2022081413/5470b12ab4af9fae0a8b487a/html5/thumbnails/26.jpg)
April 8, 2023 26
Including “secondary damage”
• When a breakwater is damaged, the port cannot function well
• The cost because of loss of production should be included in the calculation
• In general secondary damage will not change the tendency of the conclusion before, but make them more even more stronger:• The optimum for a
rubble mound breakwater is allowing quite some damage, and doing a lot of repair