    PILOT PROJECT REPORT

    VERSION 1.0.1

    14THSTREET, MARKET STREET TO COLFAX AVENUE

    CITY AND COUNTY OF DENVER, CO

    Prepared by

    Craig Weiland

    11/03/2010

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    2/28

    CONTENTS

    Introduction...................................................................................................................................................................4

    ProjectDescription........................................................................................................................................................4

    ResourcesConsulted.....................................................................................................................................................5

    PilotProject

    Summary

    ...................................................................................................................................................

    6

    CreditDiscussionbyCategory.......................................................................................................................................8

    ProjectRequirements(PR).......................................................................................................................................8

    Environment&Water(EW)...................................................................................................................................11

    Access&Equity(AE)..............................................................................................................................................13

    ConstructionActivities(CA)...................................................................................................................................17

    Materials&Resources(MR)..................................................................................................................................19

    PavementTechnologies(PT)..................................................................................................................................21

    PotentialCustomCredits.......................................................................................................................................23

    Recommendations.......................................................................................................................................................

    23

    Limitations...................................................................................................................................................................23

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    3/28

    FIGURES

    Figure1:LocationMap..................................................................................................................................................5

    Figure2:ProjectScorecard............................................................................................................................................7

    Figure3:Typical14th

    StreetConfiguration..................................................................................................................15

    Figure4:

    Pavement

    Reuse

    Quantities

    .........................................................................................................................

    20

    TABLES

    Table1:SummaryofRawScores*.................................................................................................................................6

    Table2:SummaryofPotentialScoreswithNo/LowCostAdditions(Pot.Score)**.....................................................6

    Table3:SummaryofMaximumScoreswithAllFeasibleAdditions(MaxScore)***....................................................7

    Table4:ProjectRequirementsCategory.......................................................................................................................8

    Table5:Environment&WaterVoluntaryCreditCategory.........................................................................................11

    Table6:Access&EquityVoluntaryCreditCategory...................................................................................................13

    Table7:ConstructionActivitiesVoluntaryCreditCategory........................................................................................17

    Table8:Materials&ResourcesVoluntaryCreditCategory........................................................................................19

    Table9:PavementTechnologiesVoluntaryCreditCategory......................................................................................21

    Table10:PotentialCustomCredits.............................................................................................................................23

    APPENDICES

    AppendixA:AbouttheGreenroadsRatingSystem

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    4/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 4

    INTRODUCTION

    ThisreportreflectstheresultsoftheGreenroadsPilotProjectfor14th

    Street,MarketStreettoColfaxAvenue

    ProjectfortheCityandCountyofDenver. TheresultsarepresentedusingtheGreenroadsProgressScorecard

    supplementedbyadetailedcreditbycreditdiscussion.Recommendationsarealsoincludedforapplyingthe

    Greenroadssustainabilityperformancemetrictotheproject.

    PreparationofthePilotProjectinvolvedareviewofprojectdocuments,interviewswithprojectcontacts,anda

    sitevisit. ForalistofresourcesusedtopreparethePilotProjectReport,refertotheResourcesConsultedsection.

    Thefollowingsectionprovidesabriefprojectdescription.AdetaileddescriptionoftheGreenroadsRatingSystem

    canbefoundinAppendixA,includingashortlistofGreenroadsProjectRequirements(PR)andVoluntaryCredits

    (VC)forreference.AdescriptionofthePilotProjectmethodologyisprovidedinAppendixB,andsupporting

    calculationsforcreditsearnedareprovidedinAppendixC.

    PROJECT DESCRIPTION

    Theintentofthisprojectistoenhancethepedestrianexperiencealong12blocksof14th

    StreetfromMarketStreet

    toColfaxAvenueindowntownDenver(Figure1). Thenorthernsidewalkswillbewidenedto19feetandthe

    southernsidewalk

    will

    be

    widened

    to

    16

    feet.

    The

    sidewalk

    area

    will

    include

    seating

    areas,

    elongated

    planters

    and

    planterpots,trees,streetlighting,accentlightingandwayfindingsignage. Bulboutswillalsobeinstalledonthe

    southsidetominimizepedestriancrossingdistances. AnonstreetbikelanewillbeaddedtoconnecttheCherry

    CreektrailandCivicCenterPark. TheroadwaypavingwillconsistprimarilyofHMAmillandoverlayandfulldepth

    HMAreplacementwherenecessary.

    Theprojectisa$14millionbondprojectasapublic/privatepartnership,with$10millionpublic(BetterDenver

    BondFunds)and$4millionprivate(14th

    StreetGeneralImprovementsDistrict). Theconstructioncontracthasnot

    yetbeenawarded. Thisreportservesasaninitialdesignandspecificationreviewtoevaluatehowtheproject

    wouldscoreinGreenroadsV1.0ifallgoesasplanned.

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    5/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 5

    RESOURCES CONSULTED

    ThefollowingresourceswereusedtopreparethisPilotProjectreport.

    FinalBidDocuments

    DocumentsrequiredbyGreenroadspreparedbyParsonsBrinckerhoffincluding:

    o MasterGreenroadsDocumentwithcreditbycreditdescriptions

    o 14th

    StreetContractorSustainabilityRequirements

    o Backupdocumentationforeachcreditpursued

    Figure1:LocationMap

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    6/28

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    7/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 7

    Table3:SummaryofMaximumScoreswithAllFeasibleAdditions(MaxScore)***

    ProjectName PR EW AE CA MR PT CC Max Score Eligible? AwardPotential

    14th

    St.,MarkettoColfax 11 15 27 14 22 16 12 106 Yes Evergreen

    TotalPossible 11 21 30 14 23 20 12 120 ***MaxScoresdoincludethefullpointsforallCustomCredits.Includingthesepointsinflateseachprojectscore,butdoesnotchangethe

    overall

    achievement

    level;

    this

    is

    intended

    to

    demonstrate

    the

    range

    of

    points

    possible

    to

    each

    project.

    Figure2:ProjectScorecard

    ProjectRequirements(PR) Possible A P M ConstructionActivities(CA) Possible A P M

    PR1 Environmental ReviewProcess Req X CA1 QualityManagementSystem 2 2 0 0

    PR2 LifecycleCostAnalysis Req X CA2 Environmental Training 1 1 0 0

    PR3 LifecycleInventory Req X CA3 SiteRecyclingPlan 1 1 0 0

    PR4 QualityControlPlan Req X CA4 Fossil Fuel Reduction 1 2 1 0 1

    PR5 Noise

    Mitigation

    Plan Req X CA

    5 Equipment

    Emission

    Reduction 1

    2 1 0 1

    PR6 WasteManagementPlan Req X CA6 PavingEmissionReduction 1 1 0 0

    PR7 PollutionPreventionPlan Req X CA7 WaterUseTracking 2 2 0 0

    PR8 LowImpactDevelopment Req X CA8 ContractorWarranty 3 3 0 0

    PR9 PavementManagementSystem Req X Total 14 12 0 2

    PR10 SiteMaintenancePlan Req X

    PR11 Educational Outreach Req X Materials&Resources(MR) Possible A P M

    Total 11 10 1 0 MR1 LifecycleAssessment 2 0 0 2

    MR2 PavementReuse 4 5 0 0 5

    Environment&Water(EW) Possible A P M MR3 EarthworkBalance 1 0 0 0

    EW1 Environmental ManagementSystem 2 2 0 0 MR4 RecycledMaterials 1 5 2 1 2

    EW2 RunoffFlowControl 1 3 3 0 0 MR5 Regional Materials 1 5 0 2 3

    EW3 RunoffQuality 1 3 3 0 0 MR6 EnergyEfficiency 5 0 5 0

    EW4 StormwaterCostAnalysis 1 1 0 0 Total 23 2 8 12

    EW5 SiteVegetation 1 3 1 2 0

    EW6 HabitatRestoration 3 0 0 0 PavementTechnologies(PT) Possible A P M

    EW7 Ecological Connectivity 1 3 0 0 0 PT1 LongLifePavement 5 0 5 0

    EW8 LightPollution 3 0 3 0 PT2 PermeablePavement 3 0 0 3

    Total 21 10 5 0 PT3 WarmMix Asphalt 3 0 3 0

    PT4 Cool Pavement 5 5 0 0

    Access&Equity(AE) Possible A P M PT5 QuietPavement 2 3 0 0 0

    AE1 SafetyAudit 1 2 0 2 0 PT6 PavementPerformanceTracking 1 0 0 0

    AE2 IntelligentTransportationSystems 2 5 3 0 2 Total 20 5 8 3

    AE3 ContextSensitiveSolutions 5 5 0 0

    AE4 TrafficEmissions Reduction 5 0 5 0 CustomCredit(CC) Possible A P M

    AE5 PedestrianAccess 1 2 2 0 0 CC1 UrbanHeatIslandEffect 5 0 0 5

    AE6 BicycleAccess 1 2 2 0 0 CC2 TransitSafety 2 0 0 2

    AE7 Transit&HOVAccess 1 5 0 0 4 CC3 MaintenanceDistricts 5 0 0 5

    AE8 ScenicViews 2 0 0 0 Total 12 0 0 12

    AE9 Cultural Outreach 1 2 2 0 0

    Total 30 14 7 6 All11PRMet? N o Yes Yes

    GreenroadsTotal 108 43 71 106

    CertificationLevel E E

    Credit Scorecard

    PointTotals

    A = Achievedbythisproject

    P =Potential achievable withlowadditionaleffort

    M =Maximumachievableregardlessofcost

    CertificationLevels

    C =Certified (AllPRsand32Points)

    S =Silver (AllPRsand 43Points)

    G = Gold (AllPRs and 54Points)

    E =Evergreen (AllPRsand 64Points)

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    8/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 8

    CREDIT DISCUSSION BY CATEGORY

    Thissectioncontainsadetailedreviewofcreditsawardedandnotawardedtothe14th

    Street,MarketStreetto

    ColfaxAvenueproject.Creditintentwillnotbediscussed,andthereaderisreferredtoAppendixAforthese

    details.

    PROJECT REQUIREMENTS (PR)Thisprojectmet10of11ProjectRequirements.TheseareoutlinedinTable4.

    Table4:ProjectRequirementsCategory

    *DenotesreferenceinStandardSpecifications,orinstitutionalbestpractice.

    PR-1 Environmental Review Process

    DETAILS

    ThisProjectRequirementwasnotmetwiththesubmitteddocuments. ASustainabilityPlanningandCloseout

    FormforProjectManagerswasprovided,whichincludesinformationontheprojectandkeyplayers,butdoesnot

    includedescriptionsofthepotentialenvironmental,economicandsocialimpacts,theirsignificanceorthefinal

    environmental

    decisions

    that

    were

    made.

    A

    description

    of

    public

    workshops

    and

    breakout

    groups

    for

    public

    inputontheprojectwasalsoprovided.

    RATIONALE

    TheprojectwasnotrequiredtofollowNEPAstandardsbecausenofederalfundingwasinvolvedandthestateof

    Coloradodoesnothavesimilarprocessrequirement. Toachievethisrequirement,theprojectneedstodefinethe

    impactsthattheprojectwillhave,thesignificanceoftheseimpacts,andthedecisionsthatweremadetomitigate

    theseimpacts.

    PR-2 Lifecycle Cost Analysis (LCCA)

    DETAILS

    RealCostsoftwarewasusedtoevaluatethepavementimprovementoptions. Ashortreportwasprovided,stating

    theassumptionsmade,inputs,andtheoutcomeofananalysiscomparinganasphaltoverlayorafulldepth

    concretereplacement.

    RATIONALE

    TheRealCostoutputwiththegiveninputsandassumptionssuggeststhatanasphaltoverlaywillhaveapresent

    valuelifetimecostofapproximately$1.05millionwhileaconcreteroadwaywillhaveapresentvaluelifetimecost

    ofapproximately$2.36million.

    PR-3 Lifecycle Inventory (LCI)

    DETAILS

    RequirementsMet RequirementsNotMet

    No. Title No. Title

    PR2 LifecycleCostAnalysis(LCCA) PR1 EnvironmentalReviewProcess

    PR3 LifecycleInventory(LCI)

    PR4 QualityControlPlan*

    PR5 NoiseMitigationPlan*

    PR6 WasteManagementPlan*

    PR7 PollutionPreventionPlan*

    PR8

    LowImpact

    Development

    (LID)

    PR9 PavementMaintenancePlan*

    PR10 SiteMaintenancePlan

    PR11 EducationalOutreach

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    9/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 9

    Thisrequirementhasbeenmet,asresultsfromPaLATEV2.0havebeenprovidedfortheproject. Theinputpage

    wasnotprovided(astheProjectRequirementrequests).

    RATIONALE

    ThePaLATEoutputindicatesthatoverthelifeoftheproject,7,248GJofenergywillbeconsumedand1,149,232

    kgofCO2willbeemitted.Itwasassumedthatonlyatoplayerwillneedtobereplacedinthedesignlifeof15

    Yearsand

    that

    RCM/RAP

    materials

    will

    not

    be

    removed

    from

    the

    site

    and

    will

    be

    reused

    within

    the

    project

    area.

    PR-4 Quality Control Plan

    DETAILS

    Completionofacontractorqualitycontrolplanisrequiredinthe14th

    StreetContractorSustainability

    RequirementsdocumentthatistobeattachedtotheBidPackage. Thisdocumenttakestherequirementsdirectly

    fromtheGreenroadsManual,sotherequirementwillbemet.

    RATIONALE

    ThesubmissionoftheQCPisrequiredbeforeconstructionandmustbeapprovedofbytheowner.

    PR-5 Noise Mitigation Plan

    DETAILS

    AnoisemitigationplanhasbeencreatedaccordingtotherequirementsofPR5. Acopyofthelocalnoise

    mitigationordinancewasalsoprovided.

    RATIONALE

    Thepreparednoisemitigationplanmeetsallofthe10requirementsforallofconstructionandincluding

    subcontractorwork.

    PR-6 Waste Management Plan

    DETAILS

    ThefollowinglanguagewillbeincludedintheProjectSpecificationsandBidFormsfortheprimecontractor:

    ContractortocompleteaConstructionandDemolitionWasteManagementPlan(CWMP)thatwillinclude,ata

    minimumthe

    following:

    Type

    of

    construction

    waste,

    expected

    (or

    actual)

    tonnage,

    costs

    and

    fees

    for

    landfills,

    recoveryfacilities,andhauling,contactinformationofresponsiblepartyforhauling,destinationofwaste(e.g.

    recyclingfacility,landfill,contractorsbackyard),contactinformationofresponsiblepartyfordisposalsite.This

    planistobecompletedatthebeginningofconstruction.

    RATIONALE

    ThisstatementfollowsexactlytheGreenroadsrequirements,soPR6shouldbeachievedisspecificationsare

    followed.

    PR-7 Pollution Prevention Plan

    DETAILS

    TheCityandCountyofDenverrequiresthecompletionofaConstructionActivitiesStormwaterDischargePermit

    (CASDP)for

    any

    projects

    that

    disturb

    more

    than

    1acre.

    Since

    this

    project

    disturbs

    more

    than

    1acre

    aCASDP

    will

    beacquired. Asapartofthispermittingprocess,aConstructionActivitiesStormwaterManagementPlan(CASMP)

    willbecreated. TheCASMPistheequivalentofaSWPPP.

    RATIONALE

    SpecificationsrequirethecompletionofaCASMPwhichistheequivalentofaSWPPPandwillmeetthe

    requirement.

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    10/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 10

    PR-8 Low-Impact Development (LID)

    DETAILS

    Soilboringdatawasprovidedforthisrequirementaswellasdescriptionsforthefollowingcategories:

    topographicalassessment,soilsassessment,hydrologyassessment,siteevaluation,andLIDBMPs. Duetothe

    urbannature,LIDoptionsarelimitedtowhateverwillfitintheROW,which,initsexistingstate,consistsofalmost

    entirelyimpermeablesurfaces.

    RATIONALE

    TheLIDassessmentdeterminedthatmanyoptionswerenotfeasibleduetospaceconstraintsandduetothe

    existingstructuresbeingalmostentirelyimpervious. Theyrecognizedtheuseofpermeablepaversandmore

    vegetatedareastoincreasewaterqualityandreducerunoffvolume. Unfortunatelytheycannotuseporous

    pavementsfortheroadwayastheCityofDenverdoesnthaveacurrentpolicyormeansformaintainingthese

    pavements. Itwouldlikelycostsignificantlymoretoinstallporouspavements.

    PR-9 Pavement Management Program

    DETAILS

    TheCityandCountyofDenverhasasysteminplaceforpavementmanagement. ItisthedTimsCTproducedand

    managedby

    Deighton

    Associates

    in

    Toronto,

    Ontario,

    Canada.

    A

    description

    of

    this

    system

    was

    provided

    as

    a

    seconddocumentthatindicatesitcouldmeettherequirements.

    RATIONALE

    ThedTimsCTsystemhasthecapacitytomeetalltherequirementsofPR9,assumingthatconditionassessments

    aretakenatleasteverytwoyears.

    PR-10 Site Maintenance Plan

    DETAILS

    Documentationindicatesthatmultipleentitieswillberesponsibleformaintainingtheproject. Thisincludes

    privatelandowners,theGeneralImprovementDistrict,BusinessImprovementDistrict,andtheCityandCountyof

    Denver. Twoimprovementzoneswerecreatedfortheproject,thestandardzoneandpremiumzone. Baseimprovementswillbeprovidedforbothzones,whileadditionalelementsthatsupportthevisionforthecorridor

    willbeprovidedinthepremiumzone. Alistofeachitemwasproducedtoaddresstheresponsible

    parties/organizations,schedule,methods,andfunding. Thisdocumentdoesnotspecificallysaywhatmethodswill

    beusedforroadwayreplacementbutthishasbeenmentionedelsewhereinthedocuments,suchasintheLCCA

    forPR2. FundingwasdescribedintheMasterGreenroadsdocumentprovided.

    RATIONALE

    AlloftheitemsintherequirementsareaddressedintheSiteMaintenanceTable,includingtheresponsibleparties,

    maintenanceandreplacementscheduleandinotherdocumentsprovided.

    PR-11 Educational Outreach

    DETAILSFoureducationaloutreachitemswereselectedforthisprojectasfollows:

    1. Monumentsprovidingdirectionalsignagetodestinationsalongthecorridorwillbeinstalled. Greenroads

    PilotProjectsignagewillalsobeinstalled. Theadditionofsignagewillrequirereviewandapprovalfrom

    theCityandCountyofDenver

    2. Atleasttwopresentationsabouttheprojectwillbegiventoareaschools,withthefocusontheaterand

    publicart.

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    11/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 11

    3. AtechnicalproposalonthecorridorisplannedattheASCEGreenStreetsandHighwaysConferencein

    November2010.

    4. Theresearchprojectcurrentlyunderwaycouldprovideaframeworkforareportontheexperienceof

    workingthroughGreenroads.

    RATIONALE

    TheProject

    Requirement

    requires

    that

    three

    of

    these

    items

    be

    completed

    and

    documented.

    These

    four

    items

    shouldmeetthisrequirement,providedthefollowingisprovideduponcompletion:

    1. Photosoftemporaryandpermanentsignsinstalledintherightofway.

    2. Copiesofeachpresentationandthetimeanddateofeachpresentationmadeatareaschools

    3. AcopyoftheabstractalongwiththepresentationfortheASCEGreenStreetsandHighwaysConference.

    4. Acopyofthecompletedcasestudy

    ENVIRONMENT & WATER (EW)

    Thisprojectearned10ofthe21pointsavailableinthiscategory.Amajorityofthecreditsearnedarerelatedtothe

    useofpermeablepaversanddecreasedareaofimpermeablesurfaces. Thecreditsearnedinthiscategoryare

    outlinedinTable5.

    Table5:Environment&WaterVoluntaryCreditCategory

    EW-1 Environmental Management System

    DETAILS

    ParsonsBrinckerhoffswillbeservingastheconstructionmanagementfirmfortheproject. ParsonsBrinkerhoff

    suppliedtheircurrentISO14001:2004certificatetomeetthiscredit.

    RATIONALE

    TheconstructionmanagementfirmisappropriatelyISOcertifiedtomeetthecredit. Thedocumentdoesindicated

    recertificationrequiredJuly8,2010. Therecertificationwouldneedtobeverifiedtoearnthiscredit.

    EW-2 Runoff Flow Control

    DETAILS

    StormwatercalculationswereprovidedforbothEW2andEW3. Thesecalculationsindicatedthattheinitialflow

    conditionshavearunoffvolumeof31,935ft3,aflowrateof20.75cfs,andatimeofconcentrationof20minutes.

    Their

    calculations

    indicate

    that

    the

    new

    flow

    conditions

    will

    have

    a

    runoff

    volume

    of

    29,400

    ft

    3

    ,

    a

    flowrate

    of

    19.76

    cfs,andasaturationrateof20minutes. Thesecalculationsarebasedoffofan80th

    percentileaverageannual

    rainfallevent,theequivalentofa2yearstormevent,whichismoreconservativethantherequested90th

    percentileaverageannualrainfallevent. DocumentationisalsoprovidedforthedesignBMPs(permeablepavers

    andUltraUrbanfilters)andtheexpectedflowcontrolperformancecriteria

    RATIONALE

    Thecalculationssuggestthatthenewdesignshouldhave105%ofthepredevelopmentflowcontrolandwillhave

    smallerrunoffvolumeaswell,earningtheproject3points.

    CreditsEarned CreditsNotEarned

    No. Title No. Title

    EW1 EnvironmentalManagementSystem EW6 HabitatRestoration

    EW2 RunoffQuantity EW7 EcologicalConnectivity

    EW3 RunoffQuality EW8 LightPollution

    EW4 StormwaterCostAnalysis

    EW5 SiteVegetation

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    12/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 12

    EW-3 Runoff Quality

    DETAILS

    DocumentationindicatesthatallstormwaterrunoffwillbetreatedbytheinstalledBMPs. UNIEcostone

    permeablepaverswillbeusedforinfiltrationandwillremoveallTSS. AbtechsUltraUrbanFilterswillbeinstalled

    onalldrainageinlets. PerAbtechsspecifications,watertreatedbytheUltraUrbanFilterwillataminimumhave

    theTSSreducedby50%. WiththeexpectedflowthrougheachoftheseBMPsitisexpectedthattherewillbeaTSS

    reductionof

    25.6%

    in

    the

    total

    effluent,

    with

    the

    total

    of

    all

    effluent

    from

    the

    site

    entering

    Cherry

    Creek

    being

    18.98mg/L.

    RATIONALE

    TheTSSconcentrations,ascalculated,arelowenoughtomeettherequirementsofthiscreditand100%ofthe

    runoffvolumewillbetreated. Aformaldrainagedesignreportwasnotprovided,aswouldberequiredfor

    Greenroadscertification,butallofthecreditrequirementsweremettoachieve3points.

    EW-4 Stormwater Cost Analysis

    DETAILS

    ALCCAspreadsheetwasprovidedshowingtheexpectedservicelife,constructioncosts,maintenancecosts,

    interestrate,salvagevalue,andestimatedannualcostofthestormwatermanagementsystem. Theircalculations

    indicatethat

    the

    traditional

    below

    grade

    water

    treatment

    system

    would

    have

    an

    estimated

    annual

    cost

    of

    $58,937,

    whiletheLIDsystemwillhaveanestimatedannualcostof$43,872.

    RATIONALE

    Theprovidedspreadsheetshowsalloftherequirementsforboththetraditionalbelowgradestormwatersystems

    andtheproposedLIDsystem,earningtheproject1point.

    EW-5 Site Vegetation

    DETAILS

    ProvidedwereSiteVegetationPlantingSpecifications,aDenverCityForrestersOfficelistofapprovednoninvasive

    treespecies,andtheSiteVegetationPlanSheets. TheCityandCountyofDenverhasarecommendedtreelistbut

    donothaveasimilarlistforseeditems.

    RATIONALE

    Theystatethatallvegetationchosenfortheprojectisconsiderednoninvasive,butthattheprojectcannot

    committonowateruseortheuseofonlynativeplantspecies. Thisearnstheproject1point.

    EW-6 Habitat Restoration

    DETAILS

    Thiscreditwasnotachievedorattempted.

    RATIONALE

    Thiscreditisnotapplicabletothisprojectasitisinanentirelyurbanareathatnolongercontainsanynatural

    habitats. Also,theprojecthasverylimitedspace,restrictedtothestreetrightofwaythatdoesnotcontainany

    opportunitiesfor

    off

    site

    habitat

    improvement

    anywhere

    near

    the

    project.

    EW-7 Ecological Connectivity

    DETAILS

    Thiscreditisnotapplicabletothisurbanproject.

    RATIONALE

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    13/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 13

    Awildlifeassessmentwasnotperformedfortheproject,asitisacompletelyurbanenvironmentandthereisnot

    anynaturalwildlifeofconcerninthearea. Therearenocurrentwildlifecrossingareasandthereareveryfewif

    anyvehiclewildlifecollisionsinthecorridor.

    EW-8 Light Pollution

    DETAILS

    Thiscredit

    was

    not

    achieved,

    as

    the

    installed

    lighting

    in

    not

    Dark

    Sky

    Certified.

    As

    described

    below

    the

    lighting

    systemwasdesignedusinglowwattagebulbsthatifconsideredseparateareundertherequiredmaximum

    wattage. Thelampsarealsorequiredtobefullyshielded,whichcannotbeverifiedusingtheprovidedplans.

    RATIONALE

    TheluminairesthatwillbeusedalongtheroadwayarestandardXcelEnergyluminaires.Theluminaireshavethree

    separatelights:twoforpedestriansandonefortraffic.Thetrafficlightsuselowerwattagebulbsthanarenormally

    usedinroadwaylighting.ThestreetislocatedinthetheatredistrictofdowntownDenverandisheavilylighted

    duringthenighttimehoursalready.DarkSkystandardsrequirethatluminairesarebelow250watts.Whilethe

    totalwattageoftheluminaireson14thStreetis275watts,thepedestrianlightsare110wattsandtheroadway

    lightis165watts.Thepedestrianlightsareeach55watt,3000K,QLinductionlampsystemwhichproduces3,500

    initiallumens.

    ACCESS & EQUITY (AE)

    Thisprojectearned14ofthe30pointsavailableinthiscategory. TheprimaryimprovementtoAccess&Equityis

    theinclusionofabikelaneandimprovedpedestrianfacilities. ThecreditsareoutlinedinTable6.

    Table6:Access&EquityVoluntaryCreditCategory

    AE-1 Safety Audit

    DETAILS

    Thiscreditwasnotpursuedandnopointswereearned.

    RATIONALE

    TheCityandCountyofDenverPublicWorksstaffindicatedthattheyarenotfamiliarwithroadsafetyaudit

    programsanddonothaveonethatmeetstheRSAguidelines.SincetheCitydoesnotadheretoFHWA

    requirements,theydonotimplementprogramsofthistype.

    AE-2 Intelligent Transportation SystemsDETAILS

    ITSplanpageshavebeenprovidedshowingtheuseofthreeITSsystems. Thisissufficienttoearntheproject3

    points.

    RATIONALE

    ThethreeITSsystemstobeinstalledare:

    1) Category:TrafficControl;Application:BicycleandPedestrian

    CreditsEarned CreditsNotEarned

    No. Title No. Title

    AE2 IntelligentTransportationSystems AE1 SafetyAudit

    AE3 ContextSensitiveSolutions AE4 TrafficEmissions Reduction

    AE5 PedestrianAccess AE7 TransitandHOVAccess

    AE6 BicycleAccess AE8 ScenicViews

    AE9

    CulturalOutreach

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    14/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 14

    Withtheadditionofadedicatedbikelaneonthestreet,newbicyclesignsandsymbolsareneeded.

    Pages8285ofthe90%plans,whichwereprovided,showagraphicoftheproposedsignagelocations.

    ThissignagewillreplacetheexistingSharetheRoadsignssincebicyclistscurrentlyrideinmixedtraffic.

    2) Category:LaneManagement;Application:LaneControl

    Twothroughlanesareproposedontheproject.Thethirdlanewillserveasaflexlane,withvehicles

    allowedduringthepeakhourof4pm6pmand2hourmeteredparkingatallothertimes.Newsignage

    willbe

    placed

    along

    the

    corridor

    to

    inform

    users

    of

    the

    flex

    lane

    function.

    Plan

    sheets

    of

    the

    90%

    plans

    wereprovided.

    3) Category:WarningSystems;Application:PedestrianSafety

    Pedestriansignageandpedestriancountdownsignalswillbeaddedalongthecorridoratintersectionsto

    ensurepedestriansafetyandmobility.90%plansheetswereprovided. Newpedestrianwarningsignage

    isalsoplannedatStoutStreetwheretheexistingRTDlightraillinecrosses14thStreet.Thissignageisnot

    yetintheplansbutwillbeinthebidsetonceapprovedbyRTDandtheCity.

    Photosofeachsystemneedtobeprovided,onceinstalled,forcertification.

    AE-3 Context Sensitive Solutions

    DETAILS

    ACSS

    white

    paper

    has

    been

    completed

    for

    the

    project

    that

    described

    the

    10

    Greenroads

    listed

    items.

    A

    Bicycle

    PlanAccessSheet,PedestrianPlanAccessSheet,andStrategicTransportationPlanwerealsoprovidedinsupport

    ofthewhitepaper,earningtheprojectfivepoints

    RATIONALE

    ThiswhitepaperdetailstheplanningprocessandaddresseseachoftheitemsaskedforinAE3. Formoredetails

    seetheactualdocumentprovided.

    AE-4 Traffic Emissions Reduction

    DETAILS

    Theprojectchosetomeet#1ofthethreelistedoptionstomeetthiscredit. TheCityandCountyofDenvers

    GreenPrintDenver

    plan

    published

    in

    July

    2006

    states

    the

    following

    goal:

    Completeupdatedinventoryofgreenhousegasesandbeginsubstantialprogresstowarda10%reductioninper

    capitagreenhousegasemissionsfromthe1990emissionratebytheyear2012,inconformitywiththeU.S.Mayors

    ClimateAgreement.

    ThisgoalismoreaggressivethantheminimumGreenroadsrequirementofa10%reductionof1990valuesby

    2030. ThefulldocumentwasprovidedtoGreenroadsforreview.

    RATIONALE

    Therequiredgreenhousegasemissionsstandardsarespecifiedtobemetbuttherewasnomentionofcriteriaair

    pollutantsreduction,asrequired. Theprojectdoesnotmeeteitheroftheothertwooptionsforthiscredit,but

    couldearnthefullfivepointsformeetingthefirstoptioniftheemissionsreductionregulationsalsoincluded

    mandatesforcriteriaairpollutantreductionsbelowcurrentEPAstandards. Thiscouldbeeasilyachievedwithaslightchangetothecityemissionsreductionplan.

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    15/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 15

    AE-5 Pedestrian Access

    DETAILS

    DetailswereprovidedintheCSSwhitepaper(AE3,#7)forphysicalchangesthatweremadetotheroadwayto

    providebetterpedestrianaccess. Theexistingroadwayconsistedof12footsidewalks,four11footthrough/turn

    lanes,and8footparkinglanes. Thatisbeingchangedtotheconfigurationinthepicturebelow.

    Figure3:Typical14th

    StreetConfiguration

    ThismeansthatfouradditionalfeetwillbeaddedtothesidewalkontheNorthsideofthestreetandseven

    additionalfeetwillbeaddedtotheSouthside. The19footwidthonthesouthsideincludesan8footpatiozone,

    5footpedestrianzoneanda6footamenityzone.The16footwidthonthenorthsideincludesan8footamenity

    zoneand

    8foot

    pedestrian

    zone.

    The

    wider

    sidewalks

    will

    facilitate

    outdoor

    dining

    and

    will

    provide

    awider

    pedestrianwalkspacewhilehelpingmeettheCityandCountys2004PedestrianMasterPlantohavesidewalksat

    least16feetwidewherepossible. Extensivelandscapingwillbeconstructedprimarilythrough3060footplanter

    boxes,andstreettreesintheplanterboxesandinseparatepaverareastocreateatrulyGreenStreet.Bulbouts

    areplannedateachintersectiontoshortenthepedestriancrossingdistanceandtocalmtraffic. Publicinputwas

    acquiredfromeachofthelandownersalongthecorridor,whowereinsupportofadditionalpedestrianfacilities.

    Thecosttoinstallthesidewalkwith6inchesofPCCalongthecorridoris$739,765.

    RATIONALE

    Theprojectwouldearnthefulltwopointsforthewideningofsidewalks,crosswalks,andtheadditionofbulbouts.

    Theplanterboxesandothersidewalkadditionshelptomakeitamoreenjoyablecorridorandhelptheprojectget

    othercreditssuchasEW2andEW3.

    AE-6 Bicycle Access

    DETAILS

    Theadditionofadedicatedbicyclelaneisoutlinedin#8ofAE3. Therewillbea5footwidededicatedbikelane

    betweenthethroughlanesandthededicatedparkinglaneontheNorthside. Theexistingroadwaysimplyhas

    bicyclessharingthethroughlaneswithtraffic,withsharrowsindicatingthepresenceofbicycles.

    TheCherryCreekBikePathisaregionaltraillocatedalongCherryCreektwoblockssouthofthecorridor.The14th

    Streetbikepathwillhelpfacilitateconnectionstothislargerregionaltrailaswellastothestripedlanes

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    16/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 16

    intersecting14thatArapahoeStandGlenarmSt. Inaddition,anewbicyclelanecouldhelpfurthertheCitysgoal

    toincreasethebicyclecommutetripsfrom1.6%(asdocumentedinthe2007AmericanCommunitySurvey)to10

    percentby2018agoalstatedbyMayorHickenlooperandPublicWorksManagerBillVidal. Inadditiontothe

    bicyclelaneitself,theprojectwillfund121bikerackstobeplacedalongthe12blocklengthofthecorridor. In

    April2010,theCityandCountyofDenverrolledouttheBCycleprogram.Thisisacitywideinitiativetoplace55

    sharedbicyclestationsacrosstheCity.Threeofthosestationswillbelocatedalong14thStreetoneat14thand

    Larimer,one

    at

    14th

    and

    Champa,

    and

    one

    at

    14th

    and

    Welton

    (at

    the

    Convention

    Center).

    Publicinputhasbeenpositiveconcerningtheadditionofabikelane. Manyseetheneedtoconvertshared

    bicycle/vehicularlanestodesignatedbikelanes. Stripingthebikelanewillbeanominaladditionalcostwhenthe

    restoftheroadstripingisdone.Thepurchaseandinstallationofthe121bikeracksisexpectedtocost$75,000.

    RATIONALE

    Theprojectisperformingallthenecessaryanalysesandphysicalroadwaychangestoearnthefulltwopoints. The

    dedicated5footlaneandconnectionstootherdedicatedbicyclefacilitiesmakethisavaluablepieceto

    encouragingmorebicycleuse.

    AE-7 Transit and HOV Access

    DETAILS

    Thisprojectdidnotimprovetransitroutesalongthecorridor. ThereareseveralbusroutesandtheRTDlightrail

    thatcross14th

    Streetatvariousintersections. Theprojectdidtrytoimproveaccommodationsforthelightrailand

    bussesbyaddingtactilewarningstrips,staticsignage,andrealtimeflashingwarningsignswherepedestriansneed

    tocrossthelightrailtracks. Thebulboutsweredesignedwiththebusroutesinmindtoaccommodatecrossing

    routesandnewlightingshouldimprovesafetyatcrossstreetbusstops.

    RATIONALE

    Thiscreditwasnotpursuedandisnotapplicablesincetherearenotransitroutesalongthecorridor.

    AE-8 Scenic Views

    DETAILSThisprojectisinanentirelyurbanareaandcannotachievethiscredit. TherearenoNationalScenicBywaysorany

    equivalentneartheproject.

    RATIONALE

    Thiscreditisnotapplicable

    AE-9 Cultural Outreach

    DETAILS

    Aminimumof1%ofthetotalprojectbudget($160,000)willbededicatedtopublicartinstallationsalongthe

    roadwayrightofway.ThisisstandardforallpublicprojectsconductedwithintheCityandCountyofDenver. In

    themonthsofMarchandApril2010,over250artistsrespondedtoacallforartistsforthecorridor.Eachartist

    developedan

    idea

    for

    art

    along

    the

    corridor.

    Public

    presentations

    were

    held

    in

    April

    2010

    to

    review

    and

    comment

    onthevariousideas. AnartistisanticipatedtobeselectedinSummer2010.

    RATIONALE

    Thiswouldearntheprojectthefulltwopoints. Photographsofthefinalinstalledartworkandacopyofthe

    projectbudgetwouldneedtobesubmitted.

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    17/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 17

    CONSTRUCTION ACTIVITIES (CA)

    Forthiscategory,12ofthe14possiblepointswereearned. The14th

    StreetContractorSustainability

    Requirementsdocumentasksthecontractortoachieveeachofthecreditsinthissection. Thesecreditsareall

    contingentontheselectedcontractorcomplyingwiththeprojectspecificationsascurrentlywritten.Itispossible

    that,throughchangeordersorothernegotiations,theserequirementswillchange.Thus,thesecreditsmustbe

    verifieduponcompletionofconstructionbeforepointscanbeawarded.ThecreditsareshowninTable7.

    Table7:ConstructionActivitiesVoluntaryCreditCategory

    CA-1 Quality Management System

    DETAILS

    Aprimecontractorhasnotyetbeenbidorselectedforthisproject. TheCityandCountyofDenverplanstohandle

    theConstructionManagementoftheproject. ItispossiblethatParsonsBrinckerhoffcouldhavearolein

    ConstructionManagement.AcopyofthePBISO9001:2008certificate(CertificateRegistrationNo.10001797

    QM08)wasprovided.

    RATIONALE

    AssumingPBdoesendupperformingtheConstructionManagementoftheprojectthiscreditwillbeachieved.

    CA-2 Environmental TrainingDETAILS

    ThefollowingdocumentationwasplacedintheContractorSpecifications:EnvironmentalTraining:Provide

    constructionpersonnelwiththetrainingtoidentifyenvironmentalissuesandbestpracticemethodstominimize

    environmentalimpact. UsedefinitionsperGreenroadsv1.0,CA2. Provideanenvironmentaltrainingplanandany

    updatestotheplanthatoccurthroughouttheconstructionprocess.

    RATIONALE

    ThespecificationsweretakendirectlyfromGreenroadsV1.0,sothiscreditshouldbeachieved.

    CA-3 Site Recycling Plan

    DETAILS

    Aform

    for

    aSite

    Recycling

    Plan

    was

    provided

    in

    the

    14th

    Street

    Contractor

    Sustainability

    Requirementsdocument

    asdescribedinthiscredit. Itisalsospecifiedthatthecontractormustputthefollowingintosubcontractor

    agreements:

    "Thesubcontractorwillmakeagoodfaithefforttoreducetheamountofwastegeneratedonthejobsiteand

    recyclematerialasperthecontractor'swastemanagementplan.Thesubcontractorwillfollowthedesignated

    handlingproceduresforeachtypeofwastegeneratedonsiteandprovidedocumentationtoverifymaterialreuse,

    recyclinganddisposalasindicatedinthewastemanagementplan."

    CreditsEarned CreditsNotEarned

    No. Title No. Title

    CA1 QualityManagementSystem

    CA2 Environmental Training

    CA3 SiteRecyclingPlan

    CA4 FossilFuelReduction

    CA5 EquipmentEmissionReduction

    CA6 PavingEmissionReduction

    CA7 WaterUseTracking

    CA

    8

    Contractor

    Warranty

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    18/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 18

    RATIONALE

    Thisdocumentshouldhelpreducetheamountofwasteproducedandmeettherequirementsofthiscredittoearn

    1point.

    CA-4 Fossil Fuel Reduction

    DETAILS

    Accordingto

    the

    website

    http://findbiodiesel.org/US/CO/Denver

    nine

    biodiesel

    stations

    are

    located

    within

    50

    milesofDenver.Fiveofthosestationsarewithin10milesoftheprojectsiteinDowntownDenver.AsofJanuary

    2010,theUSDepartmentofEnergywasreportingaveragecostsofB20tobe9centspergallonhigherthan

    petroleumdiesel.Incontrast,B100fuelwouldbe72centshigherthandieselgasoline,whichisasubstantial

    increase.Blendsof20percentbiodieselwith80percentpetroleumdiesel(B20)cangenerallybeusedin

    unmodifieddieselengines.MostenginemanufacturersallowB5andsomeallowuptoB20undertheircurrent

    warranties. Theowneriscommittingtoachievethiscreditbystatinginthe14thStreetContractorSustainability

    RequirementsdocumentthattheprojectwillusealternativefuelsduringconstructionbyrequiringBiodiesel20in

    allconstructionvehicles. Thiswouldensurea20%reductioninfossilfueluse. Theprimecontractormustsubmita

    signedletterwiththefossilfuelreductionmeasuresusedandpercentagereductionachievedinadditiontoa

    spreadsheetofallfuelused.

    RATIONALEThoughthenecessarydeliverablescannotyetbeprovidedtheowneriscommittingtoachievingthiscreditby

    includingcontractorrequirementsinthe14thStreetContractorSustainabilityRequirementsdocument. The

    projectwouldachieve1point.

    CA-5 Equipment Emission Reduction

    DETAILS

    Thefollowinghasbeenplacedinthe14thStreetContractorSustainabilityRequirements:Atleast50%ofthe

    nonroadconstructionequipmentfleetoperatinghoursfortheprojectwillbeaccomplishedonequipmentwith

    installedemissionreductionexhaustretrofitsandaddonfuelefficiencytechnologiesthatachievetheEPATier4

    emissionstandard.Furtherdiscussionswiththecontractorfortheprojectwillbeneededtoconfirmthattheyare

    abletomeettheTier4emissionstandardwiththeequipmentavailable.

    RATIONALE

    Thecontractorisbeingaskedtomeeta50%EPATier4requirementwhichwouldearntheproject1point. Upon

    completionthesupportingdocumentationtoconfirmthecreditwasmetwouldneedtobesubmitted.Thiscredit

    maybedifficulttoachievesincetherearecurrentlyfewnonroadvehiclesthatmeetEPATier4requirements.

    CA-6 Paving Emission Reduction

    DETAILS

    A90%NIOSHemissionsapprovedpaverrequirementwasaddedtothe14thStreetContractorSustainability

    Requirementsdocument.

    RATIONALE

    Thecontractor

    will

    be

    required

    to

    meet

    this

    credit,

    earning

    the

    project

    1point.

    A

    copy

    of

    this

    certification

    and

    asignedstatementfromthepavingcontractorwouldneedtobeprovidedshowingthatthecreditwasmet.

    CA-7 Water Use Tracking

    DETAILS

    Acontractorrequirementwasaddedtothe14thStreetContractorSustainabilityRequirementsdetailing

    everythingthatshouldbeintheWaterUseTrackingDocument.

    RATIONALE

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    19/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 19

    ThecontractorrequirementsweredirectlyfromtheGreenroadscreditrequirementssothiscreditshouldearn2

    pointsuponsubmissionofthefinaldocuments.

    CA-8 Contractor Warranty

    DETAILS

    TheCityandCountyofDenverPublicWorksDepartmentrequiresthattheContractorswarrantiesandguarantees

    arefor

    athree

    year

    period.

    Title

    18

    (Section

    1801,

    Page

    68)

    of

    the

    City

    and

    County

    of

    Denvers

    General

    Contract

    Conditionsstatesthat:TheContractorswarrantiesandguaranteesforallWorkcomponentsshallcontinueforthe

    followingperiods:ForContractsexecutedundertheauthorityoftheManagerofPublicWorks,foraperiodof

    three(3)yearsafterthedateofFinalInspectionforWorkperformedwithinthePublicRightofWayorpermanent

    easementsheldbytheCity,orforaperiodofone(1)yearafterthedateofSubstantialCompletionforWork

    constructedoutsideofthePublicRightofWay,inaccordancewithGC1902,orforsuchlongerperiodoftimeas

    maybeprescribedbythetermsofanyspecialwarrantiesandguaranteesrequiredbytheContractDocuments.

    TheCitysGeneralContractConditionswereprovided.

    RATIONALE

    TheGeneralContractConditionsrequireawarrantyasdescribedinthiscreditandwouldearntheproject3points.

    MATERIALS & RESOURCES (MR)Forthiscategory,2ofthe23possiblevoluntarycreditsareearned. Theonlypointsearnedareforrecycled

    materials. Itappearsthattheprojectcouldgetpointsforusingregionalmaterialsaswell,butuntilacontractoris

    selectedandmaterialsareacquireditishardtoknow. ThesecreditsareoutlinedinTable8.

    Table8:Materials&ResourcesVoluntaryCreditCategory

    MR-1 Lifecycle Assessment (LCA)

    DETAILS

    Thiscreditwillnotbecompletedaspartofthisanalysis. ThehiringofaLCAcertifiedpersonorconsultantto

    performthiscreditwasoutsideofthedesiredscopeofthisproject.

    RATIONALE

    Thiscreditwasnotattempted.

    MR-2 Pavement Reuse

    DETAILS

    Thetotalproject,newpavement,andreusevolumesforbothasphaltandconcreteareshowninFigure4below.

    Thetotalpercentageofreusedpavementintheprojectis47%.Theexistingconcreteandasphaltpavementwillbe

    reusedwithintheprojectlimitswhereitisingoodconditionanddoesnotconflictwiththegradingofthe

    proposedcurbandgutter.Asphaltpavementthatisreusedwillbemilledanda2inchoverlaywillbeaddedtothe

    pavementtoprolongtheservicelife.Theconcretethatwillbereusedwillremaininplacewithnoadditional

    changestoit.

    CreditsEarned CreditsNotEarned

    No. Title No. Title

    MR4 RecycledMaterials MR1 LifecycleAssessment(LCA)

    MR2 PavementReuse

    MR3 EarthworkBalance

    MR5 RegionalMaterials

    MR

    6 Energy

    Efficiency

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    20/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 20

    Figure4:PavementReuseQuantities

    RATIONALE

    Theprojectwillnotachievetheminimumrequirementof80%reusetoachieveanypointsandwouldneed

    significantimprovementstoreachthat.

    MR-3 Earthwork Balance

    DETAILS

    Thiscreditisnotapplicableastherewillbenocuttingandfillingoccurringfortheproject.

    RATIONALE

    Thiscreditisnotapplicable.

    MR-4 Recycled Materials

    DETAILS

    ThefractionofrecycledmaterialswascalculatedusingOption2.Aspreadsheetthatdocumentsthetotalweightof

    HMAandPCC,thetotalweightofrecycledmaterials,andthecomputedARCfortheprojectwassubmitted.The

    ARCfortheprojectis24.61%.Acopyoftheapproveddesignmixforthepavementmaterialsisnotavailable.

    RATIONALE

    The24.61%recycledcontendwouldbegoodfor2points. Toearnthepointsacopyoftheapprovedmixdesigns

    aswell

    as

    all

    supporting

    test

    documents

    (proportioning

    records,

    mix

    tickets,

    etc.)

    would

    need

    to

    be

    submitted.

    MR-5 Regional Materials

    DETAILS

    Acalculationwasdonebasedonoption1.Sincetheprojecthasnotgonetoadvertisementyet,aconstruction

    contractorisnotinplace. Duetothis,theexactlocationofalloftheconstructionmaterialsisunknown.Outof

    165constructionitems,thesourcelocationfor100ofthemisunknownatthistime.Fortheother65items,a

    reasonableassumptionofthesourcelocationwasmade.Onceacontractorisinplace,thesourcelocationsofthe

    materialsshouldbeknowntoagreaterextent.However,basedontheassumptionsmadeforthe65items,the

    total%ofmaterialsourcedfromwithin50milesoftheprojectareais52%.Thecalculationssupportingthiscredit

    wereprovided.

    RATIONALE

    Basedonthispreliminarycalculationtheprojectwouldnotreceiveanypointsbasedon52%ofthematerials

    comingfromwithin50milesoftheproject. Itappearsfromthespreadsheetthatmostoftheknownmaterial

    suppliersarefromwithina50milerangeandthatmanyoftheunknownmaterialscouldalsocomefromwithin50

    miles. Itseemsthatpointscouldbeearnedforthisonceacontractissignedandmoreofthematerialsare

    located.

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    21/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 21

    MR-6 Energy Efficiency

    DETAILS

    Theluminaireson14thStreetdonotmeettherequirementsforthiscreditastheyarestandardinduction

    luminairesbyXcelEnergy.

    RATIONALE

    Thiscredit

    was

    not

    pursued.

    PAVEMENT TECHNOLOGIES (PT)

    Forthiscategory,5ofthe20possiblevoluntarycreditswereearned. Theonlycreditearnedinthiscategoryis

    CoolPavement. Thisisbecauseamajorityoftheimpermeablesurfaceareawillbeconcretesidewalks,whichhave

    ahighalbedoandqualifyforcoolpavements. ThecreditsareshowninTable9.

    Table9:PavementTechnologiesVoluntaryCreditCategory

    PT-1 Long Life Pavement

    DETAILS

    The14thStreetMarkettoColfaxAvenueFinalGeotechnicalandPavementReportwasprovidedforthiscredit. The

    proposed14thStreetprojectincludesthereconstructingorupgradingofpavementbetweenMarketStreetand

    ColfaxAvenuedependingonpavementcondition.Theconstructionwillconsistofmillingandoverlayor

    reconstructingthepavementon14thStreetdependingontheconditionoftheexistingasphaltmatorconcrete

    surfaceandnewstreetscapingimprovementsinadjacentareas. ThereportindicatesthatHMApavingforthe

    mainline14th

    Street

    new

    pavement

    will

    be

    11.5

    inches

    thick,

    intersections

    will

    be

    12.5

    inches

    thick

    and

    overlay

    sections. AllPCCsectionswillbepaved10inchesthick. TheHMApavementshavebeendesignedfor20yearlife

    andPCCpavementswitha30yearlife,havinglifetimeequivalentsingleaxleloads(ESALs)of5,945,743and

    9,236,838respectively. AccordingtoFigurePT1.1intheGreenroadsmanualthenewHMAsectionswilllikely

    meetthelongliferequirement,assumingtheminimumsubgradeCBRandminimumbasematerialCBRaremet.

    ThePCCpavementsdonotappearinitiallytomeettherequirements. SomeoftheHMAoverlaysectionsmay

    meettherequirements,butitwillvarybyexistingpavementthickness.

    RATIONALE

    Inordertoachievethiscreditmorecalculationswouldneedtobedonetoshowthattheinstalledpavementsmeet

    therequirements. BesidesthelifetimeESALcalculations,thesubgradeCBRandbasematerialCBRwouldneedto

    beprovidedtoshowthattheminimumrequirementsweremet. Theprojectmaybeabletoachievethiscredit.

    PT-2 Permeable Pavement

    DETAILS

    Acombinationofpermeablepavers(UNIEcoStone)andUltraUrbanfilterswillbeusedtocontrolandtreatthe

    90thpercentileaverageannualrainfalleventpostconstructionrunoff. Thepaversandplanterscombinedwill

    treat2,535ft3ofthetotalrunoffareaof31,935ft

    3.Thisrepresentsapproximately7.9%oftherunofftreated

    throughpermeablepaversandplanters.Thus,thisisbelowthe50%minimumthresholdforthiscredit.

    Documentationwasprovidedforthesecalculations.

    CreditsEarned CreditsNotEarned

    No. Title No. Title

    PT4 CoolPavement PT1 LongLifePavement

    PT

    2 Permeable

    Pavement

    PT3 WarmMixAsphalt

    PT5 QuietPavement

    PT6 PavementPerformanceTracking

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    22/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 22

    RATIONALE

    Notenoughsurfaceareaistreatedbytheamountofpermeablepaversbeinginstalled.

    PT-3 Warm Mix Asphalt

    DETAILS

    TheCityandCountyofDenverwillnotapprovetheuseofWarmMixAsphaltontheproject.Theywill,however,

    allowthe

    project

    team

    to

    include

    avalue

    engineering

    option

    for

    contractors

    to

    use

    WMA

    for

    patching

    and

    full

    depthpavement.IfWarmMixAsphaltisused,theCCDwillrequirethecontractortodoanumberofdurability

    testsfortheWMApriortoapproval.Astatementtothiseffecthasbeenplacedinthe14thStreetContractor

    SustainabilityRequirements.

    RATIONALE

    Thiscreditisnotcurrentlybeingpursued.

    PT-4 Cool Pavement

    DETAILS

    Thisprojectwillhaveapavementsurfacewithaminimumalbedoof0.3for56.9%ofthetotalprojectpavement

    surfacingbyarea,asshownbythefollowing:

    BaseBid

    TotalProjectPavedArea:41,654.98SquareYards(SY)

    LSA(LightSurfaceArea):23,695.63SY

    Project%CoolPavement:56.9%

    Thiscalculationisnotbackedwithanyalbedotestresultscurrently.

    RATIONALE

    Accordingtothecalculationtheprojectwillmeetthe50%requirementforcoolpavements. Toachievethiscredit

    albedotestresults,aphotoofthepavementwithcoolpavementareasidentified,andaplanshowingthelocations

    ofcoolpavementswouldneedtobeprovided.

    PT-5 Quiet Pavement

    DETAILS

    Thiscreditdoesnotapplybecausepostedspeedlimitsareunder30milesperhour.

    RATIONALE

    Thiscreditisnotapplicabletothisproject.

    PT-6 Pavement Performance Tracking

    DETAILS

    TheCityhasapavementmanagementsysteminplace(describedinPR9PavementManagementSystem).

    However,theCitydoesnothavetheresourcestoperformanetworkwideconditionassessmentontwoyear

    intervals.The

    City

    conducts

    assessments

    based

    on

    measured

    distresses

    in

    block

    long

    segments.

    They

    assess

    streets

    every5or6yearsandthePMSsoftwareusesdeteriorationcurvestoprojectdecliningPCIvaluesannually.

    RATIONALE

    TheCityandCountyofDenverdoesnotcurrentlyhavetheresourcestoattainthiscredit.

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    23/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 23

    POTENTIAL CUSTOM CREDITS

    ThreebestpracticesimplementedonthisprojectwereidentifiedaspotentialCustomCredits.Atotalof12

    additionalpointsaresuggested.CC1wouldlikelyfitintheEnvironment&watercategorywhileCC2andCC3

    wouldlikelyfitintotheAccess&Equity.SomeresearchhasbeencompletedbyParsonsBrinckerhoff,butthe

    GreenroadsDevelopmentTeamwillneedrevieweachcredittoensuretheymeetthesamestandardsasother

    credits. Ifthecreditsmeetthesestandards,theywillearnpointsforthisprojectandbeincorporatedintolater

    versionsoftheratingsystem. Table10providesthecredittitlesandintent.

    Table10:PotentialCustomCredits

    RECOMMENDATIONS

    Onlyone

    of

    the

    Project

    Requirement

    is

    not

    currently

    met.

    To

    become

    Greenroads

    certified

    PR

    1Environmental

    ReviewProcesswouldneedtobecompletedbydefiningtheenvironmentalimpacts,theirsignificance,and

    howtheywillbemitigated.

    AE4TrafficEmissionsReduction,MR5RegionalMaterials,andPT1LongLifePavementarecreditsthatseem

    achievablewithlowadditionaleffort. Theprojectappearstobeontracktoachievethesecreditswithsome

    minorchangesoradditionalcalculations.

    Manyofthecreditsthatarecurrentlyshownasachievedstillrequiresubmissionofadditionaldocumentsupon

    completionforproof. ThisincludesalmostalloftheConstructionActivitiescreditsbecausetheywillbe

    performedduringconstruction. Carefultrackingofcontractorprogresswillberequiredtoensurethatthese

    creditsareachieved.

    TheproposedcustomcreditswillrequirefurtherresearchanddiscussionbetweenGreenroadsandtheproject

    teamtoevaluatethemeritandvalueofeachproposedcredit. Theprojectscorecardcurrentlyshowsthe

    customcreditsintheMaximumPossiblecategory,astheGreenroadsteamdoesnotwanttounfairlyshow

    achievementthatmaynotprovetobepossible. Ifcustomcreditsareeventuallygranted,theywillonlyaddto

    thetotalachievementshowninthisreport.

    LIMITATIONS

    1. PilotProjectresultsarebasedondiscussionswithprojectpersonnelonlyandanyprojectdocumentsprovided

    totheUniversityofWashingtonReviewTeam.Ingeneral,thisonlyshowshowtheprojectshoulddogiventhe

    currentdesignandspecifications. Followupreviewsandadditionaldocumentationarenecessaryfor

    certificationandtoreflecttheprojectssustainabilitypractices.

    2. Regulatoryrequirementstendtodictatemanyoftheactionsofmostroadwayprojectteamsand

    transportationagencies.However,theintentofGreenroadsistoencouragebestpracticesthatgoaboveand

    beyondexistingUnitedStatesregulationsandrequirements.Alistofcurrentregulatoryrequirementsis

    providedintheIntroductiontotheGreenroadsManual(Muench&Anderson,2010).

    3. Greenroadsiscontinuallyunderdevelopment.Thisreviewhasbeencompletedundertheversion1.0.1rating

    systemandmaynotscoreequivalentlyunderfutureversionsofGreenroads. Officialcertificationisnot

    No. Title Pts. Description

    CC1 UrbanHeatIslandEffect 5 Installvegetationtoreduceurbanheatislandeffect

    CC2 TransitSafety 2 Improvetransitsafetyattransitcrossingsand/orstopsinthe

    roadwaycorridor.

    CC3 MaintenanceDistricts 5 Formamaintenancedistricttoensurecontinuedmaintenanceofthe

    roadwayfacility

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    24/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 24

    currentlyavailableunderversion1.0.1. Tocertifythisproject,itwouldneedtobereviewedunderversion1.5

    whichisexpectedtobereleasedsoonandwillhavedifferencesfromversion1.0.1.

    4. DifferentGreenroadsreviewersmayinterpretavailableinformationinaslightlydifferentmanner.Bestefforts

    havebeenmadetobetransparentaboutlogicbehinddecisionstoawardanddenycreditsinthisreview.

    However,notallsubjectivitymayhavebeenremoved.

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    25/28

    APPENDIX A

    About the Greenroads Rating System

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    26/28

    ABOUT GREENROADS

    ThissectiondetailstheGreenroadsSustainabilityPerformanceMetric,includingabriefbackgroundondevelopmentofthesystem,

    theoperatingdefinitionofsustainabilityused,andabriefdescriptionofhowitworksandcanbeimplemented.Moredetailed

    information,includingtheVersion1.0.1manualofrequirementsandcreditscanbefoundontheofficialGreenroadswebsite:

    http://www.greenroads.us.

    ThelistofcreditsincludingabriefdescriptionisincludedattheendofthisappendixinTableA.1.

    BACKGROUNDGreenroadsisaresearchproject(Sderlund,2007)thatisjointlydevelopedbytheUniversityofWashington(UW)andCH2MHILL.

    Greenroadsisacollectionofsustainabilitybestpracticesthatapplytoroadwaydesignandconstruction,muchliketheLeadershipin

    EnergyandEnvironmentalDesign(LEED)RatingSystemforBuildingsthatisadministeredbytheUnitedStatesGreenBuilding

    Council(USGBC).Ingeneral,thesesustainabilitybestpracticesaredividedintotwotypes:requiredandvoluntary.Thereiscurrently

    onerequiredcategorywith11requiredbestpracticescalledProjectRequirementsorPRs.Atminimum,allofthesebestpractices

    mustbecompletedinorderforaroadwaytobeconsideredaGreenroad.

    WhatisaGreenroad?

    AGreenroadisdefinedasroadwayprojectthathasbeendesignedandconstructedtoalevelofsustainabilitythatissubstantially

    higherthancurrentcommonpractice.

    WhatisSustainability?

    Sustainabilityisthecharacteristicofasystemthatrepresentsitscapacitytosupportnaturallawsandhumanvalues.(Anderson,2008;Muenchet.al,2010)

    ProjectsthatregisterusingtheGreenroadswebsiteareeligibletoearnacertificationawardandwillbeabletodisplaythe

    Greenroadslogoontheirprojecttorecognizetheirachievement.

    STRUCTURE OF THE METRIC

    Ingeneral,theGreenroadssustainabilitybestpracticesaredividedintotwotypes:requiredandvoluntary.Thereiscurrentlyone

    requiredcategorywith11requiredbestpracticescalledProjectRequirementsorPRs.Atminimum,allofthesebestpracticesmust

    becompletedinorderforaroadwaytobeconsideredaGreenroad.Thirtyseven(37)othervoluntarybestpracticesare

    characterizedinfiveadditionalcategories,calledvoluntarycreditsorVCs.AfterthePRrequirementshavebeenmet,anumberof

    differentVCsmaybeachievedandpointsmaybeearnedtowardoneoffourratings:Certified,Silver,GoldandEvergreen.

    Additionally,asixth

    VC

    category

    is

    available

    to

    projects

    that

    demonstrate

    and

    implement

    innovative

    ideas

    or

    more

    sustainable

    practicesandwouldliketowriteorsubmittheirowncustomizedornewideasforpoints.

    FollowingisabriefdescriptionofthesevencategoriesinGreenroads.TherelativeweightsofthefivemainVCcategoriesareshown

    inFigureA.1.

    ProjectRequirements

    Thiscategorycontainsall11ProjectRequirements(PR)thataGreenroadsprojectmustmeetinordertobeconsideredfora

    certificationlevelaward.Thegeneralintentofthiscategoryistoencourageenvironmentallyresponsibledecisionmaking

    processesandtohavemanagementplansinplaceforconstruction,andtoestablishaminimumbaselineforeveryprojectthat

    appliesforcertification.

    Environment

    &

    Water

    (EW)Thiscategorycontainseight(8)voluntarycreditsworthupto21points.Theintentofthiscategoryistopromotebestpractices

    relatedtostormwatermanagementandecologicalresourceswithintheprojectboundary.

    Access&Equity(AE)

    Thiscategorycontainsnine(9)voluntarycreditsworthupto30points.Theintentofthiscategoryistopromotesafety,access,

    andmobilitytousersoftheroadway.

    ConstructionActivities(CA)

    Thiscategorycontainseight(8)voluntarycreditsworthupto14points.Theintentofthiscategoryistopromoteresponsible

    constructionmanagement,reduceuseoffossilfuelsandimprovehealthandsafetyofconstructionworkers.

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    27/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    November 3, 2010 A-5

    Materials&Resources(MR)

    Thiscategorycontainssix(6)voluntarycreditsworthupto23points.Theintentofthiscategoryistopromoteresponsible

    materialsandenergymanagementbycombinationsofrecycling,reusingandreducingbothvirginandwastematerials.

    PavementTechnologies(PT)

    Thiscategorycontainssix(6)voluntarycreditsworthupto20points.Theintentofthiscategoryistohighlightspecificpavement

    engineeringinnovationsandideasorbroadtypesoftechnologiesortechniqueswhicharewellestablishedinpracticeandhave

    directsustainability

    benefits.

    CustomCredits(CC)

    Thiscategorycontainsupto10creditswhichmaybeearnedbyaprojectthatimplementssustainableorinnovativeideas.The

    projectteammaysubmitapplicationswithadetaileddescriptionandexplanationofthepracticetoearncreditsinthiscategory

    ranginginvaluefrom1to5points.Pointsawardedforthecustomcreditaredeterminedthroughreviewandcollaborationwith

    Greenroadsrepresentatives.Thereiscurrentlynolimitestablishedforhowmanycustomcreditsaprojectmaysubmitfor

    review.

    FigureA.1.RelativeWeightsofGreenroadsVCCategories(Muenchetal.2010)

    TableA.1Greenroadsv1.0.1ListofCredits

    No. Title Pts. Description

    Project

    Requirements

    (PR)

    Mandatory

    for

    all

    projects

    PR1 EnvironmentalReviewProcess Req Completeacomprehensiveenvironmentalreview

    PR2 LifecycleCostAnalysis(LCCA) Req PerformLCCAforpavementsection

    PR3 LifecycleInventory(LCI) Req PerformLCIofpavementsection

    PR4 QualityControlPlan Req Have aformalcontractorqualitycontrolplan

    PR5 NoiseMitigationPlan Req Haveaconstructionnoisemitigationplan

    PR6 WasteManagementPlan Req HaveaplantodivertC&Dwastefromlandfill

    PR7 PollutionPreventionPlan Req HaveaTESC/SWPPP

    PR8 LowImpactDevelopment(LID) Req CompleteaLIDfeasibilitystudy

    PR9 PavementManagementSystem Req Haveapavementmanagementsystem

    PR10 SiteMaintenancePlan Req Havearoadsidemaintenanceplan

  • 8/10/2019 14th Street Market Street to Colfax Avenue Pilot p

    28/28

    Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue

    TableA.1Greenroadsv1.0.1ListofCredits

    No. Title Pts. Description

    PR11 EducationalOutreach Req Publicizesustainabilityinformationforproject

    Environment&Water(EW)Upto21Points

    EW1 EnvironmentalManagementSystem 2 ISO14001certificationforgeneralcontractor

    EW2 RunffFlowControl 13 Reducerunoffquantity

    EW3 RunoffQuality 13 Treatstormwatertoahigherlevelofquality

    EW4 StormwaterCostAnalysis 1 ConductanLCCAforstormwaterelements

    EW5

    SiteVegetation

    13 Use

    native

    low/no

    water

    vegetation

    EW6 HabitatRestoration 3 Restorehabitatbeyondwhatisrequired

    EW7 EcologicalConnectivity 1or3 Connecthabitatacrossroadways

    EW8 LightPollution 3 Discouragelightpollution

    Access&Equity(AE)Upto30Points

    AE1 SafetyAudit 12 Performroadwaysafetyaudit

    AE2 IntelligentTransportationSystems(ITS) 25 ImplementITSsolutions

    AE3 ContextSensitiveSolutions 5 Planforcontextsensitivesolutions

    AE4 TrafficEmissionsReduction 5 Reduceemissionswithquantifiablemethods

    AE5 PedestrianAccess 2 Provide/improvepedestrianaccessibility

    AE6 BicycleAccess 2 Provide/improvebicycleaccessibility

    AE7 TransitAccess 15 Provide/improvetransitaccessibility

    AE8 ScenicViews 2 Provideviewsofsceneryorvistas

    AE9 CulturalOutreach 12 Promoteart/culture/communityvalues

    Construction

    Activities

    (CA)

    Up

    to

    14

    Points

    CA1 QualityManagementSystem 2 ISO9001certificationforgeneralcontractor

    CA2 EnvironmentalTraining 1 Provideenvironmentaltraining

    CA3 SiteRecyclingPlan 1 Haveaplantodivertwastefromlandfill

    CA4 FossilFuelReduction 12 Usealternativefuelsinconstructionequipment

    CA5 EquipmentEmissionsReduction 12 MeetEPATier4standardsfornonroadequip.

    CA6 PavingEmissionsReduction 1 UsepaversthatmeetNIOSHrequirements

    CA7 WaterTracking 2 Developdataonwateruseinconstruction

    CA8 ContractorWarranty 3 Warrantyontheconstructedpavement

    Materials&Resources(MR)Upto23Points

    MR1 LifeCycleAssessment(LCA) 2 ConductadetailedLCAoftheentireproject

    MR2 PavementReuse 45 Reuseexistingpavementsections

    MR3 EarthworkBalance 1 Usenativesoilratherthanimportfill

    MR4 RecycledMaterials 5 Userecycledmaterialsfornewpavement

    MR5 RegionalMaterials 5 Useregionalmaterialstoreducetransportation

    MR6

    EnergyEfficiency

    5 Improve

    energy

    efficiency

    of

    operational

    systems

    PavementTechnologies(PT)Upto20Points

    PT1 LongLifePavement 5 Designpavementsforlonglife

    PT2 PermeablePavement 3 UsepermeablepavementasaLIDtechnique

    PT3 WarmMixAsphalt(WMA) 3 Use WMAinplaceofHMA

    PT4 CoolPavement 5 Contributelesstourbanheatislandeffect(UHI)

    PT5 QuietPavement 3 Useaquietpavementtoreducenoise

    PT6 PavementPerformanceTracking 1 Relateconstructiontoperformancedata

    CustomCredits(CC)Availableforallprojectsbasedoncontextandinnovation,subjecttoapproval

    CC1 CustomCredit1 15 Designanewvoluntarycredit

    CC2 CustomCredit2 15 Designanewvoluntarycredit

    GreenroadsTotalPoints: 118