1450A ZENAIR FLOATS Pre-closing inspection Page 1 of 1
Edition 1.0 DATE: March 28. 2011
Pump out holes: check with the drawings for the location of the pump out holes. Holes are drilled in on inboard side of skin, Idendify the sealed bulkheads for the separate compartments. With a marker, label the apex of the bulkhead with an “S” to indicate a sealed bulkhead.
CLOSING INSPECTION Final inspection before installing the bottom skins.
Original apex of sealed bulkhead
Apex drain hole on Bulkheads not sealed
1450A ZENAIR FLOATS
Drill the drain hole- cut the corners.
Drain holes for the sides of the wheel well compartments
Pre-closing Page
Edition 1.0 DATE: March 28. 2011
cut the corners.
Aprex drain holes for not sealed bulkheads.
Drain holes for the sides of the wheel well compartments nose wheel 1 hole on each side (view from aft sdie of bulkhead
closing inspection Page 2 of 2
Aprex drain holes for not sealed bulkheads.
1 hole on each side (view from aft sdie of bulkhead
1450A ZENAIR FLOATS
drain holes for wheel well side compartment
Front side of step bulkhead, drain holes
FLOATS Pre-closing Edition 1.0 DATE: March 28. 2011
drain holes for wheel well side compartment -
bulkhead, drain holes for wheel well side compartments
closing inspection Page 3 of 3
1450A ZENAIR FLOATS Pre-closing inspection Page 4 of 4
Edition 1.0 DATE: March 28. 2011
Rivet line through the flanges of the 2 channels Rivet line along the bottom of the channels
Check the bolt hols are drilled
1450A ZENAIR FLOATS Pre-closing inspection Page 5 of 5
Edition 1.0 DATE: March 28. 2011
6- Nose wheel hinge bolts, hole size, alinment
Bolt fits.
7 – check bolt alignmnet – hinge extrusion are drilled for bolt size Main wheel hinge extrusion (2 front 2 rear)
Test bolt
1450A ZENAIR FLOATS
Front Pick up at bulkhead FL-4
2 bolts: one at the end, the other thru shim
Pre-closing Page
Edition 1.0 DATE: March 28. 2011
5/32” rivets in extrusions
end, the other thru shim
closing inspection Page 6 of 6
5/32” rivets in extrusions
1450A ZENAIR FLOATS
Rear pick up on Bulkhead FL-8
SL nut
FLOATS Pre-closing Edition 1.0 DATE: March 28. 2011
SL nut on FL-65
closing inspection Page 7 of 7
1450A ZENAIR FLOATS
Intersection rivet: through front and rear extrusion: 3/16” rivets (extrusion riveted with 5/32” rivets)
Pre-closing Page
Edition 1.0 DATE: March 28. 2011
Intersection rivet: through front and rear extrusion: 3/16” rivets (extrusion
closing inspection Page 8 of 8
1450A ZENAIR FLOATS Pre-closing inspection Page 9 of 9
Edition 1.0 DATE: March 28. 2011
3/16” rivet at inersection rivets (with extrusion o n back side) top and bottom 5/32” rivets in extrusion
Nose wheel hinge
1450A ZENAIR FLOATS Pre-closing inspection Page 10 of 10
Edition 1.0 DATE: March 28. 2011
sl
The skin is flush with the end rib - file any over hang.
Overlaping skins
1450A ZENAIR FLOATS Pre-closing inspection Page 11 of 11
Edition 1.0 DATE: March 28. 2011
Check rivets – there should be no gap between the r ivet head and the skin.
If necessary, drill out and replace rivets.
1450A ZENAIR FLOATS Pre-closing inspection Page 12 of 12
Edition 1.0 DATE: March 28. 2011
Check the flanges – the edge are straight – if necessary, pinch the flange between your fingers and bend up or down.
- The angle of the flanges looks good, the follow the low set by the edge of the skin.
- At the apex of the bulkhead, he left and right flange are even.