14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44. Geneva March 2, 2012. Patrick Fiévet Heat of IT Operations and Support Section. Agenda. IPCRECLASS Project introduction and highlights Project plan Project status and demonstration Perspectives. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/1.jpg)
14. Report on the progress of the WIPO IPCRECLASS projectIPC Committee of Experts 44
GenevaMarch 2, 2012
Patrick FiévetHeat of IT Operations and Support Section
![Page 2: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/2.jpg)
Agenda
IPCRECLASS
Project introduction and highlights
Project plan
Project status and demonstration
Perspectives
![Page 3: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/3.jpg)
IPCRECLASS project
Project introduction and highlights
On-line and off-line reclassification
IPC reclassification stage management
Validation (calls to IPCPUBPREP validation service)
Earliest possible feedback and alerts
Monitoring
Backward compatible protocol
![Page 4: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/4.jpg)
IPCRECLASS project
Project introduction and highlights
Export WL for off-line reclassification
Preserve email based submission of RL through IPCRECLASS
Several filter options (WL, RL, reports, stages,…)
WL and RL visible under IPC reclassification web site
![Page 5: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/5.jpg)
IPCRECLASS MAP
IPCRECLASS
IPCPUBPREP
MCDIPCReclassification
Website
MCD-OPS Patentscope
USPTO
DPMA
Offices
Espacenet
![Page 6: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/6.jpg)
IPCRECLASS Project plan
Preparation- Resource based planning:
Project initiation: Q2 2010
Terms of reference Q3-Q4 2010
Procurement procedure and bid selection: Q2 2011
Outsourced Implementation: Q3-Q4 2011
Integration, acceptance, operational setup: Q1 2012
Production use: Q2 2012
![Page 7: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/7.jpg)
IPCRECLASS status
IPCRECLASS
IPCPUBPREP
MCDIPCReclassification
Website
MCD-OPS Patentscope
USPTO
DPMA
Offices
Espacenet
![Page 8: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/8.jpg)
IPCRECLASS Status
Project Status:
implementation 100% completed
WIPO acceptance testing completed,
IPCRECLASS available for testing by offices,
Test period: February 21-March 31, 2012
![Page 9: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/9.jpg)
IPCRECLASS status:
Practical aspects:
Visit IPCRECLASS on-line help,
Under Manage/Office, Update your email address(es),
Reclassify according to your office WL i.e.« TO DO » list
Check errors received from MCD or off-line submissions
See your office reclassification progress
IPCRECLASS URL: http://www.wipo.int/ipcreclass using your Office Rapporteur Login e.g.: BRRAP01
![Page 10: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/10.jpg)
WL Welcome Screen (BRRAP01)
![Page 11: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/11.jpg)
Online reclassification
![Page 12: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/12.jpg)
Add new symbol
![Page 13: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/13.jpg)
Return selected symbol
![Page 14: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/14.jpg)
Mark reclassification as completed
![Page 15: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/15.jpg)
Upload “Offline” RESULT LIST (BRRAP01)
![Page 16: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/16.jpg)
“Offline” RESULT LIST was uploaded
![Page 17: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/17.jpg)
REPORTS
![Page 18: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/18.jpg)
IPCRECLASS project perspectives
Next steps: Towards production use
Transition plan based on residual WL
Production use : Mid-April for IPC 2012.01
Freeze of reclassification submissions April 10-13
Residual WL for previous IPC revisions to be prepared by EPO (2012.01 back to 2007.01),
IPC reclassification web site reset,
IPC 2013.01 reclassification 100% through IPCRECLASS
![Page 19: 14. Report on the progress of the WIPO IPCRECLASS project IPC Committee of Experts 44](https://reader035.vdocuments.site/reader035/viewer/2022062719/56813075550346895d96543b/html5/thumbnails/19.jpg)
IT operations and support for IPC
Questions?
Thank you