  • 7/25/2019 14. Design Practice for Piping Arangement (Pipe Rack)

    1/53

    CONTENTS

    1. STANDARD PIPING ARRANGEMENT

    2. RACK LAYOUT

    3. HEIGHT OF RACK

    4. PIPING ARRANGEMENT AND RACK WIDTH

    4.1 Piping arrangement

    4.2 Rack width

    5. LOADING DATA

    5.1 Type of Loading

    5.2 Calculation of load

    5.3 Loading ata !orm

    ". RACK STRUCTURE (FOR INFORMATION ONLY)

    #. STANDARD MEASURE AGAINST THERMAL EXPANSION

    $. EXPANSION U-BEND

    %. DOUBLE OFFSET EXPANSION

    1&. EXPANSION BELLOWS

    1&.1 '(pan)ion *oint in +eneral

    1&.2 ,trength calculation

    1&.3 -n)tallation of ellow) '(pan)ion /oint

    11. SPESIFICATION FORM FOR EXPANSION JOINT

    0ttachment 1 Thickne)) of ot Cold -n)tallation for reference

    0ttachment 1 eight of hotCold -n)ulation for reference

  • 7/25/2019 14. Design Practice for Piping Arangement (Pipe Rack)

    2/53

    0ttachment 1 ,tructure and loading condition of pipe Rack

    0ttachment 1 Calculation ,heet for ma(imum ending )tre)) anchor force 6

    frictional !orce

    1. STANDARD PIPING ARRANGEMENT

    -n)ide of unit 7.,.8.L

    7n rack 1

    Proce)) Piping 1 Proce)) Piping

    a

    Line) connecting '9uipment item)

    that are )eparated more than "m

    from each other

    a

    Line) to recei:e :ariou) product

    Line for raw material)

    Product line) from tank) heat

    e(changer) or pump) to )torage or

    other unit) or plant)

    2

    a

    ;tility Piping

    Line) for )team conden)ate

    Line) for :ariou) kind) of water

    c ,upply line) raw material)< etc. to

    unit plant

    = >ard piping )hould e< where e:er

    po))ile< placed on the ground. ey

    are to e placed on rack) only if

    nece))ity road or acce)) ?ake it

    una:oidale.

    2

    8lowdown piping flare@piping

    3

    -n)trument duct) and A electrical

    duct)

    4

    ;tility Piping

    a

    Line) for )team and conden)ate

    Line) for B2 ga)< plant air and

    in)trument air

    c Line) for oiler feed@water< city

    water< proce)) water< pure water and

    cooling water e(cept underground

    piping

    d

    Line) for fuel oil ga)

    5

    Cat way

  • 7/25/2019 14. Design Practice for Piping Arangement (Pipe Rack)

    3/53

    7n ground 1

    i)charge line for recip rocating

    compre))or) and :irating line) for

    it

    1 Line) for recei:ing and deli:ery of

    raw material) and product)

    2

    -nlet and outlet line) for )torage

    tank) ha:ing with dike)

    3

    Li9uid line) of large diameter)

    Trench 1

    'lectrical power cale)

    2

    Line) for pump cooling water

    3

    rain line)

    4

    Line) leading to )ump tank)

    ;nderground 1

    ;tility piping

    a

    Cooling water line) and oily )ewer

    line)

    Line) for fire@fighting water

    c Line) for water )upply

    2. RACK LAYOUT

    Rack lay out i) determined a)ically y the location of proce)) line) raw

    material) 6 product) and utility line) entering and lea:ing to and from the

    plant unit concerned.

    1 -n determining rack layout< take the following re9uirement) into

    con)ideration.

    a -n)tallation maintenance and tran)portation and e9uipment 6

    machine) are ea)ily performed.

    Piping etween unit) a) )hort a) po))ile.

    c The numer and length of rack) are kept to minimum.

    2 The following) are the typical rack layout).

  • 7/25/2019 14. Design Practice for Piping Arangement (Pipe Rack)

    4/53

  • 7/25/2019 14. Design Practice for Piping Arangement (Pipe Rack)

    5/53

    3. HEIGHT OF RACK

    1 The )tandard height of rack) to e mea)ured at the top )urface) of

    the lowe)t eam) are in the tale elow.

    2 -n determining height of rack < taken the following re9uirement)

    into con)ideration.

    a ?inimum o:erhead clearance for each type of road) i) a)follow)

    Type of Load 1 Bote)

    !or maintenance pa))age)in)ide of 8.L

    25&&

    !or main road in)ide of 8.L 4&&& eight limit for large:ehicle) are 35&&

    !or main road) out)ide of

    8.L ,econd cla)) Anational road)

    45&& The Road 0ct

    !or main road) out)ide of8.L !ir)t cla)) nationalroad)

    "&&& The Road 0ct

    !or railroad )idetrack "#&& The Railroad 0ct

    Bo ifficulty occur) in connection with tran)portation A 3&&&&& T> 1&&&&

    ?ethanol< Ployutene< refinery "&&& @ $&&&

    2 The inter:al) of rack column) )hould e determined in con)ideration

    of the following factor).

    a Layout of e9uipment 6 machine).

    Pipe )iDe

    ?inimum pipe )iDe on the rack and allowale deflection of the

    minimum pipe )iDe.

    c Pipe weight

    eight of fluid in pipe< weight of pipe and :al:e< weight of

    hotcold in)ulation.

    d ,upport for )pecial piping

    Piping) that are )upported at )hort inter:al) copper pipe