I. Introducere I. Introduction
Cartea tehnica a constructiei se compune
din ansamblul de documente referitoare la
proiectarea, executia, receptia, exploatarea,
intretinerea, repararea si urmarirea in timp a
constructiei.
Ea cuprinde documentatia de baza
structurata pe patru capitole si doua anexe care,
prin completarea lor, formeaza, in final , Cartea
Tehnica a Constructiei in conformitate cu HG
nr.273/1994 , si anume:
Fisa de date sintetice
Capitolul A : Documentatia privind proiectarea
Capitolul B : Documentatia privind executia
Capitolul C : Documentatia privind receptia
Capitolul D : Documentatia privind exploatarea,
intretinerea, repararea si urmarirea
comportarii in timp
Jurnalul evenimentelor
The technical book of the building consist
an overall documents refering to the design,
execution, reception, exploitation, maintenance,
repair and tracking of the building in time.
It includes the base documentation that is
structured in four chapters and two annexes
which, from their completion form the Technical
Book as per GD no.273/1994, in the end, as it
follows:
Index card of the synthetic dates
Chapter A : The design documentation
Chapter B : The execution documentation
Chapter C : The reception documentation
Chapter D : Documentation for exploitation,
maintenance, repair and tracking of
the behavior in time.
Events journal
Cap. A : Documentatia privind proiectarea Chip. A : Design documentation
Documentatia privind proiectarea va
cuprinde, conform HG nr.592 / 1993 (Regulament
privind procedurile de organizare a licitatiilor) :
1. Tema de proiectare, elaborata de investitor (beneficiar)
2. Amplasarea obiectului judet, localitate, strada, numar
3. Avize si acorduri: Avizele si acordurile emise de organele in drept,
potrivit legislatiei in vigoare, privind:
avizul ordonatorului principal de credite privind necesitatea si oportunitatea
realizarii investitiei;
certificatul de urbanism;
avizele privind asigurarea utilitatilor: o energiei termice si electrice; o gaz metan; o apa, canal; o telecomunicatii o acordul Inspectiei de Stat in
Constructii (ISC) privind
The design documentation should include
as per GD no.592/1993 (Rule of the the auction
organization procedures) :
1. Design theme, developed by the investor (owner)
2. Location of the object county, locality, street, number
3. Notifications and agreements: The notifications and agreements issued by the
law enforcement, as per foree legislation, on :
the principal credits sequencer notification on the necessity and opportunity of the
investment accomplishment;
urbanism cerficate
notifications for utilities insurance: o thermic and electrical energy o marsh gas o water, sewer system o telecommunication o the agreement of the State
Inspectorate in Constructions (SIC)
-
interventiile la constructiile
existente etc.
avizele pentru consumul de combustibil;
avizele pentru protectia mediului si apelor;
alte avize de specialitate potrivit dispozitiilor legale;
acordul proprietarilor vecini pentru cazurile in care noua constructie intervine
cu lucrari la imobilele acestora;
aviz Aparare Civila.
4. Documentatia tehnica
4.1. Parti scrise
4.1.1. Prezentarea generala a lucrarilor
a. Elemente generale
Proiectul tehnic trebuie sa fie verificat,
avizat si aprobat potrivit prevederilor legale.
El este format din documentatia scrisa si
desenata.
Proiectul tehnic se elaboreaza pe baza
studiului de fezabilitate aprobat, etapa in care au
fost stabilite elementele si solutiile principale ale
lucrarii si au fost obtinute toate avizele, acordurile
si aprobarile executiei lucrarii, in conformitate cu
prevederile legale. Proiectul tehnic se verifica de
catre specialisti atestati de MLPAT conform
regulamentului aprobat prin HG nr. 731 / 1991
(Regulament de atestare tehnico-profesionala a
specialistilor cu activitate in constructii) si se
avizeaza si se aproba de investitor.
La lucrarile ce se executa din fonduri publice
este necesar si studiul de prefezabilitate.
b. Descrierea lucrarilor In aceasta sectiune se vor face referiri
asupra urmatoarelor elemente:
Amplasamentul;
Topografia;
Clima zonei;
Geologia, seismicitatea;
Prezentarea proiectului pe volume, brosuri, capitole;
Organizarea de santier, descriere sumara,
on the improvement at the existing
constructions etc.
notifications for fuel consuming;
notifications for environment and water protection;
another notifications as per legal dispositions;
the agreement of the neighbours owner when the new construction intervene with
works on their immobile;
notification from Civil Defence.
4. Technical documentation
4.1. Written parties
4.1.1. General view of the works
a. General elements
The technical project needs to be checked,
noticed and approved as per legal previsions.
It is composed by the written
documentation and the drawn parts.
The technical project is developed on the
approved feasibility study, stage inside were
established the elements and principal solutions of
the construction and were obtained all the
notifications, the agreements and approvals of the
building execution, as per legal previsions. The
technical project is checked by the certificate
experts certified by MLPAT as per the rule
approved by HG no. 731 / 1991 (Regulation that
certified the experts technical-proffesional activity
in constructions) and is notificated and approved
by the investor.
At the works that are executed with public
funds it is necessary the fesability study also.
b. Description of the works This section is referring at the followings:
Emplacement;
Topography;
Zonal climate;
Geology, seismicity;
The presentation of the project on volumes, brochures, chapters;
Site organization, summary description,
-
demolari, devieri de retele etc.;
Sursele de apa, energie electrica, gaze, telefon;
Caile de acces, caile de comunicatie;
Trasarea lucrarilor;
Protejarea lucrarilor executate si a materialelor din santier;
Masurarea lucrarilor;
Curatenia in santier;
Serviciile sanitare;
Relatiile intre proiectant, consultant si investitor;
Memoriile tehnice pe specialitati.
4.1.2. Caietele de sarcini
Caietele de sarcini dezvolta in scris elementele
tehnice mentionate in planse si prezinta informatii,
precizari si prescriptii complementare planselor.
Ele se elaboreaza de catre proiectant pe baza
planselor deja terminate si se organizeaza in
brosuri distincte pe specialitati.
a. Tipuri si forme de caiete de sarcini
In functie de destinatie pot fi:
caiete de sarcini pentru executia lucrarilor;
caiete de sarcini pentru receptii, teste, probe, verificari si puneri in functiune,
urmarirea comportarii in timp a
constructiilor;
caiete de sarcini pentru furnizorii de materiale, utilaje, echipamente si confectii
diverse etc.
b. Continutul caietelor de sarcini Caietele de sarcini trebuie sa cuprinda:
breviarele de calcul pentru dimensionarea elementelor de constructii si instalatii;
nominalizarea planselor care guverneaza lucrarea;
proprietatile fizice, chimice, de aspect, de calitate, tolerante, probe pentru materialele
componente ale lucrarii
dimensiunea, forma, aspectul si descrierea executiei lucrarii;
ordinea de executie, probe, teste, verificari ale lucrarii;
standardele, normativele si alte prescriptii care trebuie respectate la materiale, utilaje,
demolitions, networks deviation;
Water sources, electrical energy, gas, phone;
Access roads, communication ways;
Setting out of the works;
Protection of the executed works and materials on site;
Works measuring;
Cleaning the site;
Sanitary services;
Relationships between the designer, consultant and investor;
Technical prescription on activities.
4.1.2. Technical Specifications
The Technical Specifications develop in
write the technical elements mentioned in the
drawings and have information and drawing
complementary specifications. These ones are
issued by the designer on the drawings finished
already and are organized in separate brochures on
specialities.
a. Types and forms of the technical specifications:
Depending on the destination these can be:
technical specifications for the works execution;
technical specifications for reception, tests, events, verifications and start of regular
productions, tracking the constructions in
time;
technical specifications for the material, equipment, machinery and for various
manufacture suppliers etc.
b. Technical specifications contents The technical specifications should include:
Breviary calculation for admeasurements of the construction and plants elements;
Nomination of the drawings that governs the work;
Physical, chemical, estetique, quality, tolerence properties of the work
components material;
Dimension, form, aspect and description of the work execution;
The order of execution, samples, tests, controls of the work;
Standards, normative and other prescriptions that must be respected in the
-
confectii, executie, montaj etc.;
conditii de receptie, aspect, culori, tolerante etc.
4.1.3. Breviare de calcul pe specialitati (actiuni, ipoteze de calcul, rezultatele
calculelor de dimensionare si
verificare etc.)
4.2. Parti desenate Partile desenate se compun din:
4.2.1 Planurile generale
planurile de amplasare a reperelor de nivelment planimetrice;
planuri topografice principale;
planurile de amplasare a forajelor si profilelor geotehnice;
planurile principale privind sistematizarea verticala a terenului;
planurile principale privind constructiile subterane;
planurile de amplasare a reperilor ficsi si mobil de tasare.
4.2.2. Plansele obiectului Plansele se organizeaza in volume pe specialitati
a. Arhitectura Aceasta sectiune va cuprinde planse privind
arhitectura fiecarui obiect, conform borderoului
intocmit de proiectant:
planul de amplasare;
planurile de arhitectura ale nivelurilor subterane si supraterane, ale teraselor,
acoperisurilor etc.;
sectiuni, fatade, detalii etc.;
tablouri de prefabricate, confectii;
tablouri de tamplarii si tablouri de finisaje interioare si exterioare;
etc.
b. Structura Aceasta sectiune va cuprinde plansele privind
alcatuirea si executia structurii de rezistenta
pentru fiecare obiect, conform borderoului
intocmit de proiectant:
planurile infrastructurii si sectiunile caracteristice;
planurile suprastructurii si sectiunile caracteristice;
descrierea solutiilor constructive recomandate si a tehnologiilor de executie
case of materials, equipments,
manufactures, execution, montage etc.;
Conditions for reception, aspect, colors, tolerance etc.
4.1.3. Breviaries calculation on specialties (actions, calculation hypotheses,
results of the admeasurements and
checking calculation )
4.2. Drawn parts The drawn parts consist:
4.2.1. Master plans
layout of marks lacation !!!!!!!!!!!!!!!
principal topographic layout;
layout for drilling locations and for the geotechnic profiles;
principal layout concerning the vertical systematization of the area;
principal layout for the underground constructions;
layout for placement of the fixed and mobile compaction marks.
4.2.2 Objects drawing The drawings are organized in volumes on
specialities
a. Architecture This section will include architecture drawings for
every object, in conformity with the borderau
issued by the designer:
placement layout;
architecture layout for the underground and areal levels, terrace, roofs etc.;
sections, faade, details etc.;
precast panels, manufactures;
joinery panels and panels for interior and exterior finishing;
etc.
b. Structure This section will include drawings with the
composition and execution of the resistance
structure for each object, in conformity with the
bordereau issued by the designer:
layout of the infrastructure and his characteristic sections;
layout of the superstructure and his characteristic sections;
description of the recommended solution for the construction and execution
-
recomandate.
c. Instalatiile Aceasta sectiune va cuprinde planse privind
montajul instalatiilor fiecarui obiect, conform
borderoului intocmit de proiectant:
planurile de amplasare a utilajelor si echipamentelor;
schemele de amplasare a utilajelor si echipamentelor;
scheme ale instalatiilor;
sectiuni, vederi, detalii.
d. Dotari si instalatii tehnologice Aceasta sectiune va cuprinde planurile principale
de tehnologie si montaj si anume:
desene de ansamblu;
scheme tehnologice ale fluxului tehnologic;
scheme cinematice;
schemele instalatiilor;
diagrame, monograme, calculele ingineresti, tehnologice si de montaj;
planuri de montaj, geometrii, dimensiuni de amplasare, scheme tehnologice de
montaj;
liste cu utilaje si echipamentele din componenta planurilor tehnologice.
e. Dotari de mobilier, inventar gospodaresc, paza contra incendiilor, protectia muncii
Aceasta sectiune va cuprinde:
planurile de amplasare si montaj;
listele cu dotari.
4.2.3. Indicarea distinct a diferentelor fata de detaliile de executie initiale, cu
precizarea cauzelor care au dus la
aceste diferente.
technologies.
c. Plants This section will include drawings concerning the
installations montage for each object, in
conformity with the borderau issued by the
designer:
layout for machinery and equipments placement;
sketch for machinery and equipments placement;
plants sketch;
sections, views, details.
d. Endowment and technological plants This section will include the principal
technological and montage layouts:
overall designs;
technological sketches for the technological flow;
kinematic sketches;
installation sketches;
diagrams, monograms, engineering, technological and montage calculations;
montage layouts, geometry, placement dimensions, technological montage
sketchs;
list with machinery and equipments from the technological layouts.
e. Furniture endowment, inventory household, guard against fire, labor
protection
placement and montage layouts;
endowment lists.
4.2.3 Indicating the distinct differences against the initial execution details,
with the clarification of the causes that
leaded to those differences.
Cap. B Documentatia privind executia
Cph. B Execution documentation
Documentatia tehnica privind executia cuprinde:
1. Autorizatia de construire a obiectivului de investitie
Documentatia pentru eliberarea autorizatiei de
construire contine urmatoarele piese: (in
conformitate cu prevederile art.5 si 6 din Legea
nr. 50/1991) .
Technical documentation concerning execution
consist:
1. Building permit of the investment objective
The documentation for the building permit issue
consist the followings pieces (as per law no.
50/1991 art. 5 and 6) .
-
1.1. Certificatul de urbanism pentru constructia in cauza. Certificatul este emis
de autoritatile publice locale. Cererea tip
se obtine de la sediul prefecturii sau
primariei.
1.2. Dovada titlului solicitantului asupra terenului si constructiilor (titlu de
proprietate sau act de concesionare in
copie legalizata).
1.3. Proiectul pentru autorizatie de construire, in doua exemplare. Continutul proiectului
pentru autorizatia de construire este
prezentat in Anexa 14.
Inceperea lucrarilor de construire se va
face dupa obtinerea autorizatiei.
2. Proces-verbal de predare primire a amplasamentului si a bornelor de repere
(Anexa 1)
3. Inregistrari de calitate cu caracter permanent efectuate pe parcursul
executarii lucrarilor, precum si
documentatii care atesta calitatea
lucrarilor:
Actele sunt de trei feluri:
a. Acte referitoare la calitatea materialelor folosite la realizarea constructiei.
Acestea sunt:
certificate de calitate a materialelor;
rezultatele incercarilor efectuate pe materialele, instalatiile si echipamentelor
care au fost puse in lucrare.
b. Acte care se completeaza de catre constructor, beneficiar si proiectant la
fiecare etapa de lucru:
Formularele sunt urmatoarele:
Proces-verbal de predare-primire a amplasamentului si a bornelor de reper
Proces-verbal de trasare lucrari
Proces-verbal de lucrari ascunse Registrul proceselor-verbale de lucrari
ascunse
Proces-verbal faze determinante
Proces-verbal aspect beton dupa decofrare
Condica de betoane
Proces-verbal de receptie a terenului de fundare, a fundatiilor si structurii de
rezistenta
1.1. Urbanism certificate for the respective construction. The certificate is issued by the
local public authorities. The tip demand is
obtained from the towmhall or prefecture
office.
1.2. The proof of the applicant title on the land and constructions (title of property or
concession act in legalized copy).
1.3. The project for the building permit, in two copies. The content of the project for the
building permit is presented in 14th
Annex
The works will start after obtaining the
building permit.
2. Hand over for the placement and curbstone mark (1
st Annex)
3. Quality records with permanent character carried out on the works execution, as well
as documentations that certificate the
works quality:
There are three forms of these acts:
a. Acts referring to the quality of materials used at the building accomplishment:
These are:
quality certificate of the materials;
the results of the attempts carried out on materials, installations and equipments that
were uded in the work.
b. Acts that are completed by the constructor, owner and designer for the each and every
stage of work:
The forms are the following:
Hand over for the placement and curbstone marks
Setting out hand over
Hand over for the works which become hidden hand over register for hidden works
Determinat phase hand over
Hand over for the concrete aspect after the formwork removal
Concrete ledger
Hand over for the reception of the area, foundations and resistance structure
-
Proces-verbal de montarea instalatiilor de masurare din proiectul de urmarire a
comportarii in exploatare
Jurnalul principalelor evenimente (inundatii, cutremure, temperature
excesive)
c. Acte care nu folosesc formulare tip dar care trebuie sa existe in Cartea Tehnica:
Registrul unic de comunicari si dispozitii de santier
Nota de constatare a organelor de control
Expertize tehnice ca urmare a unor greseli de executie sau ca urmare a unor accidente
tehnice
Caiete de atasament.
Hand over for mounting the measurement installations included in the tracking
project of the behavior in time
The journal of the principal events (floods, earthquakes, high temperature)
c. Acts that don`t use standard forms but witch must exist in the Technical Book:
The unique communications and site dispositions register
Establishment note for the control experts
Technical examination that follows some execution error or some technical
accidents
Attachment specifications
Cap. C Documentatia privind receptia lucrarilor
Chp. C Execution documentation
Receptia lucrarilor de constructii de orice
categorie si instalatii aferente se efectueaza atat la
lucrari noi cat si la interventiile in timp (reparatii
capitale, consolidari, modificari, modernizari,
extinderi etc.) asupra lucrarilor existente si se
realizeaza in doua etape (conform Hotararii
Guvernului HG nr. 273/1994 Regulamentul de receptie a lucrarilor de constructii si instalatii
aferente acestora);
receptia la terminarea lucrarilor;
receptia finala le expirarea perioadei de garantie.
Completarea datelor de la acest capitol se face
numai dupa ce s-au completat datele de la
capitolul B Executarea lucrarilor si Fisa de date tehnice punctele de la 1 la 7.
1. Receptia la terminarea lucrarilor Participantii sunt:
comisia de receptie;
proiectantul lucrarii;
executantul lucrarii.
2. Receptia finala Participantii sunt:
comisia de receptie;
The reception of the construction works of
any category and installations are carried out to
the new construction but also at the changes made
in time (capital repairs, consolidations, changes,
improvements, extensions etc.) on the existing
constructions and it`s realized in two stages (as
per GD no. 273/1994 Reception rule of the construction works and installations afferent) ;
reception at the finishing of the works
final reception at the end of the guarantee period.
The dates completion from this chapter is made
after the dates from the chapter B Works execution and Technical dates sheet were completed !!!!!!!!!!!!!
1. Reception at the end of the works The participants are:
the reception commission;
the designer;
the executant.
2. Final reception The participants are:
the reception commission;
-
proiectantul lucrarii;
executantul lucrarii.
Comisia de receptie
se numeste de catre investitor
este formata din cel putin 5 membri dintre care:
o unul este reprezentatul investitorului;
o unul este reprezentant al ordinii publice locale;
o ceilalti vor fi specialisti in domeniu.
pentru constructiile de importanta exceptionala comisiile vor fi formate din
minim 7 membri si numarul de specialisti
va fi de minim 5.
Pentru locuintele cu max. P+1 comisiile vor fi alcatuite din 2 membri:
o investitorul; o delegatul administratiei locale.
pentru constructiile cu inaltimea mai mare de 28 m sau cu sali de capacitate mai mare
de 150 persoane, in comisie va exista si o
persoana desemnata de Comandamentul
Trupelor de Pompieri.
Formularele care trebuie completate cu
ocazia receptiei sunt urmatoarele:
a. Proces-verbal de receptie la terminarea lucrarilor
b. Proces-verbal de receptie finala b.1. Pentru constructiile cu max. P+1
b.2. Pentru celelalte tipuri de constructii
c. Alte acte suplimentare incheiate ca urmare a cererii comisiilor de receptie prin care se
prevad verificari sau cercetari
suplimentare cu indicarea rezultatelor
obtinute si a modului de rezolvare.
the designer;
the executant.
The reception commission
it is named by the owner
it has at least 5 members :
o one of the is the owner representative;
o one is the public and local administration representative;
o the other ones will be experts in the respective activity.
For the constructions with a exceptional importance the commissions will have 7
members and the experts number will be
at least 5
For the buildings with max ground floor and floor the commissions will have 2
members:
o the owner; o the public and local administrative
representative.
For the constructions higher than 28 m or with meeting rooms for over 150 persons,
the commission will have a person from
the Fire brigade Commandament.
The forms that needs to be completed for the
reception are the followings:
a. Hand over for the reception at the end of the works
b. Hand over for final reception b.1. For constructions with ground floor and floor
b.2. For the other types of construction
c. Another additional acts concluded as a
consequence of the reception commissions
demand witch prevese checkings or additional
controls with the indication of the results obtained
and solution manner.
Cap. D Documentatie privind urmarirea comportarii in exploatare si interventii in timp
Chp. D The documentation for tracking the behavior in the exploitation and interventions in
time
Cuprinde urmatoarele documente (conform HG
nr.273/1994)
1. Prevederi ale proiectantului 1.1. Privind urmarirea comportarii constructiei 1.2. Instructiunile de exploatare si intretinere
Consist the following documents (as per GD
no.273/1994)
1. Designer previsions 1.1. On the tracking of the construction
behavior
-
1.3. Lista prescriptiilor de baza care trebuie respectate in timpul executiei si
exploatarii
2. Proiectele in baza carora s-au efectuat, dupa receptia finala a lucrarilor, modificari ale
constructiei fata de proiectul initial realizat.
Documentatia care este necesara la acest
punct este aceeasi ca la cap A Documentatie privind proiectarea.
3. Proiectul de urmarire speciala a constructiei - daca este cazul
4. Acte de constatare a unor deficiente aparute dupa receptia executarii lucrarilor si
masurile de interventie luate.
Aceste acte sunt:
Nota de constatare
Proces-verbal de remediere a defectelor
5. Proces-verbal de predarea primire a instalatiilor de masurare prevazute prin proiectul
de urmarire speciala a constructiei incheiat intre
executant si beneficiar.
6. Referatul cu concluziile anuale si finale asupra rezultatelor urmaririi speciale
7. Procese-verbale de predarea primire a constructiei cand se schimba proprietarului.
8. Jurnalul evenimentelor intocmit conform modelului de formular.
1.2. Exploitation and maintenance instructions 1.3. The list with the base prescriptions that
needs to be respected in the execution and
exploitation
2. The projects on witch were carried out, after the final reception, changes of the
construction over the initial project.
The necessary documentation at this point is the
same as the one from the chapter A The design documentation
3. The project for special tracking of the construction if it is necessary
4. Establishment acts for some deficiency that occurs after execution reception and
the intervention measures that were taken.
These acts are:
Finding sheet
Hand over for the defect remedial
5. Hand over for installation measurement from the special tracking project of the
construction concluded between the
executant and owner.
6. Report with final and annual conclusions on the special tracking results.
7. Hand over for construction when the owner is changing.
8. Events journal issued as per the standard model of the form.
Jurnalul evenimentelor
Events journal
Denumirea obiectului . . . . . . . . . . . . . . . . .
Instructiuni de completare
1. Evenimentele care se inscriu in jurnal se codifica cu urmatoarele litere in coloana
categoria evenimentului UC rezultatele verificarilor periodice din cadrul urmaririi curente;
US Rezultatele verificarilor si masuratorilor din cadrul urmaririi speciale, in cazul in care implica
luarea unor masuri;
M Masuri de interventie in cazul constatarii unor deficiente (reparatii, consolidari, demolari,
etc.);
E Evenimente exceptionale (cutremur, inundatii,
The name of the object
Completion instructions
1. The events that are written in the journal are encoded with the following characters in the
event category colum: CT the results of the periodical checking included in the current tracking;
ST the results of the checking and measurement form the special tracking when it is necessary to
take action;
M intervention measurement when some deficiences are detected (repairs, consolidations,
demolations, etc.);
E exceptional events (earthquakes, floods, fire,
-
incendii, ploi torentiale, caderi masive de zapada,
poluari sau alunecari de teren etc.);
D Procese verbale intocmite de organele de verificare pe faze de executie lucrarilor;
C Rezultatele controlului privind modul de intocmire si pastrare a Cartii Tehnice a Constructiei
2. Evenimentele consemnate in jurnal si care au corespondent in actele cuprinse in
documentatia de baza, se prevad cu trimiteri la
dosarul respective, mentionanad natura actelor.
3. Schimbarea proprietarului se va consemna si in jurnalul evenimentelor.
Prezentarea capului de tabel:
1. Numar curent: _______________ 2. Data evenimentului ___________ 3. Categoria evenimentului
_________________________________
4. Prezentarea evenimentului si a efectelor sale asupra constructiei cu trimiteri in actele din
documentatia de baza
______________________________
______________________________
______________________________
______________________________
______________________________
5. Numele, prenumele si unitatea persoanei care inscrie evenimentul si semnatura sa
Numele ___________________________
Prenumele _________________________
Unitatea ___________________________
Semnatura _________________________
6. Semnatura responsabilului cu Cartea Tehnica a Constructiei Numele ___________________________
Prenumele _________________________
Semnatura _________________________
torrent rain, heavy fall of snow, pollutions or
landslides etc.);
D hand over issued by the checking experts on execution stages of the work;
C The results of the control made on the completion and storage manner of the Technical book of the construction.
2. Events that are completed in the journal and witch have connection with the acts included
in the base documentation, these one have
references to the respective file, with the acts
origin mentioned.
3. When the owner will be changed it will be written in the events journal too.
The head of the table:
1. Current number: ______________ 2. Event date: __________________ 3. Event`s category
_________________________________
4. Event`s presentation and his effects on the construction with references on the acts from the
base documentation
__________________________________
__________________________________
__________________________________
__________________________________
__________________________________
5. Name, surname and the unit of the person that is writing the event and his signature
Name _____________________________
Surname __________________________
Unit ______________________________
Signature __________________________
6. The signature of the Construction technical book responsible
Name ____________________________
Surname _________________________
Signature __________________________
Modul de intocmire a Cartii tehnice a Constructiei
Technical book of the Construction preparation
method
Cartea tehnica a constructiei se intocmeste de
catre investitor pentru toate obiectele de
constructii definitive, supuse regimului de
autorizare a constructiilor (conform HG nr.
273/1994).
The Technical book of the construction is
issued by the investor for all the final construction
objects, on the building permit rule (as per GD
no.273/1994)
-
Cartea tehnica se definitiveaza inainte de
receptia finala.
Cartea tehnica, dupa constituire, se
completeaza si se pastreaza de catre investitor sau
de catre proprietar.
Actele ce formeaza documentatia de baza a
cartii tehnice a constructiei vor fi indosarite pe
capitolele respective in ordinea de mai jos cu file
numerotate si parafate pe masura incheierii lor:
Fisa de date sintetice
Capitolul A Proiectare
Capitolul B Executie
Capitolul C Receptie
Capitolul D Exploatare
Jurnalul evenimentelor Fiecare dosar va cuprinde borderoul dosarului si
va purta un indicativ format din litera
corespunzatoare capitolului (A, B, C, D) si
numarul de ordine al dosarului, in cifre arabe.
Centralizatorul cartii tehnice va cuprinde
borderoul general al dosarelor documentatiei de
baza si copiile borderourile cu cuprinsul fiecarui
dosar.
Cartea tehnica a constructiei se intocmeste intr-un
exemplar.
Cartea tehnica se intocmeste pentru constructii noi de catre investitor impreuna cu proiectantul astfel:
Proiectantul obiectului de constructie intocmeste si preda investitorului pe masura
elaborarii si cel mai tarziu pana la data receptiei
finale a lucrarilor documentatiei prevazuta la
capitolul A- documentatie privind proiectarea si in
capitolul D documente privind exploatarea
Comisiile de receptie la terminarea lucrarilor de constructii si de receptie finala a
constructiei predau investitorului documentatia
prezentata la capitolul B - documentatia privind
executia, imediat dupa intocmirea ei
Investitorul obiectului de constructie primeste toate actele ce cad in sarcina
proprietarului si a comisiilor de receptie , le
completeaza cu actele ce cad in sarcina sa (cele
prevazute la capitolul B), le indosariaza pe
capitole; dupa receptia finala, investitorul retine
un exemplar complet.
Proprietarul sau utilizatorul completeaza Cartea Tehnica a Constructiei cu documentatia
prevazuta in Jurnalul Evenimentelor.
Proprietarul sau administratorul va asigura
The Technical book must be completed before
the final reception.
The Technical book, after the constitution, is
kept and completed by the investor or by the
owner.
The acts that form the technical book base
documentation will be filed on the respective
chapters in the below order, and the pages will be
numbered and stamped as they will be finished:
Index card of the synthetic date
Chapter A Design
Chapter B Execution
Chapter C Reception
Chapter D Exploitation
Events journal Each file will include the dossier bordereau and
will have a code base on the character of the
chapter (A, B, C, D) and the number of the dossier
in arabic numeral.
The master table of the technical book includes
the general bordereau of the dossiers of the base
documentation and the copies of the bordereaus
from each dossier.
The technical book of the construction is
issued in a single copy.
The technical book - is issued for new
constructions by the investor together with the designer as it follows:
The designer of the construction object issues and deliver to the investor as per
elaboration and latest up to final reception date of
the works, the documentation from chapter A (The design documentation) and D (The
exploitation documentation);
Reception commission, at the end of the work and final reception of the construction hand
over to the investor the documentation form
chapter B the execution documentation, immediately after they were issued
The construction object investor receive all the owner and reception commission acts,
completes them, (the one from chapter B), filed
them on chapters, after the final reception, and
the investor keeps a full copy.
The owner or user completes the Technical book of the Construction with the Events journal
documents.
-
activitatea de urmarire a comportarii constructiei
in exploatare si investitii in timp asupra acesteia.
Modul de intocmire si completare a cartii
tehnice a constructiei se controleaza in mod
obligatoriu astfel:
- de catre comisiile de receptie finala a obiectelor de constructie, cu ocazia
receptiei;
- de catre organele de control imputernicite in acest domeniu
Rezultatele controlalelor se vor consemna in
mod obligatoriu in Jurnalul Evenimentelor.
Cartea Tehnica a Constructiei se pastreaza pe
toata durata de executie a obiectului pana la
demolarea sa; dupa demolare; investitorul preda
exemplarul complet la arhiva unitatilor
administrativ-teritoriale pentru pastrare. Inainte de
predare, ea va fi completata cu modul de
desfasurare a actiunii de postutilizare pe baza
instructiunilor elaborate de proiectant.
The owner or administrator will ensure the
tracking activity of the construction behavior in
exploitation and investements on this in time.
The way of issue and completion of the
technical book of the construction is checked
obligatory as it follows:
- by the final reception of the construction commissions, at the reception;
- by the control organs empowered from the area
The control results will be obligatory written in
the Events journal.
The Technical book of the Construction is kept on
all the execution period until his demolition , after
the demolition, the investor hands the full copy to
the territorial administrative units that keep these
documents. Before the hand over, it is completed
with the post service activities on the designer
instructions.
Obligatii si raspunderi ale partilor implicate in
realizarea Cartii Tehnice a Constructiei
Obligatiile si raspunderile sunt prezentate conform
Legii nr. 10/1995
Liabilities and responsabilities for the implicated
parts in the Technical book of Construction
completion
The liabilities and responsabilities are presented
as per Law no. 10/1995
1. Obligatii si raspunderi ale investitorilor
Investitorii sunt persoane fizice sau juridice care
finanteaza si realizeaza investitii sau interventii la
constructiile existente in sensul legii si au
urmatoarele obligatii principale referitoare la
calitatea lucrarilor:
Stabilirea nivelului calitativ ce trebuie realizat prin proiectare si executie pe baza
reglementarilor tehnice, precum si a studiilor si
cercetarilor efectuate;
Obtinerea acordurilor si a avizelor prevazute de lege, precum si a autorizatiei de
construire;
Asigurarea verificarii proiectelor prin specialisti verificatori de proiecte atestati;
Asigurarea verificarii executiei corecte a lucrarilor de constructii prin diriginti de
specialitate sau agenti economici de consultanta
specializati, pe tot parcursul proiectelor;
Actionarea in vederea solutionarii
1. Liabilities and responsabilities of the investors
Investors are individuals or juridical person that
funds and make investments or is intervening at
the existing constructions in the name of law and
have the following liabilities:
Establishment of the quality level that has to be realized through design and execution on the
technical regulations, as well as studies and
examinations carried out;
Obtaining the agreements and notifications, as well as building permit;
Ensuring the checking of the projects through the attested project experts;
Ensuring the checking of the correct execution of the works through site managers or
consultancy economic agents on the entire
projects;
Solving the unconformities, defects that appeared in the execution and also the projects
-
neconformitatilor, a defectelor aparute pe
parcursul executiei lucrarilor, precum si a
deficientelor proiectelor;
Asigurarea receptiei lucrarilor de constructii la terminarea lucrarilor si la expirarea
perioadei de garantie;
Intocmirea cartii tehnice a constructiei si predarea acesteia catre proprietar;
Expertizarea constructiilor de catre expertii tehnici atestati si obtinerea acordului ISC,
in situatiile in care la aceste constructii se executa
lucrari de reconstruire, consolidare, transformare,
extindere etc.
deficiencies;
Ensuring the construction works reception at the end of the works and at the expiration of the
guarantee period;
Elaboration of the Technical book of the Constructionand his handing over to the owner;
Constructions examination made by the attested experts and obtaining the SIC agreement,
in the situation when are executed reconstruction,
transformation, consolidation and extension
works etc.
2. Obligatii si raspunderi ale proiectantilor
2. Liabilities and responsabilities of the designer
Proiectantii de constructii raspund de
indeplinirea urmatoarelor obligatii principale
referitoare la calitatea constructiilor:
Precizarea prin proiect a categoriei de importanta a constructiei;
Asigurarea prin proiecte si detalii de executie nivelului de calitate corespunzator
cerintelor, cu respectarea reglementarilor tehnice
si a clauzelor contractuale;
Prezentarea proiectelor elaborate in fata specialistilor verificatori de proiecte atestati,
stabiliti de catre investitor precum si solutionarea
neconformitatilor si neconcordantelor semnalate;
Elaborarea caietelor de sarcini, a instructiunilor tehnice privind executia lucrarilor,
exploatarea, intretinerea si reparatiile, precum si,
dupa caz, a proiectelor de urmarire privind
comportarea in timp a constructiilor.
Documentatia privind post utilizarea constructiilor
se efectueaza numai la solicitarea proprietarului;
Stabilirea, prin proiect, a fazelor de executie determinate pentru lucrarile aferente
cerintelor si participarea pe santier la verificarile
de calitate legate de acestea;
Stabilirea modului de tratare a defectelor aparute in executie, din vina executantului, la
constructiile la care trebuie sa asigure nivelul de
calitate corespunzatoare cerintelor, precum si
urmarirea aplicarii pe santier a solutiilor adoptate,
dupa insusirea acestora de catre specialistii
verificatori de proiecte atestati, la cererea
investitorului;
Participarea la intocmirea cartii tehnice a constructiei si la receptia lucrarilor executate.
The designers of the constructions have the
following principal responsabilities related to the
construction quality:
Project specification on the importance of the construction;
Ensuring throught project and execution details the quality level as per requirements, also
respecting the technical rules and contractual
clauses ;
The presentation of the issued projects in the front of the experts that are checking the
projects and also the solving of the unconformities
and incongruity that appeard;
The elaboration of the technical specification regarding the works execution , the
exploitation, the maintenance and repairs also
when it is necessary of the tracking projects
regarding the behavior in time. Documents
regarding post service of the construction is issued
only at the owner demand.
Estabilisment, through project, of the execution stages for the afferent works, demands
and participation at the quality checkings on the
site related on this.
Establishing the way to treat the defects appeard in the execution, because of the
executant, at the construction that needs a quality
level as per requirements, and also the tracking of
the solutions appliance, after those were learned
by the attested expert in project, at the owner
demand;
The participation at the Technical book of the construction elaboration and at the reception
-
of the completed works.
3. Obligatii si raspunderi
ale executantilor
3. Liabilities and responsabilities
of the executant
Executantul lucrarilor de constructii are
urmatoarele obligatii principale:
Sesizarea investitorilor asupra neconformitatilor si neconcordantelor constatate
in proiecte, in vederea solutionarii;
Inceperea executiei lucrarilor numai la constructii autorizate in conditiile legii si numai
pe baza si in conformitate cu proiecte verificate de
specialisti atestati;
Asigurarea nivelului de calitate corespunzator cerintelor printr-un sistem propriu
de calitate conceput si realizat prin personal
propriu, cu responsabili tehnici cu executia
atestati;
Convocarea factorilor care trebuie sa participe la verificarea lucrarilor ajunse in faze
determinante ale executiei si asigurarea conditiilor
necesare efectuarii acestora, in scopul obtinerii
acordului de continuare a lucrarilor;
Solutionarea neconformitatilor, a defectelor si a neconcordantelor aparute in faze de
executie, numai pe baza solutiilor stabilite de
proiectant cu acordul investitorului;
Utilizarea in executia lucrarilor numai a produselor si a procedeelor prevazute in proiect,
certificate sau pentru care exista agremente
tehnice, care conduc la realizarea cerintelor,
precum si gestionarea probelor-martor; inlocuirea
produselor si a procedeelor prevazute in proiect cu
altele care indeplinesc conditiile precizate si
numai pe baza solutiilor stabilite de proiectanti cu
acordul investitorului;
Respectarea proiectelor, a detaliilor de executie si a dispozitilor de santier pentru
realizarea nivelului de calitate corespunzator
cerintelor;
Sesizarea, in termen de 24 h, a inspectiei de stat in constructii, in cazul producerii unor
accidente tehnice in timpul executiei lucrarilor;
Supunerea la receptie numai a constructiilor care corespund cerintelor de calitate
si pentru care a predate investitorului documentele
necesare intocmirii cartii tehnice a constructiei;
Ducerea la indeplinire, la termenele
The executant of the works has the following
principal liabilities:
Owner notification on about the unconformities and unconcordant that were
estabilished in the project, for solving them;
Start of the execution only on the authorized constructions in the law conditions and
only on base and conformity with the projects that
were checked by the attested experts;
Ensuring the quality level appropriate to the demands thought a personal quality concept
realized throught personal staff, with technical
responsible in execution that were attested;
Convocation of the factors that needs to participate at the checking for the works found in
determinat phase and ensuring the necessary
conditions to perform, for obtaining the work
continuation;
Solving the unconformities, defects and unconcordances that appeard in the execution
phases, only on the solutions established by the
project with the owner`s agreement;
Utilisation only the products and process from the projects in the execution, certified or for
how exist technical agreements that leads at the
requirements completion, also the management of
the witness samples, replacing the products and process from the project with outher that meet
with the project, based on the designer
establismed solution with the owner agreement;
Respecting the projects, execution details and site dispositions for obtaining the quality level
as per requirements;
Notice, in 24 h, the state inspectorate in construction, in case of some technical accidents
that occured in the execution;
Reception only at the construction that are in accord with the quality requirements and for
who the necessary documents were handed to the
owner for the technical book of the construction
completion;
-
stabilite, a masurilor dispuse prin actele de control
sau prin documentele de receptie a lucrarilor de
constructii;
Remedierea, pe propria cheltuiala, a defectelor calitative aparute din vina sa, atat in
perioada de executie cat si in perioada de garantie
stabilita potrivit legii;
Reducerea terenurilor ocupate temporar la starea lor initiala, la terminarea executiei
lucrarilor;
Stabilirea raspunderilor tuturor participantilor la procesul de productie factori de raspundere, colaboratori, subcontractanti in conformitate cu sistemul propriu de asigurare a
calitatii adoptat si cu prevederile legale in vigoare.
Completion, at the established terms, of the measures in the control acts or through the
reception documents of the construction works;
Remedy, on his own expense, of the quality defects that occured by his fault, in the
execution period as well as the guarantee period
as per law;
Compression of the land temporary used at their initial status, at the end of the works;
Establishing the responsabilities for all the participants at the product process responsibility factors, contributors, subcontractors in conformity with the personal ensurement quality
system adapted with the legal previsions in force.
4. Obligatii si raspunderi
ale proprietarilor constructiilor
4. Liabilities and responsabilities
of the construction owners
Proprietarii constructiilor au urmatoarele
obligatii principale:
Efectuarea la timp a lucrarilor de intretinere si de reparatii care revin, prevazute
conform normelor legate in cartea tehnica a
constructiei si rezultate din activitatea de urmarire
a comportarii in timp a constructiilor;
Pastrarea si completarea la zi a cartii tehnice a constructiei si predarea acestei, la
instrainarea constructiei, noului poprietar;
Asigurarea urmaririi comportarii in timp a constructiilor, conform prevederilor din cartea
tehnica si reglementarilor tehnice;
Efectuarea, dupa caz, de lucrari de reconstituire, consolidare, transformare, extindere,
desfiintare partiala, precum si de alte lucrari de
reparatii ale constructiei numai pe baza de
proiecte intocmite de catre persoane fizice sau
persoane juridice autorizate si verificate potrivit
legii;
Asigurarea realizarii lucrarilor de investitii asupra constructiilor,impuse prin reglementarile
legale;
Asigurarea efectuarii lucrarilor din etapa de postutilizare a constructiilor, cu respectarea
prevederilor legale in vigoare.
The owners of the construction have the
following liabilities:
Carry out of the maintenance and repair works in time, as per legal norms included in the
technical book of the construction and the results
from behavior tracking in time of the construction;
Storage and completion up to date of the technical book of the construction and handing
her, at the alientation to the new owner;
Ensure the tracking of construction behavior in time, as per technical book and the
technical regulations;
Carry out, if is necessary, of reconstruction, consolidations, transformations,
extension, partial suppression and also other repair
works of the construction issued by individual or
juridical persons authorized and checked as per
law;
Ensure the achievement of the investition works for constructions, imposed by the legal
regulations;
Ensure the completion of the works from the post service stage of the construction, in
conformity with the legal regulations.
5. Obligatii si raspunderi ale administratorilor si
ale utilizatorilor constructiilor
5. Liabilities and responsabilities of the
administrators and users of the construction
-
Aministratorii si utilizatorii constructiilor au
urmatoarele obligatii principale:
Folosirea constructiilor conform instructiunilor de exploatare prevazute in cartea
tehnica a constructiei;
Efectuarea la timp a lucrarilor de intretinere si de reparatii care la revin conform
contractului;
Efectuarea de lucrari de investitie la constructia existenta de reconstruire, consolidare,
transformare, extindere etc., numai cu acordul
proprietarului si cu respectarea prevederilor
legale;
Efectuarea urmaririi comportarii in timp a costructiilor conform cartii tehnice a constructiei
si contractului incheiat cu proprietarul;
Sesizarea in termen de 24 de ore, a inspectiei de stat in constructii, in cazul unor
accidente tehnice la constructiile in exploatare.
The administrators and users of the construction
have the following principal liabilities:
Use of the construction as per exploitation instructions on the technical book of the
construction;
Accomplishment in time the maintaining and repair works as per contract;
Investment works accomplishment at the existing construction reconstruction, consolidation, transformation, extension etc., only
with the owner`s agreement and as per legal
previsions;
Accomplishment of the tracking of behavior for construction as per technical book of
the construction and the contract concluded with
the owner;
Notice in 24 hours, the state inspectorate in construction in case of some technical accidents
at the constructions that are in exploitation