Zone Verification Test Time:2015 11 18 12:55:40
Substation: 220KV KSK NTDC, LAHORETest Item: Zone Verification
Manufacturer: GEDevice address:note: Phase Distance Resistive Reach- ForwardDirection
Set fixed value: Zone 1(A)=10 , Zone 2(A)=5
Zone 3(A)=5 , Zone 4(A)=2 , Zone 5(A)=2Prefault: 1 ; Postfault: 0.5Health voltage after fault: No.Select fault: A-B, B-C, C-A, A-B-C,Z Setting(L-N): Z=4. , Angle=0.Time Setting(s): 0.02Select fault: A-B, B-C, C-A, A-B-C,Z Setting(L-N): Z=6. , Angle=0.Time Setting(s): 0.2Select fault: A-B, B-C, C-A, A-B-C,Z Setting(L-N): Z=6.5 , Angle=0.
Time Setting(s): 0.7..Input name: Trip1Input name: Trip2Input name: Trip3Input name:Input name:
Test Object: Line ProtectionLine:Tested by: Adeel Zafar, Assistant Manager (P&I)Device name: D60Device type: Distance RelaySerial/model:
Test mode: Auto
Earth Compensation Mode: Z0/Z1 , Z0/Z1: 2.95 , Angle: 6Close angle: 0CT Direction : ObjectZone 1:Test points: 0.5, 0.9, 1.05,Z Setting(L-L): Z=3. , Angle=0.Zone 2:Test points: 0.9, 1.05,Z Setting(L-L): Z=5. , Angle=0.Zone 3:Test points: 0.9, 1.05,
Z Setting(L-L): Z=6. , Angle=0..Binary input setting:Bin 1Bin 2Bin 3Bin 4Bin 5Trigger Logic : or
Test objects
Setting
Test results
Trip time(s) Fault Type Z Setting(ohm) % Fixed Val Judge
0.038 A-B Zone 1: 3. 50 10 A Passed
0.044 A-B Zone 1: 3. 90 10 A Passed
No Trip A-B Zone 1: 3. 105 10 A Passed
Report Time: 11/18/2015 12:57:28
Annual Testing of 132KV KSK-NARANG (E18Q1)
/ Page
2
-
7/25/2019 132kv Ksk-narang e18q1 Distance Relay Phase Resistive Reach Forward
2/4
-
7/25/2019 132kv Ksk-narang e18q1 Distance Relay Phase Resistive Reach Forward
3/4
0.0385 B-C Zone 1: 3. 50 10 A Passed
0.0435 B-C Zone 1: 3. 90 10 A Passed
No Trip B-C Zone 1: 3. 105 10 A Passed
0.0375 C-A Zone 1: 3. 50 10 A Passed
0.0445 C-A Zone 1: 3. 90 10 A Passed
No Trip C-A Zone 1: 3. 105 10 A Passed
0.038 A-B-C Zone 1: 3. 50 10 A Passed
0.0435 A-B-C Zone 1: 3. 90 10 A Passed
No Trip A-B-C Zone 1: 3. 105 10 A Passed
0.237 A-B Zone 2: 5. 90 5 A Passed
No Trip A-B Zone 2: 5. 105 5 A Passed
0.237 B-C Zone 2: 5. 90 5 A Passed
No Trip B-C Zone 2: 5. 105 5 A Passed
0.24 C-A Zone 2: 5. 90 5 A Passed
No Trip C-A Zone 2: 5. 105 5 A Passed
0.239 A-B-C Zone 2: 5. 90 5 A Passed
No Trip A-B-C Zone 2: 5. 105 5 A Passed
0.7345 A-B Zone 3: 6. 90 5 A Passed
No Trip A-B Zone 3: 6. 105 5 A Passed
0.7385 B-C Zone 3: 6. 90 5 A Passed
No Trip B-C Zone 3: 6. 105 5 A Passed
0.7365 C-A Zone 3: 6. 90 5 A Passed
No Trip C-A Zone 3: 6. 105 5 A Passed
0.7375 A-B-C Zone 3: 6. 90 5 A Passed
No Trip A-B-C Zone 3: 6. 105 5 A Passed
Report Time: 11/18/2015 12:57:28
Annual Testing of 132KV KSK-NARANG (E18Q1)
/ Page
2
-
7/25/2019 132kv Ksk-narang e18q1 Distance Relay Phase Resistive Reach Forward
4/4