    Zone Verification Test Time:2015 11 18 12:55:40

    Substation: 220KV KSK NTDC, LAHORETest Item: Zone Verification

    Manufacturer: GEDevice address:note: Phase Distance Resistive Reach- ForwardDirection

    Set fixed value: Zone 1(A)=10 , Zone 2(A)=5

    Zone 3(A)=5 , Zone 4(A)=2 , Zone 5(A)=2Prefault: 1 ; Postfault: 0.5Health voltage after fault: No.Select fault: A-B, B-C, C-A, A-B-C,Z Setting(L-N): Z=4. , Angle=0.Time Setting(s): 0.02Select fault: A-B, B-C, C-A, A-B-C,Z Setting(L-N): Z=6. , Angle=0.Time Setting(s): 0.2Select fault: A-B, B-C, C-A, A-B-C,Z Setting(L-N): Z=6.5 , Angle=0.

    Time Setting(s): 0.7..Input name: Trip1Input name: Trip2Input name: Trip3Input name:Input name:

    Test Object: Line ProtectionLine:Tested by: Adeel Zafar, Assistant Manager (P&I)Device name: D60Device type: Distance RelaySerial/model:

    Test mode: Auto

    Earth Compensation Mode: Z0/Z1 , Z0/Z1: 2.95 , Angle: 6Close angle: 0CT Direction : ObjectZone 1:Test points: 0.5, 0.9, 1.05,Z Setting(L-L): Z=3. , Angle=0.Zone 2:Test points: 0.9, 1.05,Z Setting(L-L): Z=5. , Angle=0.Zone 3:Test points: 0.9, 1.05,

    Z Setting(L-L): Z=6. , Angle=0..Binary input setting:Bin 1Bin 2Bin 3Bin 4Bin 5Trigger Logic : or

    Test objects

    Setting

    Test results

    Trip time(s) Fault Type Z Setting(ohm) % Fixed Val Judge

    0.038 A-B Zone 1: 3. 50 10 A Passed

    0.044 A-B Zone 1: 3. 90 10 A Passed

    No Trip A-B Zone 1: 3. 105 10 A Passed

    Report Time: 11/18/2015 12:57:28

    Annual Testing of 132KV KSK-NARANG (E18Q1)

    / Page

    2

  • 7/25/2019 132kv Ksk-narang e18q1 Distance Relay Phase Resistive Reach Forward

    2/4

  • 7/25/2019 132kv Ksk-narang e18q1 Distance Relay Phase Resistive Reach Forward

    3/4

    0.0385 B-C Zone 1: 3. 50 10 A Passed

    0.0435 B-C Zone 1: 3. 90 10 A Passed

    No Trip B-C Zone 1: 3. 105 10 A Passed

    0.0375 C-A Zone 1: 3. 50 10 A Passed

    0.0445 C-A Zone 1: 3. 90 10 A Passed

    No Trip C-A Zone 1: 3. 105 10 A Passed

    0.038 A-B-C Zone 1: 3. 50 10 A Passed

    0.0435 A-B-C Zone 1: 3. 90 10 A Passed

    No Trip A-B-C Zone 1: 3. 105 10 A Passed

    0.237 A-B Zone 2: 5. 90 5 A Passed

    No Trip A-B Zone 2: 5. 105 5 A Passed

    0.237 B-C Zone 2: 5. 90 5 A Passed

    No Trip B-C Zone 2: 5. 105 5 A Passed

    0.24 C-A Zone 2: 5. 90 5 A Passed

    No Trip C-A Zone 2: 5. 105 5 A Passed

    0.239 A-B-C Zone 2: 5. 90 5 A Passed

    No Trip A-B-C Zone 2: 5. 105 5 A Passed

    0.7345 A-B Zone 3: 6. 90 5 A Passed

    No Trip A-B Zone 3: 6. 105 5 A Passed

    0.7385 B-C Zone 3: 6. 90 5 A Passed

    No Trip B-C Zone 3: 6. 105 5 A Passed

    0.7365 C-A Zone 3: 6. 90 5 A Passed

    No Trip C-A Zone 3: 6. 105 5 A Passed

    0.7375 A-B-C Zone 3: 6. 90 5 A Passed

    No Trip A-B-C Zone 3: 6. 105 5 A Passed

    Report Time: 11/18/2015 12:57:28