Siemens Transformers
Siemens Romania
CIPRIAN DUMITRASCU
Energy Sector
Page 2 March 2013 – Siemens Transformers RomaniaSiemens s.r.l. 2013
Agenda
Market Overview
Performance of TR in Romania
Strategy and Outlook
Page 3 March 2013 – Siemens Transformers RomaniaSiemens s.r.l. 2013
Market Size
Population: 19,5 Mio GDP: 134‘‘787‘ EUR Currency: Romanian Lei (RON) Area: 237,500 km2
Capital: Bucharest (~2M people inmetropolitan area)
Country overview
Transformer Market
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
50000
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
DTPT
Sources:
Own info
Market intelligence
Page 4 March 2013 – Siemens Transformers RomaniaSiemens s.r.l. 2013
Customer Overview
Transmission
Transelectrica
Production Hidroelectrica, Termoelectrica Nuclearelectrica
Grid Parameters Customers
HV: 400kV
HV: 220kV
HV: 110kV
MV: 20, 10, 6kV
LV: 0.4 kV
Various EPC and wind project companies, e.g.
Verbund
Enel Green Power
Energobit
ElcomexDistribution Enel , CEZ, E.ON , Electrica
Various Industry customers (coal, metals, chemical, paper, etc.)
Page 5 March 2013 – Siemens Transformers RomaniaSiemens s.r.l. 2013
Utilities – Purchasing Strategy
Company Acceptance for Siemens RC Factories Position of local
competitors Comments
EON ~ -
DT usually done by localsNo investment in PT
ENEL ~ ~Investments done & reduction expected; Tender frame contracts; Homologation mandatory, existing for DT. PT local and italian competitors
CEZ ~ - -
Change of strategy new vector group. Very tough commercial conditions.No investment so far in DTs. Tender frame contract for PT lost against local producer.
Electrica(state owned) ~ - -
Take cheapest option, no points on technical aspects or losses.
Transelectrica(state owned) ~
Tough technical requirements.Electronic tender as rule.
Production companies ~ - - Very limited investment due to lack of available funding.
Windcustomers
(direct or EPC based)
- -
Expandable businessInsist on having very good delivery : aprox. 6 months.Want cheaper solutionsSales force necessary
Page 6 March 2013 – Siemens Transformers RomaniaSiemens s.r.l. 2013
Agenda
Market Overview
Performance of TR in Romania
Strategy and Outlook
Discussion
Page 7 March 2013 – Siemens Transformers RomaniaSiemens s.r.l. 2013
Order income + past years+ actual+ forecast
EPT013
ET TR
2011 2012 Forecast Q12013YTD
Forecast Q22013YTD
Forecast Q32013YTD
Forecast Q42013YTD
New Orders Direct Business with third parties 4,034 3,900 2,190 3,170 4,424 4,898Direct business with affiliated companies Intra Company Business 683 847 NEW ORDERS, DIRECT BUSINESS 4,717 4,747 2,190 3,170 4,424 4,898 Net revenue Direct Business with third parties 2,790 1,103 147 1,401 4,388Direct business with affiliated companies Intra Company Business 683 509 NET REVENUE, DIRECT BUSINESS 3,473 1,611 147 1,401 4,388 NEW ORDERS, International Business 17,984 6,319 1,803 7,200NET REVENUE, International business 17,428 11,248 2,452 9,200
Page 8 March 2013 – Siemens Transformers RomaniaSiemens s.r.l. 2013
Order Intake
Allocated Factories
Power Transformers Distribution Transformers
≤40MVA(class I)
≤200MVA(class II)
≥200MVA(class III, IV, VI)
Oil Filled(class XII)
GEAFOL(class IX)
STAL(STN)
STAL(KPT)
KPT DB(STAW)
DK(DB)
In 2010 and 2011, Siemens had more than 30% market share as IBV.
Every 2-3 years there is a low year, without significant market opportunities.
Currently, financing crisis means lots of delayed projects.
New government since end of 2012, uncertainty investment plan for the state owned companies.
Evaluation of renewable energy support scheme in progress, unknown result for business plan.
Uncertainty leads to delayed projects in renewable energy.
Page 9 March 2013 – Siemens Transformers RomaniaSiemens s.r.l. 2013
Competitor Landscape PT and DT
ElectroputereName
PT 110kV – 400kV
Scope Traditional RO transformer maker Always price agressive and on brink of bankrupcy,
but trying to gain back market share
Description
Retrasib PT 110-400kV
Better quality than Electroputere; Recently trying to bid for lots of export business in
CEE Won recent Tulcea Vest Project ( 3x250MVA )
Elerom DT & PT 110kV
Very herratic behaviour, active on some projects only
More active in one region of Romania (E.on)
DT& PT Poland and Germany factory for class 2 units, very aggressive Italy factory for class 1 Distributors strategy for DT
Schneider Market leader in DT, Competitive package combination with the MV
panels.
ETRA PT 110-400KV
Former supplier for Siemens industry projects Recently almost no activity in RO
ABB
DT
Page 10 March 2013 – Siemens Transformers RomaniaSiemens s.r.l. 2013
Current Projects
Transelectrica: 2x63 MVA, Bradu : 2x400MVA + 2x200 MVA + 2x16MVA; Wind business: 1x40MVA, 1x25MVA, 3x11MVA, 1x400MVA; Stejaru HPP: 7xPTs between 40 and 200 MVA Various small industrial customers for oil-filled and GEAFOL Distribution Transformers Directly from DB: panel builder B&K Electrosistem
Page 11 March 2013 – Siemens Transformers RomaniaSiemens s.r.l. 2013
Agenda
Market Overview
Performance of TR in Romania
Strategy and Outlook
Page 12 March 2013 – Siemens Transformers RomaniaSiemens s.r.l. 2013
Business Outlook
Romanian economy stable within European Union area No political pressure against Nuclear or overall Energy plans
Unclarity regarding the support scheme by green certificates for Wind and Solar Power -> delayed projects;
Further growth expected (GDP + 1,5% p.a. in 2013-2017)
General market environment
Transelectrica: next frame agreement expected (5 pcs. 200MVA, 3 pcs. 400MVA, 2x100MVA shunt reactors)
Wind business 1000 MVA/year, for the next three years in case the legal frame remains unchanged;
Several CCHP projects in pipeline (Tulcea, Fagaras) – momentary on hold due to financial instability;
Upcoming projects
Page 13 March 2013 – Siemens Transformers RomaniaSiemens s.r.l. 2013
Support from factories
100 MVA Shunt reactor Mintia : a impressive collection of problems, delays at every possible stage.
Results: Customer penalty invoice in amount of 0’28 Mio Eur. Severe deterioration of Siemens image to the main transmission customer ( Transelectrica ) due to this project.
PN
Delivery time far greater then market expectations (4-6 weeks) Wrong factory allocation for dry types Technical documentation not in line with customer expectations
DK/DB
Proving that orders can be secured each fiscal year. Thanks for the constant help and support ! Main TS ( Tulcea Vest ) project in 2012 lost due to transformer prices promised before tender and not
confirmed during e-biding stage. Approximately 1 million euro difference for 3 pcs. 250MVA transformers, mainly due to transport costs.
KPT/STAL/STN
Page 14 March 2013 – Siemens Transformers RomaniaSiemens s.r.l. 2013
Feedback and wishes
Overall market PT and DT seems to be increasing , further „white elephants“ expected;
Public utilities tend to move to electronic auction, therefore strong price pressure;
Further investments of wind power plants are expected for the next 2-3 years – around 4x250MVA /year in case legal frame remains unchainged;
Demand side
No Chinese nor Koreean manufacturers active yet on the market ! Opportunity to be considered
Toshiba delivered 4x25MVA, SF6 MPT for Subway Project in Bucharest.
DT average delivery market requirement 4-6 weeks
Supply side
Currently high Siemens market share will be very difficult to defend; Market price adaptation is necessary;
We strongly insist not to reduce TR headcounts in the RC from 2 to 1 persons. We will see volumes dropping as a result.
Page 15 March 2013 – Siemens Transformers RomaniaSiemens s.r.l. 2013
Transformers
Thank you !Ciprian DumitrascuSiemens SRL