13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
1
IMACS:Inamori-Magellan Areal Camera and
Spectrograph
Magellan SAC Status Report
13-14 April 2002
OCIW, Pasadena, Ca
![Page 2: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/2.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
2
IMACS project team:
A. Dressler Pr. Investigator
B. Bigelow Instrument Scientist
B. Sutin, H. Epps Optical des./eng.
B. Bigelow, T. Hare
S. Gunnels, G. Luppino,
R. Cleary Mechanical des.
V. Kowal, R. Storts, J. Castillo Mechanical fab.
A. Bagish, D. Carr, J. Asa Electronics
G. Burley, I. Thompson, J. Estrada Detector systems
C. Birk, K. Clardy Software eng.
![Page 3: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/3.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
3
![Page 4: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/4.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
4
![Page 5: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/5.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
5
![Page 6: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/6.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
6
![Page 7: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/7.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
7
![Page 8: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/8.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
8
Optics Status:
Collimator:
C01 (Field lens) Done, ready to mount in cell
C02 - C05 Done, mounted in structure
Long Camera:
L01 Done, mounted in cell
L02/L03/L04 Lenses done, will be
re-mounted in cells
L05, L06 Done, mounted in cells
Long camera should be fully assembled by end of April 2002
![Page 9: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/9.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
9
Optics Status cont.
Short Camera:
S01, S08 (aspheres) At Tinsley, due 6/02
S07 At TORC, due end of April?
S02-S09 Ready to be coated at STF
Filters:
2 sets of CTIO B,V,I, Done
2 sets of CTIO R Due end of April ‘02
CTIO U (LCAM) Awaits ADC coating results
Sloan u’, g’, r’, i’, z’ Not ordered
![Page 10: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/10.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
10
![Page 11: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/11.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
11
![Page 12: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/12.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
12
![Page 13: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/13.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
13
![Page 14: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/14.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
14
Current grating selection:
RulingDensity
Lines/mm
BlazeAngle
Degrees
Order CentralWavelength
um
WavelengthRange
um
DispersionR/0.5 arcsec
slit300 4.3 1 0.665 0.365-0.974 2163
300 36.87 5-11 0.336-0.738 0.308-0.799 20687
600 8.63 1 0.518 0.365-0.675 3494600 13 1 0.841 0.684-1.0 6120
1200 17.45 1 0.444 0.365-0.523 65351200 26.7 1 0.924 0.864-1.0 20694
1200 26.7 2 0.404 0.365-0.443 15776
1200 26.7 2 0.520 (max) 0.482-0.557 28082
![Page 15: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/15.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
15
Optics Status cont.
Grisms:
200 l/mm Undersized mat’l re-ordered
300 l/mm Material due in August
600 l/mm Material due in May
Imaging Mirror: Mirror is being re-coated
following failure of
over-coated silver.
![Page 16: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/16.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
16
Mechanical Engineering Status:
Guide camera stages (Hare) Done, mods. IP
Mask server (Bigelow) Done, on structure
*Field Lens (Hare) Ready for mounting
LCAM shutter (Hare) Done, ready to install
Filter servers (Bond) Done, ready to install
*Disperser server (Hare) Assy. IP, drive remaining
*Grating cells Assy. IP
*Grism cells Designed, ready for draft.
Mirror cell Done
![Page 17: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/17.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
17
Mechanical Engineering cont.
Collimator mech. (Bigelow) Done, installed
*Long camera mech. (Bigelow) Final Assy. in April
Short camera mech. (Bigelow) Done, ready for optics
Dewar (Luppino) Done, ready for CCDs
Instrument Structure (Gunnels) Done, installed
*Instrument Carriage (Gunnels) Done, minor mods. IP
*Instrument Enclosures (Gunnels) Design IP
![Page 18: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/18.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
18
Center-field guide camera assembled and tested
![Page 19: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/19.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
19
![Page 20: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/20.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
20
Long camera with shutter, FS, and dewar mounted
![Page 21: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/21.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
21
Electronic Engineering:
Alan Bagish (OCIW) is completing the electronics design for IMACS. Joe Asa is providing final assembly services on a consulting basis. Status of electronics:
Schematics design (all motion stages) Done
(4) Motion control (MC) chassis, Done
(1) Power supply chassis, Done
(1) Shutter control chassis Done
(2) Electronics racks for chassis IP
Instr. wiring harnesses IP
![Page 22: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/22.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
22
![Page 23: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/23.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
23
Detector systems:
Guide cameras:
- 23 cameras have been fabricated
- IMACS currently has one of three needed
- Remainder by May ‘02?
Science array:
- Detector array (8 CCDs) has been flattened to 7.5 microns
- Individual detectors flat to 13 microns
- Dewar and detector system mechanics done
- Cold test of array in May
![Page 24: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/24.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
24
Software:
Guiding (Clardy):
- Guider position control GUI Done
- Guider position graphical display Done
- Interface to telescope control ****
![Page 25: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/25.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
25
![Page 26: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/26.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
26
Slit Mask Cutting (Clardy) :
- Mask Generation (MG) ****
inputs - images, data files, other
output - text file with targets, names, etc.
- Mask Definition (MD) Done
- inputs - text file from MG, other text files
- output - mask definition file
- database for observing, data reduction
- Mask Fabrication (MF) Done
- inputs - mask definition file
- output - test, laser G-code, mill G-code, .ps files
![Page 27: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/27.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
27
Software:
Instrument Control (Birk)
Individual module testing:
Module GUI status H/W testsPr. Guider done 75%SH guider done 75%CF guider done 90%Slit Mask Server done 75%Disperser Server 25% 0%Long Camera Focus done 90%Filter Servers (2) done 90%Flexure Control done 75%Detector Focus 25% 0%HP Sensor System done 50%
![Page 28: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/28.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
28
Software:
Instrument Control cont.
Integrated instrument testing:
- One GUI at this level, showing all critical aspects of each module (encoder positions, limit status, temperatures, etc).
- This GUI is written and 75% tested, unfinished stages remain (Disperser Server, Grating tilts, detect. focus)
User Level Software:
- Two GUIs at this level:
- Instr. control interface (select a grating, etc.) - 50% done
- Graphical Instr. Status Display - 25% done
![Page 29: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/29.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
29
Examples of individual stage test GUIs
Filter server GUI
SH guider GUI
![Page 30: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/30.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
30
Engineering GUI, shows status of all stage functions and sensors, operates in parallel for all modules.
![Page 31: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/31.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
31
User/Observer instrument control GUI
![Page 32: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/32.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
32
Graphics-based instrument GUI
![Page 33: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/33.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
33
Software:
Science Array Control (Birk)
Shutter control:
- micro-controller for linear motors 90% done
CCD readout / camera control:
- ‘ccdserver’ for array readout
- ‘camgui’ for user interface
- both are functional 75% done
Quick-Look Tool:
- functional with simulated data 90% done
![Page 34: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/34.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
34
Detector GUI
Quick-look tool
![Page 35: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/35.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
35
Slit Masks:
Laser system:
- Convergent Gemini 150 W. CO2 laser cutting system
- Ordered November 7, 2001 - $280K
- Acceptance testing completed March 18-22, 2002
- Currently in shipment to Chile
- Due at LCO May 1, 2002
ASB Facility:
- 200A electrical service required
- Air compressor delivered, installation required
- Ventilation, fire, and fume extraction systems still required
![Page 36: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/36.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
36
![Page 37: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/37.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
37
Slit Masks:
Slit mask blanks:
- Fabricated by California Hydroforming
- Current order of 100 mask blanks in progress
- Order of 1000 parts to follow first delivery
Mask cost:
- Estimated to about $100 per mask, including laser
(500 masks/year for 10 years)
![Page 38: 13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April](https://reader036.vdocuments.site/reader036/viewer/2022070403/56649f2f5503460f94c495c7/html5/thumbnails/38.jpg)
13-14 April 2002 Inamori-Magellan Areal Camera & Spectrograph
38
Coming up:
- First light through optics - end of April
- Grating tilt mechanism assembly and testing - flexure
- Cold testing of CCD array - May
- Instrument enclosures - August
- All short camera optics coated - September