1.2.2 stakeholder role by: seth byers vince primer evan davis jacob barton

7
1.2.2 Stakeholder Role 1.2.2 Stakeholder Role By: Seth Byers Vince Primer Evan Davis Jacob Barton

Upload: aubrey-stephens

Post on 18-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

1.2.2 Stakeholder Role1.2.2 Stakeholder Role

By: Seth Byers

Vince PrimerEvan Davis Jacob Barton

Roles

Vince Cost Estimator

Seth Construction Contractor/Manager

Evan Landscape Architect

Jacob Health And Safety Engineer

Cost Estimator

Cost estimators collect and analyze data in order to estimate the time, money, materials, and labor required to manufacture a product, construct a building, or provide a service. They generally specialize in a particular industry or type of product.

Construction Contractor/Manager

Construction managers plan, coordinate, budget, and supervise construction projects from development to completion.

Landscape Architect

Landscape architects plan and design land areas for parks, recreational facilities, private homes, campuses, and other open spaces.

Health And Safety Engineer

Health and safety engineers develop procedures and design systems to prevent people from getting sick or injured and to keep property from being damaged. They combine knowledge of systems engineering and of health and safety to make sure that chemicals, machinery, software, furniture, and other consumer products will not cause harm to people or buildings

Concept Map