12 th u.s./north american mine ventilation symposium june 9 – 11, 2008, reno, nevada, usa...

23
12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR COLLIERY VENTILATION PRACTICE Leon van den Berg, Kobus van Zyl, Wynand Marx BBE Consulting, South Africa Andrew Thomson Anglo Coal Operations Limited - Anglo Coal, South Africa

Upload: anna-martin

Post on 18-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS

FOR COLLIERY VENTILATION PRACTICE

Leon van den Berg, Kobus van Zyl, Wynand MarxBBE Consulting, South Africa

Andrew ThomsonAnglo Coal Operations Limited - Anglo Coal, South Africa

Page 2: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

Presentation Overview

• Background • Mine ventilation software developed• Mine ventilation simulation integration

– Current practices– Typical design and modeling approach – Simulation as part of the planning process

• Case study• Questions

Page 3: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

Background

• Mine ventilation simulation software not new • Faster and improved mine vent assessment• Improved health and safety• Mine vent optimization and LoM planning

– Energy efficient– Cost effective ventilation design

Page 4: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

VUMA-Network

• Windows based software• Network graphically constructed• Consist of branches and nodes• Input data for branches and nodes• Steady state environmental conditions• Aero, contaminant and thermo solutions• Results:

– Reporter– 3D Viewer

Page 5: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

VUMA-Coal

• Coal mine specific terminology• Vent wall leakage control• New graphic model construction methods

– Main development branch – Integrated leakage components– Air crossing

• No thermo solution• Maximum depth of 500 m

Page 6: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

VUMA-Coal Leakage Calculation

• Based on work done by Martinson in 1985– Modeling of parallel leakage paths– Use fixed resistance factor per wall [ΔP based]

• Cannot model every vent wall in a coal mine• Equivalent leakage for “path length”• Based on

– Combined cross sectional wall area for path length – Wall resistance

• Path length specified by user• Calibrated and verified in the field

Page 7: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

Field Trials - Leakage

Page 8: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

VUMA-Coal Main Development Branch

Page 9: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

VUMA-Coal Main Development Branch

Page 10: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

VUMA-Coal Main Development Branch

Page 11: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

VUMA-Coal Main Development Branch

Page 12: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

VUMA-Coal Main Development Branch

Page 13: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

VUMA-Coal Air Crossing

• Added resistance in system• Use control manager to add resistance into

system• Field verified• Air Crossing graphic input component

Page 14: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

VUMA-Coal Air Crossing

Page 15: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

Simulation as Part of The Planning Process

OPERATIONAL

LoM PLANNING

SIM

ULA

TIO

N

Page 16: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

Mine Ventilation System and Design Process

– Obtain mine ventilation network layout and standards

– Construct an operational simulation model– Calibrate operational model with actual vent

data– Determine critical “snap-shots” over LoM– Solve and optimize airflow – Determine airflow profiles over LoM– Liaise with mine planning team– Document inputs and results

Page 17: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

Case Study

• Anglo Coal Greenside Colliery• 3 sections in the north and 1 in the south• North mining far away from infra-structure• Need to move all sections north• This will require 45 m3/s more air in the north• Proposed actions

– Seal off abandoned areas in the South– Seal off workings of old section in the south

Page 18: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

Case Study

Sealing Area 1 10 m3/s

Sealing Area 2 20 m3/s

Sealing Area 3 25 m3/s

Section to be moved 50 m3/s

Total 110 m3/s

Page 19: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

Case Study Results

Sealingstrategy

Cumulative Air Available

for North [m3/s]

Total Up Cast Volume

[m3/s]

Cumulative Leakage [m3/s]

Base 0 515 125

Area 1 15 510 125

Area 2 25 505 135

Area 3 30 495 142

Move Section

45 475 150

40 m3/s 25 m3/s65 m3/s =110 m3/s

Page 20: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

General Benefits Using Mine Vent Simulation

• Benefits achieved by Anglo Coal– A number of considered RBH with fan stations not

required [$ 3 million saving in 2006].– Improved LoM vent capital scheduling– Indicated new ventilation infrastructure requirements

[and scheduling]. Production losses avoided– VUMA-coal models specified all future fan station

aerodynamic design criteria– Documented reviews allow continuity in future as LoM

OPEX and CAPEX schedules

Page 21: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

Conclusions

• VUMA-coal proven to be necessary design tool• VUMA-coal successfully integrated into mine

planning process

Page 22: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

ACKNOWLEDGEMENT

Anglo Coal for their support of VUMA-coal and for allowing the examples and case study to be published in this paper.

Page 23: 12 th U.S./North American Mine Ventilation Symposium June 9 – 11, 2008, Reno, Nevada, USA DEVELOPMENT AND INTEGRATION OF VENTILATION SIMULATION TOOLS FOR

12th U.S./North American Mine Ventilation SymposiumJune 9 – 11, 2008, Reno, Nevada, USA

Questions ?