O&M COST/RECOURCE OPTIMIZATION
![Page 2: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/2.jpg)
THE GLOBAL ON-DEMAND NETWORK OFLOCAL, INDEPENDENT, AND CERTIFIEDRENEWABLE ENERGY PROFESSIONALS.
PRESENTED BY
![Page 3: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/3.jpg)
O&M COST/RECOURCE OPTIMIZATION
![Page 4: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/4.jpg)
A: O&M AS A COST CENTER.
B: O&M AS A PROFIT CENTER.
C: HOW DO WE REDUCE O&M COSTS ?
O&M CHALLENGES
![Page 5: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/5.jpg)
1/ Regarding the EPC inheriting the O&M scope, how long and secure is the budget towards the obligatory services ?
2/ Since O&M was built into the EPC and construction costs, isn’t there an incentive to do as little for a less as possible ?
3/ As a cost center division the O&M is a burden from normal operations. Available capital is precious and most likely diverted towards the PROFIT centers of the organization
O&M CHALLENGES
AS A COST CENTER
![Page 6: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/6.jpg)
1/ The O&M service provider is incentivized towards increasing costs and profits on within ALL portfolios extending beyond the EPC and COD scope of work.
2/ The contentious dialogue ( five to ten years ) begins after COD. What IS and IS NOT included inthe SOW. All other work becomes a T&M item !!!
3/ T&M ( beyond scope of work ) can develop into a blank check !!
O&M CHALLENGES
$$$ AS A PROFIT CENTER $$$
![Page 7: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/7.jpg)
O&M CHALLENGES
TOP TEN LIST OF GUARANTEED WAYS TO
REDUCE ANNUAL O&M COSTS
![Page 8: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/8.jpg)
• IMPLIMENT O&M WITHIN THE DESIGN AND INSTALLATION
![Page 9: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/9.jpg)
• PROFIT OR COST CENTER. ALIGN THE SCOPE OF WORK TO THE BUDGET AND IDENTIFY SHORTFALLS
![Page 10: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/10.jpg)
• HAVE A CONTINGUECY PLAN AND BUDGET. ALLIGN ALL THE PARTIES
![Page 11: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/11.jpg)
• IMPLIMENT THIRD PARTY OWNERS REP DURING CONSTRUCTION AND THIRD PARTY COMMISSIONING AGENT
![Page 12: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/12.jpg)
• DISCUSS AND NEGOTIATE WHEN AND WHERE ADDITIONAL FEES WILL APPLY
![Page 13: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/13.jpg)
• INSIST ON A HIGHER LEVEL ASSET DATA CONTROL PLAN
![Page 14: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/14.jpg)
• INSIST ON A RELIABLE, ROBUST MONITORING AND REPORTING SYSTEM. HOLD THE OEM ACCOUNTABLE FOR MALFUNCTIONS AND ERRORS
![Page 15: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/15.jpg)
• INSIST ON IMPLEMENTING A WELL DOCUMENTED INVENTORY OF ALL CRITICAL ASSET COMPONENTS
![Page 16: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/16.jpg)
• CONSIDER A HYBRID O&M SCOPE OF WORK ON A BIANNUAL ROTATION
![Page 17: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/17.jpg)
• USE LOCALIZE LABOR FOR ALL SCHEDULED ACTIVITIES REDUCING TRAVEL,HOTELS AND OVERTIME. INSIST THAT YOUR SERVICE PROVIDER CAN DELIVER AND BE FULLY COMPLIANT
![Page 18: 12 pv o&m cost-resource optimization](https://reader033.vdocuments.site/reader033/viewer/2022051706/58ecaf851a28ab7a268b470b/html5/thumbnails/18.jpg)
1. IMPLIMENT O&M WITHIN THE DESIGN AND INSTALLATION
2. PROFIT OR COST CENTER. ALIGN THE SCOPE OF WORK TO THE BUDGET AND IDENTIFY SHORTFALLS
3. HAVE A CONTINGUECY PLAN AND BUDGET. ALLIGN ALL THE PARTIES
4. IMPLIMENT THIRD PARTY OWNERS REP DURING CONSTRUCTION AND THIRD PARTY COMMISSIONING AGENT
5. DISCUSS AND NEGOTIATE WHEN AND WHERE ADDITIONAL FEES WILL APPLY
6. INSIST ON A HIGHER LEVEL ASSET DATA CONTROL PLAN
7. INSIST ON A RELIABLE, ROBUST MONITORING AND REPORTING SYSTEM. HOLD THE OEM ACCOUNTABLE FOR MALFUNCTIONS AND ERRORS
8. INSIST ON IMPLEMENTING A WELL DOCUMENTED INVENTORY OF ALL CRITICAL ASSET COMPONENTS
9. CONSIDER A HYBRID O&M SCOPE OF WORK ON A BIANNUAL ROTATION
10. USE LOCALIZE LABOR FOR ALL SCHEDULED ACTIVITIES REDUCING TRAVEL,HOTELS AND OVERTIME. INSIST THAT YOUR SERVICE PROVIDER CAN DELIVER AND BE FULLY COMPLIANT