Appendix I Stewart Area Water Analysis

Stewart Area Water Analysis

Prepared for

City of Yuba City

November 2016

285-12-16-10

Stewart Area Water Analysis

————

City of Yuba City

November 2016

285-12-16-10

Patrick A. Johnston, Senior Engineer Date

QA/QC Review: Elizabeth T. Drayer,

Engineering Manager Date

Table of Contents

i City of Yuba City November 2016 Stewart Area Water Analysis w\c\285\12-16-10\wp\111416_SAWA

1.0 Introduction ............................................................................................................................................. 1

2.0 Evaluation Criteria ................................................................................................................................... 1

2.1 Pipeline Criteria ................................................................................................................................ 2

2.2 Booster Pumping Criteria ................................................................................................................. 2

2.3 Storage Criteria ................................................................................................................................ 2

2.4 Fire Flow Criteria .............................................................................................................................. 2

2.5 Peaking Factors ................................................................................................................................ 3

3.0 Model Update .......................................................................................................................................... 3

4.0 Water Demands ...................................................................................................................................... 3

5.0 System Analysis ...................................................................................................................................... 5

5.1 Storage Analysis ............................................................................................................................... 5

5.2 Pumping Analysis ............................................................................................................................. 7

5.3 Pipeline Analysis .............................................................................................................................. 8

6.0 Summary of Findings .............................................................................................................................. 8

Stewart Area Water Analysis

1 City of Yuba City November 2016 Stewart Area Water Analysis w\c\285\12-16-10\wp\111416_SAWA

1.0 INTRODUCTION

This report analyzes the effect of the Bogue Stewart Master Plan Area (Stewart Area) development on the City of Yuba City’s (City) water distribution system. The land uses that have been provided for this area include residential, commercial, parks/open space and one area with a land use of business, technology and light industry. The planned development will all contribute to the demands on the City’s potable water system.

The hydraulic model of the distribution system was originally developed during the 1997 Water Master Plan project, updated during the 2004 Water Master Plan and the 2006 Update to Water Demand and Infrastructure System Evaluation projects, and was later updated by City staff to include some of the piping in Regions 2 and 3. Piping for Region 5 was already included in the model. The model is now in a hydraulic modeling software package called WaterCAD.

For the purpose of this analysis, the Stewart Area consists of two portions. The main portion is bordered on the north by Bogue Road, on the west side by South Walton Avenue, and on the south by Stewart Road. The eastern border is not linear, but serves to include approximately half of the land area between Railroad Avenue and Garden Highway within the Stewart Area. The second portion of the Stewart Area is bordered on the west by Garden Highway, on the south approximately by the extension of Stewart Road, and on the east by Levee Road. The northern border is just south of Drummond Drive. The Stewart Area is highlighted in green on Figure 1-1.

The planned land uses for the area include: R-1: Low Density Residential

R-2: Medium/Low Density Residential

R-3: Medium/High Density Residential

C-M: Business, Technology and Light Industry

C-2: Community Commercial

C-1: Neighborhood Commercial

C-O: Office, Office Park

PF: Public Facility

This report analyzes the expected total water demands from the Stewart Area development and the effect of these demands on the City’s potable water distribution system to determine if any improvement projects are triggered by this planned development.

2.0 EVALUATION CRITERIA

The system evaluation criteria that were used to evaluate the effect of the planned Stewart Area development on the City’s water system were taken from the 2004 Water Master Plan Update and the 2006 Update to Water Demand and Infrastructure System Evaluation. The effect of the increased water demands from the development of the Stewart Area was determined by using these criteria to evaluate system performance.

Stewart Area Water Analysis

2 City of Yuba City November 2016 Stewart Area Water Analysis w\c\285\12-16-10\wp\111416_SAWA

2.1 Pipeline Criteria

The criteria used to evaluate the operation of the distribution system pipeline network are shown in Table 2-1.

Table 2-1. Pipeline Velocity and Pressure Criteria

System Criteria ValueAllowable Velocities

Maximum Day and Peak Hour Maximum Velocity

7 feet per second (fps)

Fire-Flow Maximum Velocity 10 fps Allowable Pressures

Normal Operation Maximum Pressure 60 pounds per square inch (psi) Normal Operation Minimum Pressure 40 psi Peak Hour Minimum Pressure 30 psi Fire-Flow Minimum Pressure (at all junctions) 20 psi

2.2 Booster Pumping Criteria

There are no storage facilities that supply the City distribution system via gravity. Therefore, the pumping facilities must supply the demands in the system. The pumping facilities are considered to be adequately sized if the firm pumping capacity is equal to or larger than the Peak Hour demands on the system. For the City, the firm pumping capacity is defined as the combined capacity of the pumping system with the largest single pump out of service.

2.3 Storage Criteria

The criteria used to evaluate the storage in the City system in the prior Water Master Plan updates includes an operational storage component equal to 25 percent of Maximum Day demands and an emergency storage component equal to 75 percent of Average Day demands. Fire flow storage requirements depend on the flow rate and length of time for different fire flow requirements. The largest fire flow storage value is 1,200,000 gallons, as calculated based on a fire flow demand of 5,000 gallons per minute (gpm) and a duration of four hours.

2.4 Fire Flow Criteria

The minimum fire flow requirements for different land use categories are included in Table 2-2. The system must be capable of supplying these fire flow demands for a duration of four hours.

Stewart Area Water Analysis

3 City of Yuba City November 2016 Stewart Area Water Analysis w\c\285\12-16-10\wp\111416_SAWA

Table 2-2. Fire Flow Requirements

Land Use Category Fire Flow Demand, gpm R-1: Low Density Residential 2,000 R-2: Medium/Low Density Residential 3,000 R-3: Medium/High Density Residential 3,000 C-M: Business, Technology and Light Industry 5,000 C-2: Community Commercial 5,000 C-1: Neighborhood Commercial 5,000 C-O: Office, Office Park 5,000 PF: Public Facility 4,000

2.5 Peaking Factors

Peaking factors will be used to scale up the Average Day demands to allow the evaluation of the system under Maximum Day and Peak Hour demand conditions based on the performance criteria described in the sections above. According to the 2006 Water Master Plan Update, the City’s Maximum Day demands are 2.0 times the Average Day demands, and the City’s Peak Hour demands are 3.5 times the Average Day demands. These same peaking factors were used in this analysis to calculate the Maximum Day and Peak Hour demands.

3.0 MODEL UPDATE

Pipelines for the Stewart Area were added to the model. Two storage facilities were added to the system within the Stewart Area, along with booster pumping facilities, at locations provided by the City. No other updates to the hydraulic model were included. Pipeline alignments and diameters provided by the City were initially used to run the model. The pipe diameters were updated to provide appropriate pressures within the distribution system.

4.0 WATER DEMANDS

The base demands used in the model are those that had been updated during the El Margarita Development Analysis in January 2015. The demands for the El Margarita area are included in the model used for this analysis.

To estimate the demands within the Stewart Area, information on the expected land uses was analyzed, along with non-residential land use demand factors that had been developed during the El Margarita Development Analysis by analyzing billing data. Additional land use factors from information provided by the City for Elementary/Middle School, Open Space and Parks. The demand factors are summarized in Table 4-1 below.

Stewart Area Water Analysis

4 City of Yuba City November 2016 Stewart Area Water Analysis w\c\285\12-16-10\wp\111416_SAWA

Table 4-1. Demand Factors

Land Use Gallons Per Day Per Acre (gpd/ac) Business, Technology and Light Industry 294 Community Commercial 1,555 Elementary/Middle School 3,455 Manufacturing, Processing and Warehousing 4,995 Neighborhood Commercial 1,549 Office and Office Park 1,121 Open Space 3,740 Parks 3,740 Public and Semi-Public 191 Regional Commercial 570

Information provided by the City included the estimated areas for each non-residential land use within the development area. Demands were calculated using these areas and the demand factors above. For residential areas, a demand of 216 gallons per capita per day (gpcd) was used, along with an estimate of 2.67 persons per dwelling unit. The 216 gpcd value is the 2015 target from the 2015 Urban Water Management Plan. Information provided by the City contained the number of dwelling units estimated within each residential area within the Stewart Area. The residential and non-residential demand estimate calculations produced a total Average Day demand of 1.73 mgd for the Stewart Area, as summarized below in Table 4-2. Open Space was not included, as there is no demand.

Table 4-2. Average Daily Demand for the Stewart Area

LU Code Land Use Area, acre Flow, gpd R-1 Low Density Residential 384 967,786 R-2 Medium/Low Density Residential 63 328,869 R-3 Medium/High Density Residential 30 410,117 C-M Business, Technology and Light Industry 59 17,225 C-2 Community Commercial 35 54,892 C-1 Neighborhood Commercial 8 11,974 C-O Office/Office Park 8 9,248 EMS Elementary/Middle School 23 80,701 OS Open Space 9 34,037

PFPublic Facility (includes Public Facility PG&E Substation and Public Parks 5 890

PK Parks 17 63,286

Total 641 1,979,026

Stewart Area Water Analysis

5 City of Yuba City November 2016 Stewart Area Water Analysis w\c\285\12-16-10\wp\111416_SAWA

These demands for the Stewart Area were added to the demands that were already in the model scenarios, as shown in Table 4-3 below.

Table 4-3. Estimated Demands

Scenario Existing Demands,

mgdEl Margarita

Demands, mgd Stewart Area

Demands, mgd Total Anticipated Demands, mgd

Average Day 14.4 1.1 1.98 17.48 Maximum Day 28.8 2.1 3.96 34.86 Peak Hour 50.4 3.7 6.93 61.03

The demands for the Stewart Area were added to the hydraulic model at appropriate junctions within the Stewart Area.

5.0 SYSTEM ANALYSIS

The operation of the City’s water distribution system was analyzed with the estimated demands for the Stewart Area development to determine the effect that these demands will have on system operation, and to determine if the system improvements that have been proposed are adequate.

5.1 Storage Analysis

The City’s existing storage facilities are summarized in Table 5-1. As indicated in Section 2.3, the total required storage is equal to the sum of the storage components for operational, emergency and fire flow requirements. The operational storage requirement is 25 percent of the Maximum Day demand. The emergency storage requirement is 75 percent of the Average Day demand. The fire flow storage is the largest fire flow storage value, which for the City is 1.2 million gallons (MG).

Table 5-1. Existing Storage Facilities

Tank Site Total Storage Capacity, MG Water Treatment Plant 8.0 Harter Tanks 4.0 Sam Brannon Tank 1.0 Rowe Avenue Tank 1.0 Burns Tank 3.0 Sanborn Tank 3.2

Total 20.2

The current storage requirements for the existing system are displayed in Table 5-2, which indicates that there is a current storage requirement of 19.2 MG, which means that there is currently a surplus of 1 MG of storage capacity. This amount of surplus storage would be sufficient to support 0.8 mgd of Average Day demand. Using the residential demand assumptions of 216 gpcd

Stewart Area Water Analysis

6 City of Yuba City November 2016 Stewart Area Water Analysis w\c\285\12-16-10\wp\111416_SAWA

and 2.67 persons per dwelling unit, this translates to approximately 1,400 additional housing units that could be supported by the existing surplus storage in the City.

Table 5-2. Storage Requirements with Current Demand

Scenario Anticipated Demands,

mgd Storage Requirement Storage Requirement, MGAverage Day 14.4 Emergency Storage is 75% of

Average Day Demand 10.8

Maximum Day 28.8 Operational Storage is 25% of Maximum Day Demand

7.2

Fire Flow 5,000 gpm for 4 hours 1.2

Total 19.2

The current storage requirements for the existing system, when the demands for El Margarita are included, are shown in Table 5-3.

Table 5-3. Storage Requirements with Current Demand with El Margarita Demands

Scenario Anticipated Demands,

mgd Storage Requirement Storage Requirement, MGAverage Day 15.5 Emergency Storage is 75% of

Average Day Demand 11.6

Maximum Day 30.9 Operational Storage is 25% of Maximum Day Demand

7.7

Fire Flow 5,000 gpm for 4 hours 1.2

Total 20.5

The current storage requirements for the existing system, when the demands for both the El Margarita and Stewart Areas are included, are shown in Table 5-4.

Table 5-4. Storage Requirements with Current Demand with El Margarita and Stewart Area Demands

Scenario Anticipated Demands,

mgd Storage Requirement Storage Requirement, MGAverage Day 17.14 Emergency Storage is 75% of

Average Day Demand 13.1

Maximum Day 34.19 Operational Storage is 25% of Maximum Day Demand

8.7

Fire Flow 5,000 gpm for 4 hours 1.2

Total 23.0

Stewart Area Water Analysis

7 City of Yuba City November 2016 Stewart Area Water Analysis w\c\285\12-16-10\wp\111416_SAWA

The required capacity of additional storage facilities to provide adequate storage for the existing demand conditions plus both the demands for both the El Margarita and Stewart Areas is 2.8 MG (Required Storage of 23.0 MG – Existing Storage of 20.2 MG).

The individual storage requirements for the current system demands, the El Margarita Area and the Stewart Area, shown separately, are as follows:

Current System: 19.2 MG

El Margarita Area: 1.4 MG

Stewart Area: 2.5 MG The information provided by the City indicated that two new storage facilities are proposed for the Stewart Area, one on the west side and one on the east side. The system hydraulic model was used to determine if the two storage facilities could be combined into one location. The model indicated that the system can operate adequately with one larger storage facility located in either of the proposed locations within the Stewart Area.

5.2 Pumping Analysis

The City’s existing firm booster pumping capacity is summarized in Table 5-5. The firm booster pumping capacity is defined as the combined capacity of all booster pumping facilities with the largest unit out of service. The City’s distribution system is served entirely by its pumping facilities. Therefore, the firm capacity should be equal to or greater than the Peak Hour demand. The largest pump is the 7.4 million gallons per day (mgd) pump located at the water treatment plant. The firm pumping capacity of the City’s distribution system is 55.2 mgd.

Table 5-5. Pumping Capacity

Location Firm Pumping Capacity, mgd Water Treatment Plant (Existing High Lift Pump Station) 30.0 Booster Pumps at Sam Brannon Tank Site 1.3 Booster Pumps at Rowe Avenue Tank Site 1.3 Booster Pumps at Garden/Burns Tank Site 3.3 Booster Pumps at Harter Tank Site 10.8 Booster Pumps at Sanborn Tank Site 8.5

Total 55.2

As shown in Section 4.0 Water Demands, the anticipated Peak Hour demands after the El Margarita and Stewart areas are fully developed are projected to be 61.0 mgd. This is higher than the firm pumping capacity of 55.2 mgd presented above. Therefore, the firm pumping capacity of the new pump station at the proposed storage facility planned for the Stewart Area must be at least 5.8 mgd.

Stewart Area Water Analysis

8 City of Yuba City November 2016 Stewart Area Water Analysis w\c\285\12-16-10\wp\111416_SAWA

5.3 Pipeline Analysis

The estimated demands for the Stewart Area were added to the hydraulic model to determine if the existing distribution system has sufficient capacity to support these demands, and to determine if the pipelines that have been proposed are adequately sized. For each scenario, if the pumps at the Water Treatment Plant (WTP) were not sufficient, as indicated by pressures in the system that did not meet the pressure criteria, then additional pumps were turned on to increase supply and boost pressure.

As indicated in Table 2-1, the minimum pressure criterion for normal operating conditions is 40 psi, which will be used to evaluate Maximum Day demand conditions. The minimum pressure criterion for Peak Hour demand conditions is 30 psi. The minimum pressure criterion for Maximum Day demand plus fire flow is 20 psi.

The pressures in the distribution system under Maximum Day demand conditions for existing demands plus demands for the El Margarita and Stewart Areas, with four pumps operating at the WTP pump station and one pump operating at the Burns/Garden Pump Station, are displayed on Figure 5-1.

Figure 5-2 shows the system pressures in the distribution system under Peak Hour demand conditions for existing demands plus demands for the El Margarita and Stewart Areas, with four pumps operating at the WTP, two pumps at the Harter Tank Site, one pump operating at the Sanborn Tank Site, one pump operating at the Burns/Garden Storage Facility and one pump operating at the proposed storage facility on the west side of the Stewart Area. The results show that a minimum pressure of 30 psi is maintained within the distribution system, except for one small area west of El Margarita, which is where the demands for the El Margarita area are assigned. This is likely caused by the demands for the El Margarita area being represented by a single demand in this location and has nothing to do with the Stewart Area development.

The model was run within the Stewart Area under Maximum Day for existing demands plus demands for the El Margarita and Stewart Areas plus Fire Flow demand conditions. Fire flow demands were assigned to junctions within the hydraulic model according to the adjacent planned land uses. The pipeline diameters were sized in the model to maintain a minimum pressure of 20 psi during the fire flow demand conditions. Figure 5-3 displays in red the recommended pipeline diameters for the pipeline network within the Stewart Area based on the Fire Flow analysis.

The pressures shown on Figure 5-4 indicate the residual pressure at each junction when the fire flow demand is added to that junction. Fire flow demands are not added all at the same time. The residual pressures are calculated individually for each junction, with only the fire flow for that junction added to the system. For these results, three pumps were operating at the WTP pump station, one pump was operating at the Sanborn Tank Site and one pump was operating at the storage facility proposed for the east side of the Stewart Area.

6.0 SUMMARY OF FINDINGS

The analysis described above showed that when both the El Margarita and Stewart Areas are fully developed, additional pumping and storage facilities will be required. The analysis also showed that the pipeline network that has been proposed for the Stewart Area is adequate for all areas

Stewart Area Water Analysis

9 City of Yuba City November 2016 Stewart Area Water Analysis w\c\285\12-16-10\wp\111416_SAWA

except for the southwest corner, where larger pipeline diameters are needed to provide adequate fire flow capacity.

The analysis showed that the City’s current storage facilities are not sufficient to support the development of both the El Margarita and Stewart Areas. The storage deficit is estimated to be 2.8 MG.

The analysis showed that the City’s current pumping facilities are not sufficient to support the development of both the El Margarita and Stewart Areas. The firm pumping capacity deficit is estimated to be 5.8 mgd.

While the City’s existing pipeline network is adequate to support the Stewart Area development, the pipelines proposed within the Stewart Area are not. It is recommended that the pipelines in the southwest corner of the Stewart Area be installed as 16-inch diameter pipelines to support the fire flow demands in this area.

Last Saved: 11/17/2016 1:31:01 PM W:\Clients\285 City of Yuba City\12-16-10 W and WW Modeling\GIS\MXD\Figure1-1.mxd : pjohnston

Figure 1-1 Bogue Stewart Master

Plan Area Development City of Yuba City

Bogue Stewart Master PlanArea Analysis

0 4,0002,000

Scale in Feet

Symbology

Western Stewart AreaEastern Stewart Area

Parcels

SMITH RD

GA

RD

EN H

WY

SING

H'S

WAY

WA

LLA

CE

DR

HAS

TIN

GS

CT

TRID

EN

TC

T

COLONY

CT

WILD

RIVER

DR

BUR

L CT

LASK D

R

S W

ALT

ON

AV

E

MILLFRONT

AVE

EUREKA DR

WIND

RIVER CT

WAVERLYCT

TRUCKEE

CT

TIMBE

R C

T

RH

INE C

T

KE

LSE

Y C

T

ROYAL

RIVER DR

MEADO

W

WALK DR

MU

IR R

D

LOISLN

AUR

OR

A DR

SOUTHPOINTEDRDOLPHIN

CT

PECAN DR

LONELYOAK DR

CA

RM

ELO

WAY

DRUMMOND DR

CORBY CT

GOLDRIVER DR

NEPTUNE DR

TULSA DR

HA

STIN

GS

WAY

SOU

TH

PAR

K DR

RA

MO

NA

AVE

NA

UR

A C

T

CECILY CT

BIG

OA

KS CT

HAM

STEAD

LN

EM

ER

ALD

DR

SPRINGCREEK CT TIFFANY

WAY

SH

ELB

Y C

T

HARBORTOWN DR

EL VALLASCIR

LOSBRAVOS DR

WH

ITE O

AK

DR

SHANGHAI BEND RDR

APID

FALLS D

R

COLD

WATER ST

OR

EG

ON

WAY

CIRCASSIANDR

REED RD

CANTERBURY DR

UTA

HC

T

SHADY LN

TAYLORRD

STARRRD

CO

LOM

BIA D

R BOGUE RDPAC

IFIC

A D

R

DEER

CREEK DR

IDA

HO

WAY

MA

CK

EN

ZIE

WAY

OLE

AND

ER D

R

EDGEWATER WAY

CLA

RE

MO

NT

WAY

MISSISSIPPI DR

BIG

OA

KS

DR

WHITE

ROCK DR

RA

ILR

OA

D A

VE

MOSBURG LP

CA

RR

DR

HW

Y 9

9 N

BH

WY

99

SB

GREEN

VALLEY RD

CA

MIN

ITO

RD

STEWART RD

TUS

CA

N R

D

0 5,0002,500

Scale in Feet

SECO

ND

ST

LIVE

OA

K B

LVD

WIN

CO

JUDY WAY

HEIDI WAY

WA

LNU

T S

T

HWY20 EB

PLUM

AS

CT

S W

ALT

ON

AV

E

AR

I CT

ADELINEST

DOLPHINCT

RO

SE

LN

WEBB ST

LORELWAY

MU

IRR

D

TEAL CT

B ST

DA

PH

NE

LNE

UG

EN

EC

T

OH

LEY

ER

RD

PEASE RD

BUTTEHOUSE RD

COLE CT

MARKLEYRD

LIZANNEDR

PATTONAVE

SHIRLEYPL

SUNSETAVE

HOLLYAVE

CR

ESW

ELL

DR

EDITHAVE

HE

MB

RE

ER

D

ELM

ER

AVE

FORTNARD

GE

NE

VAAV

E

PUTM

AN

AVE

BU

TTE

AVE

RA

ILR

OA

D A

VE

BOGUE RD

HO

LCO

MB

RD

N W

ALT

ON

AVE

POOLEBLVD

GLIDDEN LN

HW

Y 9

9 N

B

CA

MIN

ITO

RD

YOUNG RD

ELM

ER

AVE

LAN

GR

D

GR

OV

ER

D

HWY20 EB HWY 20 WB

GA

BR

IEL

AVE

STEWART RD

REED RD

SMITH RD

STARR RD

RE

DD

ING

AVE

DA

PH

NE

LN

TAYLOR RD

LINCOLN RD

S G

EO

RG

E W

AS

HIN

GTO

N B

LVD

S T

OW

NS

HIP

RD

54

46

47

56

4545

45

55

5548 48 48

51

4747

4747

43

4444

44

44

55

5252

54

49

52

49

45

4645 4645

46

4747

47

4747

4949

555555

5552 5353

5354 54

54

53

55

4747

4747

48

4847

48

4647

50

49 49

5051

50

51

49

51

4545

4545

4343

4343

43

4141 40

4140

40

4040

40

4040

404040

45 4544

45

45

4545 4545

45

45

47

55

48

49 49 49

5051

50

51

44

45

46

46 47

44

4646

45

4545

4847

46

4746

44

45

45

44

454544

44

4444

4444

44

45

45

45

46 4849

4744

45

45

4646

46

47

48

4849

49

5151

50

46 48 49 5351

40

40

42

40

43

40

44 46

4544

45

45

45 46

46

46

46

46

47

4646

47

474747

4849

47 4747

474848

49

49

49

49 50

49

4748

48

5050

51

51

53

54

58

40

44

46

45

51

54

5049

54

49

46

42

43

4343

42

42

43

42

42

42

4343

42

43

43

42

42 4342

42

42

42

4342

42

43

4343 43

43

43

42

42

42

42

42

4243

43

43

43

42

43

43

42

43

43

43

42

43

42

43

42

42

42 42

42

43

4242

42

43

4242

43

43

42

44

43

43

4040

4040

40

4040 40

40 4040

40

40

40 40

40

40

40

40

40

40

4040

40 40

4040

40

40

4040

55555554

54

54

545454 54

5454

54

54

54

54

5547

4747

47

47

4747

47

44 44

44

4344 44

44

44

44 4445 44

44

474747

4747

47

464647

47

4747

47

46

46

4646 46

42

4444

43

444444

44

43

43

43

43

43 4343

4444

44

4343

4343 44

44 44

4343

4444

4242

42

42424141

4141

414141

41

4141

42

42

42

42 42

4242

6

72 00

48

42 43

44

42

4444

44 44

41

45

45

43

4343

4444

45

49

45 4545

44

44

43

4343

4343

43

434343

43

4343

4343

43 43

43

43 43

4343 43

4343

434343

434343

4344

4444

444343

43

43

43

43434242

43

4242

41

4343

4343

43434343

434343

4343

43 43 4343

43

43

43

4443

43

4443

4342

42 42

43

4343

42

4242

42

4242

42

42

4242

43

4343

42

46

53

44

42

44

4644

43

444545

43

4343

42

424242

42

42

42

42

42

42

42

43

4343

8

24

446

7258

49 49

4747

4444

461346

48848

1347

30674610

47

798 79

4140

404242 41

44

44

44 4340

4142

42 41

424340

41 44

41

41

44 41

41

41

4041

40

Figure 5-1 System Pressures for

Maximum Day Demands City of Yuba City

Bogue Stewart Master PlanArea Analysis

Last

Sav

ed: 1

1/18

/201

6 2:

34:5

7 P

M W

:\Clie

nts\

285

City

of Y

uba

City

\12-

16-1

0 W

and

WW

Mod

elin

g\G

IS\M

XD

\Fig

ure5

-1-W

ater

.mxd

: pj

ohns

ton

Symbology

PRESSURE< 30 psi30 - 40 psi

40 - 60 psi

60 - 65 psi> 65 psi

PipesParcels

0 5,0002,500

Scale in Feet

SECO

ND

ST

LIVE

OA

K B

LVD

JUDY WAY

GROVECT

HWY20 EB

PLUM

AS

CT

S W

ALT

ON

AV

E

AR

I CT

ADELINEST

NINA

WAY

DOLPHINCT

RO

SE

LN

WEBB ST

POOLEBLVD

LORELWAY

MU

IRR

D

ELMST

PLUM

AS ST

B ST

DA

PH

NE

LNE

UG

EN

EC

T

OH

LEY

ER

RD

OLI

VE

ST

PEASE RD

KIRA CTBUTTEHOUSE RD

MARKLEYRD

BLE

VIN

RD

PATTONAVE

SHIRLEYPL

SUNSETAVE

BANDYWAY

HOLLYAVE

CR

ESW

ELL

DR

EDITHAVE

HE

MB

RE

ER

D

ELM

ER

AVE

FORTNARD

GE

NE

VAAV

E

PUTM

AN

AVE

BU

TTE

AVE

RA

ILR

OA

D A

VE

BOGUE RD

HO

LCO

MB

RD

N W

ALT

ON

AVE

POOLEBLVD

GLIDDEN LN

HW

Y 9

9 N

B

CA

MIN

ITO

RD

YOUNG RD

ELM

ER

AVE

LAN

GR

D

GR

OV

ER

D

HWY20 EB

GA

BR

IEL

AVE

STEWART RD

REED RD

SMITH RD

STARR RD

RE

DD

ING

AVE

DA

PH

NE

LN

TAYLOR RD

LINCOLN RD

S G

EO

RG

E W

AS

HIN

GTO

N B

LVD

S T

OW

NS

HIP

RD

54

45

56

4343

43

54

5345 46 46

49

45 45

4444

40

4343

43

44

54

5151

5351

52

47

42

43

44

43

45

4546

46

45

4747

47

54

54

5451 5151

5252 53

53

51

54

454545

4545

45

46

46

4546

4545

48

4849

48

50

48

49

4343

4343

4242

4242

43

4041 40

4140

40

4040

40

4040

393939

39

4343

43

43

43

43 43434343

45

54

464647 47

4849

48

505044

44 45

43

4444

43

4343

43

45

44

4544

42

42

42

434242

41

434343

4344

43

43

44 4646

4544

44

42

4444

44

45

46

4647

48

50

47

45 46 47 5249

39

40

41

40

42

41

45

4443

44

44

43 45

45

45

45

44

45

4545

45

464545

46 47

46 4546

464646

4748

48

48

47

48

48

4647

47

4848

49

50

52

53

39

44

47

44

43

49

53

49

53

47

43

40

38

43

424238

41

41

40

38

41

41

39

41

41

4039

40 4140

39

38

42

39

40

41

41

41

42

42

38

40

39

39

40

39

4141

41

42

3938

41

40

41

38

41

41

41

39

41

41

42

3941

39 41

42

39

40

3841

39

39

41

41

38

44

44

46

4040

403939

39

393939 39

393939

3939

39

39

39

39

39

39

39

40

4040

40 40

4040

40

41

4040

53535352

52

53

525253 52

5252

52

53

53

5344

4444

44

44

4444

44

44

41 42

424142

42

42

41

44 4344 44

43

444444

4444

44

4444

4444 44

4444

44

44

4444 44

41

4241

41

444444

44

42

42

42

42

41 4142

4444

44

4141

4141 41

41 41

4141

45

4344

404040

40

39393737

3535

373737

37

3535

38

38

38

38

3838 38

3838

6

66 00

46

39 40

46

39

4444

44 44

40

4243

45

41

4242

4444

4545 4545

44

44

41

414141

4141

41

414242

414141 41

42

42 41

4141

41 41

414141

41

42

4242

434343

444343

4242

424141

42

42 42

4141

41

4141 42

4242

4242

4242 42

42

42

4242

43

434342

42

42

4443

43

4343

4343

4242

41

42 4242

43

41

4141

4141

41

41

4141

4242

41 41

42

44

44

52

44

39

45

4442

42

564545

40

4040

3939

3939

39

39

39

39

39

39

39

40

4040

8

24

456

66

4747

4646

4444

4513

8 478 47

1345

307352

52

74874

4140

404242 41

44

44

44 4240

4041

41 41

414241

41 44

41

41

43 40

41

40

4040

41

Figure 5-2 System Pressures for

Peak Hour Demands City of Yuba City

Bogue Stewart Master PlanArea Analysis

Last

Sav

ed: 1

1/18

/201

6 2:

33:2

4 P

M W

:\Clie

nts\

285

City

of Y

uba

City

\12-

16-1

0 W

and

WW

Mod

elin

g\G

IS\M

XD

\Fig

ure5

-2-W

ater

.mxd

: pj

ohns

ton

Symbology

PRESSURE< 30 psi30 - 40 psi

40 - 60 psi60 - 65 psi

> 65 psi

PipesParcels

Last Saved: 11/17/2016 2:58:24 PM C:\Users\pjohnston\Documents\Projects\YubaCity\WaterModel\Stewart\ExistingMD3.mxd : pjohnston

Figure 5-3 Recommended Pipeline

Diameters City of Yuba City

Bogue Stewart Master PlanArea Analysis

0 4,0002,000

Scale in Feet

Symbology

Proposed Pipe with DiameterExisting Pipes

Parcels

14

12

16

16

16

16

1212

16

16

12

16

14

12

16

16

14

1612

16

14

14

12

1616 14

1616

121216

12

16

14

12 16

16

99

BOGUE

STEWART

WA

LTO

N

RA

ILR

OA

D

SMITH

GA

RD

EN

LASK

STARR

TAYLOR

NAND

TULSA

TUS

CA

N

GE

RM

AIN

E

SHANGHAI BEND

AR

I

SLEEPYPH

ILLI

PS

CO

LOM

BIA

BIG

OA

KS

MU

IR

NEPTUNEHARBOR TOWN

STE

PH

EN

LOIS

MA

GN

OLIA

PAC

IFIC

A

PARKWOOD

ALYSSA

SING

H'S

JEFF

RE

Y

RAPID

FALLS

RADDISON

WH

ITE O

AK

EUREKA

BLUE OAK

SOU

TH PA

RK

RAJ

MILLFRONT

OA

K

CARR

GO

LD R

IVE

R

DE

L LA

GO

SOUTHLAND

CA

MIN

ITO

HAS

TIN

GS

DONALD

SA

PP

HIR

E

LONELY OAK

MA

CK

EN

ZIE

SH

ELB

Y

OLE

AN

DE

R

AU

TUM

NW

OO

D

CECILY

NA

UR

A

SOUTHPOINTE

MO

RR

ISON

CIRCASSIAN

EM

ER

ALD

WHITE ROCK

EL VALLAS

CORBY

HAM

STEAD

GR

EE

N V

ALL

EY

BRAN

DO

N

PH

ILLI

PS

99

Last Saved: 11/18/2016 2:43:50 PM W:\Clients\285 City of Yuba City\12-16-10 W and WW Modeling\GIS\MXD\Figure5-4-Water.mxd : pjohnston

Figure 5-4 Residual Pressures with Max

Day + Fire Flow Demands withRecommended Diameters

City of Yuba CityBogue Stewart Master Plan

Area Analysis

0 4,0002,000

Scale in Feet

Symbology

Residual Pressure< 20 psi

> 20 psi

Pipes

Parcels

SMITH RD

GA

RD

EN H

WY

SING

H'S

WAY

WA

LLA

CE

DR

HAS

TIN

GS

CT

TRID

EN

TC

T

COLONY

CT

WILD

RIVER

DR

BUR

L CT

LASK D

R

S W

ALT

ON

AV

E

MILLFRONT

AVE

EUREKA DR

WIND

RIVER CT

WAVERLYCT

TRUCKEE

CT

TIMBE

R C

T

RH

INE C

T

KE

LSE

Y C

T

ROYAL

RIVER DR

MEADO

W

WALK DR

MU

IR R

D

LOISLN

AUR

OR

A DR

SOUTHPOINTEDRDOLPHIN

CT

PECAN DR

LONELYOAK DR

CA

RM

ELO

WAY

DRUMMOND DR

CORBY CT

GOLDRIVER DR

NEPTUNE DR

TULSA DR

HA

STIN

GS

WAY

SOU

TH

PAR

K DR

RA

MO

NA

AVE

NA

UR

A C

T

CECILY CT

BIG

OA

KS CT

HAM

STEAD

LN

EM

ER

ALD

DR

SPRINGCREEK CT TIFFANY

WAY

SH

ELB

Y C

T

HARBORTOWN DR

EL VALLASCIR

LOSBRAVOS DR

WH

ITE O

AK

DR

SHANGHAI BEND RDR

APID

FALLS D

R

COLD

WATER ST

OR

EG

ON

WAY

CIRCASSIANDR

REED RD

CANTERBURY DR

UTA

HC

T

SHADY LN

TAYLORRD

STARRRD

CO

LOM

BIA D

R

BOGUE RD

PAC

IFIC

A D

R

DEER

CREEK DR

IDA

HO

WAY

MA

CK

EN

ZIE

WAY

OLE

AND

ER D

R

EDGEWATER WAY

CLA

RE

MO

NT

WAY

MISSISSIPPI DR

BIG

OA

KS

DR

WHITE

ROCK DR

RA

ILR

OA

D A

VE

MOSBURG LP

CA

RR

DR

HW

Y 9

9 N

BH

WY

99

SB

GREEN

VALLEY RD

CA

MIN

ITO

RD

STEWART RD

TUS

CA

N R

D

34

40

34

29

3936

262729

46

47 39 43 4323

2423

45

35

29

4422

23

22

45 42

24

43

3941

29