Sultan Al-Khomashi
September 2014
1
![Page 2: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/2.jpg)
September 2014
Sultan Al-Khomashi – GM P&C
Owner Controlled Insurance Program (OCIP) A missing advantage for project owners & developers
2
![Page 3: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/3.jpg)
Transport & Infrastructure
Fundamental to any society
Vital for society and economy development
Connects
people and takes the economy to whole new levels
3
![Page 4: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/4.jpg)
The Future of Modern economy
4
![Page 5: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/5.jpg)
Saudi Arabia 750bn SAR Infrastructure projects by 2020
5
#1 Construction market in middle east
11th Globally in infrastructure potential investment
![Page 6: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/6.jpg)
That brings new
Challenges to the market
6
![Page 7: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/7.jpg)
Mega Projects characteristics
• Very high cost projects
• Multi interdependent contracts
• High risk exposures
• Unique perils
• Multi-year execution programs
• Community vital projects
7
![Page 8: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/8.jpg)
Traditional insurance
Not enough
8
![Page 9: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/9.jpg)
The traditional insurance - Disadvantages
• Different insurance policies & providers
• Low quality of insurance coverage
• Insurance premiums are imbedded into the contractors cost structure
• Principal pays indirect costs
• Gaps or duplications of coverage
Project instability
9
![Page 10: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/10.jpg)
it’s time to think about …
OCIP
10
![Page 11: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/11.jpg)
What is OCIP?
The Owner Controlled Insurance Program is a
Tailor-made Policy held by the project owner
wrapping up different policies into a single program
to cover virtually all liability and loss arising from
construction project.
11
![Page 12: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/12.jpg)
OCIP covers all project phases
12
Testing/handover phase
Construction phase
Operational phases
The design phase risk
![Page 13: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/13.jpg)
OCIP is a wrapped-up package of
policies
13
OCIP
Workmen’s Compensation
Operational liability
Construction All Risks
Plant and equipment coverage
Professional Indemnity
Delay in Startup
Marine Cargo
Advance Loss of profit
![Page 14: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/14.jpg)
Who is covered under OCIP?
• Project Owner/ Principal
• Financial Parties
• Construction Contractors
• Sub-Contractors of all tiers
• Architects and Engineers
• Consultants
• Manufacturers or suppliers
• Anyone Who is "Enrolled"
14
![Page 15: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/15.jpg)
OCIP features
One Program
Control
Consistent Coverage
Dedicated Limits
No Cross Litigation
Consistent Services
Decreased Markups
High Liability limits for Small Contracts
Full cover for operation
15
![Page 16: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/16.jpg)
Peace of mind
16
You will have
![Page 17: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/17.jpg)
Additional benefits
17
Risk & Loss Control
Claim Management
Better financial
arrangements
![Page 18: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/18.jpg)
Traditional CAR/EAR insurance
Vs. OCIP
18
Tra
d.
Ins
ura
nc
e
Purchased by Contractors
Limited liability
No workers’ compensations
Narrow Liability Limit
No completed operations coverage
Gaps on coverage
OC
IP
Purchased by Owner
Wide liability coverage
Can include workers compensation
Can include general liability with higher limits
Can include completed operational coverage
![Page 19: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/19.jpg)
OCIP vs. Traditional insurance
19
Potential saving in OCIP
![Page 20: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/20.jpg)
New challenges needs..
New perspective
20
New solutions
![Page 21: 11.10 ocip presentation (sultan al khomashi)final](https://reader033.vdocuments.site/reader033/viewer/2022052321/54942e0dac7959ff2d8b4aec/html5/thumbnails/21.jpg)
Final Slide
Tawuniya logo, contact information
Q&A
21
Thank