1 11 ENERGY SYSTEMS 1.0 Executive Summary 4.0 Goals & Targets 5.0 Partnerships 6.0 Research 7.0 Building Design 8.0 Design Process 11.0 Energy Systems 12.0 Rainwater System 2.0 Project Background & Overview 3.0 Vision & Leadership 13.0 Reclaimed Water System 14.0 Landscape & Site 15.0 Living Roof & Living Wall 17.0 Ventilation 10.0 Building Materials 18.0 Building Rating Systems 19.0 Monitoring & Measurement 20.0 Construction 22.0 Inhabitants vs. Occupants 24.0 Operations & Maintenance FUTURE SECTIONS TO BE ADDED: 9.0 Structural System & Wood “The novel approach to capturing and sharing energy with a neighbouring building is an elegant solution to the problem of adding a building to a campus and of how to make adding that building a positive experience from an energy or a gas perspective for that campus.” – Jorge Marques, Technology Innovation Manager BC Hydro, Industry Partner LESSONS LEARNED Set challenging goals Look for synergies Reduce demand through integration Attach funding to building components Capture all waste energy 11.0 ENERGY SYSTEMS 16.0 Lighting 25.0 Continual Evaluations 23.0 Community (food...) 21.0 Commissioning & Performance Testing 11.5 Benefits 11.4 Goals & Targets 11.6 Challenges 11.3 Campus Context 11.7 Lessons Learned 11.1 Overview 11.2 Description Image 11.1 Energy Exchange Diagram 11.1 System Overview One of the most important goals of the CIRS project was to achieve net-positive energy performance. By harvesting renewable and waste energy, CIRS is able to supply not only its own energy needs but also a portion of the needs of an adjacent building. The end result is that the addition of a 4-storey, 5675 square meter building to the campus reduces UBC’s overall energy consumption by over 1 million kilowatt hours per year. A high-performance building envelope, passive design strategies, provisions for inhabitant control of personal spaces and energy efficient equipment were used to minimize the building energy loads. Multiple systems work together to serve the different needs in the building and use energy efficiently. A heat recovery system captures waste heat in the exhaust ventilation from the fume hoods on the adjacent Earth and Ocean Sciences (EOS) building and transfers it to the heat pumps in CIRS. The heat pumps provide heating and cooling for the building through the radiant slabs and a displacement ventilation system. 30 vertical, geo-exchange wells Heat pumps upgrade heat from the geo-exchange wells and the EOS heat exchangers Surplus heat is returned back to EOS to pre- heat the air for space ventilation Heat Exchangers capture thermal energy from the EOS fume hoods Radiant panels heat ventilation air that is distributed through the Under Floor Air Distribution system Existing Earth and Ocean Sciences (EOS) Building

Upload: others

Post on 09-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 11.0 ENERGY SYSTEMS - University of British Columbiaadmin-playground.sites.olt.ubc.ca/.../11_EnergySystems_2.pdf · 2016-12-15 · 11 ENERGY SYSTEMS 11.4 Goals and Targets Table 11.2

1

11 E N E R G Y S YS T E M S

1.0 Executive Summar y

4.0 G oals & Targets

5.0 Par tnerships

6.0 Research

7.0 Bui lding Design

8.0 Design Process

11.0 Energy Systems

12.0 R ainwater System

2.0 Projec t Background & O ver view

3.0 Vis ion & Leadership

13.0 Reclaimed Water System

14.0 Landscape & Site

15.0 Living Roof & Living Wal l

17.0 Venti lat ion

10.0 Bui lding M aterials

18.0 Bui lding R ating Systems

19.0 M onitoring & M easurement

20.0 Construc t ion

22.0 I nhabitants vs. Occupants

24.0 Operations & M aintenance

FUTURE SEC TIONS TO BE ADDED:

9.0 Struc tural System & Wood

“The novel approach to capturing and sharing energy with a neighbouring building is an elegant solution to the problem of adding a building to a campus and of how to make adding that building a positive experience from an energy or a gas perspective for that campus.”

– Jorge Marques, Technology Innovation Manager BC Hydro, Industry Partner

L E S S O N S L E A R N E D

Set challenging goals

Look for synergies

Reduce demand through integration

Attach funding to building components

Capture all waste energy

11.0 E N E R G Y S YS T E M S

16.0 Lighting

25.0 Continual Evaluations

23.0 Communit y ( food. . . )

21.0 Commissioning & Per formance Test ing

11.5 B enefits

11.4 G oals & Targets

11.6 Chal lenges

11.3 Campus Contex t

11.7 Lessons Learned

11.1 O ver view

11.2 Descr ipt ion

Image 11.1 Energy Exchange Diagram

11.1 System OverviewOne of the most important goals of the CIRS project was to achieve net-positive energy performance. By harvesting renewable and waste energy, CIRS is able to supply not only its own energy needs but also a portion of the needs of an adjacent building. The end result is that the addition of a 4-storey, 5675 square meter building to the campus reduces UBC’s overall energy consumption by over 1 million kilowatt hours per year.

A high-performance building envelope, passive design strategies, provisions for inhabitant control of personal spaces and energy efficient equipment were used to minimize the building energy loads. Multiple systems work together to serve the different needs in the building and use energy efficiently. A heat recovery system captures waste heat in the exhaust ventilation from the fume hoods on the adjacent Earth and Ocean Sciences (EOS) building and transfers it to the heat pumps in CIRS. The heat pumps provide heating and cooling for the building through the radiant slabs and a displacement ventilation system.

30 vertical, geo-exchange wells Heat pumps upgrade heat

from the geo-exchange wells and the EOS heat exchangers

Surplus heat is returned back to EOS to pre-heat the air for space ventilation

Heat Exchangers capture thermal energy from the EOS fume hoods

Radiant panels heat ventilation air that is distributed through the Under Floor Air Distribution system

Existing Earth and Ocean Sciences (EOS) Building

Page 2: 11.0 ENERGY SYSTEMS - University of British Columbiaadmin-playground.sites.olt.ubc.ca/.../11_EnergySystems_2.pdf · 2016-12-15 · 11 ENERGY SYSTEMS 11.4 Goals and Targets Table 11.2

2

C I R S T E C H N I C A L M A N UA L

The energy exchange system returns excess heat from the CIRS heat pumps to EOS, which reduces its heat load and the demand on the campus steam system. The equivalent amount of energy in the heat transferred to EOS is greater than the total amount of energy consumed in CIRS. A ground source geo-exchange field supplements the waste heat recovery and provides heating and cooling to the pumps. An evacuated tube array on the roof that captures solar energy and an internal heat recovery system that captures waste heat from the building systems pre-heat the domestic hot water. Photovoltaic cells on the atrium roof and the window sunshades convert solar energy into electricity. Ongoing monitoring and research will study the energy consumption and effectiveness of the building systems in relation to inhabitants’ behaviour and help to optimize the operation of the building.

Image 11.2 CIRS Energy Systems Diagram

Page 3: 11.0 ENERGY SYSTEMS - University of British Columbiaadmin-playground.sites.olt.ubc.ca/.../11_EnergySystems_2.pdf · 2016-12-15 · 11 ENERGY SYSTEMS 11.4 Goals and Targets Table 11.2

3

11 E N E R G Y S YS T E M S

Image 11.3 Solar Energy Diagram

AG E N T S

Architects: Perkins + Will

Electrical/Mechanical Engineers: Stantec

Structural Engineers: Fast & Epp

Operations: UBC Building Operations

11.2 System DescriptionMechanical Heating and Cooling

Heating and cooling (cooling is provided for the lecture theatre only) are provided by three water-to-water heat pumps, which are located in the basement mechanical room and attached to three different heat sources. The main heat source is heat recovery coils connected to the lab exhaust of the adjacent Earth and Ocean Sciences (EOS) Building. Based on site-measured data, the lab exhaust provides a continuous exhaust of 10,384 liters per second (623,000 liters per minute or 22,000 cubic feet per minute) and provides more heat annually than is required by CIRS. The excess heat is returned to preheat the makeup air in EOS. The second heating source for CIRS is a series of heat recovery coils located in the CIRS exhaust air stream, feeding heat back into the hot water loop. This heat source is available only when the ventilation system is running. The coils collect heat from the exhaust flows from the air handling units and the washrooms as well as heat from the heat pumps in mechanical and service rooms. The third heat source is a small ground source geo-exchange field. This supplements the heat recovery systems and when operated will allow more energy to be returned to the EOS building, increasing the net-positive energy balance of CIRS.

Tempered ventilation air and a radiant floor system provide heating and cooling of the interior spaces. The large lecture theatre is the only space supplied with mechanical heating and cooling, with tempered ventilated air delivered through the raised flooring. The office spaces are heated with ventilation air supplied through the under floor system and supplemented in certain areas by radiant baseboard heating. A radiant floor system, supplemented by tempered ventilation air in the café, provides heat to the atrium social spaces and cafe.

Photovoltaic array in the atrium skylight glazing.

Photovoltaic Solar Shade

Evacuated Tube Solar Collector Array pre-heats domestic hot water.

Page 4: 11.0 ENERGY SYSTEMS - University of British Columbiaadmin-playground.sites.olt.ubc.ca/.../11_EnergySystems_2.pdf · 2016-12-15 · 11 ENERGY SYSTEMS 11.4 Goals and Targets Table 11.2

4

C I R S T E C H N I C A L M A N UA L

P R O C E S S

Design Process:

A dedicated energy charette, as well as water adn daylighting charettes, followed by an integrated design process provided means for developing creative energy solutions.

Construction:

Energy systems were installed during the construction of the base building.

Commissioning:

Operations:

Domestic Hot Water

A 40 square meter evacuated tube array on the roof and the heat pumps provide heat for the domestic hot water in CIRS. The array provides a significant amount of heat annually (15,400 kilowatt-hours) resulting in an excess during the summer. In the future, waste heat from the solar hot water array could be captured and reused. Currently, it dissipates to the atmosphere.

Renewable Electricity

A 25-kilowatt photovoltaic (PV) cell array supplies less than ten per cent of the building’s electrical consumption (22,148 kilowatt-hours per year). BC Hydro provides the rest through the campus electrical grid. Although an original design intention was to supply all of the energy needs of CIRS through renewable sources, such as solar energy or wind turbines, this was not feasible due to current technology capabilities and the local climate and site constraints. Photovoltaic cells are often removed from projects to reduce costs during the value-engineering phase, however this project secured their use by leveraging special funding arrangements. Research infrastructure grants from the Canadian Foundation for Innovation (CFI) and Sustainable Development Technology Canada (SDTC) funded the photovoltaic cells. The fixed external sunshades of the façades and on the roof of the atrium support the cells.

Ongoing Energy Modeling

Stantec Consulting completed the energy model for CIRS using the eQUEST v3.61 and DOE2.2e software packages. The energy model projected a 63 per

Image 11.4 CIRS EOS Energy Balance Diagram

613, 540 ekWhr/ yr

-622, 070 ekWhr/ yr

-1,036,783 ekWhr/ yr

Page 5: 11.0 ENERGY SYSTEMS - University of British Columbiaadmin-playground.sites.olt.ubc.ca/.../11_EnergySystems_2.pdf · 2016-12-15 · 11 ENERGY SYSTEMS 11.4 Goals and Targets Table 11.2

5

11 E N E R G Y S YS T E M S

Table 11.1 Energy Model Summary

cent energy savings (including non-regulated energy and renewable energy savings) relative to the Model National Energy Code for Buildings (MNECB) reference building. In calculating the energy savings of the heat-recovery system between CIRS and the adjacent EOS building, the model projects that the amount of energy used by CIRS (including the EOS heat recovery system) to total 613,540 equivalent kilowatt-hours per year (ekWhr/yr). The energy model results also showed the amount of energy in the heat that can be accepted back by EOS to be 622,070 ekWh/yr making CIRS net-positive in energy performance. After taking into account actual equipment efficiency at the UBC Steam Plant and the distribution losses (60% overall efficiency) the total projected savings to the overall campus energy consumption is 1,036,780 ekWh/yr. Actual operational data will be compared to the energy model output after one year of data are available. The data is collected on a regular basis to inform operational adjustments and provide data for systems research. is available. The data is collected on a regular basis to inform operational adjustments and provide data for systems research.

Energy Use Energy Consumed/Reduced (ekWhr/yr)

CIRS + EOS pre-heat system 613, 540

CIRS Heat Transfer to EOS -622, 070

Total Savings at the UBC Plant -1,036,783

CO S T S

Costs will be added in a future update

Image 11.5 Left: View of EOS Building from CIRS. Right: Pipes for the Energy Exchange System Photographs by Martin Tessler

Page 6: 11.0 ENERGY SYSTEMS - University of British Columbiaadmin-playground.sites.olt.ubc.ca/.../11_EnergySystems_2.pdf · 2016-12-15 · 11 ENERGY SYSTEMS 11.4 Goals and Targets Table 11.2

6

C I R S T E C H N I C A L M A N UA L

11.3 Campus ContextUBC Campus Plan

In order to accommodate planned future growth in a sustainable manner, the University is initiating an integrated planning approach to maximize the efficiency of existing systems, limit future demand and reduce carbon emission and costs. For energy planning, this approach operates on two scales: developing sustainable alternatives to campus wide systems and implementing sustainable strategies on individual projects. New projects are expected to integrate strategies to minimize energy consumption and use local sustainable options for electricity, space heating and hot water. New projects must also look for opportunities to utilize waste heat from any adjacent buildings. The waste heat recovery system used in CIRS is pioneering this approach. The University has identified other potential waste heat sources on campus and is siting new projects near them. The knowledge and experience gained from CIRS will be incorporated into future applications.

(Campus Plan map, pg 59)

UBC Campus Plan, Part 2 Campus Plan Section 6.2 Sustainability Practices (pg 38-39)

UBC Climate Action Plan

The University Climate Action Plan has set goals for UBC to become a net-positive energy performance organization and to reduce UBC’s greenhouse gas emissions by 100 per cent by 2050. Multiple opportunities for carbon reduction have been identified in areas relating to campus development and infrastructure, food, travel and transportation and energy supply. Choosing energy systems for new projects that have low or no carbon emissions and finding synergies with existing buildings to help reduce those buildings’ carbon emissions contributes towards the University’s energy goals.

A number of policies within the UBC Climate Action Plan should lead to the targeted energy use reduction and lower carbon emissions:• DV-01 Increase the energy efficiency of development on campus

• DV-02 Establish long term funding for energy efficiency for both new construction and existing buildings.

• EN-01 Expand energy management activities on campus.

• EN-07 Reduce energy consumption from laboratory and research activities

UBC Climate Action Plan (www.sustain.ubc.ca/climate-action)

UBC Technical Guidelines, Divisions 15 & 16

Division 15 governs the design and construction of mechanical systems. Division 16 governs the design and construction of electrical systems. These guidelines include instructions on coordination with and approval from UBC Building operations for energy efficiency.

UBC Technical Guidelines 2011 Edition, Division 15 & 16

Page 7: 11.0 ENERGY SYSTEMS - University of British Columbiaadmin-playground.sites.olt.ubc.ca/.../11_EnergySystems_2.pdf · 2016-12-15 · 11 ENERGY SYSTEMS 11.4 Goals and Targets Table 11.2

7

11 E N E R G Y S YS T E M S

11.4 Goals and TargetsTable 11.2 lists the project goals and targets specifically related to the research of CIRS. For a complete list of all the goals and targets for CIRS, refer to Section 4.0 Goals & Targets.

Category Goals Targets5 - SUPPLY SYSTEMS Supply all building energy

requirements from on-site sustainable and renewable energy sources.

Achieve net positive energy performance

Be greenhouse gas emission neutral.

Direct energy consumption target: Meet and exceed the best achieved to date for comparable uses: < 75kWh/m2/year overall, <15 kWh/m2/year for heating.

Install PVs for 30% of building operation requirements.

Reduce energy loads.

Harvest and export energy exceeding the building needs.

6 - ENERGY REDUCTION HVAC

Design CIRS to be as passive and simple as possible.

Demonstrate that all strategies have the lowest possible energy requirements.

Design a high performance building envelope.

Building envelope thermal performance to average R20 (3.5 RSI).

7 - ENERGY REDUCTION LIGHTING

CIRS will integrate daylight systems that provide 100% of the illumination required through the building during the day to minimize lighting power consumption at other times.

18 – SEAMLESS DESIGN & OPERATION

The building will seamlessly integrate the design and ongoing operations.

Table 11.2 Goals and Targets for the Energy Systems

Page 8: 11.0 ENERGY SYSTEMS - University of British Columbiaadmin-playground.sites.olt.ubc.ca/.../11_EnergySystems_2.pdf · 2016-12-15 · 11 ENERGY SYSTEMS 11.4 Goals and Targets Table 11.2

8

C I R S T E C H N I C A L M A N UA L

R AT I N G S Y S T E M S

LEED

Energy & Atmosphere Prerequisites:

1 - Fundamental Building Systems Commissioning

2 - Minimum Energy Performance

3- CFC Reduction in HVAC&R Equipment

Energy & Atmosphere Credits:

1.1, 1.2, 1.3, 1.4, 1.5 - Optimize Energy Performance

2.1 & 2.2 Renewable Energy

3 - Best Practice Commissioning

4 - Ozone Protection

5 - Measurement & Verification

6 - Green Power

Indoor Environmental Quality Credits:

6.1 & 6.2 – Controllability of Systems

7.1 & 7.2 – Thermal Comfort

Living Building Challenge

7 – Net Zero Energy

9 – Healthy Air

20 - Inspiration & Education

Division 15 contains a number of strategies designed to increase the flexibility of buildings for low grade energy supply systems and heat recovery, to reduce the capital cost of the energy supply system and to reduce maintenance costs.

UBC Technical Guidelines 2011 Edition, Division 15, Section 15710

The Building Management System (BMS) Design Guidelines specifies that UBS should provide an energy monitoring software facility in both the Campus Building Management System (CBMS) and Building Management System Network Data Server (NDS) to monitor and report electrical energy usage and instantaneous energy demand.

UBC Technical Guidelines 2011 Edition, Division 15. UBC Building Management Systems Design Guidelines

11.5 BenefitsThe energy systems used at CIRS benefitted the project in the following ways:Evaluates the Energy Modeling Process

• The energy model will provide a valuable comparison for ongoing systems monitoring, optimization and research. As well, an evaluation of the energy model will provide feedback to the design team about the actual performance of various strategies.

Creates Redundancy

• The use of multiple energy systems is considered to be more robust and resilient than relying completely on one energy source. Multiple energy systems also provide more opportunities for research and systems testing.

Inspired a New Approach to Campus-Wide Energy Supply/Consumption

• Inspired by the potential of the waste heat recovery system, UBC is looking for other synergies between new projects and buildings with excessive waste energy/heat. The campus is converting the district heating system from a natural gas-powered steam system to a biomass powered hot water system, further expanding the opportunities for waste heat recovery and other renewables such as solar hot water.

Reduces Heat Demand and Carbon Emissions at EOS

• The Earth and Ocean Science (EOS) building is currently heated from the campus-wide natural gas-powered steam system. Reallocating surplus heat from CIRS to the EOS building reduces the amount of heat drawn from the steam system, thereby lowering the overall demand for natural gas and associated carbon emissions. The resulting greenhouse gas emissions reduction from this strategy is 185.6 tons carbon dioxide (CO2), with a campus-wide boiler efficiency of 60%.

Provides Opportunities for Continued Learning

• Ongoing testing will investigate balancing human comfort and behaviour with energy consumption, highlighting occasions for further reducing demand and optimizing the systems. Lessons learned at CIRS will communicated widely to help improve the design of future buildings.

Page 9: 11.0 ENERGY SYSTEMS - University of British Columbiaadmin-playground.sites.olt.ubc.ca/.../11_EnergySystems_2.pdf · 2016-12-15 · 11 ENERGY SYSTEMS 11.4 Goals and Targets Table 11.2

9

11 E N E R G Y S YS T E M S

11.6 ChallengesThe energy systems used at CIRS were challenging to the project in the following ways:

Resolving Project Objectives with Project Realities: Wind

• The site of UBC Point Grey campus is not adequate for the use of wind turbines large enough to provide a significant amount of power. Constraints include the abundance of large trees and height restrictions for airplane transit pathways to the nearby airport.

Producing the Highest Quality Energy Modeling

• Most energy models compare a design to an energy code with a set of rules about what is included in the calculations. In order to reach a target of energy positive using multiple systems, the model for this project was extended to include extra loads and detailed profiles of energy usage.

• There are many types of energy modeling programs, some more comprehensive and complicated than others and therefore the design team had to test different options to determine the best for this project.

Estimating Energy Consumption of the Loop Cafe

• No data exists for the energy consumption of food services facilities on UBC campus. Therefore careful extrapolation has been undertaken in the energy consumption estimate for the Loop Café in CIRS. Monitoring of actual usage is required to obtain an accurate metric.

Utilizing all Sources of Waste Heat

• Waste heat generated during the operation of building systems is a valuable resource. Many sources of waste heat have been identified and used in CIRS, however, some waste heat supplies were not acknowledged and have not been captured or utilized for gain. For example, the waste heat from the evacuation tubes for the solar hot water on the roof has not been harnessed.

R E L AT E D S E C T I O N S

3.0 Vision& Leadership

4.0 Goals & Targets

6.0 Research

7.0 Building Design

8.0 Design Process

12.0 Rainwater System

16.0 Lighting

17.0 Ventilation

18.0 Building Rating Systems

19.0 Monitoring & Measurement

20.0 Construction

21.0 Commissioning & Performance Testing

Page 10: 11.0 ENERGY SYSTEMS - University of British Columbiaadmin-playground.sites.olt.ubc.ca/.../11_EnergySystems_2.pdf · 2016-12-15 · 11 ENERGY SYSTEMS 11.4 Goals and Targets Table 11.2

10

C I R S T E C H N I C A L M A N UA L

11.7 Lessons LearnedThe experiences gained through the energy systems used at CIRS provided valuable lessome to apply to future projects. Some of the key lessons are:

Set Challenging Goals

• Establishing challenging goals, such as being approximately ten per cent energy positive, inspires design teams and stakeholders to look for creative, unconventional solutions.

Look for Synergies

• Waste from nearby buildings and infrastructure, such as exhaust from fume hoods, may provide a beneficial resource or design solution to a new project.

Reduce Demand through Integration

• Ensuring buildings and their systems are interconnected can reduce overall levels of consumption, emissions and waste.

Attach Funding to Building Components

• Sourcing grants to fund specific building components ensures that they will remain in the project through the Value Engineering phase. If they are removed, the project loses money as well as identifiable association with prestigious funding agencies and organizations.

Capture all Waste Energy

• Most building systems (such as solar hot water evacuation tubes) generate some waste or excess heat while operating, which is a valuable resource that can be included in a waste heat recovery system.

R E S O U R C E S

• Diagrams links• Drawings links• Stantec:

www.stantec.com• UBC Campus Plan• Campus Plan Map 2-9:

Potential Waste Heat Sources (pg 59)

• UBC Climate Action Plan: www.sustain.ubc.ca/climate-action

11.8 Future LearningAdditional lessons learned over the operational life of the building will be added at periodic intervals