Chapter 2: Analyzing Business CasePhase 1: Systems Planning
● Systems planning is the first of five phases in the systems development life cycle (SDLC)
● In this phase, you will learn how IT projects get started and how a systems analyst evaluates a proposed project and determines its feasibility
22
Chapter Objectives
● Learn the concept of a business case and how a business case affects an IT project
● Describe the strategic planning process and why it is important to the IT team
● Explain the purpose of a mission statement
● Describe the SDLC, and explain how it serves as a framework for systems development and business modeling
33
Chapter Objectives
● List the reasons for information systems projects and the factors that affect such projects
● Explain the initial review of systems requests and the role of the systems review committee
● Define operational feasibility, technical feasibility, economic feasibility, and schedule feasibility
44
Chapter Objectives
● Describe the steps in a preliminary investigation and the end product of an investigation
55
Introduction
● The term business case refers to the reasons, or justification, for a proposal
● System development typically starts with a system request (how requests originate, and evaluated), followed by a preliminary investigation(feasibility study) and how to conduct a report to mgr which concludes the planning phrase.
66
Strategic Planning – A framework for IT development
● Strategic Planning Overview– SWOT
• Examines a company’s Strengths, Weaknesses, Opportunities, and Threats
• A SWOT analysis benefits planning process by identify technical, human and financial resources.
Figure 2-2
77
Strategic Planning
● From Strategic Plans to Business Results– A company develops
a mission statement based on the firm’s purpose, vision, and values
Purpose, vision, and values shape its mission statement, which in turn leads to goals, objectives, and business operations. Business results directly affect stakeholders.
Figure 2-3
88
Strategic Planning
● A mission statement briefly states the company’s overall purpose, products, services, and values.
Figure 2-4
99
Strategic Planning
● Based on a mission statement, a company must identify a set of goals (long term) that will accomplish the mission. To achieve goals, objectives (short term) must be defined too.
Figure 2-4
1010
Strategic Planning
A Business Example Popkin.com (p.51)Business Enterprise Direction Model: analyze strategy,
covers future vision, ID key business policy, contains following components: mission statement;
Business objective: specific measurement for long term results;
Specific strategies for achieve objectives; Critical Success Factors (CSFs) to fulfill its mission;Critical Business Issues (CBIs) that must be dealt with; Balanced Scorecard- a short summary of most critical
measures;Case of actions: A clear summary of the primary
business issues;Business vision: What will be like when the
transformations are complete.
Figure 2-5
1111
● Starting point of a project: Systems request for IT support (reasons)
Information Systems Projects: reasons, internal/external factors affecting sys projects
Figure 2-6: 5 reasons for sys. request
1212
Factors that affect system projects: Internal: strategic plan, top mgr;
inside user requests; IT sys change; existing sys.
External: technology; suppliers; customers; competitors, economy, and government.
Information Systems Projects
Figure 2-8
Information Technology Department
Existing Systems The
EconomyGovernment
Competitors
Customers
Suppliers
Technology
Strategic PlanTop
Managers
User Requests
1313
Information Systems Projects
● Project Management Tools– All IT projects
must be managed and controlled
– Begins with a systems request, and continues until the project is completed or terminated Figure 2-
11
1414
Evaluation of Systems Requests
● Systems Requests Forms– Many organizations use a special form
for systems requests– A properly designed form streamlines
the request process and ensures consistency
– Must be easy to understand and include clear instructions
– Should include enough space for all required information and should indicate what supporting documents are needed
1515
Evaluation of Systems Requests
● Systems Requests Forms (p. 57)
Figure 2-12
1616
Evaluation of Systems Requests
● Systems Review Committees– Most large companies use a
systems review committee to evaluate systems requests
– Many smaller companies rely on one person to evaluate system requests instead of a committee
– The goal is to evaluate the requests and set priorities
1717
Overview of Feasibility
Feasibility study: several tests before further proceed. Four main yardsticks to measure a proposal: operational, technical, economic, schedule
Figure 2-13
1818
Overview of Feasibility
● A systems request must pass several tests, called a feasibility study, to see whether it is worthwhile to proceed further
● Operational Feasibility– A proposed system will be used
effectively after it has been developed– Consider questions like: new system
reduce workforce? Require training? Require operating change? Legal/ethical?
1919
Overview of Feasibility
● Technical Feasibility– Refers to the technical resources
needed: Need to upgrade or purchase new HW,
SW? New technical expertise? will new system be able to handle
future transaction volume and growth?
2020
Overview of FeasibilityEconomic Feasibility–Total cost of ownership (TCO), including ongoing support and maintenance. –Tangible benefits: benefits can be measured in dollars, new scheduling sys that reduce overtime. online package tracking sys that decreases the need for clerical staff
–Intangible benefits: advantages that hard to measure in
dollars but significant to company. A new Web site that enhances company’s image.
A user-friendly sys that improves user satisfaction.
2121
Schedule Feasibility:
Schedule Feasibility
Means that a project can be implemented in an acceptable time frame, consider interaction of time and cost
Will a speedy schedule pose any risk?Need to appoint a new project mgr?Timetable is strict?More critical, time or user satisfaction?
2222
Evaluating Feasibility
● The first step in evaluating feasibility is to identify and weed out systems requests that are not feasible
● Even if the request is feasible, it might not be necessary
● Feasibility analysis is an ongoing task that must be performed throughout the systems development process
2323
Setting Priorities
● Factors that Affect Priority– Will the systems project result in more
information or produce better results? How? Are the results measurable?
– Will the proposed system reduce costs? Where? When? How? How much?
– Will the system increase revenue for the company? Where? When? How? How much?
2424
Setting Priorities
● Factors that Affect Priority– Will the system serve customers
better?– Will the system serve the
organization better?– Can the project be implemented in
a reasonable time period? How long will the results last?
– Are the necessary financial, human, and technical resources available?
2525
Setting Priorities
● Factors that Affect Priority– Whenever possible, the analyst
should evaluate a proposed project based on tangible costs and benefits that represent actual (or approximate) dollar values
2626
Setting Priorities
● Discretionary and Nondiscretionary Projects– Projects where management has a
choice in implementing them are called discretionary projects
– Projects where no choice exists are called nondiscretionary projects
2727
Preliminary Investigation Overview
● Interaction with Managers and Users
Fact-Finding
Figure 2-14
2828
Preliminary Investigation Overview
● Planning the Preliminary Investigation– A systems analyst typically follows
a series of steps– The exact procedure depends on
the nature of the request, the size of the project and the degree of urgency
2929
Preliminary Investigation Overview
● Step 1: Understand the Problem or Opportunity– When you analyze a systems
request, you need to determine which departments, users, and business processes are involved
3030
Preliminary Investigation Overview
● Fishbone diagram (Ishikawa diagram)
Figure 2-17
3131
Preliminary Investigation Overview
● Step 2: Define the Project Scope and Constraints– Project scope – Project creep– Constraint
3232
Preliminary Investigation Overview
● Step 2: Define the Project Scope and Constraints– Means to define the boundaries, or
extent, of the project– Being as specific as possible
3333
Preliminary Investigation OverviewEach constrain has has three characteristics
Figure 2-18
3434
Preliminary Investigation Overview
● Step 3: Perform Fact-Finding May require long or short time
depending on the nature of the the investigation.
3535
Preliminary Investigation Overview
● Analyze Organization Charts for whom should you interview.
Figure 2-19
3636
Preliminary Investigation Overview
● Step 3: Perform Fact-Finding– Steps for conducting interviews:1.determine who to interview2. Establish objectives for interview3. Prepare interview questions4. Conduct interview5. Document interview6. Evaluate interview
Figure 2-20
3737
Preliminary Investigation Overview
Alternative Fact-Finding methods:
– Review documentation– Observe current sys. in operations– Conduct a user survey
3838
Preliminary Investigation Overview
● Step 4: Evaluate FeasibilityAfter analyzing the problem, defining the
project scope and constrains, and performing fact-finding, you must: – Evaluate the project’s operational,
technical, economic, and schedule feasibility
eg. can use financial analysis tools in Part 3 of Toolkit to evaluate economic feasibility
3939
Preliminary Investigation Overview
● Step 5: Estimate Project Development Time and Cost, consider issues:– What information must you obtain,
and how will you gather and analyze the information?
– What sources of information will you use, and what difficulties will you encounter in obtaining information?
4040
Preliminary Investigation Overview
● Step 5: Estimate Project Development Time and Cost– Will you conduct interviews? How
many people will you interview, and how much time will you need to meet with the people and summarize their responses?
– Will you conduct a survey? Who will be involved? How much time will it take people to complete it? How much time will it take to prepare it and tabulate the results?
4141
Preliminary Investigation Overview
● Step 5: Estimate Project Development Time and Cost– How much will it cost to analyze the
information gathered and to prepare a report with findings and recommendations?
– You should provide an estimate for the overall project, so managers can understand the full cost impact and timetable
4242
Preliminary Investigation Overview
● Step 6: Present Results and Recommendations to Management– The final task in the preliminary
investigation is to prepare a report to management
– The format of the preliminary investigation report varies from one company to another
4343
Preliminary Investigation Report: preparing a formal document to mgr.
Figure 2-21
4444
Preliminary Investigation Overview
● Step 6: Present Results and Recommendations to Management: report format:– Introduction: overview of report– Systems request summary: request basis– Findings: results of preliminary investigation– Recommendations for future actions(critical
decision making for mgr.)– Time & cost estimates: total cost of
ownership– Expected benefits(tangible and intangible, a
timetable when to occur)– Appendix for supporting info.
4545
Chapter Summary
● Strategic planning allows a company to examine its purpose, vision, and values and develops a mission statement
● Systems projects are initiated to improve performance, provide more information, reduce costs, strengthen controls, or provide better service
● In the preliminary investigation, the analyst evaluates the sys. request on operation, technical, economic, and schedule standpoint
4646
Chapter Summary
● Analysts evaluate systems requests on the basis of their expected costs and benefits
● The steps in the preliminary investigation are to understand the problem or opportunity; define project scope and constrains; finding facts; estimate project’s benefit; estimate time and cost.
● Outcome of planning phase is to produce a report to mgr for recommendations.
● Chapter 2 Complete