2018SUMMARY REPORT
10‑Year Transmission System Assessment
![Page 2: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/2.jpg)
Agility, flexibility needed to plan for changing energy marketplace
In today’s marketplace, our customers expect us to respond quickly. In fall 2017, Foxconn selected Wisconsin for its first U.S.‑based manufacturing facility for flat‑screen technology. The Mount Pleasant Tech Interconnection Project was developed to respond to the needs of a facility that would constitute the largest load at a single substation in ATC’s service territory. We filed an application in January to build a new substation and associated transmission lines with the Public Service Commission of Wisconsin, which approved the project in July. Construction will start this fall and the project will be in service in late 2019.
Long‑term transmission planning has always been a complex undertaking, but it was relatively consistent in the days of steady load growth and a stable generation mix. But conditions in the early 21st century are no longer as predictable as they were in the past, adding new challenges to the process.
As a transmission‑only electric utility, we collaborate with our customers to determine needed replacements, expansions and connections to the grid. Recent changes in generation and the energy marketplace have required us to be flexible and agile in our planning to accommodate customer needs.
2 AMERICAN TRANSMISSION CO.
Transmission investments Projections from past and current Transmission System Assessments
2014 2015 2016 2017 2018
Specific Network Projects
$1.4B $1.4B $1.3B $0.7B / $1.0B* $0.5B
Regional Multi‑Value Projects
$0.5B $0.5B $0.5B $0.4B $0.3B
Asset Maintenance $1.2B $1.4B $1.4B $1.4B $1.5B
Other Capital Categories $0.2B / $0.8B $0.4B / $1.2B $0.4B / $1.2B $0.3B / $0.8B $0.5B / $1.1B
Total 10‑Year Capital Cost $3.3B / $3.9B $3.7B / $4.5B $3.6B / $4.4B $2.8B / $3.6B $2.8B / $3.4B
* The Specific Network Projects range in 2017 reflects the fact that Northern Area Reliability Assessment projects in the 10‑Year Assessment project list and in the MISO Transmission Expansion Plan database may be replaced by generation being considered in the Midcontinent Independent System Operator generation queue.
![Page 3: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/3.jpg)
Ron SneadVice President, System Planning
Jim Vespalec Director, Asset Planning & Engineering
Kingsford
De Pere
PewaukeeHeadquarters
Madison
ATC O�ces
Minnesota
Illinois
Wisconsin
Michigan
CottageGrove
Agility, flexibility needed to plan for changing energy marketplace
Upper Michigan Energy Resources Corp., a subsidiary of WEC Energy Group, proposed in early 2017 to add 180 megawatts of generation at two sites in the Upper Peninsula. The project was approved later that year, and construction began immediately. This allowed us to scale back projects identified in our Northern Area Reliability Assessment. UMERC’s two plants are located near existing transmission infrastructure and will require two new substations and only a short segment of transmission line to connect the facilities.
Generation retirements have a large impact on the transmission grid. We anticipate that more than 30 percent of the coal‑fired generation in our service territory will be retired by the end of 2019. With the retirement of the Kewaunee Nuclear Station in 2013, we canceled a pair of 50‑mile, 138‑ and 345‑kV lines that had been in the planning stages for several years – the change in generation allowed the need to be satisfied instead with a new substation that went into service this year. The announced closing of the Pleasant Prairie Power Plant in southeastern Wisconsin meant that another transmission connection into northern Illinois was no longer needed, and the Wisconsin‑Illinois Electric Reliability Project was canceled.
We also work with our customers to evaluate cost‑effective non‑transmission solutions when examining the condition of our aging assets. Recently, we made the decision to retire a 69‑kV line in northeastern Wisconsin that was in poor condition when we determined, with Wisconsin Public Service, that the local distribution company’s two substations served by the line could be tied into a nearby rebuilt 138‑kV line for about half the cost.
These examples demonstrate the dynamic nature of the electric industry today. That’s why it’s prudent to conduct an annual review of market conditions and transmission needs. Our 10‑year forecast calls for a slight decrease in capital expenditures from last year, with $2.8 to $3.4 billion in system improvements. This document contains a summary of ATC’s planning initiatives, and an overview of asset renewal and network‑driven projects in each of our planning zones.
For more detailed information, please visit www.atc10yearplan.com.
32018 | 10-YEAR ASSESSMENT
![Page 4: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/4.jpg)
4 AMERICAN TRANSMISSION CO.
Regional and economic planning
MARKET CONSTRAINTS
Two of the five narrowly constrained areas identified in the MISO region are associated with ATC, and we continue to track these as well as other constraints. Such tracking assists in planning projects that alleviate congestion within the MISO market.
OTHER MISO PLANNING ACTIV IT IES
Our planning staff participates in various technical and policy discussions and provides future direction for Midwest Transmission Expansion Plan activities. We also are involved in joint planning studies with neighboring regional transmission organizations, including PJM and SPP.
MISO and PJM coordinate, conduct and analyze several market efficiency project studies. This analysis is reviewed by an inter‑regional planning stakeholder advisory committee, which typically examines economic projects that could benefit both Regional Transmission Organizations and qualify for cross‑border cost‑sharing.
ATC is an active participant in a variety of efforts to address regional and inter‑regional planning initiatives
to maintain a reliable grid and capture economic benefits in a dynamic energy marketplace. Policy
initiatives to curb greenhouse gas emissions and expand the use of renewable energy continue to evolve,
and we work closely with our customers to plan for an electric transmission system that will serve their
needs well into the future.
MIDCONTINENT INDEPENDENT SYSTEM OPERATOR TRANSMISSION EXPANSION PLANNING
MISO planning studies address long‑ and short‑term issues as well as targeted needs. Long‑term studies primarily look at value‑based options that provide economic benefits in the 10‑ to 20‑year horizon. Short‑term planning is primarily driven by transmission owners’ reliability and North American Electric Reliability Corporation compliance needs in a five‑ to 10‑year period.
ATC staff participates in the MISO short‑term reliability and economic studies in a variety of ways: ensuring accurate project information is included in the MISO database, building and reviewing models, correlating needs identified by MISO analyses with specific ATC projects and participating in various studies and stakeholder forums.
![Page 5: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/5.jpg)
BADGER COULEE
This fall, we expect to energize the 180‑mile, 345‑kV Badger Coulee transmission line, one of MISO’s 17 Multi‑Value Projects designed to deliver significant benefits to electric consumers throughout the Upper Midwest. A portion of the project from the Cardinal Substation to the North Madison Substation was placed in service in fall 2017. Developed jointly with Xcel Energy, the line will:
n offset the need for about $190 million in lower‑voltage upgrades in western Wisconsin,
n increase access to the wholesale energy market and provide between $118 million and $700 million in net economic benefits over the life of the line, and
n establish another pathway for renewable energy into Wisconsin with a connection to key load centers.
BAY LAKE
The Bay Lake Project is a package of proposals that address the delicate, shifting balance between generation, load and transmission in the northern portion of our service area.
The North Appleton‑Morgan project was placed in service in September 2018, ahead of schedule and under budget. It includes 345‑kV and 138‑kV lines from our North Appleton Substation in Outagamie County to the Morgan Substation in Oconto County, Wis. Both substations have been expanded and additional work was required at 11 other substations. A new substation, Benson Lake in Marinette County, was placed into service in July 2017. It includes a large voltage‑control device. North Appleton‑Morgan was approved by the Public Service Commission of Wisconsin in May 2015, with an authorized cost of $328 million.
Major projects update
(continued on page 6)
52018 | 10-YEAR ASSESSMENT
![Page 6: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/6.jpg)
6 AMERICAN TRANSMISSION CO.
CARDINAL – H ICKORY CREEK
ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin for a 102‑ to 120‑mile, 345‑kV transmission line connecting Dubuque County, Iowa, to Dane County, Wis.
The Cardinal‑Hickory Creek Project is another MISO Multi‑Value Project. Studies indicate that it will deliver benefits to local communities and the Midwest region by:
n improving electric system reliability locally and regionally,
n delivering $23.5 million to $350.1 million in net economic benefits, and
n connecting to other 345‑kV transmission lines in the Upper Midwest and helping to enable 25 gigawatts of cost‑effective renewable energy to be delivered to communities in the region.
If approved by Wisconsin and Iowa regulators, the project is estimated to be in service in 2023.
SPRING VALLEY – NORTH LAKE GENEVA
Construction is underway on the $71 million Spring Valley‑North Lake Geneva Project, which was approved by the Public Service Commission of Wisconsin in spring 2016. This project is needed to meet an increase in electric demand in Walworth and Kenosha counties in Wisconsin.
The project involves:
n construction of a new 138‑kV transmission line of approximately 23 miles, stretching from the North Lake Geneva Substation in southern Walworth County to the Spring Valley Substation in western Kenosha County,
n construction of a new 138‑kV and 69‑kV substation on an ATC‑owned parcel along Highway 50 in the Town of Wheatland,
n construction of a new 69‑kV transmission line to connect the new substation to the existing Twin Lakes Substation in Twin Lakes, and
n other power line modifications.
The project is expected to be placed into service in 2019.
Major projects update continued
The Mount
Pleasant Tech
Interconnection
Project will serve
up to 230 MW of
load, the largest
load connected to
a single substation
on our system.
![Page 7: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/7.jpg)
(continued on page 8)
F INGER ROAD – CANAL
The rebuild of a 69‑kV line in northeastern Wisconsin, along with associated substation work, was approved by the Wisconsin Public Service Commission in spring 2017 at a cost of $60.7 million. About 55 miles of line on 1950s‑vintage wood poles between Finger Road Substation and Canal Substation will be rebuilt. The line serves seven distribution substations in northern Kewaunee County and Door County.
The project includes:
n the replacement of 834 wood pole structures,
n the replacement of line conductor and addition of a fiber optic shield wire,
n the update at terminal‑end substations of jumpers, selective bus conductor, and disconnect switches.
Construction is scheduled to complete in January 2021.
MOUNT PLEASANT TECH INTERCONNECTION
This project is designed to support Foxconn, which upon completion will be one of the largest manufacturing facilities in the nation with a campus build‑out anticipated to be approximately 22‑million square feet. The initial projected electric usage would be 200 megawatts at this manufacturing facility, with an additional 30 MW of expected economic growth in the surrounding area. The electric load required for Foxconn’s operations will be the largest connected to ATC’s transmission system at a single substation.
The project cost is estimated to be about $117 million and includes:
n constructing a new 345‑/138‑kV Mount Pleasant Substation,
n looping the Racine – Pleasant Prairie 345‑kV line into the new substation,
n stringing a new Racine – Pleasant Prairie 345‑kV circuit in the vacant position on existing structures and looping this new circuit into the new substation,
n reconfiguring the Racine Substation 345‑kV bus,
n rerouting the Pleasant Prairie and Bain 345‑kV line,
n uprating the Elm Road – Racine 345‑kV line, and
n constructing four new 138‑kV underground lines (~400 feet) from the Mount Pleasant Substation to serve a customer‑owned substation.
ATC submitted the CPCN application in late January 2018 to the Wisconsin Public Service Commission, which approved the project in July. Construction is underway. All electrical infrastructure has an expected in‑service date of late 2019.
MACKINAC – MCGULPIN 138‑kV SUBMARINE CABLE REPLACEMENT
ATC has plans to replace the two 4‑mile, 138‑kV submarine transmission lines connecting the Upper Peninsula of Michigan to lower Michigan at an estimated cost of $105 million.
The Mackinac – McGulpin 138‑kV submarine cable replacement project was submitted for MISO review in the MTEP18 planning cycle. The project was developed for the following reasons:
n Two 138‑kV submarine circuits were damaged by an anchor strike on April 1, 2018.
n Three working cables have been reconfigured to form one 138‑kV circuit.
n The project will restore the eastern UP to the level of reliability it had before the April 1 event.
n The integrity of the remaining cables is of concern.
n The remaining cables contain a mineral‑oil based dielectric fluid; a submarine cable failure could result in a fluid leak into Lake Michigan and Lake Huron.
As proposed, the project is estimated to be in service in 2021.
72018 | 10-YEAR ASSESSMENT
![Page 8: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/8.jpg)
JUNEAUTOWN INTERCONNECTION
The Juneautown Interconnection Project is a 138‑kV distribution‑transmission interconnection needed to meet We Energies’ growing reliability and economic needs.
The cost of the project is estimated to be $34.1 million and includes:
n a new Juneautown 138 / 13.2‑kV gas‑insulated substation,
n looping the 138‑kV line between Haymarket and Harbor substations to feed the new substation, and
n routing the new line segments through new underground corridors.
An application for a Certificate of Authority was filed with the Public Service Commission of Wisconsin in January 2018 and was approved in August. Construction is scheduled to begin in fall 2019. The facilities are scheduled to be in service approximately 12 months after construction begins.
BAYPORT – P IONEER
The rebuild of a 69‑kV transmission line in northeastern Wisconsin, along with associated substation work, will be submitted to the Wisconsin Public Service Commission in spring 2019 at a cost of $51.7 million. Approximately 22 miles of line on 1910s‑vintage wood poles running between Bayport Substation and Pioneer Substation will be rebuilt. The line will serve three distribution substations in Brown County and Oconto County.
The Bayport‑Pioneer asset renewal project consists of the following:
n rebuilding the line between Bayport and Pioneer substations with double‑circuit structures,
n stringing both Bayport‑Pioneer lines, combine, and operate as one line at 138‑kV,
n converting Suamico and Sobieski substations to 138‑kV operation, and
n de‑energizing the Pulliam‑Bayport 69‑kV section of line.
The project is scheduled to be in service in December 2021.
Major projects update continued
8 AMERICAN TRANSMISSION CO.
![Page 9: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/9.jpg)
Our progress
One of ATC’s top priorities has always been electric reliability. With that focus, ATC has strengthened the grid to enable our customers to participate in and reap the benefits of the wholesale energy market.
As we continue to use our system‑wide planning process to effectively and economically improve reliability, more emphasis is being placed on the need to efficiently maintain and upgrade our older assets. Our asset management program is focused on the life‑cycle management of transmission assets. The objective is to ensure assets perform the required function in a sustainable manner while managing life‑cycle cost. Coordination of design, commissioning, operation and maintenance is crucial to developing the replacement strategy of the assets. Asset renewal is mainly driven by public and worker safety, regulatory compliance, reliability, condition and operational performance.
Due in large part to our asset management efforts, ATC consistently achieves better reliability performance than our industry peers in all voltage classes.
Our single‑focus, transmission‑only business model has produced significant results for our customers over the years.
Over the past ten years, we have:
n upgraded more than 895 miles of transmission line,
n improved 105 electric substations,
n built 25 new transmission lines (367 miles)
n connected 1,980 MW of new generation at 12 sites,
– Includes 430 MW of renewable generation at 6 sites
n saved customers millions in reduced energy costs with access to the marketplace and lower line losses,
n increased import and export capability, and
n improved transmission reliability.
By focusing on
life‑cycle cost, our
asset management
program helps us
efficiently maintain
and upgrade our
older transmission
assets.
92018 | 10-YEAR ASSESSMENT
![Page 10: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/10.jpg)
10 AMERICAN TRANSMISSION CO.
Early in our operational existence we focused on creating a smooth‑flowing electrical highway to more reliably serve our customers. This involved finding the logical places in our service area to develop transmission projects. Major, network‑driven projects accounted for significant investment in our 345‑kV system. As we were making our network more interconnected and reliable, we also analyzed the life‑cycle maintenance of our existing assets, focusing on an asset management strategy to complement and create synergies with our network additions.
Today, our effective management of transmission assets complements our planning strategy for electric reliability and economic benefits.
In a collaborative process, our asset management and planning teams work with other functional groups and stakeholders to achieve the best solutions to transmission system needs. Asset management staff monitor the system through maintenance and inspection programs to identify issues related to equipment performance or condition. Equipment needing attention is discussed internally and with customers to determine if replacement in kind is required and if other reliability needs exist within the geographic area. Needs are evaluated using various options to determine the best means of maintaining reliability. These discussions with customers occur at 10‑Year Assessment stakeholder meetings and MISO System Planning Meetings.
What drives the need for transmission system improvements?
COMMON NEEDS THAT DRIVE SYSTEM IMPROVEMENTS INCLUDE:
n New or retiring generation – changes in the generation impact on the transmission system, the location and amount of power flowing as well as system stability
n Economics – greater access to the wholesale energy marketplace provides economic opportunities to utility customers
n Enhanced NERC reliability standards – require a greater degree of redundancy and analysis to assure reliable, resilient operation
n Public policy – renewable energy mandates and pending air quality regulations will affect how the transmission system will be built and used
n Asset renewal – maintaining the system in good operating condition extends its life and improves safety and performance
n Interconnections – changes in how our customers distribute electricity to consumers require new or modified transmission facilities
n Load changes – while overall load growth is low, loads are appearing and disappearing, changing power flows on the system
n New technologies – synchronized phasor measurements, demand‑side management and distributed energy resources affect how the grid is planned and operated to maintain reliability
n Communications – improvements in communication technology, such as fiber optics, are incorporated to support an ever‑increasing need to see and control what is happening on the transmission system in real time
![Page 11: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/11.jpg)
112018 | 10-YEAR ASSESSMENT
Project is not necessarily the preferred project
alternative
Planned Proposed Provisional
Status of ATC Studies complete Studies not complete Studies not complete planning activities
Application for Application pending None None regulatory approval or order issued
Project status Project in construction Project identified Project is not planning phase or under as preferred necessarily the preferred construction alternative alternative
Asset renewal projects generally fall into the Provisional or Planned categories.
For planning purposes, ATC’s service area is divided into five zones representing distinct geographic or usage areas. Within each zone, we compile and assess transmission system needs.
PROJECT CLASSIF ICATIONS
Network and asset renewal projects have targeted in‑service dates that are designed to address system limitations and condition needs. The network projects are classified into one of three possible categories – Planned, Proposed or Provisional, depending upon the stage of the project.
Plans and proposals for the transmission system
![Page 12: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/12.jpg)
12 AMERICAN TRANSMISSION CO.
NORTH CENTRAL WISCONSIN
Zone 1
ONEIDA
LINCOLN
MARATHON
WAUPACA
SHAWANO
WOOD
JUNEAU
ADAMS
PORTAGE
WAUSHARA
MARQUETTE GREENLAKE
LANGLADE
COUNTIES INCLUDED IN ZONE 1 – NORTH CENTRAL WISCONSIN
Adams | Forest (southwestern portion) | Fond du Lac (northwestern portion) | Green Lake | Juneau | Langlade Lincoln | Marathon | Marquette | Monroe (eastern portion) | Oneida | Portage | Shawano (western portion) Vernon (eastern portion) | Vilas (southern portion) | Waupaca | Waushara | Winnebago (western portion) | Wood
Transmission system characteristics in Zone 1
ATC delivers power in Zone 1 with various transmission facilities including:
n East‑west 345‑kV line from the Village of Arpin through Stevens Point extending to the Appleton area,
n 345‑kV line extending from Stevens Point, north to Wausau, and east toward Shawano County,
n 345‑kV line extending from Wausau to northeastern Minnesota,
n 115‑kV network in the northern portion of the zone and
n 138‑kV and 69‑kV network in the southern portion of the zone.
Transmission system limitations in Zone 1
Zone 1 has a few key system performance issues. Low voltages that are a result of potential multiple contingency events will continue to be monitored, high voltages in the northern portion of the zone, and other studies have identified thermal limitations in the northern portion of the zone. The most severe limitations occur during both peak and off‑peak periods.
ELECTRIC SYSTEM OVERVIEW
Small increases expected in population, employment
Population in Zone 1 is projected to grow at 0.5 percent annually between now and 2027. Employment is projected to grow at 0.9 percent annually between now and 2027. Marathon County is projected to realize the largest increase in population and employment, while Adams County is projected to have the highest growth rate in population and employment.
Electricity usage
Peak electric demand typically occurs during the summer months, with some winter peaks appearing in the northern portion of the zone. Primary electricity users in Zone 1 include several large paper mills and food processing plants.
Electric load is forecasted to grow approximately 0.4 percent annually through 2028.
![Page 13: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/13.jpg)
132018 | 10-YEAR ASSESSMENT
![Page 14: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/14.jpg)
14 AMERICAN TRANSMISSION CO.
TRANSMISSION PROJECTS IN ZONE 1
The most notable planned, proposed and provisional network projects and asset renewal projects in Zone 1, along with their projected year of completion and the factors driving the need for the projects, are listed below.
New substationSupports transmission system expansion
Substation modi�cationsUpgrades equipment ratings to avert facility overloads
TransformerSupports local growth and improves voltage levels
Capacitor bank or reactorRelieves low voltages or high voltages
T-D interconnectionSupports local growth
69 kV
115 kV
138 kV
161 kV
230 kV
345 kV
69 kV
115 kV
138 kV
161 kV
230 kV
345 kV
SUBSTATION KEY
SUBSTATION KEY TRANSMISSION LINE KEY
TRANSMISSION LINE KEY
EXISTING TRANSMISSION LINES KEY
New substationSupports transmission system expansion
Substation modi�cationsUpgrades equipment ratings to avert facility overloads
TransformerSupports local growth and improves voltage levels
Capacitor bankRelieves low voltages or high voltages
T-D interconnectionSupports local growth
EXISTING TRANSMISSION LINES KEY
345-kV transmission line
115-, 138- or 161-kV transmission line
69-kV transmission line
Rebuilt 115- or 138-kV transmission line
Rebuilt 69-kV transmission line
115- or 138-kV transmission line rating upgrade
69-kV transmission line rating upgrade
345-kV transmission line
115-, 138- or 161-kV transmission line
69-kV transmission line
Rebuilt 115- or 138-kV transmission line
Rebuilt 69-kV transmission line
115- or 138-kV transmission line rating upgrade
69-kV transmission line rating upgrade
ONEIDA
LINCOLN
MARATHON
WAUPACA
SHAWANO
WOOD
JUNEAU
ADAMS
PORTAGE
WAUSHARA
MARQUETTE GREENLAKE
LANGLADE
SYSTEM SOLUTIONS KEY
NORTH CENTRAL WISCONSIN
Zone 1
Lines of proposed projects on the map are for illustrative purposes only and do not reflect actual routes. For information on project status and routes, see atc‑projects.com.
PROJECT DESCRIPTION IN-SERVICE YEAR NEED DRIVER
Planned Projects
Wild Rose – Harrison 69‑kV line (Y‑19) partial rebuild 2020 Condition and performance
Chaffee Creek – Lincoln Pump Station 69‑kV line 2021 Condition and performance (Y‑18) rebuild
Wautoma – Chaffee Creek 69‑kV line (Y‑49) rebuild 2021 Condition and performance
Additional projects may be found in the full 10‑Year Assessment at atc10yearplan.com.
1
2
3
![Page 15: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/15.jpg)
152018 | 10-YEAR ASSESSMENT
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
Montello
Tomahawk
Waupaca
Juneau
Allamakee
Chippewa
Wood
La Crosse
Iron
Crawford
Lincoln
Vernon
Rusk
Oconto
Jackson
Forest
Shawano
Vilas
MarinetteOneida
Adams
Portage
Green Lake
Waushara
Eau Claire Clark
Taylor
Winona
BayfieldIron
Houston
Florence
Trempealeau
Dane
Monroe
Sauk
Marquette
Richland
Outagamie
Ashland
Gogebic
Winnebago
Langlade
Menominee
Columbia
Fond Du Lac
Sawyer
Dodge
Marathon
Price
West Shawano
Tomahawk -ATC 115kV
MercuryMarine
GrandfatherFalls
Sigel
Port Edwards
Arpin
WestWisconsin
Rapids
Winneconne
Wautoma
Sand Lake
Chaffee Creek
Iola
Watersmeet
Woodenshoe
Rubicon
Hintz
Butternut
Casaloma
Conover
Badger
Whitcomb White Clay
Rocky Run
Arnott
Lawn Rd
Green LakeSW STA
South FondDu LacSW YD
Ohmstead
Metomen
Mayville
Spring Brook
Kilbourn
Academy
NorthRandolph
Trienda
WhiteLake (WE)
Melissa
Hilltop(ALTE)
Crystal Falls
Mckenna
Vesper
Wild Rose
Wittenberg
West Mauston
Wonewoc
TomahIndustrial Pk
Troy
Rock Springs
Rozellville
RiponInd Park
Rudolph
SadoffCo
Pittsville
Portage IndPark
Poynette
Randolph
Red Granite
Richland
Ripon
Rosendale
North Tomah
Okee
Omro
Merrimac
Montello
Necedah
Loch Mirror
Loganville
LakePark
LincolnPump
STA
LyndonStation
Manawa
Markesan
ManleySand
Mauston
Hillsboro
HoriconInd Park
IslandKirkwood
East Scott St
Fall River
FountainValley
Friendship
Gays Mills
Hamilton St
Columbus(ALTE)
Brandon
BrooksCorners
Camp Douglas
Beaver Dam3rd St
Apple Hills
Baraboo
Hampden
Auburndale
Belle Plaine
ACECTurtleLake
East Shawano
Artesian
DPC LyndonStation
Hancock
Lake Delton
Dartford
DorsetCorners
SilverLake(ALTE)
Mears Corners
Ellinwood
Bowen St
OshkoshPearl Ave
Sunset Point
Cranberry
Golden Sands
Hoover
Northpoint
Venus
Hodag
St Germain
Three Lakes
Mountain
FoxHills SW
STA
Silver Cliff
Wien SW STA
Kelly
Morrison Ave
Sherman St
Stratford
Weston SW YD
Eastom
Aurora St
McMillan
CWEC Sannes
ACECArrowhead
ACEC Chateau
ACEC Coloma
ACECFriendship
ACEC Glen
ACEC Grant
ACEC Quincy
ACEC Roslin
ACEC Sherwood
ACEC Wautoma
ACEC WildRose Pump
ACEC Wildrose
ACEC Cambria
CWEC Dewey
Rosholt CWEC
Lincoln Ave(UPPCO)
ACEC Brooks
ACEC Dellwood
ACEC Lewiston
ACEC Richford
ACECSpringLake
ACECWinnebago
Platt
ColumbusSouth
HarrisonNorth138kV
Metonga
Martin Rd
Maine
ACEC Calamus
RichlandCenter
Pardeeville
SummitLake (WPS)
LodiIndustrial
Park Lodi
ACECCottonville
Hilltop (WPS)
Goodman
Grand Marsh
DPC NewLisbon
Clintonville
T Corners
DPC Buckhorn
Sunnyvale
Neevin
Butler Ridge
Werner West
Aspen
Highway 22
Finnegan
Hubbard
Wyocena
Plainfield(ALTE)
North Madison345/138 kV
Groenier
Hartman Creek
Hollywood
JuneauNorthside
JuneauIndustrial
Wisconsin Rapids
Hustisford
Koch Oil
ConsulatedWater Power(rrn)
ColumbusMuni 1
CardinalGlass Tomah
Endeavor
Houghton Rock
Badger West
LakeheadIron River
Mill Creek
Staff
Woodmin
Timberwolf
Middle Vlg
Sheridan(ALTE)
Fountain Prairie
WaupunWestside
Cedar Creek
Brewer
Eagle River
Richfield
Vulcan Chem
Berlin
NorthBeaver Dam
Dam Heights
ColumbiaSW YD(ALTE)
Fox Hills
Forest
Maes
NorthFond Du
Lac
SouthBeaver Dam
North MadisonDane
PineRiver(ALTE)
Polar
Reedsburg
NorthwestRipon
Oakfield
Zobel
Neenah Creek
Horicon
Fox River
Dell Creek
Center St
Birnamwood
Seneca
Waupaca
Plover
Clear Lake(WPS)
ACECPlainfield
Iron Grove
Antigo
Arlington
GrandfatherFalls Hydro
WisconsinDellsMuni 1
StoneLake
Juneau Downtown
CWECWittenberg
WisconsinDells Muni 2
Butte DesMorts
Didion
LakeheadVesper
Florence
Rosholt
Pine Hy
Rio PumpingStation
Hartford
Marion
Northside
Whiting Ave
ACECDoylestown
Gardner Park
Skillet Creek
RhinelanderPaper
Deer Trail
DPC BellCenter
Twin Lake
Coyne St
SkanawanSW STR
Wildwood(MEWD)
Big Pond
OmroIndustrial
Park
ACECFriesland
Werner
Roeder
Portage
Fox Lake(ALTE)
Fitzgerald
Pine (WPS)
ACECHancock
CedarRidge
Wind Generation
Sanborn
Cloverleaf
Council Creek
Lakota Rd
MackfordPrairie
Cambria
ForwardEnergyCenter
Highway Eight
CWEC Tigerton
Hume
Birchwood
Sauk City Phillips St
Tayco
Saratoga
Caroline
Deforest
Union Center
Harrison69kV
Ninth Street
Caledonia(ALTE)
Maple Street
Cassel
Amherst Jct
Baker St
Warrens
Land O Lakes
Ellington
River Run
Aviation
Castle Rock
Okray
Fairwater
Meadows
CWEC Iola
StoneLake
(Xcel)
ReedsburgNishan
Westfield
Coloma
LakeheadPortage
Alto
BeaverDam East
MosineePaper Mill
Kronen
Guenther
Oxford
Pershing
Tunnel City
Sauk CityOak St
Homer Road
Adams Line 61Briggs Road Monroe County
Creekview
Springwater
Ackley
Zone 1
!1
!3!2
1
3
2
152018 | 10-YEAR ASSESSMENT
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*#*
#*
#*
Montello
Waupaca
Juneau
Wood
Iron
Lincoln
Vernon
Oconto
Rusk
Jackson
Forest
Shawano
Vilas
Oneida
Adams
Portage
Green Lake
Waushara
Clark
Taylor
Florence
Monroe
Sauk
Marquette
Richland
Outagamie
Ashland
Winnebago
Langlade
Menominee
Columbia
Fond Du Lac
Sawyer
Dodge
Marathon
Price
West Shawano
Tomahawk -ATC 115kV
GrandfatherFalls
Sigel
Port Edwards
Arpin
WestWisconsin
Rapids
Winneconne
Wautoma
Sand Lake
Chaffee Creek
Iola
Hintz
Badger
Whitcomb
Rocky Run
Arnott
Green LakeSW STA
Metomen
Mayville
Kilbourn
NorthRandolph
Trienda
WhiteLake (WE)
Hilltop(ALTE)
Mckenna
Vesper
Wild Rose
Wittenberg
West Mauston
Wonewoc
TomahIndustrial Pk
Rozellville
RiponInd Park
Rudolph
Pittsville
PortageInd Park Randolph
Red Granite
Ripon
Rosendale
North Tomah
Omro
Montello
Necedah
Loch Mirror
LincolnPump
STA
LyndonStation
Manawa
Markesan
Mauston
Hillsboro
FountainValley
Friendship
Hamilton St
Brandon
BrooksCorners
Camp Douglas
Auburndale
Belle Plaine
ACECTurtleLake
East Shawano
Artesian
DPC LyndonStation
Hancock
Lake Delton
Dartford
DorsetCorners
SilverLake(ALTE)
Mears Corners
Ellinwood
Pearl Ave
SunsetPoint
Cranberry
Golden Sands
Hoover
Northpoint
Venus
Hodag
St Germain
Three Lakes
Wien SW STA
Kelly
Morrison Ave
Sherman St
Stratford
Weston SW YD
Eastom
Aurora St
McMillan
CWEC Sannes
ACECArrowhead
ACEC Chateau
ACEC Coloma
ACECFriendship
ACEC Glen
ACEC Grant
ACEC Quincy
ACEC Roslin
ACEC Sherwood
ACEC Wautoma
ACEC WildRose Pump
ACEC Wildrose
ACECCambria
CWEC Dewey
Rosholt CWEC
ACEC Brooks
ACEC Dellwood
ACEC Lewiston
ACEC Richford
ACECSpringLake
ACECWinnebago
Platt
HarrisonNorth138kV
Metonga
Maine
Pardeeville
SummitLake (WPS)
ACECCottonville
Hilltop (WPS)
Grand Marsh
DPC NewLisbon
Clintonville
T Corners
DPC Buckhorn
Sunnyvale
Werner West
Highway 22
Finnegan
Plainfield(ALTE)
Groenier
Hartman Creek
Hollywood
Wisconsin Rapids
Koch Oil
ConsulatedWater Power(rrn)
CardinalGlass Tomah
Endeavor
Houghton Rock
Badger West
Mill Creek
Staff
Woodmin
Timberwolf
Middle Vlg
Sheridan(ALTE)
WaupunWestside
Cedar Creek
Eagle River
Richfield
Vulcan Chem
Berlin
Fox Hills
Polar
Reedsburg
NorthwestRipon
Zobel
Neenah Creek
Fox River
Dell Creek
Birnamwood
Waupaca
Plover
Clear Lake(WPS)
ACECPlainfield
Antigo
GrandfatherFalls Hydro
WisconsinDellsMuni 1
CWECWittenberg
WisconsinDells Muni 2
Didion
LakeheadVesper
Rosholt
Marion
Whiting Ave
Gardner Park
RhinelanderPaper
Deer Trail
Coyne St
SkanawanSW STR
Wildwood(MEWD)
Big PondOmro
IndustrialPark
ACECFriesland
Werner
Roeder
Portage
Fox Lake(ALTE)
Fitzgerald
Pine (WPS)
ACECHancock
Sanborn
Cloverleaf
Council Creek
MackfordPrairie
Cambria
Highway Eight
CWEC Tigerton
Hume
Birchwood
Saratoga
Caroline
Union Center
Harrison69kV
Cassel
Amherst Jct
Baker St
Warrens
Ellington
River Run
Aviation
Castle Rock
Okray
Fairwater
CWEC Iola
ReedsburgNishan
Westfield
Coloma
LakeheadPortage
Alto
MosineePaper Mill
Kronen
Guenther
Oxford
Pershing
Tunnel City
Adams Line 61Monroe County
Springwater
Ackley
P L A N N I N G ZONE 1
2018 10-YearAssessment Projects
Currently, ATC owns or operates transmission facilities in Wisconsin, Illinois, Minnesota, and the Upper Peninsula ofMichigan. Facilities include: * Approximately 9440 miles of transmission lines * 96 wholly owned substations * 419 jointly owned substations * ATC offices in Madison, Cottage Grove, Pewaukee,DePere, and Kingsford, MI
The information presented in this map documentis advisory and is intended for reference purposesonly. American Transmission Company owned andoperated facility locations are approximate.Depending on the status of the projects shown,the transmission line additions may be for illustrativepurposes only and may not reflect the actual routes.
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
Montello
WaupacaWood
Adams
Portage
Green Lake
Waushara
Marquette
Wautoma
Sand Lake
Chaffee Creek
Green LakeSW STA
Mckenna
WildRose
Red Granite
Montello
Lincoln PumpSTA
Markesan
FountainValley
Friendship
ACECTurtleLake
Hancock
SilverLake(ALTE)
Golden Sands
ACECArrowhead
ACEC Chateau
ACEC Coloma
ACECFriendship
ACEC Glen
ACEC Grant
ACEC Sherwood
ACEC Wautoma
ACEC WildRose Pump
ACEC Wildrose
ACEC Brooks
ACEC Richford ACECSpringLake
ACECWinnebago
HarrisonNorth 138kV
ACECCottonville
Grand Marsh
Plainfield(ALTE)
Hartman Creek
Neenah Creek
Waupaca
ACECPlainfield
Roeder
ACECHancock
Saratoga
Harrison69kV
Westfield
Coloma
Oxford
Adams Line 61
Springwater
Wautoma Area
to La Crossearea
!1
!2!3
!1
!3
!2
1
3
2
![Page 16: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/16.jpg)
16 AMERICAN TRANSMISSION CO.
COUNTIES INCLUDED IN ZONE 2 – MICHIGAN’S UPPER PENINSULA AND NORTHERN WISCONSIN
Alger, Mich. | Baraga, Mich. | Chippewa, Mich. | Delta, Mich. | Dickinson, Mich. | Florence, Wis. Forest, Wis. (northern portion) | Gogebic, Mich. (eastern portion) | Houghton, Mich. | Iron, Mich. Keweenaw, Mich. | Luce, Mich. | Mackinac, Mich. | Marinette, Wis. (northern portion) | Marquette, Mich. Menominee, Mich. (northern portion) | Ontonagon, Mich. (eastern portion) | Schoolcraft, Mich. | Vilas, Wis. (northern portion)
Transmission system characteristics in Zone 2
ATC delivers power in Zone 2 with various transmission facilities including:
n Morgan‑Plains, Plains‑Arnold, and Arnold‑Dead River 345‑kV lines,
n Plains‑Stiles 138‑kV double‑circuit line,
n Lakota Road‑Plains 138‑kV line,
n Holmes‑Old Mead Rd 138‑kV line, and
n 138‑kV facilities tying the Upper Peninsula of Michigan to lower Michigan.
Transmission system limitations in Zone 2
There are a number of transmission system performance issues in Zone 2, including limited ability to import or export power, generator instability, overloaded lines and equipment, low and high system voltages and chronic limitations to transmission service. Primary drivers of these issues include a mismatch of load to generation in the Upper Peninsula and aging facilities in poor or deteriorated condition. In addition, other ongoing studies, including northern area studies performed by ATC and MISO, have identified several voltage and thermal limitations. The most severe limitations occur during both peak and off‑peak periods.
ELECTRIC SYSTEM OVERVIEW
Small increases expected in population, employment
Population in Zone 2 is projected to grow about 0.2 percent annually between now and 2027, and employment is expected to grow about 0.8 percent each year in the same time period. Marquette County (Michigan) is projected to realize the largest increase in population and employment. Florence County (Wisconsin) is projected to have the highest growth rate in population while Keweenaw County (Michigan) is projected to have the highest growth rate in employment.
Electricity usage
Zone 2 typically experiences peak electric demand during the winter months. Ore mining and paper mills are the largest electricity users in the zone.
In the recent past, there have been some load reductions in Zone 2. From these reduced levels, electric load is forecasted to increase by 0.4 percent annually through 2028. Also, locally generated electricity is declining in the area with smaller, coal‑fired generators most at risk. This includes generation owned by industry, municipalities and utilities.
MICHIGAN’S UPPER PENINSULA AND NORTHERN WISCONSIN
Zone 2
![Page 17: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/17.jpg)
172018 | 10-YEAR ASSESSMENT
![Page 18: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/18.jpg)
Zone 2
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
Watson
Hulbert
Pickford
Waupaca
Antrim
Door
Dickinson
Menominee
Alcona
Montmorency
Lincoln
Oconto
Baraga
Emmet
Charlevoix
Forest
Mackinac
Shawano
Vilas
Marinette
Leelanau
Oneida
GrandTraverse
Portage
Cook
Ontonagon
Iron
Crawford
Florence
Benzie
Presque Isle
Schoolcraft
Chippewa
Brown Iosco
Keweenaw
Cheboygan
Oscoda
Marquette
GogebicAlger
Kewaunee Ogemaw
Otsego
Kalkaska
Langlade
Menominee
Houghton
Alpena
Luce
Marathon
Delta
West Shawano
Portage St Hy
Tomahawk -ATC 115kV
Lou Pac
Raco
Holmes
Rockview
Mich LimestoneLoading Dock
MichLimestone
Quarry
GrandfatherFalls
Rexton
Powers
Arnold
Watersmeet
BruceCrossing
Empire Mine
Stiles SW STA
Newberry Vlg
MichigammeFalls Hy
Brule SW STA
Chalk Hill HyWhiteRapids Hy
Mass
Nordic
Cornell-UP
Conover
Badger
Perkins
Whitcomb White Clay
Falls
PresqueIsle SW YD
National
Harris
DeadRiver(WE)
Tilden
Armory
Crystal Falls
Wittenberg
Sagola
Randville
BluffView
BrooksCorners
Champion
Belle Plaine
Big Bay
East Shawano
CranberryChandler
Venus
Hodag
St Germain
Three Lakes
Sobieski
Pioneer (WPS)
Mountain
Oconto
Bay De Noc
GrandRapids Hy
Pound
CaldronFalls Hy
Crivitz
Fox Hills SWSTA
SandstoneRapids Hy
Silver Cliff
Kelly
Morrison Ave
Sherman St
Weston SW YD
Eastom
Aurora St
Rosiere
Algoma
SawyerSW STA
Brusbay
Canal
Sister Bay
DyckesvilleSuamico
Victoria Hy
WhitePine Vlg
Seney (UPPCO)
UPSCO
Portage(UPPCO)
Rockland(UPP)
MTU
Keweenaw
Lake Mine
Henry St.(UPPCO)
K I SawyerForest Lake
Gladstone
Gwinn
Elevation St
Alger
Atlantic
CWEC Dewey
EscanabaSteam Plant
Algoma CityRosholt CWEC
Redwood
Sawyer Lumber
Bass Lake
NorthLake
LakeheadGould City
McGulpin
Metonga
Hiawatha(ESE)
Maine
LakeheadNaubinway
Evergreen
PineRiver
SummitLake (WPS)
FrankTalentinoSW STA
Hilltop (WPS)
Goodman
Indian Lake
Industrial
Watson
Chatham
Humboldt Mine
Baraga Vlg
Michigan St
Clintonville
Winona
Straits
BlaneyParkSW STA
Manistique
9 Mile SW STA
Mead Pump
Nathan
Sunnyvale
Newberry Tone
Aspen
TroutLake (CEC)
Brevort Detour
Dafter
PickfordRudyard
Gould CitySW STA
Groenier
Hiawatha(AD-REA)
Hulbert
KincheloeSW STA
JH Warden
Way Plant
TimberProducts
MichTransmitterFacility
Greenstone
Mead Paper
LakeheadRapidRiver
LakeheadIron River
MackinacMackinac Converter
Norway
Woodmin
Middle Vlg
Toivola
Sault
Cedar Creek
Twin FallsSW STA
Sherwood
Egg Harbor
North Bluff
Donken
Eckerman
EagleRiver
WhitePine Mine
Magazine
Plains
FelchMountain
GardenCorners
Perch Lake
Polar
Birnamwood
Clear Lake(WPS)
Osceola
Delta (UPPCO)
Forsyth
Iron Grove
Antigo
Brimley
Masonville(UPPCO)
GrandfatherFalls Hydro
Pine Grove
Aragon
Lena
Shingleton
Curtis Goetzville
CWEC Wittenberg
Barnum
Munising
Florence
Rosholt
Pine Hy
Marion
30thAve
St Ignace
Gardner Park
NewberryCorrectionalFacility
Engadine
RhinelanderPaper
Ingalls
Deer Trail
KingsfordMetals
Twin Lake
SkanawanSW STR
MarquetteDiesel
Valley (ESE)
NiagraPaper OfWisconsin
Thunder
Pine (WPS)
Cloverleaf
Old Mead Road
West Side
Lakota Rd
Highway Eight
CWEC Tigerton
M-38
3 Mile
Amberg
Caroline
Dunn Rd
Seney(AD-REA)
Cassel
Grede Foundries
High Falls Hy
L'anse
Land O Lakes
Glen Jenks
PeavyFalls Hy
Benson Lake
Ontonagon
Limeston
Peshtigo
Algoma South
MosineePaper MillKronen
Guenther
FrankTalentino
Boston
Homer Road
Huron
Ackley
L a k e S u p erior
L a k e Mi c higan
New substationSupports transmission system expansion
Substation modi�cationsUpgrades equipment ratings to avert facility overloads
TransformerSupports local growth and improves voltage levels
Capacitor bank or reactorRelieves low voltages or high voltages
T-D interconnectionSupports local growth
69 kV
115 kV
138 kV
161 kV
230 kV
345 kV
69 kV
115 kV
138 kV
161 kV
230 kV
345 kV
SUBSTATION KEY
SUBSTATION KEY TRANSMISSION LINE KEY
TRANSMISSION LINE KEY
EXISTING TRANSMISSION LINES KEY
New substationSupports transmission system expansion
Substation modi�cationsUpgrades equipment ratings to avert facility overloads
TransformerSupports local growth and improves voltage levels
Capacitor bankRelieves low voltages or high voltages
T-D interconnectionSupports local growth
EXISTING TRANSMISSION LINES KEY
345-kV transmission line
115-, 138- or 161-kV transmission line
69-kV transmission line
Rebuilt 115- or 138-kV transmission line
Rebuilt 69-kV transmission line
115- or 138-kV transmission line rating upgrade
69-kV transmission line rating upgrade
345-kV transmission line
115-, 138- or 161-kV transmission line
69-kV transmission line
Transmission line voltage conversion
Rebuilt 115- or 138-kV transmission line
Rebuilt 69-kV transmission line
115- or 138-kV transmission line rating upgrade
69-kV transmission line rating upgrade
TRANSMISSION PROJECTS IN ZONE 2
The most notable planned, proposed and provisional network projects and asset renewal projects in Zone 2, along with their projected year of completion and the factors driving the need for the projects, are listed on page 19.
SYSTEM SOLUTIONS KEY
MICHIGAN’S UPPER PENINSULA AND NORTHERN WISCONSIN
Zone 2
2
4
5
3
6
18 AMERICAN TRANSMISSION CO.
![Page 19: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/19.jpg)
192018 | 10-YEAR ASSESSMENT
Zone 2
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
Watson
Hulbert
Pickford
Waupaca
Antrim
Door
Dickinson
Menominee
Alcona
Montmorency
Lincoln
Oconto
Baraga
Emmet
Charlevoix
Forest
Mackinac
Shawano
Vilas
Marinette
Leelanau
Oneida
GrandTraverse
Portage
Cook
Ontonagon
Iron
Crawford
Florence
Benzie
Presque Isle
Schoolcraft
Chippewa
Brown Iosco
Keweenaw
Cheboygan
Oscoda
Marquette
GogebicAlger
Kewaunee Ogemaw
Otsego
Kalkaska
Langlade
Menominee
Houghton
Alpena
Luce
Marathon
Delta
West Shawano
Portage St Hy
Tomahawk -ATC 115kV
Lou Pac
Raco
Holmes
Rockview
Mich LimestoneLoading Dock
MichLimestone
Quarry
GrandfatherFalls
Rexton
Powers
Arnold
Watersmeet
BruceCrossing
Empire Mine
Stiles SW STA
Newberry Vlg
MichigammeFalls Hy
Brule SW STA
Chalk Hill HyWhiteRapids Hy
Mass
Nordic
Cornell-UP
Conover
Badger
Perkins
Whitcomb White Clay
Falls
PresqueIsle SW YD
National
Harris
DeadRiver(WE)
Tilden
Armory
Crystal Falls
Wittenberg
Sagola
Randville
BluffView
BrooksCorners
Champion
Belle Plaine
Big Bay
East Shawano
CranberryChandler
Venus
Hodag
St Germain
Three Lakes
Sobieski
Pioneer (WPS)
Mountain
Oconto
Bay De Noc
GrandRapids Hy
Pound
CaldronFalls Hy
Crivitz
Fox Hills SWSTA
SandstoneRapids Hy
Silver Cliff
Kelly
Morrison Ave
Sherman St
Weston SW YD
Eastom
Aurora St
Rosiere
Algoma
SawyerSW STA
Brusbay
Canal
Sister Bay
DyckesvilleSuamico
Victoria Hy
WhitePine Vlg
Seney (UPPCO)
UPSCO
Portage(UPPCO)
Rockland(UPP)
MTU
Keweenaw
Lake Mine
Henry St.(UPPCO)
K I SawyerForest Lake
Gladstone
Gwinn
Elevation St
Alger
Atlantic
CWEC Dewey
EscanabaSteam Plant
Algoma CityRosholt CWEC
Redwood
Sawyer Lumber
Bass Lake
NorthLake
LakeheadGould City
McGulpin
Metonga
Hiawatha(ESE)
Maine
LakeheadNaubinway
Evergreen
PineRiver
SummitLake (WPS)
FrankTalentinoSW STA
Hilltop (WPS)
Goodman
Indian Lake
Industrial
Watson
Chatham
Humboldt Mine
Baraga Vlg
Michigan St
Clintonville
Winona
Straits
BlaneyParkSW STA
Manistique
9 Mile SW STA
Mead Pump
Nathan
Sunnyvale
Newberry Tone
Aspen
TroutLake (CEC)
Brevort Detour
Dafter
PickfordRudyard
Gould CitySW STA
Groenier
Hiawatha(AD-REA)
Hulbert
KincheloeSW STA
JH Warden
Way Plant
TimberProducts
MichTransmitterFacility
Greenstone
Mead Paper
LakeheadRapidRiver
LakeheadIron River
MackinacMackinac Converter
Norway
Woodmin
Middle Vlg
Toivola
Sault
Cedar Creek
Twin FallsSW STA
Sherwood
Egg Harbor
North Bluff
Donken
Eckerman
EagleRiver
WhitePine Mine
Magazine
Plains
FelchMountain
GardenCorners
Perch Lake
Polar
Birnamwood
Clear Lake(WPS)
Osceola
Delta (UPPCO)
Forsyth
Iron Grove
Antigo
Brimley
Masonville(UPPCO)
GrandfatherFalls Hydro
Pine Grove
Aragon
Lena
Shingleton
Curtis Goetzville
CWEC Wittenberg
Barnum
Munising
Florence
Rosholt
Pine Hy
Marion
30thAve
St Ignace
Gardner Park
NewberryCorrectionalFacility
Engadine
RhinelanderPaper
Ingalls
Deer Trail
KingsfordMetals
Twin Lake
SkanawanSW STR
MarquetteDiesel
Valley (ESE)
NiagraPaper OfWisconsin
Thunder
Pine (WPS)
Cloverleaf
Old Mead Road
West Side
Lakota Rd
Highway Eight
CWEC Tigerton
M-38
3 Mile
Amberg
Caroline
Dunn Rd
Seney(AD-REA)
Cassel
Grede Foundries
High Falls Hy
L'anse
Land O Lakes
Glen Jenks
PeavyFalls Hy
Benson Lake
Ontonagon
Limeston
Peshtigo
Algoma South
MosineePaper MillKronen
Guenther
FrankTalentino
Boston
Homer Road
Huron
Ackley
L a k e S u p erior
L a k e Mi c higan
Lines of proposed projects on the map are for illustrative purposes only and do not reflect actual routes. For information on project status and routes, see atc‑projects.com.
PROJECT DESCRIPTION IN-SERVICE YEAR NEED DRIVER
Planned Projects
Munising‑Blaney Park 69‑kV line (Inland) rebuild 2019 Condition and performance
J703: Huron Substation, new G‑T interconnection 2019 G‑T interconnection
J704: Silver River Substation, new G‑T interconnection 2019 G‑T interconnection
Plains – Arnold 138‑kV uprate 2019 Network integration transmission service request
Proposed Project
J711‑Silver River Substation, network upgrades 2020 G‑T interconnection
Provisional Projects
Lakota – Winona 138‑kV conversion 2021 Overloads and low voltages
Mackinac – McGulpin 138‑kV submarine cables (9901, 9903), replacement
2021 Condition
Additional projects may be found in the full 10‑Year Assessment at atc10yearplan.com.
1
2
3
4
5
6
7
1
7
![Page 20: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/20.jpg)
COUNTIES INCLUDED IN ZONE 3 – SOUTH CENTRAL/SOUTHWEST WISCONSIN AND NORTH CENTRAL ILLINOIS
Columbia | Crawford (southern portion) | Dane | Dodge | Grant | Green | Iowa | Lafayette Jefferson | Richland | Rock | Sauk | Walworth | Winnebago, Ill. (northern portion)
Transmission system characteristics in Zone 3
ATC delivers power in Zone 3 with various transmission facilities including:
n Columbia‑North Madison 345‑kV lines,
n Columbia‑Rockdale 345‑kV line,
n Paddock‑Rockdale 345‑kV line,
n Paddock‑Wempletown 345‑kV line,
n Rockdale‑Wempletown 345‑kV line,
n Rockdale‑Cardinal 345‑kV line, and
n 138‑kV facilities from Nelson Dewey, around the Madison area, and in the northwest and southeast portions of Zone 3.
Transmission system limitations in Zone 3
In our analysis of Zone 3, we identified a number of transmission facility overloads. These overloads are due to new generation in the Janesville and Darlington areas. In addition, other emerging issues resulting in facility overloads include steady growth in certain areas and different generation dispatches. The most severe limitations occur during both peak and off‑peak periods.
ELECTRIC SYSTEM OVERVIEW
Increases expected in population, employment
Population in Zone 3 is projected to grow about 0.8 percent annually between now and 2027, and employment is projected to grow about 1.3 percent each year for the same time period. Dane County is projected to realize the largest increase in population and employment. Dane County is also projected to have the highest growth rate in population and employment.
Electricity usage
Electric load is forecasted to grow approximately 0.7 percent annually through 2028 in Zone 3.
SOUTH CENTRAL/SOUTHWEST WISCONSIN AND NORTH CENTRAL ILLINOIS
Zone 3
20 AMERICAN TRANSMISSION CO.
![Page 21: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/21.jpg)
212018 | 10-YEAR ASSESSMENT
![Page 22: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/22.jpg)
Boscobel
Bloomington
Colley Rd
Gran Grae
Mukwonago
Waupun
Milton Lawns
Green
StephensonJo Daviess
Juneau
Allamakee
Racine
Mchenry
La Crosse
Crawford
Lake
Vernon
Washington
Jackson
Winnebago
Adams Green Lake
Waushara
Kenosha
Walworth
Iowa
Dane
Monroe
Sauk
Grant
Lafayette
Marquette
Richland
Boone
Winnebago
Clayton
Columbia
Rock
Dubuque
Fond Du Lac
Waukesha
Jefferson
Dodge
Calumet
Delaware
WalnutGIS
Wally Road
Mercury Marine
Wautoma
Chaffee Creek
Sussex
Sugar Creek
Mukwonago
Tamarack
Concord SW YD
Rubicon
Bark River
Boxelder
Butternut
St Lawrence
Auburn
Spring Green
Tripp Rd
Rock River
McCue
Sunrise
Turtle
BrodheadSW STA
Jefferson
Rock Branch
Green LakeSW STA
South Monroe
North Monroe
NelsonDewey
SW YD
Hillman
South FondDu Lac SW YD
Ohmstead
Metomen
Mayville
Spring Brook
Yahara River
StageCoach
SW STA
Stoughton
Sun Prairie
Rockdale
Pleasant View
Kegonsa
Gran Grae
Kilbourn
Academy
NorthRandolphTrienda
Barton
Mount Horeb
Hilltop(ALTE)
CrawfishRiver
Burlington
Mckenna
WyomingValley
Zenda
Viking
VentureWiota
Wauzeka
West Mauston
Wonewoc
Tichigan
TomahIndustrial Pk
Troy
Rock Springs
RiponInd Park
SadoffCo
Stony Brook
Spring Grove
Shullsburg
Pioneer(ALTE)
PleasantValley
Potosi
Portage IndPark
Poynette
Randolph
Red Granite
Rewey
Richland
Ripon
Rosendale
NewHollandale
North Tomah
Okee
Omro
Merrimac
Mineral Point
Montello
Maple (WE)
Marine
Necedah
LakeGeneva
Lancaster
London
LakeheadCambridge
Loch Mirror
LakeheadWaterloo
LaMar
Loganville
LincolnPump STA
LyndonStation
Markesan
Manley Sand
Mauston
Mazomanie
McFarland
Hillsboro
HoriconIndPark
Idle Hour
Island
Kirkwood
Elmo
East Beloit
East Scott St
Fall River
Footville
Forward
Friendship
Fort Atkinson
Gays Mills
Gaston Rd
Hamilton St
Cottage Grove
Columbus(ALTE)
Dana Corp
Delavan
Blanchardville
Black Earth
Brandon
Brisbois
Browntown
Brodhead
Blacksmith
Brooklyn
Camp Douglas
Beaver Dam3rd St
Albany (ALTE)
Arena
Baraboo
Belmont
Benton
Burke
Hampden
ACECTurtleLake
RECShaw
Air Liquide
Ledgeview
Artesian
DPC LyndonStation
DPCPrairieDu Chien
Monticello(ALTE)
Lake Delton
Dartford
DorsetCorners
Sharon
ShirlandAve
Silver Lake(ALTE) Ellinwood
Bowen St
OshkoshPearl Ave
Sunset PointGravesville
NewHolstein SW
STA
Syene
American
ACEC Chateau
ACEC Coloma
ACEC Friendship
ACEC Glen
ACEC Quincy
ACEC Roslin
ACEC Cambria
REC Bradford
Stoughton East
REC Newark
RECOrfordville
ACEC Brooks
ACEC Dellwood
ACEC Lewiston
ACEC RichfordACECSpringLake
ACECWinnebago
Platt
ColumbusSouth
Edgewood
Cuba CitySouth
Martin Rd
Wingra
Waunakee SWSTA
Blount
Christiana
Nine Springs
PheasantBranch
Royster
SycamoreSW YD
Walnut(MGE)
ACEC Calamus
Westport
Sprecher
Rienzi Road
RichlandCenter
Pardeeville
Pflaum
UnionTownline
New Glarus
LodiIndustrial
Park Lodi
Femrite
Glen Haven
Vienna
Grand Marsh
DPC NewLisbon DPC Buckhorn
Wick Drive
Tokay
Butler Ridge
REC LaPrairie
StoughtonSouth
Finnegan
Mill Rd
SouthwestDelavan
Russell
HubbardWyocena
Miners
North Madison345/138 kV
JuneauNorthside
Bluff Creek
Scot Forge 2
JuneauIndustrial
Willow Lawn
ScotForge 1
MazomanieIndustrial
AGA Gas
Hustisford
Koch Oil
Cross Plains
Boscobel Muni
Boscobel MuniEastside
ColumbusMuni 1
Muscoda
CardinalGlassTomah
NorthStoughton
South
Endeavor
Houghton Rock
Richmond Road
MuscodaIndustrialSub
Staff
Timberwolf
REC Red Hawk
Vinburn
Fountain Prairie
Highway 151
WaupunWestside
Hillside
University(WE)
Cooney
Brewer
Ruskin
Bird St
DPC Gratiot
Bloomington
JenningsRd SW STA
Darlington
DodgevilleEden
Berlin
Boscobel
NorthBeaver Dam
Bristol(ALTE)
Dam Heights
Paddock
ColumbiaSW YD(ALTE)
Fox Hills
Forest
Cardinal
Bass Creek
Sheepskin
NorthFond Du
Lac
Elkhorn
SouthBeaver Dam
Reiner Rd
NorthMadison
CrossCountry
Dane
Waukesha
Janesville General SW YD
Cottonwood(WE)
WilliamsBay
Timberlane
Token Creek
Traxler
TwinLakes (ALTE)
SaundersCreek
PineRiver(ALTE)
Reedsburg
NorthwestRipon
Oakfield
Zobel
Neenah Creek KettleMorraine(ALTE)
Horicon
Hooterville
Fox River
Dell Creek
East Rockton
Blue River
Cambridge
Center St
Seneca
LancasterDistribution
FordDrive
North LakeGeneva
Arlington
Walworth
South LakeGeneva
Avoca
Cobblestone
Fitchburg
Centennial Park
DivisionStreet
WisconsinDellsMuni 1
BrodheadCentral
LakeheadPipeline
Juneau Downtown
WisconsinDells Muni 2
BrodheadSouth
ColladayPoint
La Pointe
Lands End
Didion
Arthur Road
Oregon
Rio PumpingStation
Hartford
Macy St
ACECDoylestown
GlacierSkillet Creek
West Towne
Verona
Katzenberg
DPC BellCenter
Belleville
Oak Ridge
Sun PrairieBusiness Park
Big Pond
Duplainville
OmroIndustrialPark
ACECFriesland
Roeder
Portage
Park Ave
Fox Lake(ALTE)
Kieler
Fitzgerald
REC Center
REC Clinton
DPCShullsburg
CedarRidge WindGeneration
TyranenaWestMiddleton
Sanborn
DPCStoneman
MonroeCentral
Sun Valley
GermantownSW YD
Council Creek
WestDarien
OrfordvilleCuba City
MackfordPrairie
Cambria
ForwardEnergyCenter
Birchwood
Whitewater
Summit
Sauk CityPhillips St
Cassville
EvansvilleMuni
Deforest
Union Center
Cypress SW YD
Merrill Hills
Ninth Street
Lone Rock
Caledonia(ALTE)
Maple Street
East Towne
REC Harmony
River Run
Aviation
Castle Rock
Fairwater
Brick Church
Tecumseh Rd
ReedsburgNishan
BrodheadNorth
Westfield
REC Fulton
Coloma
LakeheadDelavan
LakeheadPortage
Alto
BeaverDam East
Balsam
Oxford
Tunnel City
Sauk CityOak St
EastLincoln St
Esker View
Adams Line 61
LakeheadWaterloo 2
Briggs Road
Tiger
Monroe County
LakeheadDelavan T2
Falcon
StoughtonWest
Creekview
EdgertonBusiness
Park
Hill Valley
Red Bird
Zone 3
to Dubuque County area
I L L I NOIS
New substationSupports transmission system expansion
Substation modi�cationsUpgrades equipment ratings to avert facility overloads
TransformerSupports local growth and improves voltage levels
Capacitor bank or reactorRelieves low voltages or high voltages
T-D interconnectionSupports local growth
69 kV
115 kV
138 kV
161 kV
230 kV
345 kV
69 kV
115 kV
138 kV
161 kV
230 kV
345 kV
SUBSTATION KEY
SUBSTATION KEY TRANSMISSION LINE KEY
TRANSMISSION LINE KEY
EXISTING TRANSMISSION LINES KEY
New substationSupports transmission system expansion
Substation modi�cationsUpgrades equipment ratings to avert facility overloads
TransformerSupports local growth and improves voltage levels
Capacitor bankRelieves low voltages or high voltages
T-D interconnectionSupports local growth
EXISTING TRANSMISSION LINES KEY
345-kV transmission line
115-, 138- or 161-kV transmission line
69-kV transmission line
Rebuilt 115- or 138-kV transmission line
Rebuilt 69-kV transmission line
115- or 138-kV transmission line rating upgrade
69-kV transmission line rating upgrade
345-kV transmission line
115-, 138- or 161-kV transmission line
69-kV transmission line
Rebuilt 115- or 138-kV transmission line
Rebuilt 69-kV transmission line
115- or 138-kV transmission line rating upgrade
69-kV transmission line rating upgrade
TRANSMISSION PROJECTS IN ZONE 3
The most notable planned, proposed and provisional network projects and asset renewal projects in Zone 3, along with their projected year of completion and the factors driving the need for the projects, are listed on page 23.
Lines of proposed projects on the map are for illustrative purposes only and do not reflect actual routes. For information on project status and routes, see atc‑projects.com.
SYSTEM SOLUTIONS KEY
4
8
9
SOUTH CENTRAL/SOUTHWEST WISCONSIN AND NORTH CENTRAL ILLINOIS
Zone 3
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
Iowa
Dane
Sauk
WalnutGIS
Wally Road
Yahara River
Stage CoachSW STA
SunPrairie
Pleasant View
KegonsaMount Horeb
Mazomanie
McFarland
Gaston Rd
Cottage Grove
Black Earth Burke
Syene
American
Wingra
Waunakee SWSTA
East Campus
Blount
NineSprings
PheasantBranch
Royster
SycamoreSW YD
Walnut(MGE)
Blackhawk(MGE)
Westport
Sprecher
PflaumFemrite
Vienna
Wick Drive
Tokay
MazomanieIndustrial
AGA Gas
Cross Plains
NorthStoughton
SouthHighway 151
Ruskin
Bird St
WaunakeeIndustrialPark
Cardinal
Reiner Rd
Cross Country
Timberlane
Token Creek
Gateway
Fitchburg
CentennialPark
Division Street
ColladayPoint
Oregon
West Towne
VeronaOak Ridge
Sun PrairieBusiness Park
Femrite138/69 kV
WestMiddleton
Sun Valley
East Towne
Huiskamp
Colorado
Mendota
EastLincoln St
Madison Area
!9
!8!10
22 AMERICAN TRANSMISSION CO.
10
8
9
![Page 23: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/23.jpg)
232018 | 10-YEAR ASSESSMENT
Boscobel
Bloomington
Colley Rd
Gran Grae
Mukwonago
Waupun
Milton Lawns
Green
StephensonJo Daviess
Juneau
Allamakee
Racine
Mchenry
La Crosse
Crawford
Lake
Vernon
Washington
Jackson
Winnebago
Adams Green Lake
Waushara
Kenosha
Walworth
Iowa
Dane
Monroe
Sauk
Grant
Lafayette
Marquette
Richland
Boone
Winnebago
Clayton
Columbia
Rock
Dubuque
Fond Du Lac
Waukesha
Jefferson
Dodge
Calumet
Delaware
WalnutGIS
Wally Road
Mercury Marine
Wautoma
Chaffee Creek
Sussex
Sugar Creek
Mukwonago
Tamarack
Concord SW YD
Rubicon
Bark River
Boxelder
Butternut
St Lawrence
Auburn
Spring Green
Tripp Rd
Rock River
McCue
Sunrise
Turtle
BrodheadSW STA
Jefferson
Rock Branch
Green LakeSW STA
South Monroe
North Monroe
NelsonDewey
SW YD
Hillman
South FondDu Lac SW YD
Ohmstead
Metomen
Mayville
Spring Brook
Yahara River
StageCoach
SW STA
Stoughton
Sun Prairie
Rockdale
Pleasant View
Kegonsa
Gran Grae
Kilbourn
Academy
NorthRandolphTrienda
Barton
Mount Horeb
Hilltop(ALTE)
CrawfishRiver
Burlington
Mckenna
WyomingValley
Zenda
Viking
VentureWiota
Wauzeka
West Mauston
Wonewoc
Tichigan
TomahIndustrial Pk
Troy
Rock Springs
RiponInd Park
SadoffCo
Stony Brook
Spring Grove
Shullsburg
Pioneer(ALTE)
PleasantValley
Potosi
Portage IndPark
Poynette
Randolph
Red Granite
Rewey
Richland
Ripon
Rosendale
NewHollandale
North Tomah
Okee
Omro
Merrimac
Mineral Point
Montello
Maple (WE)
Marine
Necedah
LakeGeneva
Lancaster
London
LakeheadCambridge
Loch Mirror
LakeheadWaterloo
LaMar
Loganville
LincolnPump STA
LyndonStation
Markesan
Manley Sand
Mauston
Mazomanie
McFarland
Hillsboro
HoriconIndPark
Idle Hour
Island
Kirkwood
Elmo
East Beloit
East Scott St
Fall River
Footville
Forward
Friendship
Fort Atkinson
Gays Mills
Gaston Rd
Hamilton St
Cottage Grove
Columbus(ALTE)
Dana Corp
Delavan
Blanchardville
Black Earth
Brandon
Brisbois
Browntown
Brodhead
Blacksmith
Brooklyn
Camp Douglas
Beaver Dam3rd St
Albany (ALTE)
Arena
Baraboo
Belmont
Benton
Burke
Hampden
ACECTurtleLake
RECShaw
Air Liquide
Ledgeview
Artesian
DPC LyndonStation
DPCPrairieDu Chien
Monticello(ALTE)
Lake Delton
Dartford
DorsetCorners
Sharon
ShirlandAve
Silver Lake(ALTE) Ellinwood
Bowen St
OshkoshPearl Ave
Sunset PointGravesville
NewHolstein SW
STA
Syene
American
ACEC Chateau
ACEC Coloma
ACEC Friendship
ACEC Glen
ACEC Quincy
ACEC Roslin
ACEC Cambria
REC Bradford
Stoughton East
REC Newark
RECOrfordville
ACEC Brooks
ACEC Dellwood
ACEC Lewiston
ACEC RichfordACECSpringLake
ACECWinnebago
Platt
ColumbusSouth
Edgewood
Cuba CitySouth
Martin Rd
Wingra
Waunakee SWSTA
Blount
Christiana
Nine Springs
PheasantBranch
Royster
SycamoreSW YD
Walnut(MGE)
ACEC Calamus
Westport
Sprecher
Rienzi Road
RichlandCenter
Pardeeville
Pflaum
UnionTownline
New Glarus
LodiIndustrial
Park Lodi
Femrite
Glen Haven
Vienna
Grand Marsh
DPC NewLisbon DPC Buckhorn
Wick Drive
Tokay
Butler Ridge
REC LaPrairie
StoughtonSouth
Finnegan
Mill Rd
SouthwestDelavan
Russell
HubbardWyocena
Miners
North Madison345/138 kV
JuneauNorthside
Bluff Creek
Scot Forge 2
JuneauIndustrial
Willow Lawn
ScotForge 1
MazomanieIndustrial
AGA Gas
Hustisford
Koch Oil
Cross Plains
Boscobel Muni
Boscobel MuniEastside
ColumbusMuni 1
Muscoda
CardinalGlassTomah
NorthStoughton
South
Endeavor
Houghton Rock
Richmond Road
MuscodaIndustrialSub
Staff
Timberwolf
REC Red Hawk
Vinburn
Fountain Prairie
Highway 151
WaupunWestside
Hillside
University(WE)
Cooney
Brewer
Ruskin
Bird St
DPC Gratiot
Bloomington
JenningsRd SW STA
Darlington
DodgevilleEden
Berlin
Boscobel
NorthBeaver Dam
Bristol(ALTE)
Dam Heights
Paddock
ColumbiaSW YD(ALTE)
Fox Hills
Forest
Cardinal
Bass Creek
Sheepskin
NorthFond Du
Lac
Elkhorn
SouthBeaver Dam
Reiner Rd
NorthMadison
CrossCountry
Dane
Waukesha
Janesville General SW YD
Cottonwood(WE)
WilliamsBay
Timberlane
Token Creek
Traxler
TwinLakes (ALTE)
SaundersCreek
PineRiver(ALTE)
Reedsburg
NorthwestRipon
Oakfield
Zobel
Neenah Creek KettleMorraine(ALTE)
Horicon
Hooterville
Fox River
Dell Creek
East Rockton
Blue River
Cambridge
Center St
Seneca
LancasterDistribution
FordDrive
North LakeGeneva
Arlington
Walworth
South LakeGeneva
Avoca
Cobblestone
Fitchburg
Centennial Park
DivisionStreet
WisconsinDellsMuni 1
BrodheadCentral
LakeheadPipeline
Juneau Downtown
WisconsinDells Muni 2
BrodheadSouth
ColladayPoint
La Pointe
Lands End
Didion
Arthur Road
Oregon
Rio PumpingStation
Hartford
Macy St
ACECDoylestown
GlacierSkillet Creek
West Towne
Verona
Katzenberg
DPC BellCenter
Belleville
Oak Ridge
Sun PrairieBusiness Park
Big Pond
Duplainville
OmroIndustrialPark
ACECFriesland
Roeder
Portage
Park Ave
Fox Lake(ALTE)
Kieler
Fitzgerald
REC Center
REC Clinton
DPCShullsburg
CedarRidge WindGeneration
TyranenaWestMiddleton
Sanborn
DPCStoneman
MonroeCentral
Sun Valley
GermantownSW YD
Council Creek
WestDarien
OrfordvilleCuba City
MackfordPrairie
Cambria
ForwardEnergyCenter
Birchwood
Whitewater
Summit
Sauk CityPhillips St
Cassville
EvansvilleMuni
Deforest
Union Center
Cypress SW YD
Merrill Hills
Ninth Street
Lone Rock
Caledonia(ALTE)
Maple Street
East Towne
REC Harmony
River Run
Aviation
Castle Rock
Fairwater
Brick Church
Tecumseh Rd
ReedsburgNishan
BrodheadNorth
Westfield
REC Fulton
Coloma
LakeheadDelavan
LakeheadPortage
Alto
BeaverDam East
Balsam
Oxford
Tunnel City
Sauk CityOak St
EastLincoln St
Esker View
Adams Line 61
LakeheadWaterloo 2
Briggs Road
Tiger
Monroe County
LakeheadDelavan T2
Falcon
StoughtonWest
Creekview
EdgertonBusiness
Park
Hill Valley
Red Bird
Zone 3
to Dubuque County area
I L L I NOIS
5
1
3
2
16
7
8
10
PROJECT DESCRIPTION IN-SERVICE YEAR NEED DRIVER
Planned ProjectsBadger Coulee: Briggs Rd – North Madison – Cardinal 345‑kV line construction
2018 Reliability, economics and public policy
J390: Kittyhawk Substation, new G‑T interconnection 2019 G‑T interconnection
J395: Darlington – North Monroe 138‑kV line (X‑49), Uprate 2019 G‑T interconnection
Lone Rock – Boscobel 69‑kV line (Y‑124) rebuild 2019 Condition and performance
Spring Valley – North Lake Geneva 138‑kV line construction 2019 Overloads and low voltages, provide network service
Portage – Staff – North Randolph 138‑kV lines (X‑6), (X‑98), rebuild 2020 Condition and performance
Sheepskin – Stoughton 69‑kV line (Y‑12) rebuild 2021 Condition and performance
Proposed ProjectsNorthern Lights Substation, new T‑D interconnection 2020 T‑D interconnection
Cardinal – Hickory Creek 345‑kV line construction 2023 Reliability, economics and public policy
Provisional ProjectCardinal – Blount 138‑kV line construction 2029 Overloads and low voltages
Additional projects may be found in the full 10‑Year Assessment at atc10yearplan.com.
1
2
3
4
5
6
7
8
9
10
23
232018 | 10-YEAR ASSESSMENT
![Page 24: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/24.jpg)
24 AMERICAN TRANSMISSION CO.
ELECTRIC SYSTEM OVERVIEW
Increases expected in population, employment
Population in Zone 4 is projected to grow at 0.6 percent annually between now and 2027. Employment is projected to grow at 1.0 percent annually between now and 2027. Brown County is projected to realize the largest increase in population and employment. Calumet County is projected to have the highest growth rate in population and Sheboygan County is projected to have the highest growth rate in employment.
Electricity usage
Peak electric demand typically occurs during the summer months, although the northern portion of Zone 4 typically experiences nearly equal summer and winter peaks. Paper mills and foundries in and around the Green Bay and Appleton metropolitan areas are some of the largest electricity users in the zone.
Electric load is forecasted to grow at approximately 0.3 percent annually through 2028. Also, locally generated electricity is declining in the area with smaller, coal‑fired generators most at risk. This includes generation owned by industries, municipalities and utilities.
Transmission system characteristics in Zone 4
ATC delivers power in Zone 4 with various transmission facilities including:
n four 345‑kV lines extending from the Point Beach Nuclear Plant,
n two 345‑kV lines extending from the Edgewater Power Plant to South Fond du Lac and Cedarsauk,
n two additional 345‑kV lines connecting the South Fond du Lac Power Plant to Columbia and Fitzgerald,
n four 345‑kV lines connecting the Gardner Park, Werner West, Morgan, and Plains Substations,
n four 345‑kV lines from North Appleton to Kewaunee, Fox River, Werner West and Fitzgerald, and
n a 138‑kV network throughout the zone.
Transmission system limitations in Zone 4
In our analysis of Zone 4, we found high voltages in Calumet County and impending low voltages in Brown County. In addition, other ongoing studies have identified several voltage and thermal limitations. The most severe limitations occur during both peak and off‑peak periods.
Several area projects are related to the underlying condition and performance of assets in Zone 4.
COUNTIES INCLUDED IN ZONE 4 – NORTHEAST WISCONSIN
Brown | Calumet | Dodge (northeastern corner) | Door | Fond du Lac (eastern portion) | Kewaunee Manitowoc | Marinette (southern portion) | Menominee, Mich. (southern portion) | Menominee, Wis. Oconto | Outagamie | Shawano (eastern portion) | Sheboygan | Winnebago (eastern portion)
NORTHEAST WISCONSIN
Zone 4
24 AMERICAN TRANSMISSION CO.
![Page 25: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/25.jpg)
252018 | 10-YEAR ASSESSMENT
![Page 26: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/26.jpg)
26 AMERICAN TRANSMISSION CO.
SYSTEM SOLUTIONS KEY
New substationSupports transmission system expansion
Substation modi�cationsUpgrades equipment ratings to avert facility overloads
TransformerSupports local growth and improves voltage levels
Capacitor bank or reactorRelieves low voltages or high voltages
T-D interconnectionSupports local growth
69 kV
115 kV
138 kV
161 kV
230 kV
345 kV
69 kV
115 kV
138 kV
161 kV
230 kV
345 kV
SUBSTATION KEY
SUBSTATION KEY TRANSMISSION LINE KEY
TRANSMISSION LINE KEY
EXISTING TRANSMISSION LINES KEY
New substationSupports transmission system expansion
Substation modi�cationsUpgrades equipment ratings to avert facility overloads
TransformerSupports local growth and improves voltage levels
Capacitor bankRelieves low voltages or high voltages
T-D interconnectionSupports local growth
EXISTING TRANSMISSION LINES KEY
345-kV transmission line
115-, 138- or 161-kV transmission line
69-kV transmission line
Transmission line voltage conversion
Rebuilt 115- or 138-kV transmission line
Rebuilt 69-kV transmission line
115- or 138-kV transmission line rating upgrade
69-kV transmission line rating upgrade
345-kV transmission line
115-, 138- or 161-kV transmission line
69-kV transmission line
Rebuilt 115- or 138-kV transmission line
Rebuilt 69-kV transmission line
115- or 138-kV transmission line rating upgrade
69-kV transmission line rating upgrade
PROJECT DESCRIPTION IN-SERVICE YEAR NEED DRIVER
Planned ProjectsBay Lake: North Appleton – Morgan 345‑kV and 138‑kV line construction
2018 Overloads and low voltages
Cedar Ridge Wind – Mullet River 138‑kV line (X‑97) rebuild 2020 Condition and performance
Edgewater SS, 345‑kV bus reconfiguration 2020 Condition and performance
Goodman – Caldron Falls 69‑kV line (J‑88) rebuild 2020 Condition and performance
Butte des Morts – Sunset Point 138‑kV lines (40321), (80952), (A‑79), (MCRG21) rebuild
2021 Condition and performance
Finger Rd – Canal 69‑kV line (J‑10) rebuild 2021 Condition and performance
Ogden St. – Bayshore 69‑kV line construction 2021 Provide network service
Hwy V – Oak St 69‑kV line (Z‑26) rebuild 2022 Condition and performance
Proposed ProjectsBayport area – Pioneer, rebuild as double‑circuit 138‑kV 2021 Condition, performance and provide network service
Pioneer – Crivitz (E‑83/B‑2), retire 69‑kV and 2022 Condition, performance, reconfigure load to 138‑kV and provide network service
Additional projects may be found in the full 10‑Year Assessment at atc10yearplan.com.
1
2
3
4
7
5
8
6
9
10
TRANSMISSION PROJECTS IN ZONE 4
The most notable planned, proposed and provisional network projects and asset renewal projects in Zone 4, along with their projected year of completion and the factors driving the need for the projects, are listed below.
NORTHEAST WISCONSIN
Zone 4
![Page 27: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/27.jpg)
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
12th
CityLimits
ForestJunction
Morgan
Lawn Rd
Progress
HighFalls Hy
Highway V
Waupun
Ozaukee
Waupaca
Door
Menominee
Oconto
Washington
Forest
Shawano
Marinette
Green Lake
Waushara
Manitowoc
Brown
Sheboygan
Outagamie
Winnebago
Kewaunee
Menominee
Langlade
Columbia
Fond Du Lac
Dodge
Delta
Calumet
West Shawano
Holland
SheboyganFalls Energy
Center SW YD
Holmes
Mercury Marine
Mpu Plant
Winneconne
Iola
Woodenshoe
Point BeachSW YD
Elkhart Lake
Stiles SW STA
Hintz
Butternut
Chalk Hill Hy
WhiteRapids Hy
Casaloma
Badger
Auburn
SouthSheboygan
Falls
20th St
White Clay
Lawn Rd
Falls
Green LakeSW STA
SouthFond Du LacSW YD
Ohmstead
Metomen
Mayville
NorthRandolph
WhiteLake (WE)
NorthMullet River
Melissa
KaukaunaCentral
RiponInd Park
SadoffCo
Randolph
Red Granite
Ripon
Rosendale
Nicolet
NorthGate
Omro
Lake Park
Manawa
Markesan
East Scott St
FountainValley
Brandon
BrooksCorners
32nd St
Apple Hills
Belle Plaine
Ledgeview
CombinedLocks
East Shawano
Dartford
Mears Corners
Ellinwood
Bowen St
OshkoshPearl Ave
Sunset Point
Sobieski
Pioneer(WPS)
Mountain
Oconto
Bay De Noc
GrandRapids Hy
Pound
CaldronFalls Hy
Crivitz
Fox HillsSW STA
Ogden St
SandstoneRapids Hy
Silver Cliff
WestMarinetteSW YD
Mishicot
Custer
Manrap
Rosiere
KewauneeSW YD
Barnett
Algoma
Beardsley St
East Krok
SawyerSW STA
Brusbay
Canal
Sister Bay
Northeast
Rapids
Glenview
Gravesville
NewHolstein SW
STA
Velp Ave
Preble
Oak St
Liberty St
De Pere
Ashland Ave
Dyckesville
Finger Rd SWSTA
Howard
Lost Dauphin
Red Maple
Suamico
Wesmark
First Ave
Dewey
Algoma City
LakefrontSW YD
Redwood
Mirro
Northside(sfm)
(ALTE)
HarrisonNorth 138kV
Metonga
Martin Rd
Rockland(WPS)
PlymouthSub 4
RienziRoad
Goodman
Industrial
Michigan St
Clintonville
Howards Grove
Ontario
Nathan
Neevin
Werner West
Highway 22
Columbus St
Scott Paper Co
Glory Rd
Fox RiverSW YRD
Willow Lawn
Hickory St PlymouthMuncipal
Monroe St
Koch Oil
Greenleaf
Middle Vlg
WaupunWestside
LittleSuamico
Kaukauna North
Sherwood
Egg Harbor
Mason St
Berlin
North Appleton
ErdmanForest
Maes
Edgewater SW YD
NorthFond
Du Lac
Mullet River
7th St
Polar
Riverside (ALTE)
NorthwestRipon
Oakfield
KettleMorraine(ALTE)
Fox River
Waupaca
FordDrive
Fredonia
Lena
St Nazianz
Plymouth Sub 3
Butte DesMorts
Lyndon
WellsSt
Didion
Bemis
Marion
Macy St
Northside
30th Ave
Revere Dr
BrillionIron Works
Ingalls
Deer Trail
Shoto
OmroIndustrialPark
ACECFriesland
Werner
Roeder
Fox Lake(ALTE)
Fitzgerald
Thunder
Maplewood
Cedar RidgeWind Generation
Cloverleaf
BayportSW STA
MackfordPrairie
Cambria
ForwardEnergyCenter
Ryan St
CWEC Tigerton
Amberg
Tayco
Caroline
Dunn Rd
Cypress SW YD
Harrison69kV
High Falls Hy
Ellington
River Run
Aviation
Menominee
Pulliam SW YD
Booster
Luxemburg
Fairwater
Meadows
Benson Lake
Kellnersville
Tecumseh Rd
CWEC Iola
Iron Foundry
Peshtigo
Alto
Algoma South
Esker View
New HolsteinRoosevelt
Branch River
Creekview
Apollo
Zone 4
L a k e Mi c
higan
Lines of proposed projects on the map are for illustrative purposes only and do not reflect actual routes. For information on project status and routes, see atc‑projects.com.
5
8
4
3
2
1
6
710
9
272018 | 10-YEAR ASSESSMENT
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* DePere
Highway V
Brown
Velp Ave
Preble
Oak St
Liberty St
James St
De Pere
Ashland AveBluestone
Finger RdSW STA
Henry St(WPS)
Howard
Mystery Hills
SouthBroadway
Tower Dr
Van Buren St
Glory Rd
Mason St
7th St
Potts Avenue
NicoletPaper Co
Eastman Ave
BayportSW STA
Pulliam SW YDDanzAve SWSTA
GloryRoadNorth
Green Bay Area
!88
![Page 28: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/28.jpg)
28 AMERICAN TRANSMISSION CO.
COUNTIES INCLUDED IN ZONE 5 – SOUTHEAST WISCONSIN
Kenosha | Milwaukee | Ozaukee | Racine | Washington | Waukesha
ELECTRIC SYSTEM OVERVIEW
Increases expected in population, employment
Population in Zone 5 is projected to grow 0.5 percent annually between now and 2027, and employment is projected to grow 1.1 percent in the same time period. Waukesha County is projected to realize the largest increase in both population and employment. Waukesha County is also projected to have the highest growth rate in employment while Ozaukee County is projected to have the highest growth rate in population.
Electricity usage
Peak electric demand typically occurs during the summer months. Large industrial loads in the Milwaukee metropolitan area are among the largest electricity users in the zone.
Electric load is forecasted to grow approximately 0.7 percent annually through 2028.
Transmission system characteristics in Zone 5
ATC delivers power in Zone 5 with various transmission facilities including:
n the southern portion of 345‑kV lines from Point Beach and Edgewater,
n the Saukville, Arcadian, Granville, Oak Creek, and Racine 345‑/138‑kV substations,
n the transmission lines emanating from the Oak Creek power plant,
n 230‑kV facilities near Milwaukee, and
n a significant 138‑kV network in the Milwaukee area, a portion of which is underground.
Transmission system limitations in Zone 5
Transmission system performance issues in Zone 5 include heavy market flows to and from the south, resulting in high 345‑kV and 138‑kV line loadings and the need to monitor potential multiple contingency conditions.
SOUTHEAST WISCONSIN
Zone 5
![Page 29: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/29.jpg)
292018 | 10-YEAR ASSESSMENT
AMERICAN TRANSMISSION CO. 2016 10‑YEAR ASSESSMENT
![Page 30: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/30.jpg)
PROJECT DESCRIPTION IN-SERVICE YEAR NEED DRIVER
Planned Projects
Mount Pleasant Tech Interconnection Project 2019 T‑D interconnection
Mukwonago‑Edgewood‑St. Martins 138‑kV lines 2019 Condition and performance (3013), (671K61), rebuild
Spring Valley‑North Lake Geneva 138‑kV line construction 2019 Overloads and low voltages, provide network service
Paris‑Burlington 138‑kV line (8962) rebuild 2021 Condition and performance
St. Lawrence‑Barton‑Auburn 138‑kV lines 2022 Condition and performance (8032), (9752), rebuild
Proposed Projects
Juneautown Substation, new T‑D interconnection 2020 T‑D interconnection
Port Washington‑Saukville 138‑kV rebuild line 762 to a double circuit
2021 Overloads
Additional projects may be found in the full 10‑Year Assessment at atc10yearplan.com.
3
1
4
5
6
7
2
New substationSupports transmission system expansion
Substation modi�cationsUpgrades equipment ratings to avert facility overloads
TransformerSupports local growth and improves voltage levels
Capacitor bank or reactorRelieves low voltages or high voltages
T-D interconnectionSupports local growth
69 kV
115 kV
138 kV
161 kV
230 kV
345 kV
69 kV
115 kV
138 kV
161 kV
230 kV
345 kV
SUBSTATION KEY
SUBSTATION KEY TRANSMISSION LINE KEY
TRANSMISSION LINE KEY
EXISTING TRANSMISSION LINES KEY
New substationSupports transmission system expansion
Substation modi�cationsUpgrades equipment ratings to avert facility overloads
TransformerSupports local growth and improves voltage levels
Capacitor bankRelieves low voltages or high voltages
T-D interconnectionSupports local growth
EXISTING TRANSMISSION LINES KEY
345-kV transmission line
115-, 138- or 161-kV transmission line
69-kV transmission line
Rebuilt 115- or 138-kV transmission line
Rebuilt 69-kV transmission line
115- or 138-kV transmission line rating upgrade
69-kV transmission line rating upgrade
230-kV transmission line rating upgrade
345-kV transmission line
115-, 138- or 161-kV transmission line
69-kV transmission line
Rebuilt 115- or 138-kV transmission line
Rebuilt 69-kV transmission line
115- or 138-kV transmission line rating upgrade
69-kV transmission line rating upgrade
TRANSMISSION PROJECTS IN ZONE 5
The most notable planned, proposed and provisional network projects and asset renewal projects in Zone 5, along with their projected year of completion and the factors driving the need for the projects, are listed below.
SYSTEM SOLUTIONS KEY
SOUTHEAST WISCONSIN
Zone 5
30 AMERICAN TRANSMISSION CO.
![Page 31: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/31.jpg)
312018 | 10-YEAR ASSESSMENT
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
Arcadian
Branch
I L L I NOIS
St. Martin
Ozaukee
Racine
Mchenry Lake
Washington
Kenosha
Milwaukee
Walworth
Sheboygan
Boone
Rock
Fond Du Lac
WaukeshaJefferson
Dodge
Holland
MercuryMarine
Russel Term
Sussex
Sugar Creek
Shorewood
Saukville
Mukwonago
Tamarack
PleasantPrairie
SW YD
Lakeview
Bain
Concord SW YD
Somers
Rubicon
Paris
Bark River
Butternut
St Lawrence
Auburn
SouthSheboygan
Falls
PortWashingtonSW YD
South FondDu Lac SW YD
Mayville
Spring Brook
Racine
Barton
Bluemound
Tosa
Norwich
Kansas
North MulletRiver
Pennsylvania
Branch
Parkland
Lincoln
Harbor (WE)
Granville
Cornell -Milwaukee
Center
28th St
Dewey (WE)
Fiebrantz
96th St
O Connor
Mequon
Albers
CrawfishRiver
Glendale
Range Line SW
St Martins
Root River
Ramsey
Burlington
Zenda
West Junction
SpringValley(WE)
Tichigan
PleasantValley
Nicolet
Maple (WE)
Lake Geneva
HoriconInd Park
Delavan
Brandon
Beaver Dam3rd St
Brookdale
Air Liquide
Charter Steel
RangeLineDist
Sharon
Morris St
REC Bradford
51st St Term
Northside (sfm)(ALTE)
Sidney Term
43rd St Term
Edgewood
Martin Rd
Moorland
Elm Road345 Sws Yd
Butler Ridge
Mill Rd
SouthwestDelavan
Hubbard
Oak Creek (COMS230kV) SW YD
JuneauNorthside
Bluff Creek
JuneauIndustrial
Willow Lawn
Plymouth Muncipal
Monroe St
Hustisford
Koch Oil
Adams St
Richmond Road
Zion EnergyCenter
Plainfield(WE)
WaupunWestside
Oak CreekSW YD
University(WE)
Cooney
Waupun Prison
NorthBeaver Dam
Bristol(ALTE)
CedarburgSouth
Lodestar
Elkhorn
Waukesha
Mullet River
Valley(WE)
Cottonwood(WE)
Williams Bay
Swan
TwinLakes (ALTE)
Sauk Trail
Oakfield
Nicholson(WE)
KettleMorraine(ALTE)
Horicon
Center St
Clinton(ALTE)
North LakeGeneva
Kenosha
Fredonia
HaymarketSquare
Kohler
HumboltTerm
Walworth
SheboyganFalls
South LakeGeneva
Butler
CobblestoneLakeheadPipeline
River Bend
JuneauDowntown
Hayes
Lyndon
Allerton
Arthur Road
Walker
Hartford
Glacier
Barland
68th St
Katzenberg
Duplainville
Huebner
CedarRidge WindGeneration
Montana
Raymond
Douglas
GermantownSW YD
ParkHill
West Darien
ForwardEnergyCenter
NorwichTerminal
Whitewater
Summit
Merrill Hills
OakCreek (COMS 138kV)
SW YD
Brick Church
Cedarsauk
LakeheadDelavan
Alto
BeaverDam East
St Rita
Balsam
MilwaukeeCTY SW YD
Berryville
Bemis T42
Tiger
Bemis T41
LakeheadDelavan T2
Creekview
Oakview
Mt. Pleasant
State Line Sub
Juneautown
Zone 5
La
ke
Mi c
higan
Lines of proposed projects on the map are for illustrative purposes only and do not reflect actual routes. For information on project status and routes, see atc‑projects.com.
5
3
4
2
6
7
1
![Page 32: 10‑Year Transmission System Assessment€¦ · ATC, ITC Midwest LLC and Dairyland Power Cooperative filed an application in April with the Public Service Commission of Wisconsin](https://reader034.vdocuments.site/reader034/viewer/2022042116/5e93b08d33db8008204101b5/html5/thumbnails/32.jpg)
atcllc.com
ATC AT A GLANCEn Formed in 2001 as the first multi‑state, transmission‑only utility
n Owner and operator of approximately 9,600 miles of transmission line and more than 560 substations
n Meeting electric needs of more than five million people in 72 counties in four states: Wisconsin, Michigan, Minnesota and Illinois
n $4.7 billion in total assets
CONTACT
Mail P.O. Box 47 n Waukesha, WI 53187‑0047
Toll‑free (866) 899‑3204
Email [email protected]
More detailed information is available at atc10yearplan.com
Helping to keep the lights on, businesses running and communities strong®