Nomor & Periode Invoice : No. 51 Periode (Februari 2018)
Realisasi Invoice : 04 April 2018
Nomor Loan : IBRD Loan 8636-ID
Nama Konsultan : PT. Phibeta Kalamwijaya, Joint venture with PT. Kogas Driyap Konsultan
Paket Pekerjaan : Non Konsultan Service for Oversight Provider (OSP) Package-6
(East Java, Central Kalimantan, East Kalimantan, South Kalimantan Province)
Nomor & Tanggal Kontrak : HK.02.03/OSP-6/IBRD/SATKER-PKP/004/2012, Tanggal 08 Mei 2016
Periode Kontrak : 08 Mei 2012 s/d 15 Maret 2018
I. REMUNERASI 51.779.955.880 51.039.830.368 465.566.000 51.505.396.368 274.559.5121.1. Profesional Staff 36.574.483.000 36.067.330.764 320.000.000 36.387.330.764 187.152.2361.2. Supporting Staff 8.063.410.000 7.932.523.001 81.350.000 8.013.873.001 49.536.9991,3 Fee [……...% x (1.1+1.2)]
II. DIRECT REIMBURSABLE COST 29.611.713.658 28.959.513.748 263.555.685 29.223.069.433 388.644.2252.1. Duty Travel Expenses East Java 1.839.590.000 1.785.311.995 0 1.785.311.995 54.278.005
a. Transport 1.667.940.000 1.634.992.850 0 1.634.992.850 32.947.150b. Accomodation 72.700.000 58.619.145 0 58.619.145 14.080.855c. OSA (fixed) 98.950.000 91.700.000 0 91.700.000 7.250.000
2,2 Duty Travel Expenses South Kalimantan 563.663.000 528.989.697 0 528.989.697 34.673.303a. Transport 434.493.000 421.888.197 0 421.888.197 12.604.803b. Accomodation 63.370.000 47.351.500 0 47.351.500 16.018.500c. OSA (fixed) 65.800.000 59.750.000 0 59.750.000 6.050.000
2,3 Duty Travel Expenses Center Kalimantan 234.440.000 227.111.010 1.200.000 228.311.010 6.128.990a. Transport 185.140.000 180.911.010 700.000 181.611.010 3.528.990b. Accomodation 14.500.000 13.200.000 300.000 13.500.000 1.000.000c. OSA (fixed) 34.800.000 33.000.000 200.000 33.200.000 1.600.000
2,4 Duty Travel Expenses East Kalimantan 927.451.000 868.975.590 2.800.000 871.775.590 55.675.410a. Transport 788.951.000 748.558.590 1.000.000 749.558.590 39.392.410b. Accomodation 78.800.000 67.667.000 1.400.000 69.067.000 9.733.000c. OSA (fixed) 59.700.000 52.750.000 400.000 53.150.000 6.550.000
2,5 Office Operational Expenses 4.817.909.000 4.713.294.901 60.703.000 4.773.997.901 43.911.099a. Office Running Cost 2.578.764.500 2.527.166.982 32.285.000 2.559.451.982 19.312.518b. Office Supply and Consumable 1.014.662.000 988.501.280 11.823.000 1.000.324.280 14.337.720c. Communication Cost 1.084.980.000 1.065.430.181 13.650.000 1.079.080.181 5.899.819d. Internet 139.502.500 132.196.458 2.945.000 135.141.458 4.361.042
2,6 Office Equipment Expenses 1.426.978.573 1.408.133.410 0 1.408.133.410 18.845.163a. Desktop Computer 540.000.000 540.000.000 0 540.000.000 0b. Laptop 640.000.000 640.000.000 0 640.000.000 0c. Printer Laser Jet 117.250.000 117.250.000 0 117.250.000 0d. Printer Color A3 12.000.000 12.000.000 0 12.000.000 0
PROGRAM KOTA TANPA KUMUH
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN BERBASIS MASYARAKAT (PKPBM) - TA 2018
PROYEK PENINGKATAN KUALITAS KAWASAN PERMUKIMAN
DIREKTORAT JENDERAL CIPTA KARYA
KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT
NO KOMPOSISI BIAYACONTRACT AMOUNT
+ AMANDEMEN 23SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
NO KOMPOSISI BIAYACONTRACT AMOUNT
+ AMANDEMEN 23SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
e. Digital Camera 5.000.000 5.000.000 0 5.000.000 0f. GPS Tool;s 6.000.000 6.000.000 0 6.000.000 0g. LCD Projector 30.000.000 30.000.000 0 30.000.000 0h. Scanner 38.000.000 38.000.000 0 38.000.000 0i. Equipment Maintenance (Including Existing Equipment) 38.728.573 19.883.410 0 19.883.410 18.845.163j. Peta Citra Satelit (1:5000) 0 0 0 0 0
2,7 Rental Expenses 18.611.036.500 18.303.293.333 188.450.000 18.491.743.333 119.293.167a. Office Space 853.861.500 826.320.000 7.000.000 833.320.000 20.541.500b. Vehicle 16.240.625.000 16.008.958.333 156.250.000 16.165.208.333 75.416.667c. Motorcycle 1.297.800.000 1.250.200.000 25.200.000 1.275.400.000 22.400.000d. Rent for PERCEPATAN 218.750.000 217.815.000 0 217.815.000 935.000
2,8 Reporting Expenses 132.425.000 111.300.000 3.000.000 114.300.000 18.125.000a. Reguler Report 68.300.000 61.425.000 1.500.000 62.925.000 5.375.000b. Special Report 64.125.000 49.875.000 1.500.000 51.375.000 12.750.000
2,9 Fee [[……..% x [ 2.1 + 2.2 + 2.3 + 2.4 + 2.5a + 2.5b ]]
III. TRAINING ACTIVITY EXPENSES 13.193.990.720 12.929.777.541 14.390.475 12.944.168.016 249.822.7053,1 Training Activity 2011 0 0 0 0 03,2 Training Activity 2012 850.525.000 847.251.000 0 847.251.000 3.274.0003,3 Training Activity 2013 2.111.491.000 2.109.550.303 0 2.109.550.303 1.940.697
Training Activity 2016 8.561.120.000 8.336.167.743 12.568.100 8.348.735.843 212.384.157Fee [[…….. % x [ 3.1 + 3.2 + 3.3+3.4]]
IV. SOCIALIZATION ACTIVITY EXPENSES 4.534.420.323 4.529.653.326 0 4.529.653.326 4.766.9974,1 Socilization Activity in Provincial Levels [ Fixed ] 405.350.000 402.877.534 0 402.877.534 2.472.4664,2 Socilization Activity in City/Regency Levels [ Fixed ] 1.897.200.500 1.895.509.650 0 1.895.509.650 1.690.850
4,3 Fee [[…….. % x [ 4.1 + 4.2]]
4,4 Biaya Penyusunan RPLP/RTPLP (Fix cost) 1.898.000.000 1.898.000.000 0 1.898.000.000 0
V. TOTAL (I + II + III + IV) 99.120.080.580 97.458.774.983 743.512.160 98.202.287.142 917.793.438
VI. CONTIGENCIES (Fixed)
VII. TOTAL (V + VI) 99.120.080.580 97.458.774.983 743.512.160 98.202.287.142 917.793.438
Temuan BPKP I * 237.875.000 0 237.875.000
Temuan BPKP II ** 18.000.000 0 18.000.000
Temuan BPKP III *** 56.750.000 0 56.750.000
Temuan BPKP IV **** 9.790.500 0 9.790.500
VIII. TOTAL (SETELAH DIKURANGI TEMUAN) 99.120.080.580 97.136.359.483 743.512.160 97.879.871.642 1.240.208.938
IX. LOCAL TAX/VAT(10% x VII) 9.912.008.058 9.713.635.948 74.351.216 9.787.987.164 124.020.894
X. TOTAL INVOICE 109.032.088.638 106.849.995.431 817.863.375 107.667.858.806 1.364.229.832
I. REMUNERASI
1.1.Profesional Staff Februari 2018
NO N A M E POSITION
MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL
A. OSP LEVEL 1.395.984.000 1.395.962.856 0 1.395.962.856 21.144
19,77 14.000.000 276.780.000 19,77 276.780.000 0,00 14.000.000 0 19,77 276.780.000 0,00 0
17,00 15.500.000 263.500.000 17,00 263.500.000 0,00 15.500.000 0 17,00 263.500.000 0,00 0
19,00 16.700.000 317.300.000 19,00 317.300.000 0,00 16.700.000 0 19,00 317.300.000 0,00 0
14,50 4.900.000 71.050.000 14,50 71.050.000 0,00 4.900.000 0 14,50 71.050.000 0,00 0
2,50 5.300.000 13.250.000 2,50 13.250.000 0,00 5.300.000 0 2,50 13.250.000 0,00 0
2,63 4.900.000 12.887.000 2,63 12.887.000 0,00 4.900.000 0 2,63 12.887.000 0,00 0
1,00 4.900.000 4.900.000 1,00 4.900.000 0,00 4.900.000 0 1,00 4.900.000 0,00 0
Nur Rochim 11,00 4.900.000 53.900.000 11,00 53.900.000 0,00 4.900.000 0 11,00 53.900.000 0,00 0
19,77 6.500.000 128.505.000 19,77 128.483.856 0,00 6.500.000 0 19,77 128.483.856 0,00 21.144
1,00 7.200.000 7.200.000 1,00 7.200.000 0,00 7.200.000 0 1,00 7.200.000 0,00 0
14,21 7.200.000 102.312.000 14,21 102.312.000 0,00 7.200.000 0 14,21 102.312.000 0,00 0
19,00 7.600.000 144.400.000 19,00 144.400.000 0,00 7.600.000 0 19,00 144.400.000 0,00 0
B. EAST JAVA PROVINCE 17.136.325.000 16.975.410.739 105.200.000 17.080.610.739 55.714.261
19,77 11.500.000 227.355.000 19,77 227.316.667 0,00 11.500.000 0 19,77 227.316.667 0,00 38.333
17,00 12.700.000 215.900.000 17,00 215.900.000 0,00 12.700.000 0 17,00 215.900.000 0,00 0
19,00 13.700.000 260.300.000 19,00 260.300.000 0,00 13.700.000 0 19,00 260.300.000 0,00 0
Agus Shonhaji Mu'thi 13,50 13.700.000 184.950.000 12,00 164.400.000 1,00 13.700.000 13.700.000 13,00 178.100.000 0,50 6.850.000
19,77 8.500.000 168.045.000 19,77 168.016.667 0,00 8.500.000 0 19,77 168.016.667 0,00 28.333
17,00 9.400.000 159.800.000 17,00 159.800.000 0,00 9.400.000 0 17,00 159.800.000 0,00 0
33,50 10.100.000 338.350.000 32,00 323.200.000 1,00 10.100.000 10.100.000 33,00 333.300.000 0,50 5.050.000
19,77 6.500.000 128.505.000 19,77 128.483.333 0,00 6.500.000 0 19,77 128.483.333 0,00 21.667
17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0
5,00 7.700.000 38.500.000 5,00 38.500.000 0,00 7.700.000 0 5,00 38.500.000 0,00 0
TBN 0,00 7.700.000 0 0,00 0 0,00 7.700.000 0 0,00 0 0,00 0
19,00 6.500.000 123.500.000 19,00 123.500.000 0,00 6.500.000 0 19,00 123.500.000 0,00 0
17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0
19,00 7.700.000 146.300.000 19,00 146.300.000 0,00 7.700.000 0 19,00 146.300.000 0,00 0
Wahyu Hidayat 5,27 6.500.000 34.255.000 5,27 34.233.333 0,00 6.500.000 0 5,27 34.233.333 0,00 21.667
14,50 6.500.000 94.250.000 14,50 94.250.000 0,00 6.500.000 0 14,50 94.250.000 0,00 0
17,00 7.000.000 119.000.000 17,00 119.000.000 0,00 7.000.000 0 17,00 119.000.000 0,00 0
12,00 7.500.000 90.000.000 12,00 90.000.000 0,00 7.500.000 0 12,00 90.000.000 0,00 0
Brida Mardi Utomo 5,00 7.500.000 37.500.000 5,00 37.500.000 0,00 7.500.000 0 5,00 37.500.000 0,00 0
19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667
16,00 8.800.000 140.800.000 16,00 140.800.000 0,00 8.800.000 0 16,00 140.800.000 0,00 0
19,00 9.500.000 180.500.000 19,00 180.500.000 0,00 9.500.000 0 19,00 180.500.000 0,00 0
2,00 9.500.000 19.000.000 0,50 4.750.000 1,00 9.500.000 9.500.000 1,50 14.250.000 0,50 4.750.000
Soetomo 5,27 6.500.000 34.255.000 5,27 34.233.333 0,00 6.500.000 0 5,27 34.233.333 0,00 21.667
14,50 6.500.000 94.250.000 14,50 94.250.000 0,00 6.500.000 0 14,50 94.250.000 0,00 0
17,00 7.000.000 119.000.000 17,00 119.000.000 0,00 7.000.000 0 17,00 119.000.000 0,00 0
19,00 7.500.000 142.500.000 19,00 142.500.000 0,00 7.500.000 0 19,00 142.500.000 0,00 0
Qurrota A'yun 18,77 8.000.000 150.160.000 18,77 150.133.333 0,00 8.000.000 0 18,77 150.133.333 0,00 26.667
14,37 8.000.000 114.960.000 14,35 114.838.710 0,00 8.000.000 0 14,35 114.838.710 0,02 121.290
0,00 8.500.000 0 0,00 0 0,00 8.500.000 0 0,00 0 0,00 0
Hamzah R. Dani 14,00 8.500.000 119.000.000 14,00 119.000.000 0,00 8.500.000 0 14,00 119.000.000 0,00 0
19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667
17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0
7,00 9.500.000 66.500.000 7,00 66.500.000 0,00 9.500.000 0 7,00 66.500.000 0,00 0
Rahmad Hidayat 21,45 9.500.000 203.775.000 21,45 203.758.621 0,00 9.500.000 0 21,45 203.758.621 0,00 16.379
M. Tabroni 2,00 8.000.000 16.000.000 0,36 2.909.600 1,00 8.000.000 8.000.000 1,36 10.909.600 0,64 5.090.400
19,00 6.500.000 123.500.000 19,00 123.500.000 0,00 6.500.000 0 19,00 123.500.000 0,00 0
17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0
19,00 7.700.000 146.300.000 19,00 146.300.000 0,00 7.700.000 0 19,00 146.300.000 0,00 0
19,77 6.500.000 128.505.000 19,77 128.483.333 0,00 6.500.000 0 19,77 128.483.333 0,00 21.667
17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0
19,00 7.700.000 146.300.000 19,00 146.300.000 0,00 7.700.000 0 19,00 146.300.000 0,00 0
19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667
17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0
33,50 9.500.000 318.250.000 32,00 304.000.000 1,00 9.500.000 9.500.000 33,00 313.500.000 0,50 4.750.000
Aris Suprihanto
Ainul Hidayat / Agus Setijabudi Infrastructure Specialist12
7
M. Yani Zamroni, SE b. Sub Spec.SME’s11
8
Training Specialist9
4 b. Sub Spec. Monev PNPM
Moh. Zamroni S 5 Sub Spec. Monev Advance
a. Sub Spec.Training/CB for PNPM10
Sub Spec. MIS for PNPM
Socialization Specialist
Siswo Prasetyo
SISA KONTRAKCONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE S/D SAAT INIINVOICE SAAT INI
3 Sub Spec. Legal & CHU
Muh. Frid Hamzah
Program Director OCAgus Shonhaji Mu'thi1
M. Jakfar Shodiq
Hasan Ubaidillah
Assisten OC
3 a. Sub Spec. Monev PNPMHamzah R. Dani
Monev Specialist
Pranata Putra
Abdusallam2
1 Provincial Team Leader
Hasan Ubaidillah
Ja'far Sodiq2
Markus Apriono
Anis Mufadillah
Nani Saodah
MIS Specialist 6
19,77 6.500.000 128.505.000 19,77 128.483.333 0,00 6.500.000 0 19,77 128.483.333 0,00 21.667
17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0
19,00 7.700.000 146.300.000 19,00 146.300.000 0,00 7.700.000 0 19,00 146.300.000 0,00 0
19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667
17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0
10,00 9.500.000 95.000.000 10,00 95.000.000 0,00 9.500.000 0 10,00 95.000.000 0,00 0
Bambang Kristiawan 18,00 9.500.000 171.000.000 18,00 171.000.000 0,00 9.500.000 0 18,00 171.000.000 0,00 0
19,77 6.500.000 128.505.000 19,77 128.483.333 0,00 6.500.000 0 19,77 128.483.333 0,00 21.667
17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0
19,00 7.700.000 146.300.000 19,00 146.300.000 0,00 7.700.000 0 19,00 146.300.000 0,00 0
19,00 6.500.000 123.500.000 19,00 123.500.000 0,00 6.500.000 0 19,00 123.500.000 0,00 0
17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0
12,00 7.700.000 92.400.000 12,00 92.400.000 0,00 7.700.000 0 12,00 92.400.000 0,00 0
Endra Sulistiyono 4,00 7.700.000 30.800.000 4,00 30.800.000 0,00 7.700.000 0 4,00 30.800.000 0,00 0
19,00 8.000.000 152.000.000 19,00 152.000.000 0,00 8.000.000 0 19,00 152.000.000 0,00 0
17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0
8,00 9.500.000 76.000.000 8,00 76.000.000 0,00 9.500.000 0 8,00 76.000.000 0,00 0
Muh. Zamroni 7,00 9.500.000 66.500.000 7,00 66.500.000 0,00 9.500.000 0 7,00 66.500.000 0,00 0
M. Zainul Arifin 8,50 9.500.000 80.750.000 6,94 65.930.000 1,00 9.500.000 9.500.000 7,94 75.430.000 0,56 5.320.000
19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667
17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0
32,00 9.500.000 304.000.000 30,50 289.750.000 1,00 9.500.000 9.500.000 31,50 299.250.000 0,50 4.750.000
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
5,00 5.900.000 29.500.000 5,00 29.500.000 0,00 5.900.000 0 5,00 29.500.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 0,00 5.900.000 0 0,00 0 0,00 5.900.000 0 0,00 0 0,00 0
19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
5,00 5.900.000 29.500.000 5,00 29.500.000 0,00 5.900.000 0 5,00 29.500.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 0,00 5.900.000 0 0,00 0 0,00 5.900.000 0 0,00 0 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
Nurul
18 Edi Sutanto Urban Planner Specialist**)
Sub Proff. Financial 1
Sub Proff. Financial 3
Collaboration & Local Government Spec17
21
a. Sub Spec. Fin.Mgmt for PNPMMochammad Wahyudi Ernawi 15
14 Micro Fin & Fin.Mgmt Spec.
Bambang Kristiawan 16 b. Sub Spec. RLF
a. Sub Spec. Infras. PNPM & DRMAgus Setijabudi13
Adi Suprayitno
Ibnu Arfan Ismanto22
Eri Sunahar Anwar
Sub Proff. Financial 2Elly Zuroida
Sub Proff. Financial 10
Boedy Soewartono
Sub Proff. Financial 4
Sub Proff. Financial 5Yudi Tri Cahyono Kasmilan23
Sub Proff. Financial 6
Sub Proff. Financial 7
Sub Proff. Financial 8
Sub Proff. Financial 9
Sub Proff. Financial 11
24
20
Indra Agung Kurniawan19
25
26 Abdillah
Indra Adiyanto
Budi Suryawan
29
Moh. Firman Wahyudi
28
Sugeng Widodo
27
17,00 5.000.000 85.000.000 17,00 85.000.000 0,00 5.000.000 0 17,00 85.000.000 0,00 0
19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
8,50 5.500.000 46.750.000 8,50 46.750.000 0,00 5.500.000 0 8,50 46.750.000 0,00 0
8,00 5.500.000 44.000.000 8,00 44.000.000 0,00 5.500.000 0 8,00 44.000.000 0,00 0
3,00 5.500.000 16.500.000 3,00 16.500.000 0,00 5.500.000 0 3,00 16.500.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 0,00 5.500.000 0 0,00 0 0,00 5.900.000 0 0,00 0 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 2,00 5.900.000 11.800.000 2,00 11.800.000 0,00 5.900.000 0 2,00 11.800.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 2,00 5.900.000 11.800.000 2,00 11.800.000 0,00 5.900.000 0 2,00 11.800.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
5,00 5.900.000 29.500.000 5,00 29.500.000 0,00 5.900.000 0 5,00 29.500.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 0,00 5.900.000 0 0,00 0 0,00 5.900.000 0 0,00 0 0,00 0
19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
5,00 5.900.000 29.500.000 5,00 29.500.000 0,00 5.900.000 0 5,00 29.500.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 0,00 5.900.000 0 0,00 0 0,00 5.900.000 0 0,00 0 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 0,00 5.900.000 0 0,00 0 0,00 5.900.000 0 0,00 0 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
33,50 5.900.000 197.650.000 32,00 188.800.000 1,00 5.900.000 5.900.000 33,00 194.700.000 0,50 2.950.000
19,80 5.000.000 99.000.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,03 166.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
31,50 5.900.000 185.850.000 30,00 177.000.000 1,00 5.900.000 5.900.000 31,00 182.900.000 0,50 2.950.000
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
31,50 5.900.000 185.850.000 30,00 177.000.000 1,00 5.900.000 5.900.000 31,00 182.900.000 0,50 2.950.000
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
31,50 5.900.000 185.850.000 30,00 177.000.000 1,00 5.900.000 5.900.000 31,00 182.900.000 0,50 2.950.000
36
Heru Sulistiono 35
Sub Proff. Financial 12Dwijayanti Edi Jayani
Indah Zulfana
Bekti Hariyanto
Imam Syafi'i
Didik Purwo Santoso
30
Sub Proff. Financial 15
Gangsar Yudono 32
Sub Proff. Financial 23
Sub Proff. Financial 18
Sub Proff. Financial 22
Sub Proff. Financial 14
Sub Proff. Financial 13
Sub Proff. Financial 21
Sub Proff. Financial 16
Luqman Hakim
Ari Wijianto
Sub Proff. Financial 20
Sub Proff. Financial 17
Elly Sulistiawati
37
41
Heri Suyatno38
Sub Proff. Financial 19
Sub Prof, Administration 2Danny Chandra Sagita/ Luqman Hakim45
Sub Prof, Administration 3Leny Dayan Patiung
Sub Prof, Administration 4Nurmala Sari / Luqman Hakim
Sub Proff. Financial 24Theresia Dian Purnama Dewi
34
31
33
Muhammad Sulaiman
46
Sub Proff. Financial 25
47
39
43
Suswayanti 44
Susanah
Sub Prof, Administration 1
40
42
19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
30,00 5.900.000 177.000.000 30,00 177.000.000 0,00 5.900.000 0 30,00 177.000.000 0,00 0
49 Luqman Hakim Sub Prof Financial 9,00 5.900.000 53.100.000 9,00 53.100.000 0,00 5.900.000 0 9,00 53.100.000 0,00 0
50 Sri Umi Sub Prof Financial 6,00 5.900.000 35.400.000 6,00 35.400.000 0,00 5.900.000 0 6,00 35.400.000 0,00 0
Bambang Kristiawan Sub Prof Financial 2,00 5.900.000 11.800.000 0,50 2.950.000 1,00 5.900.000 5.900.000 1,50 8.850.000 0,50 2.950.000
Ika Oktavianti Sub Prof Financial 2,00 5.900.000 11.800.000 0,50 2.950.000 1,00 5.900.000 5.900.000 1,50 8.850.000 0,50 2.950.000
PERCEPATAN PENYIAPAN DOKUMEN SIAP
Dana Wahyu Prismawan Sub TA GIS - 1 2,48 6.500.000 16.120.000 2,48 16.120.000 0,00 6.500.000 0 2,48 16.120.000 0,00 0
Meyuston Lenggu Sub TA GIS - 2 2,48 6.500.000 16.120.000 2,48 16.088.800 0,00 6.500.000 0 2,48 16.088.800 0,00 31.200
Bagus Subakti Sub TA GIS - 3 2,48 6.500.000 16.120.000 2,47 16.076.914 0,00 6.500.000 0 2,47 16.076.914 0,01 43.086
Nyimas Martha O Sub TA Urban Planner - 1 1,85 6.500.000 12.000.000 1,84 11.950.000 0,00 6.500.000 0 1,84 11.950.000 0,01 50.000
Saifudin Sub TA Urban Planner - 2 1,85 6.500.000 12.000.000 1,84 11.950.000 0,00 6.500.000 0 1,84 11.950.000 0,01 50.000
Cristina Lukita Sari Sub TA Urban Planner - 3 1,80 6.500.000 11.700.000 1,80 11.695.238 0,00 6.500.000 0 1,80 11.695.238 0,00 4.762
Danny Mahardika Sub TA Teknik & Arsitek - 1 1,96 6.500.000 12.771.500 1,96 12.771.428 0,00 6.500.000 0 1,96 12.771.428 0,00 72
Aries Munanto Sub TA Teknik & Arsitek - 2 1,96 6.500.000 12.677.000 1,95 12.650.000 0,00 6.500.000 0 1,95 12.650.000 0,01 27.000
Saiful Anam Sub TA Teknik & Arsitek - 3 1,96 6.500.000 12.740.000 1,95 12.650.000 0,00 6.500.000 0 1,95 12.650.000 0,01 90.000
Lia Agustina M Sub TA Teknik Environmental - 1 1,96 6.500.000 12.771.500 1,96 12.771.428 0,00 6.500.000 0 1,96 12.771.428 0,00 72
Tutut Indra I Sub TA Teknik Environmental - 2 1,96 6.500.000 12.740.000 1,95 12.650.000 0,00 6.500.000 0 1,95 12.650.000 0,01 90.000
Allen Ardianto W Sub TA Teknik Environmental - 3 1,96 6.500.000 12.740.000 1,95 12.650.000 0,00 6.500.000 0 1,95 12.650.000 0,01 90.000
TBN Cost Estimator - 1 0,00 6.500.000 0 0,00 0 0,00 6.500.000 0 0,00 0 0,00 0
TBN Cost Estimator - 2 0,00 6.500.000 0 0,00 0 0,00 6.500.000 0 0,00 0 0,00 0
TBN Cost Estimator - 3 0,00 6.500.000 0 0,00 0 0,00 6.500.000 0 0,00 0 0,00 0
Arif Fadilah Drafter/Operator 1 2,00 5.000.000 10.000.000 2,00 10.000.000 0,00 5.000.000 0 2,00 10.000.000 0,00 0
Alfan Prasetyo Drafter/Operator 2 2,00 5.000.000 10.000.000 2,00 10.000.000 0,00 5.000.000 0 2,00 10.000.000 0,00 0
Mat Arif Drafter/Operator 3 0,00 5.000.000 0 0,00 0 0,00 5.000.000 0 0,00 0 0,00 0
Ahmad Subandrio Sidik Drafter/Operator 4 0,00 5.000.000 0 0,00 0 0,00 5.000.000 0 0,00 0 0,00 0
Mohammad Firdaus Fuadi Drafter/Operator 5 0,00 5.000.000 0 0,00 0 0,00 5.000.000 0 0,00 0 0,00 0
Zainul Arifin Drafter/Operator 6 0,00 5.000.000 0 0,00 0 0,00 5.000.000 0 0,00 0 0,00 0
TBN Surveyor 5 Orang 15,00 5.000.000 75.000.000 15,00 75.000.000 0,00 5.000.000 0 15,00 75.000.000 0,00 0
TBN Tenaga Lokal 1 Surveyor 2 Orang 29,00 3.000.000 87.000.000 29,00 87.000.000 0,00 3.000.000 0 29,00 87.000.000 0,00 0
C. EAST KALIMANTAN PROVINCE 6.845.385.000 6.721.964.672 80.900.000 6.802.864.672 42.520.328
19,77 11.500.000 227.355.000 19,77 227.316.667 0,00 11.500.000 0 19,77 227.316.667 0,00 38.333
17,00 12.700.000 215.900.000 17,00 215.900.000 0,00 12.700.000 0 17,00 215.900.000 0,00 0
33,50 13.700.000 458.950.000 32,00 438.400.000 1,00 13.700.000 13.700.000 33,00 452.100.000 0,50 6.850.000
19,77 8.500.000 168.045.000 19,77 168.016.667 0,00 8.500.000 0 19,77 168.016.667 0,00 28.333
17,00 9.400.000 159.800.000 17,00 159.800.000 0,00 9.400.000 0 17,00 159.800.000 0,00 0
33,50 10.100.000 338.350.000 32,00 323.200.000 1,00 10.100.000 10.100.000 33,00 333.300.000 0,50 5.050.000
Siswo Prasetyo 5,27 8.000.000 42.160.000 5,27 42.133.333 0,00 8.000.000 0 5,27 42.133.333 0,00 26.667
14,50 8.000.000 116.000.000 14,50 116.000.000 0,00 8.000.000 0 14,50 116.000.000 0,00 0
17,00 8.600.000 146.200.000 17,00 146.200.000 0,00 8.600.000 0 17,00 146.200.000 0,00 0
19,00 9.300.000 176.700.000 19,00 176.700.000 0,00 9.300.000 0 19,00 176.700.000 0,00 0
2,00 9.300.000 18.600.000 0,50 4.650.000 1,00 9.300.000 9.300.000 1,50 13.950.000 0,50 4.650.000
19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667
17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0
19,00 9.500.000 180.500.000 19,00 180.500.000 0,00 9.500.000 0 19,00 180.500.000 0,00 0
19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 19,77 158.133.333 0,00 26.667
17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0
19,00 9.500.000 180.500.000 18,98 180.310.000 0,00 9.500.000 0 18,98 180.310.000 0,02 190.000
Hendery Casanova 12,50 9.500.000 118.750.000 11,00 104.500.000 1,00 9.500.000 9.500.000 12,00 114.000.000 0,50 4.750.000
19,00 6.500.000 123.500.000 19,00 123.500.000 0,00 6.500.000 0 19,00 123.500.000 0,00 0
17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0
1,00 7.700.000 7.700.000 1,00 7.700.000 0,00 7.700.000 0 1,00 7.700.000 0,00 0
Deny Saputra 2,55 7.700.000 19.635.000 2,55 19.635.000 0,00 7.700.000 0 2,55 19.635.000 0,00 0
19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667
17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0
33,50 9.500.000 318.250.000 32,00 304.000.000 1,00 9.500.000 9.500.000 33,00 313.500.000 0,50 4.750.000
19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667
17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0
30,00 9.500.000 285.000.000 30,00 285.000.000 0,00 9.500.000 0 30,00 285.000.000 0,00 0
1
Micro Fin & Fin.Mgmt Spec.8
7 Infrastructure Specialist
48
2
Provincial Team Leader
Socialization SpecialistHendery Casanova
Monev SpecialistHusnul Yakin Huda
Training Specialist5
Adi Suhendro
Dadang Abdullah
FX. Isgiarto
4
Abdul Rozak
Susman Haryono a. Sub Spec.SME’s
Mohamad Ma'sum Damiri
6
Sub Prof, Administration 5
MIS Specialist Soetomo
3
19,00 6.500.000 123.500.000 19,00 123.500.000 0,00 6.500.000 0 19,00 123.500.000 0,00 0
17,00 7.200.000 122.400.000 17,00 122.400.000 0,00 7.200.000 0 17,00 122.400.000 0,00 0
19,00 7.700.000 146.300.000 19,00 146.300.000 0,00 7.700.000 0 19,00 146.300.000 0,00 0
Suwarno Hardjo 12,07 8.000.000 96.560.000 12,07 96.533.333 0,00 8.000.000 0 12,07 96.533.333 0,00 26.667
Umar Sodik 16,00 8.000.000 128.000.000 16,00 128.000.000 0,00 8.000.000 0 16,00 128.000.000 0,00 0
Harly Suhartono 4,00 8.500.000 34.000.000 4,00 34.000.000 0,00 8.500.000 0 4,00 34.000.000 0,00 0
Suyono 11,00 8.500.000 93.500.000 9,44 80.231.500 1,00 8.500.000 8.500.000 10,44 88.731.500 0,56 4.768.500
14,30 8.000.000 114.400.000 14,30 114.400.000 0,00 8.000.000 0 14,30 114.400.000 0,00 0
1,00 8.500.000 8.500.000 1,00 8.500.000 0,00 8.500.000 0 1,00 8.500.000 0,00 0
Muhammad Tauhid 20,00 8.500.000 170.000.000 18,50 157.250.000 1,00 8.500.000 8.500.000 19,50 165.750.000 0,50 4.250.000
19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,00 5.000.000 95.000.000 19,00 95.000.000 0,00 5.000.000 0 19,00 95.000.000 0,00 0
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
33,50 5.900.000 197.650.000 32,00 188.800.000 1,00 5.900.000 5.900.000 33,00 194.700.000 0,50 2.950.000
15 Marlyana Sub Prof Financial 9,00 5.900.000 53.100.000 9,00 53.100.000 0,00 5.900.000 0 9,00 53.100.000 0,00 0
16 Yoga Oetama Sub Prof Financial 8,60 5.900.000 50.740.000 7,04 41.559.600 1,00 5.900.000 5.900.000 8,04 47.459.600 0,56 3.280.400
PERCEPATAN PENYIAPAN DOKUMEN SIAP
Dana Adisukma Sub TA GIS - 1 2,30 6.500.000 14.950.000 2,30 14.925.000 0,00 6.500.000 0 2,30 14.925.000 0,00 25.000
Tommy Sembiring Sub TA GIS - 2 2,30 6.500.000 14.950.000 2,30 14.789.286 0,00 6.500.000 0 2,30 14.789.286 0,00 160.714
Monthana Kharisma Kadri Sub TA Urban Planner - 1 2,30 6.500.000 14.950.000 2,30 14.925.000 0,00 6.500.000 0 2,30 14.925.000 0,00 25.000
Jelita Citrawati Jihan Sub TA Urban Planner - 2 2,30 6.500.000 14.950.000 2,30 14.789.286 0,00 6.500.000 0 2,30 14.789.286 0,00 160.714
Reni Handayani Sub TA Tehnik & Arsitek - 1 2,40 6.500.000 15.600.000 2,40 15.476.190 0,00 6.500.000 0 2,40 15.476.190 0,00 123.810
Untung Sub TA Tehnik & Arsitek - 2 2,40 6.500.000 15.600.000 2,40 15.476.191 0,00 6.500.000 0 2,40 15.476.191 0,00 123.809
Febrina Zulya Sub TA Teknik Environmental - 1 2,30 6.500.000 14.950.000 2,30 14.925.000 0,00 6.500.000 0 2,30 14.925.000 0,00 25.000
Muhammad Rizky Sa'bani Sub TA Teknik Environmental - 2 2,30 6.500.000 14.950.000 2,30 14.789.286 0,00 6.500.000 0 2,30 14.789.286 0,00 160.714
TBN Cost Estimator - 1 0,00 6.500.000 0 0,00 0 0,00 6.500.000 0 0,00 0 0,00 0
TBN Cost Estimator - 2 0,00 6.500.000 0 0,00 0 0,00 6.500.000 0 0,00 0 0,00 0
Yaskinul Anwar Drafter/Operator - 1 1,00 5.000.000 5.000.000 1,00 5.000.000 0,00 5.000.000 0 1,00 5.000.000 0,00 0
Cahyaning Permata dewi Drafter/Operator - 2 1,00 5.000.000 5.000.000 1,00 5.000.000 0,00 5.000.000 0 1,00 5.000.000 0,00 0
Hendri Fauzi Drafter/Operator - 3 1,00 5.000.000 5.000.000 1,00 5.000.000 0,00 5.000.000 0 1,00 5.000.000 0,00 0
Zeth Birawin Songgo Drafter/Operator - 4 1,00 5.000.000 5.000.000 1,00 5.000.000 0,00 5.000.000 0 1,00 5.000.000 0,00 0
Nur Ichsan, Nandik Purwanto, Erli Anastasia Wardhani Surveyor 5 Orang 3,00 5.000.000 15.000.000 3,00 15.000.000 0,00 5.000.000 0 3,00 15.000.000 0,00 0
Dian Ika Sari, Erni Loboran, Mohan Wibowo, Ermia Tammu Tenaga Lokal 1 Surveyor 2 Orang 4,00 3.000.000 12.000.000 4,00 12.000.000 0,00 3.000.000 0 4,00 12.000.000 0,00 0
D. CENTRAL KALIMANTAN PROVINCE 4.107.649.000 4.007.352.333 55.400.000 4.062.752.333 44.896.667
19,77 11.500.000 227.355.000 19,77 227.316.667 0,00 11.500.000 0 19,77 227.316.667 0,00 38.333
17,00 12.700.000 215.900.000 17,00 215.900.000 0,00 12.700.000 0 17,00 215.900.000 0,00 0
4,42 13.700.000 60.554.000 4,42 60.554.000 0,00 13.700.000 0 4,42 60.554.000 0,00 0
Anto S. Andai 26,50 13.700.000 363.050.000 25,00 342.500.000 1,00 13.700.000 13.700.000 26,00 356.200.000 0,50 6.850.000
M. Saiful Arif 12,77 8.000.000 102.160.000 12,77 102.133.333 0,00 8.000.000 0 12,77 102.133.333 0,00 26.667
H. Zainul Mushoffie 22,00 8.000.000 176.000.000 22,00 176.000.000 0,00 8.000.000 0 22,00 176.000.000 0,00 0
18,00 9.000.000 162.000.000 18,00 162.000.000 0,00 9.000.000 0 18,00 162.000.000 0,00 0
Sukwan Itta 2,00 9.000.000 18.000.000 0,50 4.500.000 1,00 9.000.000 9.000.000 1,50 13.500.000 0,50 4.500.000
Aris Hariyanto 4,77 8.000.000 38.160.000 4,77 38.133.333 0,00 8.000.000 0 4,77 38.133.333 0,00 26.667
14,00 8.000.000 112.000.000 14,00 112.000.000 0,00 8.000.000 0 14,00 112.000.000 0,00 0
17,00 8.600.000 146.200.000 17,00 146.200.000 0,00 8.600.000 0 17,00 146.200.000 0,00 0
10,00 9.300.000 93.000.000 10,00 93.000.000 0,00 9.300.000 0 10,00 93.000.000 0,00 0
Suwisnu 16,00 9.300.000 148.800.000 14,50 134.850.000 1,00 9.300.000 9.300.000 15,50 144.150.000 0,50 4.650.000
Moh. Zamroni S. 5,27 8.000.000 42.160.000 5,27 42.133.333 0,00 8.000.000 0 5,27 42.133.333 0,00 26.667
Wahyu Hidayat 6,50 8.000.000 52.000.000 6,50 52.000.000 0,00 8.000.000 0 6,50 52.000.000 0,00 0
21,00 8.000.000 168.000.000 21,00 168.000.000 0,00 8.000.000 0 21,00 168.000.000 0,00 0
2,00 8.000.000 16.000.000 2,00 16.000.000 0,00 8.000.000 0 2,00 16.000.000 0,00 0
Alexsen L. Panjaitan 24,50 8.000.000 196.000.000 23,00 184.000.000 1,00 8.000.000 8.000.000 24,00 192.000.000 0,50 4.000.000
Mohammad Aziz
Provincial Team Leader Emmy Uthanya Antang
Training Specialist3
4 Infrastructure Specialist
Urban Planner Specialist**)11
Marlyana 12
Nur Varida Agustin
14 Sub Prof, AdministrationMarlina Indah Susanti
Sub Proff. Financial 2
Sub Proff. Financial 1
Collaboration & Local Government Spec
9 a. Sub Spec. RLFYoga Oetama
Masitah Harahap
Heru Agus Sulistyo
10
13
MIS Specialist
1
2
19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667
16,00 8.800.000 140.800.000 16,00 140.800.000 0,00 8.800.000 0 16,00 140.800.000 0,00 0
2,00 8.800.000 17.600.000 2,00 17.600.000 0,00 8.800.000 0 2,00 17.600.000 0,00 0
Yusnita 21,00 8.800.000 184.800.000 21,00 184.800.000 0,00 8.800.000 0 21,00 184.800.000 0,00 0
19,00 8.000.000 152.000.000 19,00 152.000.000 0,00 8.000.000 0 19,00 152.000.000 0,00 0
17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0
24,50 9.500.000 232.750.000 22,87 217.265.000 1,00 9.500.000 9.500.000 23,87 226.765.000 0,63 5.985.000
14,30 8.000.000 114.400.000 14,30 114.400.000 0,00 8.000.000 0 14,30 114.400.000 0,00 0
28,00 8.500.000 238.000.000 28,00 238.000.000 0,00 8.500.000 0 28,00 238.000.000 0,00 0
TBN 0,50 8.000.000 4.000.000 0,00 0 0,00 8.000.000 0 0,00 0 0,50 4.000.000
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 23,50 5.900.000 138.650.000 21,00 118.000.000 1,00 5.900.000 5.900.000 22,00 123.900.000 1,50 14.750.000
9 TBN Sub Proff. Financial 1,00 5.900.000 5.900.000 1,00 5.900.000 0,00 5.900.000 0 1,00 5.900.000 0,00 0
E. SOUTH KALIMANTAN PROVINCE 7.089.140.000 6.966.640.164 78.500.000 7.045.140.164 43.999.836
1 19,77 11.500.000 227.355.000 19,77 227.316.667 0,00 11.500.000 0 19,77 227.316.667 0,00 38.333
7,35 12.700.000 93.345.000 7,35 93.345.000 0,00 12.700.000 0 7,35 93.345.000 0,00 0
Iwan Setiawan 42,50 12.700.000 539.750.000 41,00 518.950.000 1,00 12.700.000 12.700.000 42,00 531.650.000 0,50 8.100.000
Hasan Ubaidillah 5,27 8.500.000 44.795.000 5,27 44.766.667 0,00 8.500.000 0 5,27 44.766.667 0,00 28.333
14,50 8.500.000 123.250.000 14,50 123.250.000 0,00 8.500.000 0 14,50 123.250.000 0,00 0
8,00 9.200.000 73.600.000 8,00 73.600.000 0,00 9.200.000 0 8,00 73.600.000 0,00 0
0,00 9.200.000 0 0,00 0 0,00 9.200.000 0 0,00 0 0,00 0
Arif Rachman / Ahmad Zaini 27,10 9.200.000 249.320.000 25,52 234.748.387 1,00 9.200.000 9.200.000 26,52 243.948.387 0,58 5.371.613
19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667
17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0
1,00 9.500.000 9.500.000 1,00 9.500.000 0,00 9.500.000 0 1,00 9.500.000 0,00 0
3,00 9.500.000 28.500.000 3,00 28.500.000 0,00 9.500.000 0 3,00 28.500.000 0,00 0
11,00 9.500.000 104.500.000 11,00 104.500.000 0,00 9.500.000 0 11,00 104.500.000 0,00 0
Dwi Joko Riswoto 2,00 8.000.000 16.000.000 0,50 4.000.000 1,00 8.000.000 8.000.000 1,50 12.000.000 0,50 4.000.000
19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667
17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0
19,00 9.500.000 180.500.000 19,00 180.500.000 0,00 9.500.000 0 19,00 180.500.000 0,00 0
19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667
17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0
32,00 9.500.000 304.000.000 30,50 289.750.000 1,00 9.500.000 9.500.000 31,50 299.250.000 0,50 4.750.000
Arif Rachman 5,27 6.500.000 34.255.000 5,27 34.233.333 0,00 6.500.000 0 5,27 34.233.333 0,00 21.667
Sari Melawati 4,00 6.500.000 26.000.000 4,00 26.000.000 0,00 6.500.000 0 4,00 26.000.000 0,00 0
M. Yatin 10,76 6.500.000 69.940.000 10,76 69.940.000 0,00 6.500.000 0 10,76 69.940.000 0,00 0
13,00 6.500.000 84.500.000 13,00 84.500.000 0,00 6.500.000 0 13,00 84.500.000 0,00 0
5,00 6.900.000 34.500.000 5,00 34.500.000 0,00 6.900.000 0 5,00 34.500.000 0,00 0
Muhammad Ripay 9,00 6.900.000 62.100.000 9,00 62.100.000 0,00 6.900.000 0 9,00 62.100.000 0,00 0
19,77 8.000.000 158.160.000 19,77 158.133.333 0,00 8.000.000 0 19,77 158.133.333 0,00 26.667
17,00 8.800.000 149.600.000 17,00 149.600.000 0,00 8.800.000 0 17,00 149.600.000 0,00 0
33,50 9.500.000 318.250.000 32,00 304.000.000 1,00 9.500.000 9.500.000 33,00 313.500.000 0,50 4.750.000
8,77 10.000.000 87.700.000 8,77 87.666.667 0,00 10.000.000 0 8,77 87.666.667 0,00 33.333
19,00 10.000.000 190.000.000 19,00 190.000.000 0,00 10.000.000 0 19,00 190.000.000 0,00 0
Rusdian 33,00 10.000.000 330.000.000 33,00 330.000.000 0,00 10.000.000 0 33,00 330.000.000 0,00 0
19,00 6.500.000 123.500.000 19,00 123.500.000 0,00 6.500.000 0 19,00 123.500.000 0,00 0
14,00 7.200.000 100.800.000 14,00 100.800.000 0,00 7.200.000 0 14,00 100.800.000 0,00 0
0,00 7.200.000 0 0,00 0 0,00 7.200.000 0 0,00 0 0,00 0
Akhmad Ridhany Fidzi 5,00 7.200.000 36.000.000 5,00 36.000.000 0,00 7.200.000 0 5,00 36.000.000 0,00 0
Iwan Setiawan 5,27 8.000.000 42.160.000 5,27 42.133.333 0,00 8.000.000 0 5,27 42.133.333 0,00 26.667
14,50 8.000.000 116.000.000 14,50 116.000.000 0,00 8.000.000 0 14,50 116.000.000 0,00 0
17,00 8.600.000 146.200.000 17,00 146.200.000 0,00 8.600.000 0 17,00 146.200.000 0,00 0
4,00 9.300.000 37.200.000 4,00 37.200.000 0,00 9.300.000 0 4,00 37.200.000 0,00 0
Edi Sudiono 23,50 9.300.000 218.550.000 21,90 203.651.400 1,00 9.300.000 9.300.000 22,90 212.951.400 0,60 5.598.600
10,00 8.000.000 80.000.000 9,97 79.733.333 0,00 8.000.000 0 9,97 79.733.333 0,03 266.667
14,36 8.000.000 114.880.000 14,35 114.838.710 0,00 8.000.000 0 14,35 114.838.710 0,01 41.290
32,00 8.500.000 272.000.000 30,50 259.250.000 1,00 8.500.000 8.500.000 31,50 267.750.000 0,50 4.250.000
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Provincial Team Leader
12
Urban Planner Specialist**)7
Local Gov & Public Policy Spec
Yusepta
Training Specialist
Collaboration & Local Government SpecAnto S. Andai / Frind Emanuel
Kusdarminto
Rini S. Friyanti
a. Sub Spec.SME’s
Irfan / Firman S
Socialization Specialist
Akhmad Ridhany Fidzi Sub Proff. Financial 2
Sukwan Itta
4
5
6
7
Arif Rachman10
9
8
13
6
8Sub Proff. Financial
Bagus Priono
Deni Jauhari
Monev SpecialistIwan Setiawan2
3 MIS Specialist
Micro Fin & Fin.Mgmt Spec.Asmaul Aziz
5
Infrastructure Specialist
Edi Sudiono
a. Sub Spec. RLF
Ardan Noor
Sarkowi
Dwi Kurniasih 11
Micro Fin & Fin.Mgmt Spec.
Rusdian
Sub Proff. Financial 1
Urban Planner Specialist**)
Abdolli
Fathur Rahmi Gultom
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
7,00 5.900.000 41.300.000 7,00 41.300.000 0,00 5.900.000 0 7,00 41.300.000 0,00 0
Sub Proff Admin for Kota/Kabupaten 3,00 5.900.000 17.700.000 3,00 17.700.000 0,00 5.900.000 0 3,00 17.700.000 0,00 0
19,77 5.000.000 98.850.000 19,77 98.833.333 0,00 5.000.000 0 19,77 98.833.333 0,00 16.667
17,00 5.500.000 93.500.000 17,00 93.500.000 0,00 5.500.000 0 17,00 93.500.000 0,00 0
33,50 5.900.000 197.650.000 32,00 188.800.000 1,00 5.900.000 5.900.000 33,00 194.700.000 0,50 2.950.000
16 Nor Afidah Sub Prof Financial 9,00 5.900.000 53.100.000 9,00 53.100.000 0,00 5.900.000 0 9,00 53.100.000 0,00 0
17 Nor Afidah Sub Prof Financial 8,00 5.900.000 47.200.000 6,50 38.350.000 1,00 5.900.000 5.900.000 7,50 44.250.000 0,50 2.950.000
PERCEPATAN PENYIAPAN DOKUMEN SIAP
Mulyadi Sub TA GIS 2,30 6.500.000 14.950.000 2,30 14.950.000 0,00 6.500.000 0 2,30 14.950.000 0,00 0
Bubun Primbun Sub TA Urban Planner 2,30 6.500.000 14.950.000 2,25 14.625.000 0,00 6.500.000 0 2,25 14.625.000 0,05 325.000
Dini Danianti Sub TA Tehnik & Arsitek 2,30 6.500.000 14.950.000 2,30 14.950.000 0,00 6.500.000 0 2,30 14.950.000 0,00 0
Ainal Muttaqin, ST Sub TA Teknik Environmental 2,30 6.500.000 14.950.000 2,25 14.625.000 0,00 6.500.000 0 2,25 14.625.000 0,05 325.000
TBN Cost Estimator 0,00 6.500.000 0 0,00 0 0,00 6.500.000 0 0,00 0 0,00 0
Fitri Eka Sumitra Drafter/Operator - 1 1,00 5.000.000 5.000.000 1,00 5.000.000 0,00 5.000.000 0 1,00 5.000.000 0,00 0
Eka Saktianto Drafter/Operator - 2 1,00 5.000.000 5.000.000 1,00 5.000.000 0,00 5.000.000 0 1,00 5.000.000 0,00 0
Wahyu Kurniawan, Alpianor, Isa Ansari, M. Zakaria, Abdurrahman Surveyor 5 Orang 5,00 5.000.000 25.000.000 5,00 25.000.000 0,00 5.000.000 0 5,00 25.000.000 0,00 0
TBN Tenaga Lokal 1 Surveyor 2 Orang 0,00 3.000.000 0 0,00 0 0,00 3.000.000 0 0,00 0 0,00 0
36.574.483.000 36.067.330.764 320.000.000 36.387.330.764 187.152.236
1.2.Supporting Staff Februari 2018
NO NAMA POSISI
MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL
A. EAST JAVA PROVINCE 936.227.500 914.640.000 11.300.000 925.940.000 10.287.50018,77 3.500.000 65.695.000 18,77 65.683.333 0,00 3.500.000 0 18,77 65.683.333 0,00 11.66717,00 3.800.000 64.600.000 17,00 64.600.000 0,00 3.800.000 0 17,00 64.600.000 0,00 033,50 4.100.000 137.350.000 32,00 131.200.000 1,00 4.100.000 4.100.000 33,00 135.300.000 0,50 2.050.0004,00 2.000.000 8.000.000 4,00 8.000.000 0,00 2.000.000 0 4,00 8.000.000 0,00 0
16,00 2.200.000 35.200.000 16,00 35.200.000 0,00 2.200.000 0 16,00 35.200.000 0,00 033,50 2.400.000 80.400.000 32,00 76.800.000 1,00 2.400.000 2.400.000 33,00 79.200.000 0,50 1.200.00019,77 2.000.000 39.540.000 19,77 39.533.333 0,00 2.000.000 0 19,77 39.533.333 0,00 6.66717,00 2.200.000 37.400.000 17,00 37.400.000 0,00 2.200.000 0 17,00 37.400.000 0,00 032,50 2.400.000 78.000.000 31,00 74.400.000 1,00 2.400.000 2.400.000 32,00 76.800.000 0,50 1.200.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 31,50 45.675.000 0,00 1.450.000 0 31,50 45.675.000 2,00 2.900.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 21.250.000 0,00 1.250.000 0 17,00 21.250.000 0,00 1.700.00019,00 1.450.000 27.550.000 19,00 27.550.000 0,00 1.450.000 0 19,00 27.550.000 0,00 0
Ramadhani Fitriza 15,77 1.250.000 19.712.500 15,77 19.708.333 0,00 1.250.000 0 15,77 19.708.333 0,00 4.1670,00 1.350.000 0 0,00 0 0,00 1.350.000 0 0,00 0 0,00 00,00 1.450.000 0 0,00 0 1.450.000 0 0,00 0 0,00 0
TBN 0,00 1.450.000 0 0,00 0 0,00 1.450.000 0 0,00 0 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33315,00 1.100.000 16.500.000 15,00 16.500.000 0,00 1.100.000 0 15,00 16.500.000 0,00 033,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00019,00 1.000.000 19.000.000 19,00 19.000.000 0,00 1.000.000 0 19,00 19.000.000 0,00 07,00 1.100.000 7.700.000 7,00 7.700.000 0,00 1.100.000 0 7,00 7.700.000 0,00 00,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0
PERCEPATAN PENYIAPAN DOKUMEN SIAP
Wasiatul Rosidah Ass. OM-1 2,00 2.400.000 4.800.000 2,00 4.800.000 0,00 2.400.000 0 2,00 4.800.000 0,00 0
Cahya Erni Dwi Astuti Ass. OM-2 2,00 2.400.000 4.800.000 2,00 4.800.000 0,00 2.400.000 0 2,00 4.800.000 0,00 0
Hasti Widyani Ass. OM-3 1,00 2.400.000 2.400.000 1,00 2.400.000 0,00 2.400.000 0 1,00 2.400.000 0,00 0
TBN Sekretaris/ Comp Oprtr-1 0,00 2.000.000 0 0,00 0 0,00 2.000.000 0 0,00 0 0,00 0
TBN Sekretaris/ Comp Oprtr-2 0,00 2.000.000 0 0,00 0 0,00 2.000.000 0 0,00 0 0,00 0
TBN Sekretaris/ Comp Oprtr-3 0,00 2.000.000 0 0,00 0 0,00 2.000.000 0 0,00 0 0,00 0
Sri Utami OB-1 2,00 1.200.000 2.400.000 2,00 2.400.000 0,00 1.200.000 0 2,00 2.400.000 0,00 0
15
Office Manager
Ramadhani Fitriza Ass. Office Manager
1
14
13
2
3
4
Eko Heppy Nugroho 5
9
Danar Hadi Prasetyo
Sri Windari Office Boy7
6
Security 2M. Muchlis Chumaida
TBN Computer Operator 3
SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INICONTRACT AMOUNT + AMANDEMEN 23
Nor Afidah Sub Proff. Financial 3
Ika Oktavianti/ Romdhoni Secretary
Computer Operator 1
Computer Operator 2
Romdhoni
Security 18
Bangkit Priyohusodho / Muhson
Sub Prof, AdministrationRisna Hastuti
Sub Total 1.1
Mukhammad Zainuri OB-2 1,20 1.200.000 1.440.000 1,20 1.440.000 0,00 1.200.000 0 1,20 1.440.000 0,00 0
Daud Supriyadi OB-3 1,00 1.200.000 1.200.000 1,00 1.200.000 0,00 1.200.000 0 1,00 1.200.000 0,00 0
KORKOT 3.860.267.500 3.824.301.333 22.400.000 3.846.701.333 13.566.167 19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 1 (Kab. Pacitan) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 2 (Kab. Ponorogo) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 3 (Kab. Tulung 33,50 1.450.000 48.575.000 32,00 46.400.000 1,00 1.450.000 1.450.000 33,00 47.850.000 0,50 725.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 4 (Kab. Blitar) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 5 (Kab. Kediri) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 6 (Kota. Kediri) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 7 (Kab. Jombang) 33,50 1.450.000 48.575.000 32,00 46.400.000 1,00 1.450.000 1.450.000 33,00 47.850.000 0,50 725.00019,37 1.250.000 24.212.500 17,77 24.205.000 0,00 1.250.000 0 17,77 24.205.000 1,60 7.50017,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 8 (Kab. Nganjuk) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 020,17 1.250.000 25.212.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,40 504.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 9 (Kota Madiun) 33,50 1.450.000 48.575.000 32,00 46.400.000 1,00 1.450.000 1.450.000 33,00 47.850.000 0,50 725.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 10 (kab. Magetan) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 11 (Kab. 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 12 (Kab. 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 13 (Kab. Gresik) 30,50 1.450.000 44.225.000 29,00 42.050.000 1,00 1.450.000 1.450.000 30,00 43.500.000 0,50 725.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 14 (Kota Surabaya) 27,50 1.450.000 39.875.000 27,50 38.193.000 0,00 1.450.000 0 27,50 38.193.000 0,00 1.682.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 15 (Kab. Sidoarjo) 33,50 1.450.000 48.575.000 32,00 46.400.000 1,00 1.450.000 1.450.000 33,00 47.850.000 0,50 725.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 16 (Kab. Mojokerto) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 17 (Kota Malang) 33,50 1.450.000 48.575.000 32,00 46.400.000 1,00 1.450.000 1.450.000 33,00 47.850.000 0,50 725.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 18 (Kab. Malang) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 19 (Kab. Pasuruan) 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 20 (Kota. 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 21 (Kab. 33,50 1.450.000 48.575.000 32,00 46.400.000 1,00 1.450.000 1.450.000 33,00 47.850.000 0,50 725.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 22 (Kab. Jember) 33,50 1.450.000 48.575.000 32,00 46.400.000 1,00 1.450.000 1.450.000 33,00 47.850.000 0,50 725.000
Computer Operator 20
Heny Lutfiana16
Sofyan Akilie15
Computer Operator 21
Computer Operator 22
13
20
Stifani Fauziyah, Amd /Afan Januar H, ST22
Delia Ratna Susita/ Siti Fatimah21
Wasiatul Rosidah14
Rizqiyyah Muyassaroh18
Rizqiyyah Muyassaroh17
Intan Budi Arifah19
Computer Operator 17
Computer Operator 19
4
Nofa Eka Aprillia3
Computer Operator 16
10
Dewi Martiyana9
Eka Novita Sari
12
Nurul Safitri
8
7
Nella Wati6
5
Computer Operator 7
Computer Operator 8Yesi Fatmasari
Riza Zuhrroti Mawaddah
2
Computer Operator 3
Computer Operator 2
1
Budi Santoso
Andrias C EkoComputer Operator 1
Maslukha
Nurul Hidayah
Computer Operator 18
11 Moh. Ali
Hana Hariani
Siti Sholikhah
Computer Operator 15
Computer Operator 14
Computer Operator 11
Computer Operator 12
Computer Operator 13
Computer Operator 4
Computer Operator 5
Computer Operator 6
Computer Operator 10
Computer Operator 9
19,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 23 (Kab. 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 0
Computer Operator 24 (Kab. 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16713,00 1.350.000 17.550.000 13,00 17.550.000 0,00 1.350.000 0 13,00 17.550.000 0,00 0
Computer Operator 25 (Kab. 22,00 1.450.000 31.900.000 22,00 31.900.000 0,00 1.450.000 0 22,00 31.900.000 0,00 0
TBN Computer Operator Kab. Bondowoso 0,00 1.450.000 0 0,00 0 0,00 1.450.000 0 0,00 0 0,00 0
TBN Computer Operator Kota Pasuruan 0,00 1.450.000 0 0,00 0 0,00 1.450.000 0 0,00 0 0,00 0
TBN Computer Operator Kab. Trenggalek 0,00 1.450.000 0 0,00 0 0,00 1.450.000 0 0,00 0 0,00 0
19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 1 (Kab. Pacitan) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 2 (Kab. Ponorogo) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 3 (Kab. Tulung Agung) 33,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 4 (Kab. Blitar) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 5 (Kab. Kediri) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 6 (Kota Kediri) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 7 (Kab. Jombang) 33,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00017,77 1.000.000 17.770.000 17,77 17.770.000 0,00 1.000.000 0 17,77 17.770.000 0,00 017,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 8 (Kab. Nganjuk) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 9 (Kota Madiun) 33,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 10 (Kab. Magetan) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 11 (Kab. Bojonegoro) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 12 (Kab. Lamongan) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 0
19,00 1.000.000 19.000.000 19,00 19.000.000 0,00 1.000.000 0 19,00 19.000.000 0,00 0
17,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 13 (Kab. Gresik) 31,50 1.200.000 37.800.000 30,00 36.000.000 1,00 1.200.000 1.200.000 31,00 37.200.000 0,50 600.000
19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 14 (Kota Surabaya) 33,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 15 (Kab. Sidoarjo) 33,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 16 (Kab. Mojokerto) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 17 (Kota Malang) 33,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 18 (Kab. Malang) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 19 (Kab. Pasuruan) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 0
Lintang Atyophya
Heri Waluyo29
Ahmadi
Office Boy 14
Office Boy 15
Office Boy 16
Office Boy 17
M. Kholili 40
Djumadi42
39
Aminun38
Suryanto37
34
Nurhadi
36
Office Boy 2
Computer Operator 25
Office Boy 1
Yudit Suryo Prayugo23
Computer Operator 24
Computer Operator 23
35
M. Sholihah
Office Boy 18
Office Boy 19
Dian Wahyuni41
Dewi Masita44
Priyo Aji Saputro43
Office Boy 9
Office Boy 10
Office Boy 11
Office Boy 12
Office Boy 13
Office Boy 3
Office Boy 4
Office Boy 5
Office Boy 8
Office Boy 7
Office Boy 6
Yuli Purwaningtyas
33
Wiwid Basuki31
Abelia Sanjaya30
Achmad Fatoni32
Ulin Nayyiron
26
Puji Lestari27
28
Lisa Eka Nur Apri Septiana25
Mukarom
Nur Dewi Asiyah
24
19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 20 (Kota Pasuruan) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 21 (Kab. Probolinggo) 33,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 22 (Kab. Jember) 32,50 1.200.000 39.000.000 31,00 37.200.000 1,00 1.200.000 1.200.000 32,00 38.400.000 0,50 600.00019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 23 (Kab. Situbondo) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 24 (Kab. Banyuwangi) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 0
Office Boy 25 (Kab. Pamekasan) 22,00 1.200.000 26.400.000 22,00 26.400.000 0,00 1.200.000 0 22,00 26.400.000 0,00 0
TBN Office Boy Kab. Bondowoso 0,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0
TBN Office Boy Kota Pasuruan 0,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0
TBN Office Boy Kab. Trenggalek 0,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0
B. SOUTH KALIMANTAN PROVINCE 685.932.500 671.358.333 8.500.000 679.858.333 6.074.16719,77 2.000.000 39.540.000 19,77 39.533.333 0,00 2.000.000 0 19,77 39.533.333 0,00 6.66717,00 2.200.000 37.400.000 17,00 37.400.000 0,00 2.200.000 0 17,00 37.400.000 0,00 033,50 2.400.000 80.400.000 32,00 76.800.000 1,00 2.400.000 2.400.000 33,00 79.200.000 0,50 1.200.00019,77 1.750.000 34.597.500 19,77 34.591.667 0,00 1.750.000 0 19,77 34.591.667 0,00 5.83317,00 1.850.000 31.450.000 17,00 31.450.000 0,00 1.850.000 0 17,00 31.450.000 0,00 033,50 2.000.000 67.000.000 32,00 64.000.000 1,00 2.000.000 2.000.000 33,00 66.000.000 0,50 1.000.00019,77 1.500.000 29.655.000 19,77 29.650.000 0,00 1.500.000 0 19,77 29.650.000 0,00 5.00017,00 1.600.000 27.200.000 17,00 27.200.000 0,00 1.600.000 0 17,00 27.200.000 0,00 026,50 1.700.000 45.050.000 25,00 42.500.000 1,00 1.700.000 1.700.000 26,00 44.200.000 0,50 850.00018,00 1.500.000 27.000.000 18,00 27.000.000 0,00 1.500.000 0 18,00 27.000.000 0,00 017,00 1.600.000 27.200.000 17,00 27.200.000 0,00 1.600.000 0 17,00 27.200.000 0,00 019,00 1.700.000 32.300.000 19,00 32.300.000 0,00 1.700.000 0 19,00 32.300.000 0,00 019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33316,00 1.100.000 17.600.000 16,00 17.600.000 0,00 1.100.000 0 16,00 17.600.000 0,00 033,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00018,00 1.000.000 18.000.000 18,00 18.000.000 0,00 1.000.000 0 18,00 18.000.000 0,00 017,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 02,50 1.200.000 3.000.000 1,00 1.200.000 0,00 1.200.000 0 1,00 1.200.000 1,50 1.800.000
PERCEPATAN PENYIAPAN DOKUMEN SIAPFahrin Rosyadi Ass. OM 2,00 2.400.000 4.800.000 2,00 4.800.000 0,00 2.400.000 0 2,00 4.800.000 0,00 0
Doni Pranata Sekretaris/ Comp Oprtr 2,00 2.000.000 4.000.000 2,00 4.000.000 0,00 2.000.000 0 2,00 4.000.000 0,00 0
Jiyani OB 2,00 1.200.000 2.400.000 2,00 2.400.000 0,00 1.200.000 0 2,00 2.400.000 0,00 0
KORKOT 730.055.000 710.200.000 13.250.000 723.450.000 6.605.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 32,00 46.400.000 1,00 1.450.000 1.450.000 33,00 47.850.000 0,50 725.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,50 1.350.000 23.625.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,50 675.00033,00 1.450.000 47.850.000 32,00 46.400.000 1,00 1.450.000 1.450.000 33,00 47.850.000 0,00 019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 32,00 46.400.000 1,00 1.450.000 1.450.000 33,00 47.850.000 0,50 725.00019,77 1.250.000 24.712.500 19,77 24.708.333 0,00 1.250.000 0 19,77 24.708.333 0,00 4.16717,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 32,00 46.400.000 1,00 1.450.000 1.450.000 33,00 47.850.000 0,50 725.000
5 Ana Dewi Lestari Computer Operator 5 11,50 1.450.000 16.675.000 10,00 14.500.000 1,00 1.450.000 1.450.000 11,00 15.950.000 0,50 725.000
19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00019,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.000
8
Computer Operator 4
3
5
Sefriady
Office Boy 2Muhammad Nurdiansyah7
Suci Arliati6
Computer Operator 3
4
Rita EW
Office Boy 1
Irfan
Office Boy 24
Office Boy 20
Office Boy 21
3
Misbachul Munir 45
Fitria Widianti48
47Office Boy 22
Heny Nur Cahyani
50
49
Office Boy 25
Office Boy 23
Joko Sulistyono46
Computer Operator 1
Hasiyah
Kurdi/Iwan Sunata/Angga Saputra
Joko Maryudanto
Senol Afidin
Computer Operator 2
SecretaryKhairunnisa2
Computer Operator 1
7
6
Office Boy
Security 1
Security 2
Computer Operator 2Adin Junia
Office Boy 3
Ass Office Manager
Hartomi Taher
Mutia Hikmah2
1
Nor Asikin1
4
Mulyani/Yetty Fatimah
Noviyanti
19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.000
10 Gading Melati Office Boy 5 11,50 1.200.000 13.800.000 10,00 12.000.000 1,00 1.200.000 1.200.000 11,00 13.200.000 0,50 600.000
C. CENTRAL KALIMANTAN PROVINCE 705.642.500 692.875.000 8.500.000 701.375.000 4.267.50019,77 2.000.000 39.540.000 19,77 39.533.333 0,00 2.000.000 0 19,77 39.533.333 0,00 6.66717,00 2.200.000 37.400.000 17,00 37.400.000 0,00 2.200.000 0 17,00 37.400.000 0,00 033,50 2.400.000 80.400.000 32,00 76.800.000 1,00 2.400.000 2.400.000 33,00 79.200.000 0,50 1.200.00019,77 1.750.000 34.597.500 19,77 34.591.667 0,00 1.750.000 0 19,77 34.591.667 0,00 5.83316,00 1.850.000 29.600.000 16,00 29.600.000 0,00 1.850.000 0 16,00 29.600.000 0,00 033,50 2.000.000 67.000.000 32,00 64.000.000 1,00 2.000.000 2.000.000 33,00 66.000.000 0,50 1.000.00019,77 1.500.000 29.655.000 19,77 29.650.000 0,00 1.500.000 0 19,77 29.650.000 0,00 5.00017,00 1.600.000 27.200.000 17,00 27.200.000 0,00 1.600.000 0 17,00 27.200.000 0,00 033,50 1.700.000 56.950.000 32,00 54.400.000 1,00 1.700.000 1.700.000 33,00 56.100.000 0,50 850.00019,00 1.500.000 28.500.000 19,00 28.500.000 0,00 1.500.000 0 19,00 28.500.000 0,00 017,00 1.600.000 27.200.000 17,00 27.200.000 0,00 1.600.000 0 17,00 27.200.000 0,00 019,00 1.700.000 32.300.000 19,00 32.300.000 0,00 1.700.000 0 19,00 32.300.000 0,00 019,77 1.000.000 19.770.000 19,77 19.770.000 0,00 1.000.000 0 19,77 19.770.000 0,00 017,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00017,23 1.000.000 17.230.000 17,23 17.230.000 0,00 1.000.000 0 17,23 17.230.000 0,00 017,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 029,50 1.200.000 35.400.000 28,00 33.600.000 1,00 1.200.000 1.200.000 29,00 34.800.000 0,50 600.00019,00 1.000.000 19.000.000 19,00 19.000.000 0,00 1.000.000 0 19,00 19.000.000 0,00 017,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 023,00 1.200.000 27.600.000 23,00 27.600.000 0,00 1.200.000 0 23,00 27.600.000 0,00 0
KORKOT 173.945.000 169.966.668 2.650.000 172.616.668 1.328.33219,00 1.250.000 23.750.000 19,00 23.750.000 0,00 1.250.000 0 19,00 23.750.000 0,00 017,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 32,00 46.400.000 1,00 1.450.000 1.450.000 33,00 47.850.000 0,50 725.00019,77 1.000.000 19.770.000 19,77 19.766.668 0,00 1.000.000 0 19,77 19.766.668 0,00 3.33217,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.000
D. EAST KALIMANTAN PROVINCE 519.810.000 509.606.667 6.800.000 516.406.667 3.403.33319,00 2.000.000 38.000.000 19,00 38.000.000 0,00 2.000.000 0 19,00 38.000.000 0,00 017,00 2.200.000 37.400.000 17,00 37.400.000 0,00 2.200.000 0 17,00 37.400.000 0,00 033,50 2.400.000 80.400.000 32,00 76.800.000 1,00 2.400.000 2.400.000 33,00 79.200.000 0,50 1.200.00019,00 1.750.000 33.250.000 19,00 33.250.000 0,00 1.750.000 0 19,00 33.250.000 0,00 017,00 1.850.000 31.450.000 17,00 31.450.000 0,00 1.850.000 0 17,00 31.450.000 0,00 033,50 2.000.000 67.000.000 32,00 64.000.000 1,00 2.000.000 2.000.000 33,00 66.000.000 0,50 1.000.00019,00 1.500.000 28.500.000 19,00 28.500.000 0,00 1.500.000 0 19,00 28.500.000 0,00 016,00 1.600.000 25.600.000 16,00 25.600.000 0,00 1.600.000 0 16,00 25.600.000 0,00 00,00 1.700.000 0 0,00 0 0,00 1.700.000 0 0,00 0 0,00 00,00 1.500.000 0 0,00 0 0,00 1.500.000 0 0,00 0 0,00 04,00 1.600.000 6.400.000 4,00 6.400.000 0,00 1.600.000 0 4,00 6.400.000 0,00 00,00 1.700.000 0 0,00 0 0,00 1.700.000 0 0,00 0 0,00 0
19,77 1.000.000 19.770.000 19,77 19.766.667 0,00 1.000.000 0 19,77 19.766.667 0,00 3.33317,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.00015,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 017,00 1.100.000 18.700.000 17,00 18.700.000 0,00 1.100.000 0 17,00 18.700.000 0,00 033,50 1.200.000 40.200.000 32,00 38.400.000 1,00 1.200.000 1.200.000 33,00 39.600.000 0,50 600.0000,00 1.000.000 0 0,00 0 0,00 1.000.000 0 0,00 0 0,00 00,00 1.100.000 0 0,00 0 0,00 1.100.000 0 0,00 0 0,00 00,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0
PERCEPATAN PENYIAPAN DOKUMEN SIAP 0,00 0
Shinta Ayu Lestari Ass. OM-1 2,00 2.400.000 4.800.000 2,00 4.800.000 0,00 2.400.000 0 2,00 4.800.000 0,00 0
Yenni Kombong Ass. OM-2 1,30 2.400.000 3.120.000 1,30 3.120.000 0,00 2.400.000 0 1,30 3.120.000 0,00 0
Nanda Kusuma Wardani Sekretaris/ Comp Oprtr-1 2,00 2.000.000 4.000.000 2,00 4.000.000 0,00 2.000.000 0 2,00 4.000.000 0,00 0
Sarce Padondan Sekretaris/ Comp Oprtr-2 1,50 2.000.000 3.000.000 1,50 3.000.000 0,00 2.000.000 0 1,50 3.000.000 0,00 0
Natal Kristian OB-1 2,00 1.200.000 2.400.000 2,00 2.400.000 0,00 1.200.000 0 2,00 2.400.000 0,00 0
Maria Jenny OB-2 1,60 1.200.000 1.920.000 1,60 1.920.000 0,00 1.200.000 0 1,60 1.920.000 0,00 0
KORKOT 451.530.000 439.575.000 7.950.000 447.525.000 4.005.00019,00 1.250.000 23.750.000 19,00 23.750.000 0,00 1.250.000 0 19,00 23.750.000 0,00 017,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 029,20 1.450.000 41.340.000 27,00 39.150.000 1,00 1.450.000 1.450.000 28,00 40.600.000 1,20 740.000
Security 1
Security 2To be name
5
To be name
Computer Operator 3Sukmawati1
Security 1Hermiko Purnama Jaya
Ass Office Manager
Secretary
7
Office Boy 4
7
Rahmanto
3 Computer Operator 1Sudirman
Computer Operator 2
Office BoySani
Azis Santoso
Heldy Yuliaty1
2
Ass Office Manager
Secretary
Andreas Andrianto/ Rizki
Computer Operator 1
Wahyu Yulianto4
6
2
Erna Fatmawaty
4
6
Yoga Setiawan/ Wahyu Yulianto5
Grid Degra Prasdiman3
Pina Yanti2
9 Suryati
1
Computer Operator 1
Office Boy 1Lodewik
Achmadi1
Computer Operator 2
Office Boy
Security 2
18,00 1.250.000 22.500.000 18,00 22.500.000 0,00 1.250.000 0 18,00 22.500.000 0,00 017,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,20 1.450.000 47.140.000 31,00 44.950.000 1,00 1.450.000 1.450.000 32,00 46.400.000 1,20 740.00017,50 1.250.000 21.875.000 17,50 21.875.000 0,00 1.250.000 0 17,50 21.875.000 0,00 017,00 1.350.000 22.950.000 17,00 22.950.000 0,00 1.350.000 0 17,00 22.950.000 0,00 033,50 1.450.000 48.575.000 32,00 46.400.000 1,00 1.450.000 1.450.000 33,00 47.850.000 0,50 725.00019,00 1.000.000 19.000.000 19,00 19.000.000 0,00 1.000.000 0 19,00 19.000.000 0,00 015,00 1.100.000 18.500.000 15,00 18.500.000 0,00 1.100.000 0 15,00 18.500.000 0,00 029,50 1.200.000 35.400.000 28,00 33.600.000 1,00 1.200.000 1.200.000 29,00 34.800.000 0,50 600.00016,00 1.000.000 16.000.000 16,00 16.000.000 0,00 1.000.000 0 16,00 16.000.000 0,00 014,00 1.100.000 15.400.000 14,00 15.400.000 0,00 1.100.000 0 14,00 15.400.000 0,00 022,50 1.200.000 27.000.000 21,00 25.200.000 1,00 1.200.000 1.200.000 22,00 26.400.000 0,50 600.00018,00 1.000.000 18.000.000 18,00 18.000.000 0,00 1.000.000 0 18,00 18.000.000 0,00 012,00 1.100.000 13.200.000 12,00 13.200.000 0,00 1.100.000 0 12,00 13.200.000 0,00 012,50 1.200.000 15.000.000 11,00 13.200.000 1,00 1.200.000 1.200.000 12,00 14.400.000 0,50 600.000
8.063.410.000 7.932.523.001 81.350.000 8.013.873.001 49.536.999Sub Total 1.2
Office Boy 2
Office Boy 1Eka Saraswati6
Nur Laila5
Computer Operator 2
Computer Operator 1
Office Boy 3Ahmad Yupiansyah4
3 Iis Tri Rahayu
Dewi Tarwiyati2
II. DIRECT REIMBURSABLE COST
2.1. Duty Travel Expenses Province Jawa Timur Februari 2018
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
2.1.1 IN PROVINCE
2.1.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3% x Number of Kelurahan) 74.400.000 43.470.000 0 43.470.000 30.930.000
a. To Tulungagung, Trenggalek & Pacitan (119 kel x 3% = 4 kel)
Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0
Acomodation 6 time x 1 person x 2 days 10 150.000 1.500.000 10,00 1.470.000 0,00 150.000 0 10,00 1.470.000 0,00 30.000
OSA 6 time x 1 person x 3 days 15 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0
b. To Madiun, Kota Madiun, Nganjuk (91 kel x 3% = 3 kel)
Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0
Acomodation 6 time x 1 person x 2 days 10 150.000 1.500.000 10,00 1.500.000 0,00 150.000 0 10,00 1.500.000 0,00 0
OSA 6 time x 1 person x 3 days 15 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0
c. To Ponorogo & Magetan (79 kel x 3% = 3 kel)
Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0
Acomodation 6 time x 1 person x 3 days 14 150.000 2.100.000 14,00 2.100.000 0,00 150.000 0 14,00 2.100.000 0,00 0
OSA 6 time x 1 person x 4 days 19 50.000 950.000 19,00 950.000 0,00 50.000 0 19,00 950.000 0,00 0
d. To Kota Mojokerto, Mojokerto & Jombang (231 kel x 3% = 7 kel)
Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0
Acomodation 6 time x 1 person x 2 days 14 150.000 2.100.000 14,00 2.100.000 0,00 150.000 0 14,00 2.100.000 0,00 0
OSA 6 time x 1 person x 3 days 19 50.000 950.000 19,00 950.000 0,00 50.000 0 19,00 950.000 0,00 0
e. To Kota Malang, Malang & Kota Batu (179 kel x 3% = 6 kel)
Tranport 6 time x 1 person 8 200.000 1.600.000 8,00 1.600.000 0,00 200.000 0 8,00 1.600.000 0,00 0
Acomodation 6 time x 1 person x 2 days 13 150.000 1.950.000 13,00 1.950.000 0,00 150.000 0 13,00 1.950.000 0,00 0
OSA 6 time x 1 person x 3 days 21 50.000 1.050.000 21,00 1.050.000 0,00 50.000 0 21,00 1.050.000 0,00 0
f. To Kota Blitar, Blitar, Kediri & Kota Kediri (150 kel x 3% = 5 kel)
Tranport 6 time x 1 person 4 200.000 800.000 4,00 800.000 0,00 200.000 0 4,00 800.000 0,00 0
Acomodation 6 time x 1 person x 2 days 8 150.000 1.200.000 8,00 1.200.000 0,00 150.000 0 8,00 1.200.000 0,00 0
OSA 6 time x 1 person x 3 days 13 50.000 650.000 13,00 650.000 0,00 50.000 0 13,00 650.000 0,00 0
g. To Kota Pasuruan & Pasuruan (125 kel x 3% = 4 kel)
Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0
Acomodation 6 time x 1 person x 2 days 10 150.000 1.500.000 10,00 1.500.000 0,00 150.000 0 10,00 1.500.000 0,00 0
OSA 6 time x 1 person x 3 days 15 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0
h. To Kota Probolinggo & Probolinggo (76 kel x 3% = 3 kel)
Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0
Acomodation 6 time x 1 person x 2 days 10 150.000 1.500.000 10,00 1.500.000 0,00 150.000 0 10,00 1.500.000 0,00 0
OSA 6 time x 1 person x 3 days 15 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0
i. Transport Surabaya, Sidoarjo (454 kel x 3% = 14 kel)
OSA 6 time x 1 person x 3 days 24 50.000 1.200.000 24,00 1.200.000 0,00 50.000 0 24,00 1.200.000 0,00 0
j. To Banyuwangi, Bondowoso, & Situbondo (86 kel x 3% = 3 kel)
Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0
Acomodation 6 time x 1 person x 2 days 10 150.000 1.500.000 10,00 1.500.000 0,00 150.000 0 10,00 1.500.000 0,00 0
OSA 6 time x 1 person x 3 days 15 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0
k. To Gresik, Lamongan, Tuban, & Bojonegoro (175 kel x 3% = 6 kel)
Tranport 6 time x 1 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0
Acomodation 6 time x 1 person x 2 days 11 150.000 1.650.000 11,00 1.575.000 0,00 150.000 0 11,00 1.575.000 0,00 75.000
OSA 6 time x 1 person x 3 days 19 50.000 950.000 19,00 950.000 0,00 50.000 0 19,00 950.000 0,00 0
l. To Bangkalan, Sumenep, & Pamekasan (54 kel x 3% = 2 kel)
Tranport 6 time x 1 person 4 200.000 800.000 4,00 800.000 0,00 200.000 0 4,00 800.000 0,00 0
Acomodation 6 time x 1 person x 2 days 9 150.000 1.350.000 9,00 1.275.000 0,00 150.000 0 9,00 1.275.000 0,00 75.000
OSA 6 time x 1 person x 3 days 13 50.000 650.000 13,00 650.000 0,00 50.000 0 13,00 650.000 0,00 0
m. To Lumajang & Jember (49 kel x 3% = 2 kel)
Tranport 6 time x 1 person 2 200.000 400.000 2,00 400.000 0,00 200.000 0 2,00 400.000 0,00 0
Acomodation 6 time x 1 person x 2 days 2 150.000 300.000 2,00 300.000 0,00 150.000 0 2,00 300.000 0,00 0
OSA 6 time x 1 person x 3 days 6 50.000 300.000 6,00 300.000 0,00 50.000 0 6,00 300.000 0,00 0
SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT ININO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT ININO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23
MONITORING OSP-6 JAWA PROVINSI JAWA TIMUR
KOTA KUMUH INFRA SKALA KOTA
Dari Surabaya ke SIDOARJO
Transport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000
Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000
OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
Dari Surabaya ke SURABAYA
Transport 2 0 0 0,00 0 0,00 0 0 0,00 0 2,00 0
Acomodation 6 0 0 0,00 0 0,00 0 0 0,00 0 6,00 0
OSA 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000
Dari Surabaya ke MOJOKERTO
Transport 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Acomodation 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
Dari Surabaya ke GRESIK
Transport 2 200.000 400.000 1,00 200.000 0,00 200.000 0 1,00 200.000 1,00 200.000
Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000
OSA 4 50.000 200.000 2,00 100.000 0,00 50.000 0 2,00 100.000 2,00 100.000
Dari Surabaya ke TULUNG AGUNG
Transport 2 200.000 400.000 1,00 200.000 0,00 200.000 0 1,00 200.000 1,00 200.000
Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000
OSA 4 50.000 200.000 1,00 50.000 0,00 50.000 0 1,00 50.000 3,00 150.000
Dari Surabaya ke KOTA MALANG
Transport 2 200.000 400.000 2,00 400.000 0,00 200.000 0 2,00 400.000 0,00 0
Acomodation 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 2 50.000 100.000 2,00 100.000 0,00 50.000 0 2,00 100.000 0,00 0
Dari Surabaya ke KOTA PROBOLINGGO
Transport 2 200.000 400.000 0,00 0 0,00 200.000 0 0,00 0 2,00 400.000
Acomodation 6 150.000 900.000 0,00 0 0,00 150.000 0 0,00 0 6,00 900.000
OSA 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000
Dari Surabaya ke KOTA PASURUAN
Transport 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Acomodation 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
Dari Surabaya ke KOTA MADIUN
Transport 1 200.000 200.000 1,00 200.000 0,00 200.000 0 1,00 200.000 0,00 0
Acomodation 3 150.000 450.000 1,00 150.000 0,00 150.000 0 1,00 150.000 2,00 300.000
OSA 4 50.000 200.000 2,00 100.000 0,00 50.000 0 2,00 100.000 2,00 100.000
Dari Surabaya ke Kab. JEMBER
Transport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000
Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000
OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
KOTA KUMUH NON INFRA SKALA KOTA
Dari Surabaya ke JOMBANG
Transport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT ININO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23
Acomodation 2 150.000 300.000 0,00 0 0,00 150.000 0 0,00 0 2,00 300.000
OSA 3 50.000 150.000 0,00 0 0,00 50.000 0 0,00 0 3,00 150.000
Dari Surabaya ke PACITAN
Transport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000
Acomodation 2 150.000 300.000 0,00 0 0,00 150.000 0 0,00 0 2,00 300.000
OSA 3 50.000 150.000 0,00 0 0,00 50.000 0 0,00 0 3,00 150.000
Dari Surabaya ke MAGETAN
Transport 2 200.000 400.000 1,00 200.000 0,00 200.000 0 1,00 200.000 1,00 200.000
Acomodation 4 150.000 600.000 1,00 150.000 0,00 150.000 0 1,00 150.000 3,00 450.000
OSA 6 50.000 300.000 2,00 100.000 0,00 50.000 0 2,00 100.000 4,00 200.000
Dari Surabaya ke TUBAN
Transport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000
Acomodation 2 150.000 300.000 0,00 0 0,00 150.000 0 0,00 0 2,00 300.000
OSA 3 50.000 150.000 0,00 0 0,00 50.000 0 0,00 0 3,00 150.000
Dari Surabaya ke KOTA BLITAR
Transport 2 200.000 400.000 1,00 200.000 0,00 200.000 0 1,00 200.000 1,00 200.000
Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000
OSA 4 50.000 200.000 1,00 50.000 0,00 50.000 0 1,00 50.000 3,00 150.000
Dari Surabaya ke TRENGGALEK
Transport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000
Acomodation 2 150.000 300.000 0,00 0 0,00 150.000 0 0,00 0 2,00 300.000
OSA 3 50.000 150.000 0,00 0 0,00 50.000 0 0,00 0 3,00 150.000
Dari Surabaya ke KOTA KEDIRI
Transport 2 200.000 400.000 1,00 200.000 0,00 200.000 0 1,00 200.000 1,00 200.000
Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000
OSA 4 50.000 200.000 2,00 100.000 0,00 50.000 0 2,00 100.000 2,00 100.000
Dari Surabaya ke BANYUWANGI
Transport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000
Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000
OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
Dari Surabaya ke SITUBONDO
Transport 2 200.000 400.000 1,00 200.000 0,00 200.000 0 1,00 200.000 1,00 200.000
Acomodation 3 150.000 450.000 0,00 0 0,00 150.000 0 0,00 0 3,00 450.000
OSA 4 50.000 200.000 1,00 50.000 0,00 50.000 0 1,00 50.000 3,00 150.000
Dari Surabaya ke PASURUAN
Transport 2 200.000 400.000 2,00 400.000 0,00 200.000 0 2,00 400.000 0,00 0
Acomodation 3 150.000 450.000 1,00 150.000 0,00 150.000 0 1,00 150.000 2,00 300.000
OSA 4 50.000 200.000 3,00 150.000 0,00 50.000 0 3,00 150.000 1,00 50.000
MONITORING KE KAB/KOTA (COACHING CLINIC)
Transport 40 200.000 8.000.000 0,00 0 0,00 200.000 0 0,00 0 40,00 8.000.000
Acomodation 40 150.000 6.000.000 0,00 0 0,00 150.000 0 0,00 0 40,00 6.000.000
OSA 80 50.000 4.000.000 0,00 0 0,00 50.000 0 0,00 0 80,00 4.000.000
2.1.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM 143.000.000 131.900.000 0 131.900.000 11.100.000
A. For City Coordinator and Assistance City Coordinator
(1884 Kel x 50%) x 6 6 time x 471 kelurahan 1602 50.000 80.075.000 1601,50 80.075.000 0,00 50.000 0 1601,50 80.075.000 0,50 0
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT ININO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23
B. For Ass. City Coordinator Infrastructure and FM in the city
(1884 Kel - 195 Kel luar kota) x 50%) x 18 18 time x 422 kelurahan 968 50.000 48.375.000 967,50 48.375.000 0,00 50.000 0 967,50 48.375.000 0,50 0
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For City Coordinator Infrastructure and FM out of te town
1. Tulungagung to Trenggalek/Ponorogo to TrenggalekTransport (24 time x 2 person x 2 days) 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
2. Jember to Lumajang Transport (24 time x 2 person x 2 days) 7 50.000 350.000 7,00 350.000 0,00 50.000 0 7,00 350.000 0,00 0
3. Situbondo to Bondowoso Transport (24 time x 2 person x 2 days) 4 50.000 200.000 4,00 200.000 0,00 50.000 0 4,00 200.000 0,00 0
4. Pamekasan to Bangkalan Transport (24 time x 2 person x 2 days) 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
5. Pamekasan to Sumenep Transport (24 time x 4 person x 2 days) 8 50.000 400.000 8,00 400.000 0,00 50.000 0 8,00 400.000 0,00 0
6. Bojonegoro to Tuban Transport (24 time x 3 person x 2 days) 9 50.000 450.000 9,00 450.000 0,00 50.000 0 9,00 450.000 0,00 0
7. Malang to Kota Batu Transport (24 time x 4 person x 2 days) 8 50.000 400.000 8,00 400.000 0,00 50.000 0 8,00 400.000 0,00 0
8. Kab. Probolinggo to Kota Probolinggo Transport (24 time x 5 person x 2 days) 4 50.000 200.000 4,00 200.000 0,00 50.000 0 4,00 200.000 0,00 0
9. Kab. Mojokerto to Kota Mojokerto Transport (24 time x 3 person x 2 days) 8 50.000 400.000 8,00 400.000 0,00 50.000 0 8,00 400.000 0,00 0
10. Kota Madiun to Kab. Madiun Transport (24 time x 2 person x 2 days) 8 50.000 400.000 8,00 400.000 0,00 50.000 0 8,00 400.000 0,00 0
11. Kab Blitar to Kota Blitar Transport (24 time x 4 person x 2 days) 13 50.000 650.000 13,00 650.000 0,00 50.000 0 13,00 650.000 0,00 0
MONITORING TEMATIK
Monitoring Tim Korkot Kota Surabaya di Dalam Kota
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
KEL/ DESA NON KUMUH 16 50.000 800.000 0,00 0 0,00 50.000 0 0,00 0 16,00 800.000
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
KEL/ DESA NON KUMUH 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
Monitoring Tim Korkot Sidoarjo di Dalam Kota
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
KEL/ DESA NON KUMUH 30 50.000 1.500.000 0,00 0 0,00 50.000 0 0,00 0 30,00 1.500.000
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
KEL/ DESA NON KUMUH 22 50.000 1.100.000 0,00 0 0,00 50.000 0 0,00 0 22,00 1.100.000
Monitoring Tim Korkot Gresik di Dalam Kota
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000
KEL/ DESA NON KUMUH 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000
Monitoring Tim Korkot Gresik ke (1) Bojonegoro, (2) Tuban, (3) Lamongan
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
KEL/ DESA NON KUMUH 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000
Monitoring Tim Korkot Mojokerto di Dalam Kota
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
KEL/ DESA NON KUMUH 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
KEL/ DESA NON KUMUH 16 50.000 800.000 0,00 0 0,00 50.000 0 0,00 0 16,00 800.000
Monitoring Tim Korkot Malang di Dalam Kota
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000
KEL/ DESA NON KUMUH 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
Monitoring Tim Korkot Kota Surabaya Ke (1) Bangkalan, (2) Pamekasan, (3) Sumenep
Monitoring Tim Korkot Sidoarjo ke (1) Jombang, (2) Nganjuk, (3) Pacitan,(4) Ponorogo
Monitoring Tim Korkot Kota Mojokerto ke (1) Mojokerto, (2) Kota Madiun, (3) Madiun, (4)
Magetan
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT ININO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23
Monitoring Tim Korkot Tulung Agung di Dalam Kota
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
KEL/ DESA NON KUMUH 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000
Monitoring Tim Korkot Tulung AGung ke (1) Blitar, (2) Kota Blitar
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
KEL/ DESA NON KUMUH 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000
Monitoring Tim Korkot Kota Pasuruan di Dalam Kota
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000
KEL/ DESA NON KUMUH 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000
Monitoring Tim Korkot Kota Pasuruan ke Pasuruan
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
KEL/ DESA NON KUMUH 8 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000
Monitoring Tim Korkot Kota Probolinggo di Dalam Kota
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000
KEL/ DESA NON KUMUH 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
Monitoring Tim Korkot Kota Probolinggo ke (1) Probolinggo, (2) Lumajang
KEL/DESA KUMUH DI NON KOTA SKALA KOTA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
KEL/ DESA NON KUMUH 6 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000
2.1.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL 1.800.000 1.800.000 0 1.800.000 0
1. Ponorogo to Trenggalek Transport (12 time x 3 person x 1 days) 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
2. Jember to Lumajang Transport (12 time x 3 person x 1 days) 3 200.000 600.000 3,00 600.000 0,00 200.000 0 3,00 600.000 0,00 0
3. Situbondo to Bondowoso Transport (12 time x 3 person x 1 days) 3 200.000 600.000 3,00 600.000 0,00 200.000 0 3,00 600.000 0,00 0
4. Pamekasan to Bangkalan Transport (12 time x 3 person x 1 days) 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
5. Pamekasan to Sumenep Transport (12 time x 3 person x 1 days) 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
6. Bojonegoro to Tuban Transport (12 time x 3 person x 1 days) 3 200.000 600.000 3,00 600.000 0,00 200.000 0 3,00 600.000 0,00 0
2.1.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDINATION MEETING 43.150.000 43.100.000 0 43.100.000 50.000
a. From Tulungagung, Trenggalek & Pacitan To Surabaya
Tranport 12 time x 2 person 8 200.000 1.600.000 8,00 1.600.000 0,00 200.000 0 8,00 1.600.000 0,00 0
Acomodation 12 time x 2 person x 1 days 8 150.000 1.200.000 8,00 1.200.000 0,00 150.000 0 8,00 1.200.000 0,00 0
OSA 12 time x 2 person x 2 days 12 50.000 600.000 12,00 600.000 0,00 50.000 0 12,00 600.000 0,00 0
b. From Madiun, Kota Madiun, Nganjuk To Surabaya
Tranport 12 time x 2 person 9 200.000 1.800.000 9,00 1.800.000 0,00 200.000 0 9,00 1.800.000 0,00 0
Acomodation 12 time x 2 person x 1 days 9 150.000 1.350.000 9,00 1.350.000 0,00 150.000 0 9,00 1.350.000 0,00 0
OSA 12 time x 2 person x 2 days 14 50.000 700.000 14,00 700.000 0,00 50.000 0 14,00 700.000 0,00 0
c. From Ponorogo & Magetan To Surabaya
Tranport 12 time x 2 person 7 200.000 1.400.000 7,00 1.400.000 0,00 200.000 0 7,00 1.400.000 0,00 0
Acomodation 12 time x 2 person x 1 days 7 150.000 1.050.000 7,00 1.050.000 0,00 150.000 0 7,00 1.050.000 0,00 0
OSA 12 time x 2 person x 2 days 11 50.000 550.000 11,00 550.000 0,00 50.000 0 11,00 550.000 0,00 0
d. From Kota Mojokerto, Mojokerto & Jombang To Surabaya
Tranport 12 time x 2 person 9 200.000 1.800.000 9,00 1.800.000 0,00 200.000 0 9,00 1.800.000 0,00 0
Acomodation 12 time x 2 person x 1 days 9 150.000 1.350.000 9,00 1.350.000 0,00 150.000 0 9,00 1.350.000 0,00 0
OSA 12 time x 2 person x 2 days 14 50.000 700.000 14,00 700.000 0,00 50.000 0 14,00 700.000 0,00 0
e. from Kota Malang, Malang & Kota Batu To Surabaya
Tranport 12 time x 2 person 10 200.000 2.000.000 10,00 2.000.000 0,00 200.000 0 10,00 2.000.000 0,00 0
Acomodation 12 time x 2 person x 1 days 10 150.000 1.500.000 10,00 1.500.000 0,00 150.000 0 10,00 1.500.000 0,00 0
OSA 12 time x 2 person x 2 days 15 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0
f. From Kota Blitar, Blitar, Kediri & Kota Kediri To Surabaya
Tranport 12 time x 2 person 13 200.000 2.600.000 13,00 2.600.000 0,00 200.000 0 13,00 2.600.000 0,00 0
Acomodation 12 time x 2 person x 1 days 13 150.000 1.950.000 13,00 1.950.000 0,00 150.000 0 13,00 1.950.000 0,00 0
OSA 12 time x 2 person x 2 days 20 50.000 1.000.000 20,00 1.000.000 0,00 50.000 0 20,00 1.000.000 0,00 0
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT ININO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23
g. From Kota Pasuruan & Pasuruan To Surabaya
Tranport 12 time x 2 person 8 200.000 1.600.000 8,00 1.600.000 0,00 200.000 0 8,00 1.600.000 0,00 0
Acomodation 12 time x 2 person x 1 days 8 150.000 1.200.000 8,00 1.200.000 0,00 150.000 0 8,00 1.200.000 0,00 0
OSA 12 time x 2 person x 2 days 12 50.000 600.000 12,00 600.000 0,00 50.000 0 12,00 600.000 0,00 0
h. From Kota Probolinggo & Probolinggo To Surabaya
Tranport 12 time x 2 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0
Acomodation 12 time x 2 person x 1 days 5 150.000 750.000 5,00 750.000 0,00 150.000 0 5,00 750.000 0,00 0
OSA 12 time x 2 person x 2 days 8 50.000 400.000 8,00 400.000 0,00 50.000 0 8,00 400.000 0,00 0
i. From Lumajang & Jember To Surabaya
Tranport 12 time x 2 person 5 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0
Acomodation 12 time x 2 person x 1 days 5 150.000 750.000 5,00 750.000 0,00 150.000 0 5,00 750.000 0,00 0
OSA 12 time x 2 person x 2 days 8 50.000 400.000 8,00 400.000 0,00 50.000 0 8,00 400.000 0,00 0
j. From Banyuwangi, Bondowoso & Situbondo To Surabaya
Tranport 12 time x 2 person 9 200.000 1.800.000 9,00 1.800.000 0,00 200.000 0 9,00 1.800.000 0,00 0
Acomodation 12 time x 2 person x 1 days 9 150.000 1.350.000 9,00 1.350.000 0,00 150.000 0 9,00 1.350.000 0,00 0
OSA 12 time x 2 person x 2 days 14 50.000 700.000 14,00 700.000 0,00 50.000 0 14,00 700.000 0,00 0
k. From Gresik, Lamongan, Tuban & Bojonegoro To Surabaya
Tranport 12 time x 2 person 12 200.000 2.400.000 12,00 2.400.000 0,00 200.000 0 12,00 2.400.000 0,00 0
Acomodation 12 time x 2 person x 1 days 12 150.000 1.800.000 12,00 1.800.000 0,00 150.000 0 12,00 1.800.000 0,00 0
OSA 12 time x 2 person x 2 days 18 50.000 900.000 18,00 850.000 0,00 50.000 0 18,00 850.000 0,00 50.000
l. From Bangkalan, Sumenep & Pamekasan To Surabaya
Tranport 12 time x 2 person 6 200.000 1.200.000 6,00 1.200.000 0,00 200.000 0 6,00 1.200.000 0,00 0
Acomodation 12 time x 2 person x 1 days 6 150.000 900.000 6,00 900.000 0,00 150.000 0 6,00 900.000 0,00 0
OSA 12 time x 2 person x 2 days 10 50.000 500.000 10,00 500.000 0,00 50.000 0 10,00 500.000 0,00 0
2.1.1.5 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO TRAINING LOCATION 1.091.200.000 1.088.600.000 0 1.088.600.000 2.600.000
For Training
Inland Transport for Korkot & Askot (34 Kota/Kab) on OSP Consolidation
a. From Tulungagung, Trenggalek & Pacitan To Training Location
Tranport 6 time x 14 person 113,0 200.000 22.600.000 103,00 20.600.000 0,00 200.000 0 103,00 20.600.000 10,00 2.000.000
b. From Madiun, Kota Madiun, Nganjuk To Training Location
Tranport 6 time x 11 person 78 200.000 15.600.000 78,00 15.600.000 0,00 200.000 0 78,00 15.600.000 0,00 0
c. From Ponorogo & Magetan To Training Location
Tranport 6 time x 10 person 43 200.000 8.600.000 43,00 8.600.000 0,00 200.000 0 43,00 8.600.000 0,00 0
d. From Kota Mojokerto, Mojokerto & Jombang To Training Location
Tranport 6 time x 21 person 138 200.000 27.600.000 137,00 27.400.000 0,00 200.000 0 137,00 27.400.000 1,00 200.000
e. from Kota Malang, Malang & Kota Batu To Training Location
Tranport 6 time x 17 person 117 200.000 23.400.000 117,00 23.400.000 0,00 200.000 0 117,00 23.400.000 0,00 0
f. From Kota Blitar, Blitar, Kediri & Kota Kediri To Training Location
Tranport 6 time x 18 person 78 200.000 15.600.000 78,00 15.600.000 0,00 200.000 0 78,00 15.600.000 0,00 0
g. From Kota Pasuruan & Pasuruan To Training Location
Tranport 6 time x 13 person 85 200.000 17.000.000 85,00 17.000.000 0,00 200.000 0 85,00 17.000.000 0,00 0
h. From Kota Probolinggo & Probolinggo To Surabaya
Tranport 6 time x 8 person 39 200.000 7.800.000 39,00 7.800.000 0,00 200.000 0 39,00 7.800.000 0,00 0
i. From Lumajang & Jember To Training Location
Tranport 6 time x 6 person 59 200.000 11.800.000 59,00 11.800.000 0,00 200.000 0 59,00 11.800.000 0,00 0
j. From Banyuwangi, Bondowoso & Situbondo To Training Location
Tranport 6 time x 13 person 66 200.000 13.200.000 66,00 13.200.000 0,00 200.000 0 66,00 13.200.000 0,00 0
k. From Gresik, Lamongan, Tuban & Bojonegoro To Surabaya
Tranport 6 time x 21 person 143 200.000 28.600.000 143,00 28.600.000 0,00 200.000 0 143,00 28.600.000 0,00 0
l. From Bangkalan, Sumenep & Pamekasan To Training Location
Tranport 6 time x 8 person 48 200.000 9.600.000 48,00 9.600.000 0,00 200.000 0 48,00 9.600.000 0,00 0
m. From Sidoarjo & Kota Surabaya To Training Location
Tranport 6 time x 8 person 115 200.000 23.000.000 115,00 23.000.000 0,00 200.000 0 115,00 23.000.000 0,00 0
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT ININO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23
Inland Transport for SF, FT, FE, FS (34 Kota/Kab)
a. From Tulungagung, Trenggalek & Pacitan To Training Location
Inland transport 2 time x 65 person 308 200.000 61.600.000 302,00 61.600.000 0,00 200.000 0 302,00 61.600.000 6,00 0
b. From Madiun, Kota Madiun, Nganjuk To Training Location
Transport 2 time x 55 person 242 200.000 48.400.000 242,00 48.400.000 0,00 200.000 0 242,00 48.400.000 0,00 0
c. From Ponorogo & Magetan To Training Location
Transport 2 time x 50 person 197 200.000 39.400.000 197,00 39.400.000 0,00 200.000 0 197,00 39.400.000 0,00 0
d. From Kota Mojokerto, Mojokerto & Jombang To Training Location
Transport 2 time x 125 person 564 200.000 112.800.000 564,00 112.800.000 0,00 200.000 0 564,00 112.800.000 0,00 0
e. From Kota Malang, Malang & Kota Batu To Training Location
Transport 2 time x 100 person 415 200.000 83.000.000 415,00 83.000.000 0,00 200.000 0 415,00 83.000.000 0,00 0
f. From Kota Blitar, Blitar, Kediri & Kota Kediri To Training Location
Transport 2 time x 90 person 360 200.000 72.000.000 360,00 72.000.000 0,00 200.000 0 360,00 72.000.000 0,00 0
g. From Kota Pasuruan & Pasuruan To Training Location
Transport 2 time x 70 person 314 200.000 62.800.000 314,00 62.800.000 0,00 200.000 0 314,00 62.800.000 0,00 0
h. From Kota Probolinggo & Probolinggo To Training Location
Transport 2 time x 40 person 175 200.000 35.000.000 175,00 35.000.000 0,00 200.000 0 175,00 35.000.000 0,00 0
i. From Lumajang & Jember To Training Location
Transport 2 time x 27 person 138 200.000 27.600.000 138,00 27.600.000 0,00 200.000 0 138,00 27.600.000 0,00 0
j. From Banyuwangi, Bondowoso, & Situbondo To Training Location
Transport 2 time x 50 person 204 200.000 40.800.000 204,00 40.800.000 0,00 200.000 0 204,00 40.800.000 0,00 0
k. From Gresik, Lamongan, Tuban, & Bojonegoro To Training Location
Transport 2 time x 90 person 443 200.000 88.600.000 443,00 88.600.000 0,00 200.000 0 443,00 88.600.000 0,00 0
l. From Bangkalan, Sumenep, & Pamekasan To Training Location
Transport 2 time x 25 person 133 200.000 26.600.000 133,00 26.600.000 0,00 200.000 0 133,00 26.600.000 0,00 0
m. From Sidoarjo & Kota Surabaya To Training Location
Transport 2 time x 25 person 821 200.000 164.200.000 821,00 164.200.000 0,00 200.000 0 821,00 164.200.000 0,00 0
Special Event (by request)
1. From Tulungagung, Trenggalek & Pacitan To Surabaya
Transport 2 time x 2 person 2 200.000 400.000 0,00 0 0,00 200.000 0 0,00 0 2,00 400.000
Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
2. From Madiun, Kota Madiun, Nganjuk To Surabaya
Transport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
3. From Ponorogo & Magetan To Surabaya
Transport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
4. From Kota Mojokerto, Mojokerto & Jombang To Surabaya
Transport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
5. From Kota Malang, Malang & Kota Batu To Surabaya
Transport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
6. From Kota Blitar, Blitar, Kediri & Kota Kediri To Surabaya
Transport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT ININO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23
Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
7. From Kota Pasuruan & Pasuruan To Surabaya
Transport 2 time x 2 person 0,0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Acomodation 2 time x 2 person x 2 days 0,0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 2 time x 2 person x 3 days 0,0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
8. From Kota Probolinggo & Probolinggo To Surabaya
Transport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
9. From Lumajang & Jember To Surabaya
Transport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
10. From Banyuwangi, Bondowoso, & Situbondo To Surabaya
Transport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
11. From Gresik, Lamongan, Tuban, & Bojonegoro To Surabaya
Transport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
12. From Bangkalan, Sumenep, & Pamekasan To Surabaya
Transport 2 time x 2 person 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Acomodation 2 time x 2 person x 2 days 0 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
OSA 2 time x 2 person x 3 days 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
2.1.1.6 PERCEPATAN PENYUSUNAN DOK SIAP
Local Transport for Coordination 18 200.000 3.600.000 18,00 3.600.000 0,00 200.000 0 18,00 3.600.000 0,00 0
Local Transport for Training 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
2.1.2 TO JAKARTA
2.1.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 60.972.000 60.971.700 0 60.971.700 300
Air Transport 6 time x 5 person 15 2.600.000 34.772.000 15,00 34.771.700 0,00 2.600.000 0 15,00 34.771.700 0,00 300
In land Travel in Jakarta 6 time x 5 person 15 200.000 3.000.000 15,00 3.000.000 0,00 200.000 0 15,00 3.000.000 0,00 0
OSA 6 time x 5 person x 4 days 104 100.000 10.400.000 104,00 10.400.000 0,00 100.000 0 104,00 10.400.000 0,00 0
ToT Pembantu Nasional untuk Korkot & Askorkot
Air Transport 0 2.600.000 0 0,00 0 0,00 2.600.000 0 0,00 0 0,00 0
In land Travel in Jakarta 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
OSA 0 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
ToT Pelatihan Penguatan PRBBK lokasi Pilot
Air Transport 4 2.600.000 10.400.000 4,00 10.400.000 0,00 2.600.000 0 4,00 10.400.000 0,00 0
In land Travel in Jakarta 4 200.000 800.000 4,00 800.000 0,00 200.000 0 4,00 800.000 0,00 0
OSA 16 100.000 1.600.000 16,00 1.600.000 0,00 100.000 0 16,00 1.600.000 0,00 0
ToT Pelatihan Program Lanjutan
Air Transport 0 2.600.000 0 0,00 0 0,00 2.600.000 0 0,00 0 0,00 0
In land Travel in Jakarta 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
OSA 0 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT ININO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23
2.1.2.2 FOR EGM TO JAKARTA 154.119.000 153.215.600 0 153.215.600 903.400
Air Transport
EGM TA/SubTA Training 5 time x 3 person 10 2.600.000 22.200.000 10,00 22.130.100 0,00 2.600.000 0 10,00 22.130.100 0,00 69.900
EGM TA Sosialisasi 5 time x 1 person 5 2.600.000 10.600.000 5,00 10.532.100 0,00 2.600.000 0 5,00 10.532.100 0,00 67.900
EGM TA/SubTA MK/Sub TA RLF 5 time x 3 person 7 2.600.000 14.226.000 6,00 14.225.800 0,00 2.600.000 0 6,00 14.225.800 1,00 200
EGM TA/SubTA INFRA/Sub TA Safeguard5 time x 2 person 5 2.600.000 12.000.000 5,00 11.922.900 0,00 2.600.000 0 5,00 11.922.900 0,00 77.100
EGM TA/SubTA Monev /Sub TA Legal HCU5 time x 4 person 8 2.600.000 18.800.000 8,00 18.562.000 0,00 2.600.000 0 8,00 18.562.000 0,00 238.000
EGM TA/SubTA SIM 5 time x 2 person 7 2.600.000 13.400.000 6,00 13.400.000 0,00 2.600.000 0 6,00 13.400.000 1,00 0
EGM TA Local Goverment 5 time x 1 person 5 2.600.000 8.374.000 4,00 8.373.800 0,00 2.600.000 0 4,00 8.373.800 1,00 200
EGM TA Urban Planner 5 time x 1 person 5 2.600.000 9.819.000 4,00 9.818.900 0,00 2.600.000 0 4,00 9.818.900 1,00 100
In land Transport in Jakarta 5 time x 17 person 44 200.000 8.800.000 44,00 8.800.000 0,00 200.000 0 44,00 8.800.000 0,00 0
Acomodation 5 time x 17 person x 4 days 69 300.000 13.500.000 69,00 13.050.000 0,00 250.000 0 69,00 13.050.000 0,00 450.000
OSA 5 time x 17 person x 4 days 224 100.000 22.400.000 224,00 22.400.000 0,00 100.000 0 224,00 22.400.000 0,00 0
2.1.2.3 FOR COORDINATION MEETING TO JAKARTA AND OTHER (by request) 106.100.000 105.649.600 0 105.649.600 450.400
Air Transport 7 time x 3 person 32 2.600.000 67.200.000 32,00 67.121.300 0,00 2.600.000 0 32,00 67.121.300 0,00 78.700
Air Transport to Jakarta and other 7 4.600.000 17.300.000 7,00 17.228.300 0,00 4.600.000 0 7,00 17.228.300 0,00 71.700
In land Transport in Jakarta 7 time x 3 person 28 200.000 5.600.000 28,00 5.600.000 0,00 200.000 0 28,00 5.600.000 0,00 0
Hotel Accommodation 7 time x 3 person x 3 days 15 300.000 4.500.000 15,00 4.200.000 0,00 300.000 0 15,00 4.200.000 0,00 300.000
OSA 7 time x 3 person x 4 days 124 100.000 11.500.000 115,00 11.500.000 0,00 100.000 0 115,00 11.500.000 9,00 0
2.1.2.4 FROM LEVEL OSP TO PROVINCE 38.100.000 37.335.595 0 37.335.595 764.405
Air Transport 8 2.900.000 18.200.000 8,00 17.823.750 0,00 2.900.000 0 8,00 17.823.750 0,00 376.250
Air Transport 1 3.700.000 2.700.000 1,00 2.337.700 0,00 3.700.000 0 1,00 2.337.700 0,00 362.300
Air Transport 2 2.900.000 5.800.000 2,00 5.800.000 0,00 2.900.000 0 2,00 5.800.000 0,00 0
In land Transport in Jakarta 6 200.000 1.200.000 6,00 1.200.000 0,00 200.000 0 6,00 1.200.000 0,00 0
Hotel Accommodation 29 300.000 7.900.000 29,00 7.874.145 0,00 300.000 0 29,00 7.874.145 0,00 25.855
OSA 23 100.000 2.300.000 23,00 2.300.000 0,00 100.000 0 23,00 2.300.000 0,00 0
2.1.2.5 KORKOT TO JAKARTA (by Request) 126.749.000 125.844.500 0 125.844.500 904.500
Air Transport 6 2.600.000 11.949.000 6,00 11.948.400 0,00 2.600.000 0 6,00 11.948.400 0,00 600
In land Transport in Jakarta 3 200.000 600.000 3,00 600.000 0,00 200.000 0 3,00 600.000 0,00 0
Hotel Accommodation 0 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0
OSA 9 100.000 900.000 9,00 900.000 0,00 100.000 0 9,00 900.000 0,00 0
2.1.2.6 ACTIVITIES TO JAKARTA 2017
1 RAKOR TEAM LEADER AND SPECIALIST OSP
Air Transport 1 2.600.000 2.600.000 1,00 2.465.500 0,00 2.600.000 0 1,00 2.465.500 0,00 134.500
In land Transport in Jakarta 1 200.000 200.000 1,00 200.000 0,00 200.000 0 1,00 200.000 0,00 0
Hotel Accommodation 1 300.000 300.000 1,00 300.000 0,00 300.000 0 1,00 300.000 0,00 0
OSA 2 100.000 200.000 2,00 200.000 0,00 100.000 0 2,00 200.000 0,00 0
2 ToT PEMANDU NASIONAL untuk Pelatihan Askot dan Fasilitator (Kab Skala Prioritas)
Air Transport 22 2.600.000 45.000.000 22,00 44.440.000 0,00 2.600.000 0 22,00 44.440.000 0,00 560.000
In land Transport in Jakarta 22 200.000 4.400.000 22,00 4.400.000 0,00 200.000 0 22,00 4.400.000 0,00 0
Hotel Accommodation 0 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0
OSA 152 100.000 15.200.000 152,00 15.200.000 0,00 100.000 0 152,00 15.200.000 0,00 0
3 ToT PEMANDU SIM
Air Transport 0 2.600.000 0 0,00 0 0,00 2.600.000 0 0,00 0 0,00 0
In land Transport in Jakarta 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Hotel Accommodation 0 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0
OSA 0 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
4 KONSOLIDASI KEGIATAN SKALA KOTA DAN EXPOSES DED
Air Transport 0 2.600.000 0 0,00 0 0,00 2.600.000 0 0,00 0 0,00 0
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT ININO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23
In land Transport in Jakarta 0 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Hotel Accommodation 0 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0
OSA 0 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
5 BY REQUEST
Air Transport 2 2.600.000 5.200.000 2,00 5.124.000 0,00 2.600.000 0 2,00 5.124.000 0,00 76.000
In land Transport in Jakarta 2 200.000 400.000 2,00 400.000 0,00 200.000 0 2,00 400.000 0,00 0
Hotel Accommodation 0 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0
OSA 12 100.000 1.200.000 12,00 1.200.000 0,00 100.000 0 12,00 1.200.000 0,00 0
5 TOT DAN PELATIHAN KHUSUS TIM KORKOT (Gel. 1)
Air Transport 12 2.600.000 29.000.000 12,00 28.866.600 0,00 2.600.000 0 12,00 28.866.600 0,00 133.400
In land Transport in Jakarta 12 200.000 2.400.000 12,00 2.400.000 0,00 200.000 0 12,00 2.400.000 0,00 0
Hotel Accommodation 0 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0
OSA 72 100.000 7.200.000 72,00 7.200.000 0,00 100.000 0 72,00 7.200.000 0,00 0
TOTAL DUTY TRAVEL PROVINCE JAWA TIMUR 1.839.590.000 1.791.886.995 0 1.791.886.995 47.703.005
2.2. Duty Travel Expenses South Kalimantan Februari 2018
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
2.2.1 In Province
2.2.1.1 For Spotcheck Province to Kelurahan (3% x Number of Kelurahan) 34.420.000 17.651.500 0 17.651.500 16.768.500
a. From Banjarmasin To Kota Baru (21 kel x 3% = 1 kel)Tranport 6 time x 1 person 9,00 200.000 1.700.000 9,00 1.700.000 0,00 200.000 0 9,00 1.700.000 0,00 0Acomodation 6 time x 1 person x 1 days 7,00 250.000 1.750.000 7,00 1.750.000 0,00 250.000 0 7,00 1.750.000 0,00 0OSA 6 time x 1 person x 2 days 16,00 50.000 800.000 16,00 800.000 0,00 50.000 0 16,00 800.000 0,00 0
b. From Banjarmasin To Tabalong (25 kel x 3% = 2 kel)Tranport 6 time x 1 person 9,00 200.000 1.800.000 9,00 1.800.000 0,00 200.000 0 9,00 1.800.000 0,00 0Acomodation 6 time x 1 person x 1 days 6,00 250.000 1.350.000 6,00 1.350.000 0,00 250.000 0 6,00 1.350.000 0,00 0OSA 6 time x 1 person x 2 days 15,00 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0
c. From Banjarmasin To Hulu Sungai Tengah dan Hulu Sungai Utara (47 kel x 3% = 2 kel)Tranport 6 time x 1 person 8,00 200.000 1.600.000 8,00 1.600.000 0,00 200.000 0 8,00 1.600.000 0,00 0Acomodation 6 time x 1 person x 1 days 8,00 250.000 2.000.000 8,00 1.931.500 0,00 250.000 0 8,00 1.931.500 0,00 68.500OSA 6 time x 1 person x 2 days 16,00 50.000 800.000 16,00 800.000 0,00 50.000 0 16,00 800.000 0,00 0
d. From Banjarmasin To Hulu Sungai Selatan dan Tanah Laut (38 kel x 3% = 2 kel)Tranport 6 time x 1 person 8,00 200.000 1.600.000 8,00 1.600.000 0,00 200.000 0 8,00 1.600.000 0,00 0Acomodation 6 time x 1 person x 1 days 7,00 250.000 1.470.000 7,00 1.470.000 0,00 250.000 0 7,00 1.470.000 0,00 0OSA 6 time x 1 person x 2 days 16,00 50.000 800.000 16,00 800.000 0,00 50.000 0 16,00 800.000 0,00 0
e. From Banjarmasin To Banjar dan Banjar Baru (45 kel x 3% = 2 kel)Transport 6 time x 1 person x 1 days 10,00 50.000 500.000 10,00 500.000 0,00 50.000 0 10,00 500.000 0,00 0
f. From Banjarmasin To Barito Kuala (9 kel x 3% = 1 kel)Transport 6 time x 1 person x 1 days 4,00 50.000 200.000 4,00 200.000 0,00 50.000 0 4,00 200.000 0,00 0
g. Banjarmasin (50 kel x 3% = 2 kel)Transport 6 time x 1 person x 1 days 4,00 50.000 200.000 4,00 200.000 0,00 50.000 0 4,00 200.000 0,00 0
MONITORING OSP-6 PROVINSI KALIMANTAN SELATANKOTA KUMUH INFRA SKALA KOTA
Dari Kota Banjarmasin ke KOTABARUTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 250.000 750.000 0,00 0 0,00 250.000 0 0,00 0 3,00 750.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
Dari Kota Banjarmasin ke BANJARTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 250.000 750.000 0,00 0 0,00 250.000 0 0,00 0 3,00 750.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
Dari Kota Banjarmasin ke KOTA BANJARMASINTransport 4 0 0 0,00 0 0,00 0 0 0,00 0 4,00 0Acomodation 12 0 0 0,00 0 0,00 0 0 0,00 0 12,00 0OSA 16 50.000 800.000 0,00 0 0,00 50.000 0 0,00 0 16,00 800.000
Dari Kota Banjarmasin ke KOTA BANJARBARUTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 250.000 750.000 0,00 0 0,00 250.000 0 0,00 0 3,00 750.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
Dari Kota Banjarmasin ke KOTA BARITO KUALATransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 250.000 750.000 0,00 0 0,00 250.000 0 0,00 0 3,00 750.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
Dari Kota Banjarmasin ke KOTA HULU SUNGAI UTARATransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 250.000 750.000 0,00 0 0,00 250.000 0 0,00 0 3,00 750.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
KOTA KUMUH NON INFRA SKALA KOTA
Dari Kota Banjarmasin ke TANAH LAUTTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 250.000 750.000 0,00 0 0,00 250.000 0 0,00 0 3,00 750.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
Dari Kota Banjarmasin ke TABALONGTransport 1 200.000 200.000 0,00 0 0,00 200.000 0 0,00 0 1,00 200.000Acomodation 3 250.000 750.000 0,00 0 0,00 250.000 0 0,00 0 3,00 750.000OSA 4 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
MONITORING KE KAB/KOTA (COACHING CLINIC)
Transport 15 200.000 3.000.000 0,00 0 0,00 200.000 0 0,00 0 15,00 3.000.000Acomodation 15 250.000 3.750.000 0,00 0 0,00 250.000 0 0,00 0 15,00 3.750.000OSA 30 50.000 1.500.000 0,00 0 0,00 50.000 0 0,00 0 30,00 1.500.000
2.2.1.2 Spootcheck Kota/Kab for Ass. City Coordinator Infra and FM 38.375.000 33.225.000 0 33.225.000 5.150.000
A. For City Coordinator and Assistance City Coordinator
(226 Kel x 50%) x 6 6 time x 57 kelurahan 391,00 50.000 19.525.000 390,50 19.500.000 0,00 50.000 0 390,50 19.500.000 0,50 25.000
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city
(226 Kel - 102 Kel luar kota) x 50%) x 18 18 time x 31 kelurahan 145,00 50.000 7.250.000 144,50 7.225.000 0,00 50.000 0 144,50 7.225.000 0,50 25.000
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For City Coordinator Infrastructure and FM out of te town
1. From Tanah Laut To Kota Baru Transport (24 time x 4 person x 2 days) 18,00 100.000 1.800.000 18,00 1.800.000 0,00 100.000 0 18,00 1.800.000 0,00 02. From Tanah Laut To Hulu Sungai SelatanTransport (24 time x 3 person x 2 days) 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 03. From Banjarmasin to Barito Kuala Transport (24 time x 2 person x 2 days) 2,00 100.000 200.000 2,00 200.000 0,00 100.000 0 2,00 200.000 0,00 0
4. From Hulu Sungai Utara to Hulu Sungai TengahTransport (24 time x 3 person x 2 days) 26,00 100.000 2.600.000 26,00 2.600.000 0,00 100.000 0 26,00 2.600.000 0,00 0
5. From Hulu Utara Tengah to Tabalong Transport (24 time x 4 person x 2 days) 1,00 100.000 100.000 1,00 100.000 0,00 100.000 0 1,00 100.000 0,00 0
6. from Banjar to Banjar Baru Transport (24 time x 3 person x 2 days) 18,00 100.000 1.800.000 18,00 1.800.000 0,00 100.000 0 18,00 1.800.000 0,00 0
MONITORING TEMATIK
KEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000
KEL/DESA NON KUMUH 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000
Monitoring Tim Korkot Kota Baru Ke (1) Tanah Laut
KEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000
KEL/DESA NON KUMUH 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000
Monitoring Tim Korkot Banjar di Dalam Kota
KEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000
KEL/DESA NON KUMUH 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000
Monitoring Tim Korkot Banjar ke (1) Tabalong
KEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000
KEL/DESA NON KUMUH 4,00 100.000 400.000 0,00 0 0,00 100.000 0 0,00 0 4,00 400.000
Monitoring Tim Korkot Banjarmasin di Dalam Kota
KEL/DESA KUMUH DI KOTA SKALA KOTA 14,00 100.000 1.400.000 0,00 0 0,00 100.000 0 0,00 0 14,00 1.400.000
KEL/DESA NON KUMUH 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
Monitoring Tim Korkot Banjar Baru di Dalam Kota
KEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000
KEL/DESA NON KUMUH 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000
Monitoring Tim Korkot Hulu Sungai Utara di Dalam Kota
KEL/DESA KUMUH DI KOTA SKALA KOTA 4,00 100.000 400.000 0,00 0 0,00 100.000 0 0,00 0 4,00 400.000
KEL/DESA NON KUMUH 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
Monitoring Tim Korkot Hulu Sungai Utara ke (1) Hulu Sungai Selatan, (2) Hulu Sungai Tengah
KEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000
KEL/DESA NON KUMUH 4,00 100.000 400.000 0,00 0 0,00 100.000 0 0,00 0 4,00 400.000
Monitoring Tim Korkot Barito Kuala di Dalam Kota
KEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 100.000 200.000 0,00 0 0,00 100.000 0 0,00 0 2,00 200.000
KEL/DESA NON KUMUH 1,00 100.000 100.000 0,00 0 0,00 100.000 0 0,00 0 1,00 100.000
2.2.1.3 For CB Activity by Askot to Faskel 3.800.000 3.800.000 0 3.800.000 0
1. From Tanah Laut To Kota Baru Transport (12 time x 3 person x 1 days) 7,00 100.000 700.000 7,00 700.000 0,00 100.000 0 7,00 700.000 0,00 0
2. From Tanah Laut To Hulu Sungai SelatanTransport (12 time x 3 person x 1 days) 4,00 100.000 400.000 4,00 400.000 0,00 100.000 0 4,00 400.000 0,00 0
3. From Banjarmasin to Barito Kuala Transport (12 time x 3 person x 1 days) 2,00 100.000 200.000 2,00 200.000 0,00 100.000 0 2,00 200.000 0,00 0
4. From Hulu Sungai Tengah to Hulu Sungai UtaraTransport (12 time x 3 person x 1 days) 25,00 100.000 2.500.000 25,00 2.500.000 0,00 100.000 0 25,00 2.500.000 0,00 0
5. From Hulu Utara Tengah to Tabalong Transport (12 time x 3 person x 1 days) 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
6. from Banjar to Banjar Baru Transport (12 time x 3 person x 1 days) 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
2.2.1.4 FrmM Kab/Kota to TL Ofiice for Coordination Meeting 59.450.000 48.800.000 0 48.800.000 10.650.000
a. Tanah Laut to BanjarmasinTranport 14 time x 2 person 10,00 200.000 2.000.000 9,00 1.800.000 0,00 200.000 0 9,00 1.800.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 20,00 250.000 5.000.000 17,00 4.250.000 0,00 250.000 0 17,00 4.250.000 3,00 750.000OSA 14 time x 2 person x 3 days 29,00 50.000 1.450.000 25,00 1.250.000 0,00 50.000 0 25,00 1.250.000 4,00 200.000
b. Kota Baru to BanjarmasinTranport 14 time x 2 person 7,00 200.000 1.400.000 7,00 1.400.000 0,00 200.000 0 7,00 1.400.000 0,00 0
2,00 400.000 800.000 0,00 0 0,00 400.000 0 2,00 800.000Acomodation 14 time x 2 person x 2 days 15,00 250.000 3.750.000 13,00 3.250.000 0,00 250.000 0 13,00 3.250.000 2,00 500.000OSA 14 time x 2 person x 3 days 20,00 50.000 1.000.000 17,00 850.000 0,00 50.000 0 17,00 850.000 3,00 150.000
c. Banjar to BanjarmasinTranport 14 time x 2 person 11,00 200.000 2.200.000 10,00 2.000.000 0,00 200.000 0 10,00 2.000.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 22,00 250.000 5.500.000 19,00 4.750.000 0,00 250.000 0 19,00 4.750.000 3,00 750.000OSA 14 time x 2 person x 3 days 31,00 50.000 1.550.000 27,00 1.350.000 0,00 50.000 0 27,00 1.350.000 4,00 200.000
d. Barito Kuala to BanjarmasinTranport 14 time x 2 person 6,00 200.000 1.200.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 12,00 250.000 3.000.000 9,00 2.250.000 0,00 250.000 0 9,00 2.250.000 3,00 750.000OSA 14 time x 2 person x 3 days 17,00 50.000 850.000 13,00 650.000 0,00 50.000 0 13,00 650.000 4,00 200.000
e. Hulu Sungai Selatan to BanjarmasinTranport 14 time x 2 person 9,00 200.000 1.800.000 8,00 1.600.000 0,00 200.000 0 8,00 1.600.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 13,00 250.000 3.250.000 10,00 2.500.000 0,00 250.000 0 10,00 2.500.000 3,00 750.000OSA 14 time x 2 person x 3 days 19,00 50.000 950.000 15,00 750.000 0,00 50.000 0 15,00 750.000 4,00 200.000
f. Hulu Sungai Tengah to BanjarmasinTranport 14 time x 2 person 8,00 200.000 1.600.000 7,00 1.400.000 0,00 200.000 0 7,00 1.400.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 14,00 250.000 3.500.000 11,00 2.750.000 0,00 250.000 0 11,00 2.750.000 3,00 750.000OSA 14 time x 2 person x 3 days 19,00 50.000 950.000 15,00 750.000 0,00 50.000 0 15,00 750.000 4,00 200.000
g. Hulu Sungai Utara to BanjarmasinTranport 14 time x 2 person 6,00 200.000 1.200.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 12,00 250.000 3.000.000 9,00 2.250.000 0,00 250.000 0 9,00 2.250.000 3,00 750.000OSA 14 time x 2 person x 3 days 17,00 50.000 850.000 13,00 650.000 0,00 50.000 0 13,00 650.000 4,00 200.000
h. Tabalong to BanjarmasinTranport 14 time x 2 person 9,00 200.000 1.800.000 8,00 1.600.000 0,00 200.000 0 8,00 1.600.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 18,00 250.000 4.500.000 15,00 3.750.000 0,00 250.000 0 15,00 3.750.000 3,00 750.000OSA 14 time x 2 person x 3 days 27,00 50.000 1.350.000 23,00 1.150.000 0,00 50.000 0 23,00 1.150.000 4,00 200.000
i. Kota Banjar Baru to BanjarmasinTranport 14 time x 2 person 6,00 200.000 1.200.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 12,00 250.000 3.000.000 9,00 2.250.000 0,00 250.000 0 9,00 2.250.000 3,00 750.000OSA 14 time x 2 person x 3 days 16,00 50.000 800.000 12,00 600.000 0,00 50.000 0 12,00 600.000 4,00 200.000
2.2.1.5 From Province to Regional for Workshop & Coordination Meeting at OC 52.656.000 51.590.050 0 51.590.050 1.065.950
Workshop OC / Coordination Meeting at OCFrom Banjarmasin to SurabayaAir Transport 5 time x 9 person 20,00 2.900.000 43.756.000 20,00 43.690.050 0,00 2.900.000 0 20,00 43.690.050 0,00 65.950
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
OSA [ Fixed ] 5 time x 9 person x 2 days 65,00 100.000 6.500.000 59,00 5.900.000 0,00 100.000 0 59,00 5.900.000 6,00 600.000Local Transport 5 time x 9 person 24,00 100.000 2.400.000 20,00 2.000.000 0,00 100.000 0 20,00 2.000.000 4,00 400.000
2.2.1.6 For Several Training & Special Event from Kab. to Banjarmasin 101.000.000 101.000.000 0 101.000.000 0
For TrainingTransport for Korkot &Askot (10 Kota/Kab) on OSP Consolidation
a. Tanah Laut to BanjarmasinTranport 6 time x 6 person 25,00 200.000 5.000.000 25,00 5.000.000 0,00 200.000 0 25,00 5.000.000 0,00 0
b. Kota Baru to BanjarmasinTranport 6 time x 1 person 20,00 200.000 4.000.000 20,00 4.000.000 0,00 200.000 0 20,00 4.000.000 0,00 0
c. Banjar to BanjarmasinTranport 6 time x 5 person 45,00 200.000 9.000.000 45,00 9.000.000 0,00 200.000 0 45,00 9.000.000 0,00 0
d. Barito Kuala to BanjarmasinTranport 6 time x 1 person 13,00 200.000 2.600.000 13,00 2.600.000 0,00 200.000 0 13,00 2.600.000 0,00 0
e. Hulu Sungai Selatan to BanjarmasinTranport 6 time x 1 person 13,00 200.000 2.600.000 13,00 2.600.000 0,00 200.000 0 13,00 2.600.000 0,00 0
f. Hulu Sungai Tengah to BanjarmasinTranport 6 time x 1 person 13,00 200.000 2.600.000 13,00 2.600.000 0,00 200.000 0 13,00 2.600.000 0,00 0
g. Hulu Sungai Utara to BanjarmasinTranport 6 time x 5 person 20,00 200.000 4.000.000 20,00 4.000.000 0,00 200.000 0 20,00 4.000.000 0,00 0
h. Tabalong to BanjarmasinTranport 6 time x 2 person 26,00 200.000 5.200.000 26,00 5.200.000 0,00 200.000 0 26,00 5.200.000 0,00 0
i. Kota Banjar Baru to BanjarmasinTranport 6 time x 1 person 12,00 200.000 2.400.000 12,00 2.400.000 0,00 200.000 0 12,00 2.400.000 0,00 0
Inland Transport for SF, FT, FE, FS (34 Kota/Kab)
a. Tanah Laut to BanjarmasinTranport 2 time x 15 person 28,00 200.000 5.600.000 28,00 5.600.000 0,00 200.000 0 28,00 5.600.000 0,00 0
b. Kota Baru to BanjarmasinTranport 2 time x 10 person 33,00 200.000 6.600.000 33,00 6.600.000 0,00 200.000 0 33,00 6.600.000 0,00 0
c. Banjar to BanjarmasinTranport 2 time x 15 person 56,00 200.000 11.200.000 56,00 11.200.000 0,00 200.000 0 56,00 11.200.000 0,00 0
d. Barito Kuala to BanjarmasinTranport 2 time x 5 person 15,00 200.000 3.000.000 15,00 3.000.000 0,00 200.000 0 15,00 3.000.000 0,00 0
e. Hulu Sungai Selatan to BanjarmasinTranport 2 time x 10 person 28,00 200.000 5.600.000 28,00 5.600.000 0,00 200.000 0 28,00 5.600.000 0,00 0
f. Hulu Sungai Tengah to BanjarmasinTranport 2 time x 10 person 30,00 200.000 6.000.000 30,00 6.000.000 0,00 200.000 0 30,00 6.000.000 0,00 0
g. Hulu Sungai Utara to Banjarmasin
Tranport 2 time x 15 person 55,00 200.000 11.000.000 55,00 11.000.000 0,00 200.000 0 55,00 11.000.000 0,00 0
h. Tabalong to BanjarmasinTranport 2 time x 15 person 40,00 200.000 8.000.000 40,00 8.000.000 0,00 200.000 0 40,00 8.000.000 0,00 0
i. Kota Banjar Baru to BanjarmasinTranport 2 time x 10 person 33,00 200.000 6.600.000 33,00 6.600.000 0,00 200.000 0 33,00 6.600.000 0,00 0
e Inland Transport for SF, FK, FE, FS (To Assesment)Hulu Sungai Selatan to TabalongTransport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
f Hulu Sungai Tengah to TabalongTransport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
g Hulu Sungai Utara to TabalongTransport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Special Event (by request)a. Tanah Laut to Banjarmasin
Transport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
b. Kota Baru to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
c. Banjar to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
d. Barito Kuala to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
e. Hulu Sungai Selatan to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
f. Hulu Sungai Tengah to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
g. Hulu Sungai Utara to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
h. Tabalong to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
i. Kota Banjar Baru to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
j. Kota Banjar Baru to BanjarmasinTransport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
2.1.1.7 PERCEPATAN PENYUSUNAN DOK. SIAPLocal Transport for Coordination 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0Local Transport for Training 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0
2.2.2 To Jakarta
2.2.2.1 For Several Training to Jakarta by Request 16.812.000 16.811.403 0 16.811.403 597Air Transport 6 time x 5 person 7,00 2.900.000 10.512.000 7,00 10.511.403 0,00 2.900.000 0 7,00 10.511.403 0,00 597In land Travel in Jakarta 6 time x 5 person 4,00 200.000 800.000 4,00 800.000 0,00 200.000 0 4,00 800.000 0,00 0OSA 6 time x 5 person x 4 days 55,00 100.000 5.500.000 55,00 5.500.000 0,00 100.000 0 55,00 5.500.000 0,00 0
ToT Pemandu Nasional untuk Korkot & AskorkotAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
ToT Pelatihan Program LanjutanAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
2.2.2.2 For EGM to Jakarta 130.600.000 129.791.900 0 129.791.900 808.100Air TransportEGM TA/SubTA Training 5 time x 2 person 7,00 2.900.000 16.500.000 7,00 16.477.200 0,00 2.900.000 0 7,00 16.477.200 0,00 22.800
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
EGM TA Sosialisasi 5 time x 1 person 5,00 2.900.000 11.600.000 5,00 11.589.800 0,00 2.900.000 0 5,00 11.589.800 0,00 10.200EGM TA/SubTA MK/Sub TA RLF 5 time x 2 person 7,00 2.900.000 13.900.000 6,00 13.822.500 0,00 2.900.000 0 6,00 13.822.500 1,00 77.500EGM TA/SubTA INFRA/Sub TA Safeguard5 time x 1 person 5,00 2.900.000 12.000.000 5,00 11.922.800 0,00 2.900.000 0 5,00 11.922.800 0,00 77.200
EGM TA/SubTA Monev /Sub TA Legal HCU5 time x 1 person 5,00 2.900.000 11.500.000 5,00 11.293.200 0,00 2.900.000 0 5,00 11.293.200 0,00 206.800
EGM TA/SubTA SIM 5 time x 1 person 5,00 2.900.000 12.500.000 5,00 12.407.100 0,00 2.900.000 0 5,00 12.407.100 0,00 92.900EGM TA Local Goverment 5 time x 1 person 5,00 2.900.000 9.500.000 4,00 9.449.200 0,00 2.900.000 0 4,00 9.449.200 1,00 50.800EGM TA Urban Planner 5 time x 1 person 4,00 2.900.000 8.300.000 3,00 8.280.100 0,00 2.900.000 0 3,00 8.280.100 1,00 19.900
In land Transport in Jakarta 5 time x 10 person 34,00 200.000 6.800.000 34,00 6.800.000 0,00 200.000 0 34,00 6.800.000 0,00 0Acomodation 5 time x 10 person x 4 days 42,00 300.000 10.000.000 39,00 9.750.000 0,00 250.000 0 39,00 9.750.000 3,00 250.000OSA 5 time x 10 person x 4 days 180,00 100.000 18.000.000 180,00 18.000.000 0,00 100.000 0 180,00 18.000.000 0,00 0
2.2.2.3 For Coordination Meeting to Jakarta (by request) 51.400.000 51.108.700 0 51.108.700 291.300Air Transport 7 time x 3 person 15,00 2.900.000 41.500.000 15,00 41.408.700 0,00 2.900.000 0 15,00 41.408.700 0,00 91.300
0,00 4.900.000 0 0,00 0 0,00 4.900.000 0 0,00 0 0,00 0In land Transport in Jakarta 7 time x 3 person 14,00 200.000 2.800.000 14,00 2.800.000 0,00 200.000 0 14,00 2.800.000 0,00 0Hotel Accommodation 7 time x 3 person x 4 days 8,00 300.000 2.400.000 8,00 2.200.000 0,00 300.000 0 8,00 2.200.000 0,00 200.000OSA 7 time x 3 person x 4 days 47,00 100.000 4.700.000 47,00 4.700.000 0,00 100.000 0 47,00 4.700.000 0,00 0
2.2.2.4 Korkot to Jakarta (by Request) 75.150.000 74.811.144 0 74.811.144 338.856Air Transport 2,00 2.900.000 5.800.000 2,00 5.550.100 0,00 2.900.000 0 2,00 5.550.100 0,00 249.900In land Transport in Jakarta 2,00 200.000 400.000 2,00 400.000 0,00 200.000 0 2,00 400.000 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 3,00 100.000 300.000 3,00 300.000 0,00 100.000 0 3,00 300.000 0,00 0
2.2.2.5 ACTIVITIES TO JAKARTA 2017
1 RAKOR TEAM LEADER AND SPECIALIST OSPAir Transport 1,00 2.900.000 1.950.000 1,00 1.928.000 0,00 2.900.000 0 1,00 1.928.000 0,00 22.000Inland Transport 1,00 200.000 200.000 1,00 200.000 0,00 200.000 0 1,00 200.000 0,00 0Hotel Accomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 2,00 100.000 200.000 2,00 200.000 0,00 100.000 0 2,00 200.000 0,00 0
2 ToT PEMANDU NASIONAL untuk Pelatihan Askot dan Fasilitator (Kab. Skala Prioritas)Air Transport 13,00 2.900.000 35.100.000 13,00 35.060.844 0,00 2.900.000 0 13,00 35.060.844 0,00 39.156Inland Transport 13,00 200.000 2.600.000 13,00 2.600.000 0,00 200.000 0 13,00 2.600.000 0,00 0Hotel Accomodation 3,00 300.000 900.000 3,00 900.000 0,00 300.000 0 3,00 900.000 0,00 0OSA 104,00 100.000 10.400.000 104,00 10.400.000 0,00 100.000 0 104,00 10.400.000 0,00 0
3 ToT PEMANDU SIMAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0Inland Transport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
4 KONSOLIDASI KEGIATAN SKALA KOTA DAN EXPOSED DEDAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0Inland Transport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
5 BY REQUESTAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0Inland Transport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
TOT DAN PELATIHAN KHUSUS TIM KORKOT (Gel. 1)Air Transport 6,00 2.900.000 12.500.000 6,00 12.472.200 0,00 2.900.000 0 6,00 12.472.200 0,00 27.800Inland Transport 6,00 200.000 1.200.000 6,00 1.200.000 0,00 200.000 0 6,00 1.200.000 0,00 0Hotel Accomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 36,00 100.000 3.600.000 36,00 3.600.000 0,00 100.000 0 36,00 3.600.000 0,00 0
TOTAL DUTY TRAVEL PROVINCE SOUTH KALIMANTAN 563.663.000 528.589.697 0 528.589.697 35.073.303
2.3. DUTY TRAVEL EXPENSES PROVINCE KALIMANTAN TENGAH Februari 2018
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
2.3.1 IN PROVINCE
2.3.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3% x Number of Kelurahan) 4.800.000 2.500.000 1.200.000 3.700.000 1.100.000a. Palangkaraya (30 kel x 3% = 1 kel)
Transport 6 time x 1 person 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0b. To Waringin Timur (7 kel x 3% = 1 kel)
Tranport 6 time x 1 person 3,00 300.000 900.000 3,00 900.000 0,00 300.000 0 3,00 900.000 0,00 0Acomodation 6 time x 1 person x 1 days 6,00 150.000 900.000 6,00 900.000 0,00 150.000 0 6,00 900.000 0,00 0OSA 6 time x 1 person x 2 days 11,00 50.000 550.000 11,00 550.000 0,00 50.000 0 11,00 550.000 0,00 0
c. To Kabupaten Sukamara Tranport 0,00 1.100.000 0 0,00 0 0,00 1.100.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
d. To Kabupaten Pulau PisauTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
d. To Kabupaten KapuasTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
MONITORING OSP PADA LEVEL KOTA
KOTA KUMUH INFRA SKALA KOTADari Kota Palangkaraya ke KOTA PALANGKARAYA 16,00 50.000 800.000 0,00 0 2,00 50.000 100.000 2,00 100.000 14,00 700.000
KOTA KUMUH NON INFRA SKALA KOTADari Kota Palangkaraya ke KOTA WARINGIN TIMURTransport 2,00 300.000 600.000 0,00 0 2,00 300.000 600.000 2,00 600.000 0,00 0Acomodation 4,00 150.000 600.000 0,00 0 2,00 150.000 300.000 2,00 300.000 2,00 300.000OSA 6,00 50.000 300.000 0,00 0 4,00 50.000 200.000 4,00 200.000 2,00 100.000
2.3.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM 3.150.000 2.050.000 0 2.050.000 1.100.000
A. For City Coordinator and Assistance City Coordinator (37 Kel x 50%) x 6 6 time x 9 kelurahan 7,00 50.000 350.000 7,00 350.000 0,00 50.000 0 7,00 350.000 0,00 0Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city(37 Kel - 7 Kel luar kota) x 50%) x 18 18 time x 8 kelurahan 22,00 50.000 1.100.000 22,00 1.100.000 0,00 50.000 0 22,00 1.100.000 0,00 0Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For City Coordinator Infrastructure and FM out of the city
a. Palangkaraya to Kota WaringinTranport 24 time x 1 person 1,00 300.000 300.000 1,00 200.000 0,00 300.000 0 1,00 200.000 0,00 100.000Acomodation 24 time x 2 person x 2 days 2,00 150.000 300.000 2,00 300.000 0,00 150.000 0 2,00 300.000 0,00 0OSA 24 time x 2 person x 3 days 2,00 50.000 100.000 2,00 100.000 0,00 50.000 0 2,00 100.000 0,00 0
b. to Kabupaten SukamaraTranport 0,00 1.100.000 0 0,00 0 0,00 1.100.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
c. to Kabupaten Pulau PisauTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
d. to Kabupaten KapuasTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
MONITORING
Monitoring Tim Korkot Kota Palangkaraya di Dalam KotaKEL/DESA KUMUH DI KOTA SKALA KOTA 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/DESA NON KUMUH 8,00 50.000 400.000 0,00 0 0,00 50.000 0 0,00 0 8,00 400.000
Monitoring Tim Korkot Kota Palangkaraya Ke (1) Kotawaringin TimurKEL/DESA KUMUH DI KOTA SKALA KOTA 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/DESA NON KUMUH 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
2.3.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL 4.150.000 4.150.000 0 4.150.000 0a. Palangkaraya to Kota Waringin
Tranport 12 time x 3 person 6,00 300.000 1.800.000 6,00 1.800.000 0,00 300.000 0 6,00 1.800.000 0,00 0Acomodation 12 time x 3 person x 2 days 10,00 150.000 1.500.000 10,00 1.500.000 0,00 150.000 0 10,00 1.500.000 0,00 0OSA 12 time x 3 person x 3 days 17,00 50.000 850.000 17,00 850.000 0,00 50.000 0 17,00 850.000 0,00 0
2.3.1.4 FROM KAB/KOTA TO TL OFICE FOR COORDINATION MEETING 2.100.000 0 0 0 2.100.000a. From Waringin Timur to Palangkaraya
Tranport 14 time x 2 person 2,00 300.000 600.000 0,00 0 0,00 300.000 0 0,00 0 2,00 600.000Acomodation 14 time x 2 person x 2 days 6,00 150.000 900.000 0,00 0 0,00 150.000 0 0,00 0 6,00 900.000OSA 14 time x 2 person x 3 days 12,00 50.000 600.000 0,00 0 0,00 50.000 0 0,00 0 12,00 600.000
b. Kabupaten Sukamara to PalangkarayaTranport 0,00 1.100.000 0 0,00 0 0,00 1.100.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
c. Kabupaten Pulau Pisau to PalangkarayaTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
d. Kabupaten Kapuas to PalangkarayaTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0Acomodation 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
2.3.1.5 FROM PROVINCE TO REGIONAL FOR WORKSHOP & COORDINATION MEETING AT OC 65.200.000 64.119.000 0 64.119.000 1.081.000
Workshop OC / Coordination Meeting at OCFrom Palangkaraya to SurabayaAir Transport 5 time x 7 person 23,00 2.900.000 54.500.000 23,00 54.419.000 0,00 2.900.000 0 23,00 54.419.000 0,00 81.000OSA [ Fixed ] 5 time x 7 person x 2 days 80,00 100.000 8.000.000 74,00 7.400.000 0,00 100.000 0 74,00 7.400.000 6,00 600.000Local Transport 5 time x 7 person 27,00 100.000 2.700.000 23,00 2.300.000 0,00 100.000 0 23,00 2.300.000 4,00 400.000
2.3.1.6 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO PALANGKARAYA 5.400.000 4.500.000 0 4.500.000 900.000a. For Training
Transport for Askot Waringin Timur on OSP Consolidation 8,00 300.000 2.400.000 5,00 1.500.000 0,00 300.000 0 5,00 1.500.000 3,00 900.000Inland Transport for SF, FK, FE, FS Waringin Timur 10,00 300.000 3.000.000 10,00 3.000.000 0,00 300.000 0 10,00 3.000.000 0,00 0
b. Kabupaten Sukamara to PalangkarayaTranport 0,00 1.100.000 0 0,00 0 0,00 1.100.000 0 0,00 0 0,00 0
c. Kabupaten Pulau Pisau to PalangkarayaTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0
d. Kabupaten Kapuas to PalangkarayaTranport 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0
b. Special Event (by request)Kota Waringin to PalangkarayaTransport 2 time x 2 person 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
2.3.2 TO JAKARTA
2.3.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 8.600.000 8.483.100 0 8.483.100 116.900Air Transport 6 time x 5 person 4,00 2.900.000 5.000.000 4,00 4.883.100 0,00 2.900.000 0 4,00 4.883.100 0,00 116.900In land Travel in Jakarta 6 time x 5 person 2,00 200.000 400.000 2,00 400.000 0,00 200.000 0 2,00 400.000 0,00 0OSA 6 time x 5 person x 4 days 32,00 100.000 3.200.000 32,00 3.200.000 0,00 100.000 0 32,00 3.200.000 0,00 0
ToT Pemandu Nasional untuk Korkot & AskorkotAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
ToT Pelatihan Program LanjutanAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
2.3.2.2 FOR EGM TO JAKARTA 86.100.000 85.666.310 0 85.666.310 433.690Air TransportEGM TA/SubTA Training 5 time x 1 person 5,00 2.900.000 11.500.000 5,00 11.500.000 0,00 2.900.000 0 5,00 11.500.000 0,00 0EGM TA Sosialisasi 0,00 2.900.000 0EGM TA/SubTA MK/Sub TA RLF 5 time x 1 person 5,00 2.900.000 11.600.000 5,00 11.506.125 0,00 2.900.000 0 5,00 11.506.125 0,00 93.875EGM TA/SubTA INFRA/Sub TA Safeguard5 time x 1 person 4,00 2.900.000 7.600.000 4,00 7.573.485 0,00 2.900.000 0 4,00 7.573.485 0,00 26.515EGM TA/SubTA Monev /Sub TA Legal HCUEGM TA/SubTA SIM 5 time x 1 person 6,00 2.900.000 13.800.000 6,00 13.778.000 0,00 2.900.000 0 6,00 13.778.000 0,00 22.000EGM TA Local Goverment 5 time x 1 person 5,00 2.900.000 11.100.000 5,00 11.062.700 0,00 2.900.000 0 5,00 11.062.700 0,00 37.300EGM TA Urban Planner 5 time x 1 person 3,00 2.900.000 5.600.000 3,00 5.546.000 0,00 2.900.000 0 3,00 5.546.000 0,00 54.000
In land Transport in Jakarta 5 time x 6 person 24,00 200.000 4.800.000 24,00 4.800.000 0,00 200.000 0 24,00 4.800.000 0,00 0Acomodation 5 time x 6 person x 4 days 36,00 300.000 7.200.000 36,00 7.200.000 0,00 250.000 0 36,00 7.200.000 0,00 0OSA 5 time x 6 person x 4 days 129,00 100.000 12.900.000 127,00 12.700.000 0,00 100.000 0 127,00 12.700.000 2,00 200.000
2.3.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) 25.240.000 24.839.200 0 24.839.200 400.800Air Transport 7 time x 3 person 8,00 2.900.000 16.709.000 6,00 16.709.000 0,00 2.795.300 0 6,00 16.709.000 2,00 0Air Transport to Jakarta and Other 1,00 4.900.000 3.531.000 1,00 3.530.200 0,00 4.900.000 0 1,00 3.530.200 0,00 800In land Transport in Jakarta 7 time x 3 person 6,00 200.000 1.200.000 6,00 1.200.000 0,00 200.000 0 6,00 1.200.000 0,00 0Hotel Accommodation 7 time x 3 person x 4 days 19,00 100.000 1.900.000 12,00 1.800.000 0,00 100.000 0 12,00 1.800.000 7,00 100.000OSA 7 time x 3 person x 4 days 37,00 100.000 1.900.000 16,00 1.600.000 0,00 100.000 0 16,00 1.600.000 21,00 300.000
2.1.2.5 Korkot to Jakarta (by Request) 29.700.000 29.603.400 0 29.603.400 96.600Air Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Transport in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
2.1.2.6 ACTIVITIES TO JAKARTA 2017
1 RAKOR TEAM LEADER AND SPECIALIST OSPAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Transport in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
2 ToT PEMAMDU NASIONAL Untuk Pelatihan Askot dan Fasilitator (Kab. Skala Prioritas)Air Transport 5,00 2.900.000 12.100.000 5,00 12.011.400 0,00 2.900.000 0 5,00 12.011.400 0,00 88.600In land Transport in Jakarta 5,00 200.000 1.000.000 5,00 1.000.000 0,00 200.000 0 5,00 1.000.000 0,00 0Hotel Accommodation 5,00 300.000 1.200.000 4,00 1.200.000 0,00 300.000 0 4,00 1.200.000 1,00 0OSA 40,00 100.000 4.000.000 40,00 4.000.000 0,00 100.000 0 40,00 4.000.000 0,00 0
3 ToT PEMANDU SIMAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Transport in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
4 KONSOLIDASI KEGIATAN SKALA KOTA DAN EXPOSES DEDAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Transport in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
5 BY REQUESTAir Transport 0,00 2.900.000 0 0,00 0 0,00 2.900.000 0 0,00 0 0,00 0In land Transport in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
TOT DAN PELATIHAN KHUSUS TIM KORKOT (Gel. 1)Air Transport 4,00 2.900.000 8.200.000 4,00 8.192.000 0,00 2.900.000 0 4,00 8.192.000 0,00 8.000In land Transport in Jakarta 4,00 200.000 800.000 4,00 800.000 0,00 200.000 0 4,00 800.000 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 24,00 100.000 2.400.000 24,00 2.400.000 0,00 100.000 0 24,00 2.400.000 0,00 0
TOTAL DUTY TRAVEL PROVINCE CENTER KALIMANTAN 234.440.000 225.911.010 1.200.000 227.111.010 7.328.990
2.4. Duty Travel Expenses East Kalimantan Februari 2018
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
2.4.1 In Province
2.4.1.1 For Spotcheck Province to Kelurahan (3% x Number of Kelurahan) 86.550.000 70.167.000 2.800.000 72.967.000 13.583.000
a. From Samarinda to Balikpapan dan Paser (41 kel x 3% = 2 kel)Tranport 6 time x 1 person 4,00 400.000 1.600.000 4,00 1.600.000 0,00 400.000 0 4,00 1.600.000 0,00 0Acomodation 6 time x 1 person x 2 days 7,00 350.000 2.450.000 7,00 2.440.000 0,00 350.000 0 7,00 2.440.000 0,00 10.000OSA 6 time x 1 person x 3 days 14,00 50.000 700.000 14,00 700.000 0,00 50.000 0 14,00 700.000 0,00 0
b. From Samarinda to Kutai Kertanegara & Kota Bontang (36 kel x 3% = 2 kel)Tranport 6 time x 1 person 5,00 600.000 3.000.000 5,00 3.000.000 0,00 600.000 0 5,00 3.000.000 0,00 0Acomodation 6 time x 1 person x 2 days 8,00 350.000 2.600.000 8,00 2.600.000 0,00 350.000 0 8,00 2.600.000 0,00 0OSA 6 time x 1 person x 3 days 15,00 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0
c. From Samarinda to Berau (6 kel x 3% = 1 kel)Tranport 6 time x 1 person 5,00 1.700.000 8.500.000 5,00 8.500.000 0,00 1.700.000 0 5,00 8.500.000 0,00 0Acomodation 6 time x 1 person x 2 days 8,00 350.000 2.800.000 8,00 2.487.000 0,00 350.000 0 8,00 2.487.000 0,00 313.000OSA 6 time x 1 person x 3 days 14,00 50.000 700.000 14,00 700.000 0,00 50.000 0 14,00 700.000 0,00 0
d. From Samarinda to Malinau (6 kel x 3% = 1 kel)Tranport 6 time x 1 person 3,00 1.700.000 5.100.000 3,00 5.100.000 0,00 1.700.000 0 3,00 5.100.000 0,00 0Acomodation 6 time x 1 person x 2 days 5,00 350.000 1.750.000 5,00 1.750.000 0,00 350.000 0 5,00 1.750.000 0,00 0OSA 6 time x 1 person x 3 days 9,00 50.000 450.000 9,00 450.000 0,00 50.000 0 9,00 450.000 0,00 0
e. From Samarinda to Bulongan (3 kel x 3% = 1 kel)Tranport 6 time x 1 person 5,00 1.700.000 8.500.000 5,00 8.500.000 0,00 1.700.000 0 5,00 8.500.000 0,00 0Acomodation 6 time x 1 person x 2 days 9,00 350.000 3.150.000 9,00 2.970.000 0,00 350.000 0 9,00 2.970.000 0,00 180.000OSA 6 time x 1 person x 3 days 15,00 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0
f. From Samarinda to Nunukan (8 kel x 3% = 1 kel)Tranport 6 time x 1 person 4,00 1.900.000 7.600.000 4,00 7.600.000 0,00 1.900.000 0 4,00 7.600.000 0,00 0Acomodation 6 time x 1 person x 2 days 7,00 300.000 2.100.000 7,00 2.000.000 0,00 300.000 0 7,00 2.000.000 0,00 100.000OSA 6 time x 1 person x 3 days 12,00 50.000 600.000 12,00 600.000 0,00 50.000 0 12,00 600.000 0,00 0
g. From Samarinda to Kota Tarakan (20 kel x 3% = 1 kel)Tranport 6 time x 1 person 8,00 1.400.000 11.200.000 8,00 11.200.000 0,00 1.400.000 0 8,00 11.200.000 0,00 0Acomodation 6 time x 1 person x 2 days 15,00 350.000 5.250.000 15,00 5.070.000 0,00 350.000 0 15,00 5.070.000 0,00 180.000OSA 6 time x 1 person x 3 days 24,00 50.000 1.200.000 24,00 1.200.000 0,00 50.000 0 24,00 1.200.000 0,00 0
h. Kota Samarinda (53 kel x 3% = 2 kel)Tranport 6 time x 1 person x 1 days 5,00 50.000 250.000 4,00 200.000 0,00 50.000 0 4,00 200.000 1,00 50.000
MONITORING OSP PADA LEVEL KOTAKOTA KUMUH INFRA SKALA KOTADari Kota Samarinda ke KOTA BALIKPAPANTransport 1,00 400.000 400.000 0,00 0 0,00 400.000 0 0,00 0 1,00 400.000Acomodation 3,00 350.000 1.050.000 0,00 0 0,00 350.000 0 0,00 0 3,00 1.050.000OSA 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
Dari Kota Samarinda ke KOTA SAMARINDATransport 0,00 400.000 0 0,00 0 0,00 400.000 0 0,00 0 0,00 0Acomodation 0,00 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0OSA 8,00 50.000 300.000 0,00 0 2,00 50.000 100.000 2,00 100.000 6,00 200.000
Dari Kota Samarinda ke KOTA BONTANGTransport 1,00 600.000 600.000 0,00 0 0,00 600.000 0 0,00 0 1,00 600.000Acomodation 3,00 350.000 1.050.000 0,00 0 0,00 350.000 0 0,00 0 3,00 1.050.000OSA 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
KOTA KUMUH NON INFRA SKALA KOTADari Kota Samarinda ke KOTA PASER
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
Transport 1,00 400.000 400.000 0,00 0 0,00 400.000 0 0,00 0 1,00 400.000Acomodation 2,00 350.000 700.000 0,00 0 0,00 350.000 0 0,00 0 2,00 700.000OSA 3,00 50.000 150.000 0,00 0 0,00 50.000 0 0,00 0 3,00 150.000
Dari Kota Samarinda ke KUTAI KARTANEGARATransport 1,00 600.000 600.000 0,00 0 0,00 600.000 0 0,00 0 1,00 600.000Acomodation 2,00 350.000 700.000 0,00 0 0,00 350.000 0 0,00 0 2,00 700.000OSA 3,00 50.000 150.000 0,00 0 0,00 50.000 0 0,00 0 3,00 150.000
Dari Kota Samarinda ke BERAUTransport 1,00 1.700.000 1.700.000 0,00 0 1.700.000 0 0,00 0 1,00 1.700.000Acomodation 2,00 350.000 700.000 0,00 0 350.000 0 0,00 0 2,00 700.000OSA 3,00 50.000 150.000 0,00 0 50.000 0 0,00 0 3,00 150.000
MONITORING KE KAB/KOTA (COACHING CLINIC)Transport to Balikpapan 5,00 400.000 800.000 0,00 0 1,00 400.000 400.000 1,00 400.000 4,00 400.000Acomodation 5,00 350.000 1.750.000 0,00 0 2,00 350.000 700.000 2,00 700.000 3,00 1.050.000OSA 10,00 50.000 500.000 0,00 0 3,00 50.000 150.000 3,00 150.000 7,00 350.000
Transport to Bontang 5,00 600.000 1.200.000 0,00 0 1,00 600.000 600.000 1,00 600.000 4,00 600.000Acomodation 5,00 350.000 1.750.000 0,00 0 2,00 350.000 700.000 2,00 700.000 3,00 1.050.000OSA 10,00 50.000 500.000 0,00 0 3,00 50.000 150.000 3,00 150.000 7,00 350.000
2.4.1.2 Spootcheck Kota/Kab for Ass. City Coordinator Infra and FM 29.750.000 27.150.000 0 27.150.000 2.600.000
A. For City Coordinator and Assistance City Coordinator (173 Kel x 50%) x 6 6 time x 43 kelurahan 65,00 50.000 3.250.000 64,00 3.150.000 0,00 50.000 0 64,00 3.150.000 1,00 100.000Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city(173 Kel - 73 Kel luar kota) x 50%) x 18 18 time x 25 kelurahan 22,00 50.000 1.100.000 20,00 1.000.000 0,00 50.000 0 20,00 1.000.000 2,00 100.000Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For City Coordinator Infrastructure and FM out of te towna. From Kota Balikpapan to Paser
Tranport 28 time x 2 person 1,00 400.000 400.000 1,00 400.000 0,00 400.000 0 1,00 400.000 0,00 0Acomodation 24 time x 2 person x 2 days 2,00 350.000 700.000 2,00 700.000 0,00 350.000 0 2,00 700.000 0,00 0OSA 24 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0
b. From Kota Samarinda to Kutai KartanegaraTranport 28 time x 3 person 1,00 250.000 250.000 1,00 250.000 0,00 250.000 0 1,00 250.000 0,00 0Acomodation 24 time x 2 person x 2 days 2,00 350.000 550.000 2,00 550.000 0,00 350.000 0 2,00 550.000 0,00 0OSA 24 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0
c. From Kota Samarinda to BontangTranport 30 time x 2 person 1,00 400.000 400.000 1,00 400.000 0,00 400.000 0 1,00 400.000 0,00 0Acomodation 24 time x 2 person x 2 days 2,00 350.000 700.000 2,00 700.000 0,00 350.000 0 2,00 700.000 0,00 0OSA 24 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0
d. From Kota Tarakan to NunukanTranport 24 time x 2 person 8,00 1.200.000 9.600.000 8,00 9.600.000 0,00 1.200.000 0 8,00 9.600.000 0,00 0Acomodation 24 time x 2 person x 2 days 11,00 300.000 3.350.000 11,00 3.300.000 0,00 300.000 0 11,00 3.300.000 0,00 50.000OSA 24 time x 2 person x 3 days 21,00 50.000 1.050.000 21,00 1.050.000 0,00 50.000 0 21,00 1.050.000 0,00 0
e. From Kota Tarakan to BulunganTranport 24 time x 1 person 1,00 1.200.000 1.200.000 1,00 1.200.000 0,00 1.200.000 0 1,00 1.200.000 0,00 0Acomodation 24 time x 2 person x 2 days 2,00 300.000 600.000 0,00 0 0,00 300.000 0 0,00 0 2,00 600.000OSA 24 time x 2 person x 3 days 3,00 50.000 150.000 2,00 100.000 0,00 50.000 0 2,00 100.000 1,00 50.000
f. From Kota Tarakan to BerauTranport 24 time x 1 person 1,00 1.500.000 1.500.000 1,00 1.500.000 0,00 1.500.000 0 1,00 1.500.000 0,00 0Acomodation 24 time x 2 person x 2 days 2,00 350.000 700.000 2,00 700.000 0,00 350.000 0 2,00 700.000 0,00 0OSA 24 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0
g. From Kota Tarakan to MalinoTranport 24 time x 1 person 1,00 1.200.000 1.200.000 1,00 1.200.000 0,00 1.200.000 0 1,00 1.200.000 0,00 0Acomodation 24 time x 2 person x 2 days 2,00 300.000 600.000 2,00 600.000 0,00 300.000 0 2,00 600.000 0,00 0OSA 24 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0
MONITORING TEMATIKMonitoring Tim Korkot Kota Balikpapan di Dalam Kota
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
KEL/DESA KUMUH DI KOTA SKALA KOTA 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/DESA NON KUMUH 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000
Monitoring Tim Korkot Kota Balikpapan Ke (1) PaserKEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000KEL/DESA NON KUMUH 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000
Monitoring Tim Korkot Kota Samarinda di Dalam KotaKEL/DESA KUMUH DI KOTA SKALA KOTA 4,00 50.000 200.000 0,00 0 0,00 50.000 0 0,00 0 4,00 200.000KEL/DESA NON KUMUH 6,00 50.000 300.000 0,00 0 0,00 50.000 0 0,00 0 6,00 300.000
Monitoring Tim Korkot Kota Samarinda Ke (1) Kutai KartanegaraKEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000KEL/DESA NON KUMUH 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000
Monitoring Tim Korkot Kota Bontang di Dalam KotaKEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000KEL/DESA NON KUMUH 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000
Monitoring Tim Korkot Kota Bontang Ke (1) BerauKEL/DESA KUMUH DI KOTA SKALA KOTA 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000KEL/DESA NON KUMUH 2,00 50.000 100.000 0,00 0 0,00 50.000 0 0,00 0 2,00 100.000
2.4.1.3 For CB Activity by Askot to Faskel 0 0 0 0 0
a. From Kota Balikpapan to PaserTranport 12 time x 3 person 0,00 400.000 0 0,00 0 0,00 400.000 0 0,00 0 0,00 0Acomodation 12 time x 3 person x 2 days 0,00 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0OSA 12 time x 3 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
b. From Kota Samarinda to Kutai KartanegaraTranport 12 time x 3 person 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0Acomodation 12 time x 3 person x 2 days 0,00 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0OSA 12 time x 3 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
c. From Kota Samarinda to BontangTranport 12 time x 3 person 0,00 400.000 0 0,00 0 0,00 400.000 0 0,00 0 0,00 0Acomodation 12 time x 3 person x 2 days 0,00 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0OSA 12 time x 3 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
d. From Kota Tarakan to NunukanTranport 12 time x 3 person 0,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0Acomodation 12 time x 3 person x 2 days 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 12 time x 3 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
e. From Kota Tarakan to BulunganTranport 12 time x 3 person 0,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0Acomodation 12 time x 3 person x 2 days 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 12 time x 3 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
f. From Kota Tarakan to BerauTranport 12 time x 3 person 0,00 1.500.000 0 0,00 0 0,00 1.500.000 0 0,00 0 0,00 0Acomodation 12 time x 3 person x 2 days 0,00 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0OSA 12 time x 3 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
g. From Kota Tarakan to MalinoTranport 12 time x 3 person 0,00 1.200.000 0 0,00 0 0,00 1.200.000 0 0,00 0 0,00 0Acomodation 12 time x 3 person x 2 days 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 12 time x 3 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
2.4.1.4 From Kab/Kota to TL Office for Coordination Meeting 90.900.000 83.950.000 0 83.950.000 6.950.000
a. From Paser to SamarindaTranport 14 time x 2 person 7,00 600.000 4.200.000 6,00 3.600.000 0,00 600.000 0 6,00 3.600.000 1,00 600.000
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
Acomodation 14 time x 2 person x 2 days 39,00 250.000 9.750.000 37,00 9.250.000 0,00 250.000 0 37,00 9.250.000 2,00 500.000OSA 14 time x 2 person x 3 days 18,00 50.000 900.000 15,00 750.000 0,00 50.000 0 15,00 750.000 3,00 150.000
b. From Kutai Kartanegara to SamarindaTranport 14 time x 2 person 6,00 600.000 3.600.000 5,00 3.000.000 0,00 600.000 0 5,00 3.000.000 1,00 600.000Acomodation 14 time x 2 person x 2 days 10,00 250.000 2.500.000 8,00 2.000.000 0,00 250.000 0 8,00 2.000.000 2,00 500.000OSA 14 time x 2 person x 3 days 18,00 50.000 900.000 15,00 750.000 0,00 50.000 0 15,00 750.000 3,00 150.000
c. From Berau to SamarindaTranport 14 time x 2 person 6,00 1.700.000 10.200.000 5,00 8.500.000 0,00 1.700.000 0 5,00 8.500.000 1,00 1.700.000Acomodation 14 time x 2 person x 2 days 8,00 250.000 2.000.000 6,00 1.500.000 0,00 250.000 0 6,00 1.500.000 2,00 500.000OSA 14 time x 2 person x 3 days 18,00 50.000 900.000 15,00 750.000 0,00 50.000 0 15,00 750.000 3,00 150.000
d. From Malinau to SamarindaTranport 14 time x 2 person 5,00 1.700.000 8.500.000 5,00 8.500.000 0,00 1.700.000 0 5,00 8.500.000 0,00 0Acomodation 14 time x 2 person x 2 days 8,00 250.000 2.000.000 8,00 2.000.000 0,00 250.000 0 8,00 2.000.000 0,00 0OSA 14 time x 2 person x 3 days 15,00 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0
e. From Bulongan to SamarindaTranport 14 time x 2 person 5,00 1.700.000 8.500.000 5,00 8.500.000 0,00 1.700.000 0 5,00 8.500.000 0,00 0Acomodation 14 time x 2 person x 2 days 8,00 250.000 2.000.000 8,00 2.000.000 0,00 250.000 0 8,00 2.000.000 0,00 0OSA 14 time x 2 person x 3 days 15,00 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0
f. From Nunukan to SamarindaTranport 14 time x 2 person 4,00 1.900.000 7.600.000 4,00 7.600.000 0,00 1.900.000 0 4,00 7.600.000 0,00 0Acomodation 14 time x 2 person x 2 days 6,00 250.000 1.500.000 6,00 1.500.000 0,00 250.000 0 6,00 1.500.000 0,00 0OSA 14 time x 2 person x 3 days 12,00 50.000 600.000 12,00 600.000 0,00 50.000 0 12,00 600.000 0,00 0
g. From Balikpapan to SamarindaTranport 14 time x 2 person 7,00 200.000 1.400.000 6,00 1.200.000 0,00 200.000 0 6,00 1.200.000 1,00 200.000Acomodation 14 time x 2 person x 2 days 10,00 250.000 2.500.000 8,00 2.000.000 0,00 250.000 0 8,00 2.000.000 2,00 500.000OSA 14 time x 2 person x 3 days 21,00 50.000 1.050.000 18,00 900.000 0,00 50.000 0 18,00 900.000 3,00 150.000
h. From Tarakan to SamarindaTranport 14 time x 2 person 6,00 1.400.000 8.400.000 6,00 8.400.000 0,00 1.400.000 0 6,00 8.400.000 0,00 0Acomodation 14 time x 2 person x 2 days 10,00 250.000 2.500.000 10,00 2.500.000 0,00 250.000 0 10,00 2.500.000 0,00 0OSA 14 time x 2 person x 3 days 18,00 50.000 900.000 18,00 900.000 0,00 50.000 0 18,00 900.000 0,00 0
i. From Bontang to SamarindaTranport 14 time x 2 person 6,00 600.000 3.600.000 5,00 3.000.000 0,00 600.000 0 5,00 3.000.000 1,00 600.000Acomodation 14 time x 2 person x 2 days 10,00 250.000 2.500.000 8,00 2.000.000 0,00 250.000 0 8,00 2.000.000 2,00 500.000OSA 14 time x 2 person x 3 days 18,00 50.000 900.000 15,00 750.000 0,00 50.000 0 15,00 750.000 3,00 150.000
2.4.1.5 From Province to Regional for Workshop & Coordination Meeting at OC 54.900.000 54.491.500 0 54.491.500 408.500Workshop OC / Coordination Meeting at OCFrom Samarinda to SurabayaAir Transport 5 time x 9 person 19,00 3.700.000 47.000.000 19,00 46.991.500 0,00 3.700.000 0 19,00 46.991.500 0,00 8.500OSA [ Fixed ] 5 time x 9 person x 2 days 60,00 100.000 5.400.000 54,00 5.400.000 0,00 100.000 0 54,00 5.400.000 6,00 0Local Transport 5 time x 9 person 25,00 100.000 2.500.000 21,00 2.100.000 0,00 100.000 0 21,00 2.100.000 4,00 400.000
2.4.1.6 For Several Training & Special Event from Kab. to Banjarmasin 354.000.000 350.874.000 0 350.874.000 3.126.000For TrainingTransport for Korkot &Askot (10 Kota/Kab) on OSP Consolidation
a. From Paser to SamarindaTranport 6 time x 2 person 22,00 400.000 8.800.000 22,00 8.800.000 0,00 400.000 0 22,00 8.800.000 0,00 0
b. From Kutai Kartanegara to SamarindaTranport 6 time x 3 person 18,00 600.000 10.800.000 18,00 10.800.000 0,00 600.000 0 18,00 10.800.000 0,00 0
c. From Berau to SamarindaTranport 6 time x 1 person 6,00 1.700.000 10.200.000 6,00 10.200.000 0,00 1.700.000 0 6,00 10.200.000 0,00 0
d. From Malinau to SamarindaTranport 6 time x 1 person 6,00 1.700.000 10.200.000 6,00 10.200.000 0,00 1.700.000 0 6,00 10.200.000 0,00 0
e. From Bulongan to SamarindaTranport 6 time x 1 person 2,00 1.700.000 3.400.000 2,00 3.400.000 0,00 1.700.000 0 2,00 3.400.000 0,00 0
f. From Nunukan to SamarindaTranport 6 time x 1 person 7,00 1.900.000 13.300.000 7,00 13.300.000 0,00 1.900.000 0 7,00 13.300.000 0,00 0
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
g. From Balikpapan to SamarindaTranport 6 time x 5 person 38,00 400.000 11.600.000 38,00 11.600.000 0,00 300.000 0 38,00 11.600.000 0,00 0
h. From Tarakan to SamarindaTranport 6 time x 5 person 31,00 1.400.000 42.800.000 31,00 42.774.000 0,00 1.400.000 0 31,00 42.774.000 0,00 26.000
i. From Bontang to SamarindaTranport 6 time x 1 person 15,00 600.000 9.000.000 15,00 9.000.000 0,00 600.000 0 15,00 9.000.000 0,00 0
Inland Transport for SF, FT, FE, FS (34 Kota/Kab)a. From Paser to Samarinda
Tranport 2 time x 14 person 17,00 400.000 6.800.000 17,00 6.800.000 0,00 400.000 0 17,00 6.800.000 0,00 0b. From Kutai Kartanegara to Samarinda
Tranport 2 time x 13 person 30,00 600.000 18.000.000 30,00 18.000.000 0,00 600.000 0 30,00 18.000.000 0,00 0c. From Berau to Samarinda
Tranport 2 time x 5 person 15,00 1.700.000 25.500.000 15,00 25.500.000 0,00 1.700.000 0 15,00 25.500.000 0,00 0d. From Malinau to Samarinda
Tranport 2 time x 5 person 11,00 1.700.000 18.700.000 11,00 18.700.000 0,00 1.700.000 0 11,00 18.700.000 0,00 0e. From Bulongan to Samarinda
Tranport 2 time x 2 person 4,00 1.700.000 6.800.000 4,00 6.800.000 0,00 1.700.000 0 4,00 6.800.000 0,00 0f. From Nunukan to Samarinda
Tranport 2 time x 5 person 14,00 1.900.000 26.600.000 14,00 26.600.000 0,00 1.900.000 0 14,00 26.600.000 0,00 0g. From Balikpapan to Samarinda
Tranport 2 time x 15 person 112,00 400.000 44.800.000 112,00 44.800.000 0,00 400.000 0 112,00 44.800.000 0,00 0h. From Tarakan to Samarinda
Tranport 2 time x 10 person 28,00 1.400.000 39.200.000 28,00 39.200.000 0,00 1.400.000 0 28,00 39.200.000 0,00 0i. From Bontang to Samarinda
Tranport 2 time x 12 person 46,00 600.000 27.100.000 40,00 24.000.000 0,00 600.000 0 40,00 24.000.000 6,00 3.100.000
Inland Transport for SF, FK, FE, FS (to Assesment)1 From Paser to Balikpapan
Transport 0,00 400.000 0 0,00 0 0,00 400.000 0 0,00 0 0,00 0
Special Event (by request)a. From Paser to Samarinda
Tranport 2 time x 2 person 1,00 600.000 600.000 1,00 600.000 0,00 600.000 0 1,00 600.000 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0
b. From Kutai Kartanegara to SamarindaTranport 2 time x 2 person 1,00 600.000 600.000 1,00 600.000 0,00 600.000 0 1,00 600.000 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0
c. From Berau to SamarindaTranport 2 time x 2 person 1,00 1.700.000 1.700.000 1,00 1.700.000 0,00 1.700.000 0 1,00 1.700.000 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0
d. From Malinau to SamarindaTranport 2 time x 2 person 1,00 1.700.000 1.700.000 1,00 1.700.000 0,00 1.700.000 0 1,00 1.700.000 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0
e. From Bulongan to SamarindaTranport 2 time x 2 person 0,00 1.700.000 0 0,00 0 0,00 1.700.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
f. From Nunukan to SamarindaTranport 2 time x 2 person 0,00 1.900.000 0 0,00 0 0,00 1.900.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
g. From Balikpapan to SamarindaTranport 2 time x 2 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
h. From Tarakan to SamarindaTranport 2 time x 2 person 3,00 1.400.000 4.200.000 3,00 4.200.000 0,00 1.400.000 0 3,00 4.200.000 0,00 0
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 9,00 50.000 450.000 9,00 450.000 0,00 50.000 0 9,00 450.000 0,00 0
i. From Bontang to SamarindaTranport 2 time x 2 person 1,00 600.000 600.000 1,00 600.000 0,00 600.000 0 1,00 600.000 0,00 0Acomodation 2 time x 2 person x 2 days 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0OSA 2 time x 2 person x 3 days 3,00 50.000 150.000 3,00 150.000 0,00 50.000 0 3,00 150.000 0,00 0
2.4.1.7 PERCEPATAN PENYUSUNAN DOK SIAPLocal Transport for Coordiantion 7,00 1.400.000 9.800.000 7,00 9.800.000 0,00 1.400.000 0 7,00 9.800.000 0,00 0local Transport for Training 0,00 1.400.000 0 0,00 0 0,00 1.400.000 0 0,00 0 0,00 0
2.4.2 To Jakarta
2.4.2.1 For Several Training to Jakarta by Request 12.984.000 12.983.700 0 12.983.700 300Air Transport 6 time x 5 person 4,00 3.700.000 8.984.000 4,00 8.983.700 0,00 3.700.000 0 4,00 8.983.700 0,00 300In land Travel in Jakarta 6 time x 5 person 4,00 200.000 800.000 4,00 800.000 0,00 200.000 0 4,00 800.000 0,00 0In land Transport Samarinda - Balikpapan6 time x 5 person 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 6 time x 5 person x 4 days 32,00 100.000 3.200.000 32,00 3.200.000 0,00 100.000 0 32,00 3.200.000 0,00 0
ToT Pemandu Nasional untuk Korkot & AskorkotAir Transport 0,00 3.700.000 0 0,00 0 0,00 3.700.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
ToT Pelatihan Program lanjutanAir Transport 0,00 3.700.000 0 0,00 0 0,00 3.700.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
ToT Pemandu Nasional untuk Korkot & AskorkotAir Transport (Kalimantan utara - Jakarta PP) 0,00 4.797.000 0 0,00 0 0,00 4.797.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
ToT Pelatihan Program LanjutanAir Transport (Kalimantan utara - Jakarta PP) 0,00 4.797.000 0 0,00 0 0,00 4.797.000 0 0,00 0 0,00 0In land Travel in Jakarta 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
2.4.2.2 For EGM to Jakarta 152.205.000 151.975.890 0 151.975.890 229.110Air TransportEGM TA/SubTA Training 5 time x 2 person 7,00 3.700.000 20.300.000 7,00 20.288.600 0,00 3.700.000 0 7,00 20.288.600 0,00 11.400EGM TA Sosialisasi 5 time x 1 person 5,00 3.700.000 13.300.000 5,00 13.242.090 0,00 3.700.000 0 5,00 13.242.090 0,00 57.910EGM TA/SubTA MK/Sub TA RLF 5 time x 2 person 7,00 3.700.000 18.300.000 6,00 18.222.500 0,00 3.700.000 0 6,00 18.222.500 1,00 77.500EGM TA/SubTA INFRA/Sub TA Safeguard5 time x 1 person 5,00 3.700.000 16.400.000 5,00 16.362.800 0,00 3.700.000 0 5,00 16.362.800 0,00 37.200EGM TA/SubTA Monev /Sub TA Legal HCU5 time x 1 person 5,00 3.700.000 13.300.000 5,00 13.257.000 0,00 3.700.000 0 5,00 13.257.000 0,00 43.000EGM TA/SubTA SIM 5 time x 1 person 6,00 3.700.000 16.546.000 5,00 16.545.200 0,00 3.700.000 0 5,00 16.545.200 1,00 800EGM TA Local Goverment 5 time x 1 person 5,00 3.700.000 12.792.000 4,00 12.791.500 0,00 3.700.000 0 4,00 12.791.500 1,00 500EGM TA Urban Planner 5 time x 1 person 3,00 3.700.000 5.917.000 2,00 5.916.200 0,00 3.700.000 0 2,00 5.916.200 1,00 800
In land Transport in Jakarta 5 time x 10 person 36,00 200.000 6.800.000 34,00 6.800.000 0,00 200.000 0 34,00 6.800.000 2,00 0In land Transport Samarinda - Balikpapan5 time x 10 person 6,00 200.000 800.000 4,00 800.000 0,00 200.000 0 4,00 800.000 2,00 0Acomodation 5 time x 10 person x 4 days 54,00 300.000 9.750.000 51,00 9.750.000 0,00 250.000 0 51,00 9.750.000 3,00 0OSA 5 time x 10 person x 4 days 183,00 100.000 18.000.000 180,00 18.000.000 0,00 100.000 0 180,00 18.000.000 3,00 0
2.4.2.3 For Coordination Meeting to Jakarta (by request) 83.194.000 83.192.200 0 83.192.200 1.800Air Transport 7 time x 3 person 21,00 3.700.000 54.413.000 21,00 54.412.100 0,00 3.700.000 0 21,00 54.412.100 0,00 900
4,00 5.700.000 12.881.000 4,00 12.880.100 0,00 5.700.000 0 4,00 12.880.100 0,00 900In land Transport in Jakarta 7 time x 3 person 21,00 200.000 4.200.000 21,00 4.200.000 0,00 200.000 0 21,00 4.200.000 0,00 0In land Transport Samarinda - Balikpapan7 time x 3 person x 4 days 6,00 200.000 1.200.000 5,00 1.200.000 0,00 200.000 0 5,00 1.200.000 1,00 0OSA 7 time x 3 person x 4 days 40,00 100.000 4.000.000 34,00 4.000.000 0,00 100.000 0 34,00 4.000.000 6,00 0Hotel Accommodation 7 time x 3 person x 4 days 25,00 300.000 6.500.000 25,00 6.500.000 0,00 300.000 0 25,00 6.500.000 0,00 0
2.4.2.5 Korkot to Jakarta (by Request) 62.968.000 62.562.500 0 62.562.500 405.500Air Transport 2,00 3.700.000 3.035.000 2,00 3.035.000 0,00 3.700.000 0 2,00 3.035.000 0,00 0
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
In land Transport in Jakarta 1,00 200.000 200.000 1,00 200.000 0,00 200.000 0 1,00 200.000 0,00 0In land Transport Samarinda-Balikpapan 1,00 200.000 200.000 1,00 200.000 0,00 200.000 0 1,00 200.000 0,00 0
Air Transport (Kalimantan Utara - Jakarta PP) 1,00 4.797.000 3.033.000 1,00 3.033.000 0,00 4.797.000 0 1,00 3.033.000 0,00 0In land Transport Tarakan -Balikpapan 1,00 200.000 200.000 1,00 200.000 0,00 200.000 0 1,00 200.000 0,00 0Hotel Accommodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
2.4.2.6 ACTIVITIES TO JAKARTA 2017
1 RAKOR TEAM LEADER AND SPECIALIST OSPAir Transport 1,00 3.700.000 2.200.000 1,00 2.165.000 0,00 3.700.000 0 1,00 2.165.000 0,00 35.000In Land Transport 1,00 200.000 200.000 1,00 200.000 0,00 200.000 0 1,00 200.000 0,00 0Hotel Acomodation 1,00 300.000 300.000 1,00 300.000 0,00 300.000 0 1,00 300.000 0,00 0OSA 2,00 100.000 200.000 2,00 200.000 0,00 100.000 0 2,00 200.000 0,00 0
2 ToT PEMANDU NASIONAL untuk Pelatihan Askot dan Failitator (Kab skala prioritas)Air Transport 9,00 3.700.000 26.400.000 9,00 26.358.300 0,00 3.700.000 0 9,00 26.358.300 0,00 41.700In Land Transport 9,00 200.000 1.800.000 9,00 1.800.000 0,00 200.000 0 9,00 1.800.000 0,00 0Hotel Acomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 72,00 100.000 7.200.000 72,00 7.200.000 0,00 100.000 0 72,00 7.200.000 0,00 0
3 ToT PEMANDU SIMAir Transport 0,00 3.700.000 0 0,00 0 0,00 3.700.000 0 0,00 0 0,00 0In Land Transport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Acomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
4 KONSOLIDASI KEGIATAN SKALA KOTA DAN EXPOSES DEDAir Transport 0,00 3.700.000 0 0,00 0 0,00 3.700.000 0 0,00 0 0,00 0In Land Transport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Acomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
5 BY REQUESTAir Transport 0,00 3.700.000 0 0,00 0 0,00 3.700.000 0 0,00 0 0,00 0In Land Transport 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Hotel Acomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 0,00 100.000 0 0,00 0 0,00 100.000 0 0,00 0 0,00 0
TOT DAN PELATIHAN KHUSUS TIM KORKOT (Gel. 1)Air Transport 6,00 3.700.000 13.200.000 6,00 12.871.200 0,00 3.700.000 0 6,00 12.871.200 0,00 328.800In Land Transport 6,00 200.000 1.200.000 6,00 1.200.000 0,00 200.000 0 6,00 1.200.000 0,00 0Hotel Acomodation 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0OSA 36,00 100.000 3.600.000 36,00 3.600.000 0,00 100.000 0 36,00 3.600.000 0,00 0
TOTAL DUTY TRAVEL PROVINCE EAST KALIMANTAN 927.451.000 897.346.790 2.800.000 900.146.790 27.304.210
2.5. Office Operational Expenses Februari 2018
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
2.5.1 Office Running Cost 2.578.764.500 2.527.166.982 32.285.000 2.559.451.982 19.312.518
2.5.1.1 OSP Office 373.002.000 359.341.982 5.660.000 365.001.982 8.000.018
a East Java Province (Surabaya) 1 prov x 20 months 24,00 2.000.000 48.000.000 24,00 47.786.653 0,00 2.000.000 0 24,00 47.786.653 0,00 213.347
44,50 2.264.000 100.748.000 44,00 95.802.794 0,00 2.264.000 2.264.000 44,00 98.066.794 0,50 2.681.206
b South Kalimantan Province (Banjarmasin) 1 prov x 20 months 24,00 1.000.000 24.000.000 24,00 23.952.904 0,00 1.000.000 0 24,00 23.952.904 0,00 47.096
44,50 1.132.000 50.374.000 44,00 48.450.389 0,00 1.132.000 1.132.000 44,00 49.582.389 0,50 791.611
c Center Kalimantan Province (Palangkaraya) 1 prov x 20 months 24,00 1.000.000 24.000.000 24,00 22.553.722 0,00 1.000.000 0 24,00 22.553.722 0,00 1.446.278
44,50 1.132.000 50.374.000 44,00 47.593.360 0,00 1.132.000 1.132.000 44,00 48.725.360 0,50 1.648.640
d East Kalimantan Province (Samarinda) 1 prov x 20 months 24,00 1.000.000 24.000.000 24,00 23.844.340 0,00 1.000.000 0 24,00 23.844.340 0,00 155.660
45,50 1.132.000 51.506.000 44,00 49.357.820 1,00 1.132.000 1.132.000 45,00 50.489.820 0,50 1.016.180
2.5.1.2 City Coordinator Office 1.833.762.500 1.804.625.000 19.425.000 1.824.050.000 9.712.500
a East Java Province 25 city x 20 months 599,00 500.000 299.500.000 599,00 299.500.000 0,00 500.000 0 599,00 299.500.000 0,00 0
KATEGORI -1
1 Korkot Kab. Pacitan (25 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 0
2 Korkot Kab. Kediri (46 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 0
3 Korkot Kota Kediri (46 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 0
4 Korkot Kota Madiun (41 Kel) 42,50 950.000 40.375.000 41,00 38.950.000 1,00 950.000 950.000 42,00 39.900.000 0,50 475.000
5 Korkot Magetan (42 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 0
6 Korkot Bojonegoro (35 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 0
7 Korkot Lamongan (37 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 0
8 Korkot Pasuruan (34 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 0
9 Korkot Jember (49 Kel) 42,50 950.000 40.375.000 41,00 38.950.000 1,00 950.000 950.000 42,00 39.900.000 0,50 475.000
10 Korkot Situbondo (41 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 0
11 Korkot Banywangi (45 Kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 0
12 Korkot Trenggalek (13 kel) 5,00 950.000 4.750.000 5,00 4.750.000 0,00 950.000 0 5,00 4.750.000 0,00 0
13 Korkot Kota Probolinggo (29 kel) 9,50 950.000 9.025.000 8,00 7.600.000 1,00 950.000 950.000 9,00 8.550.000 0,50 475.000
14 Korkot Bondowoso (11 Kel) 3,00 950.000 2.850.000 3,00 2.850.000 0,00 950.000 0 3,00 2.850.000 0,00 0
KATEGORI -2
1 Korkot Kab. Ponorogo (50 Kel) 35,00 1.100.000 38.500.000 35,00 38.500.000 0,00 1.100.000 0 35,00 38.500.000 0,00 0
2 Korkot Kab. Tulungagung (81 Kel) 46,50 1.100.000 51.150.000 45,00 49.500.000 1,00 1.100.000 1.100.000 46,00 50.600.000 0,50 550.000
3 Korkot Kab. Blitar (58 Kel) 35,00 1.100.000 38.500.000 35,00 38.500.000 0,00 1.100.000 0 35,00 38.500.000 0,00 0
4 Korkot Kab. Nganjuk (50 Kel) 33,00 1.100.000 36.300.000 33,00 36.300.000 0,00 1.100.000 0 33,00 36.300.000 0,00 0
5 Korkot Kab. Malang (98 Kel) 35,00 1.100.000 38.500.000 35,00 38.500.000 0,00 1.100.000 0 35,00 38.500.000 0,00 0
6 Korkot Kota. Malang (81 Kel) 46,50 1.100.000 51.150.000 45,00 49.500.000 1,00 1.100.000 1.100.000 46,00 50.600.000 0,50 550.000
7 Korkot Kab. Pasuruan (91 Kel) 35,00 1.100.000 38.500.000 35,00 38.500.000 0,00 1.100.000 0 35,00 38.500.000 0,00 0
8 Korkot Kab. Probolinggo (76 Kel) 35,00 1.100.000 38.500.000 35,00 38.500.000 0,00 1.100.000 0 35,00 38.500.000 0,00 0
9 Korkot Kab. Pamekasan (54 Kel) 35,00 1.100.000 38.500.000 35,00 38.500.000 0,00 1.100.000 0 35,00 38.500.000 0,00 0
KATEGORI -3
1 Korkot Kab. Jombang (113 kel) 46,50 1.250.000 58.125.000 45,00 56.250.000 1,00 1.250.000 1.250.000 46,00 57.500.000 0,50 625.000
2 Korkot Kab. Gresik (103 kel) 44,50 1.250.000 55.625.000 43,00 53.750.000 1,00 1.250.000 1.250.000 44,00 55.000.000 0,50 625.000
3 Korkot Kab. Mojokerto (118 kel) 35,00 1.250.000 43.750.000 35,00 43.750.000 0,00 1.250.000 0 35,00 43.750.000 0,00 0
4 Korkot Kota Surabaya (160 kel) 44,50 1.250.000 55.625.000 43,00 53.750.000 1,00 1.250.000 1.250.000 44,00 55.000.000 0,50 625.000
KATEGORI -4
1 Korkot Kab. Sidoarjo (291 kel) 46,50 1.475.000 68.587.500 45,00 66.375.000 1,00 1.475.000 1.475.000 46,00 67.850.000 0,50 737.500
b South Kalimantan Province 4 citiy x 20 months 96,00 500.000 48.000.000 96,00 48.000.000 0,00 500.000 0 96,00 48.000.000 0,00 0
KATEGORI -1
Korkot 4 Tanah Laut (41 kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 0
Korkot Hulu Sungai Utara (29 Kel) 11,50 950.000 10.925.000 10,00 9.500.000 1,00 950.000 950.000 11,00 10.450.000 0,50 475.000
Korkot Banjar Baru (20 Kel) 11,50 950.000 10.925.000 10,00 9.500.000 1,00 950.000 950.000 11,00 10.450.000 0,50 475.000
Korkot Kota Baru (21 Kel) 11,50 950.000 10.925.000 10,00 9.500.000 1,00 950.000 950.000 11,00 10.450.000 0,50 475.000
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT + AMANDEMEN
23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT + AMANDEMEN
23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
KATEGORI -2
Korkot 1 Banjarmasin (62 kel) 46,50 1.100.000 51.150.000 45,00 49.500.000 1,00 1.100.000 1.100.000 46,00 50.600.000 0,50 550.000
Korkot 2 Tabalong (72 kel) 35,00 1.100.000 38.500.000 35,00 38.500.000 0,00 1.100.000 0 35,00 38.500.000 0,00 0
Korkot 3 Banjar (64 kel) 46,50 1.100.000 51.150.000 45,00 49.500.000 1,00 1.100.000 1.100.000 46,00 50.600.000 0,50 550.000
c Center Kalimantan Province 1 city x 20 months 24,00 500.000 12.000.000 24,00 12.000.000 0,00 500.000 0 24,00 12.000.000 0,00 0
KATEGORI -1
1 Korkot Palangkaraya 46,50 950.000 44.175.000 45,00 42.750.000 1,00 950.000 950.000 46,00 43.700.000 0,50 475.000
d East Kalimantan Province 3 city x 20 months 72,00 500.000 36.000.000 72,00 36.000.000 0,00 500.000 0 72,00 36.000.000 0,00 0
KATEGORI -1
Korkot 2 (Balikpapan, Paser 48 kel) 35,00 950.000 33.250.000 35,00 33.250.000 0,00 950.000 0 35,00 33.250.000 0,00 0
Korkot 3 (Tarakan, Malinau bulungan, Nunukan 44 kel) 33,00 950.000 31.350.000 33,00 31.350.000 0,00 950.000 0 33,00 31.350.000 0,00 0
Korkot 2 (new) (bontang , Kukar 36 Kel) 11,50 950.000 10.925.000 10,00 9.500.000 1,00 950.000 950.000 11,00 10.450.000 0,50 475.000
KATEGORI -2
Korkot 1 (Samarinda, Kukar 89 kel) 46,50 1.100.000 51.150.000 45,00 49.500.000 1,00 1.100.000 1.100.000 46,00 50.600.000 0,50 550.000
Korkot 3 (paser, balikpapan, berau 56 kel) 11,50 1.100.000 12.650.000 10,00 11.000.000 1,00 1.100.000 1.100.000 11,00 12.100.000 0,50 550.000
2.5.1.3 Assitant CD City Coordinator Office 372.000.000 363.200.000 7.200.000 370.400.000 1.600.000
a East Java Province 11 city x 20 months 941,50 200.000 188.300.000 913,00 182.600.000 27,00 200.000 5.400.000 940,00 188.000.000 1,50 300.000
b South Kalimantan Province 6 citiy x 20 months 404,50 200.000 80.900.000 399,00 79.800.000 5,00 200.000 1.000.000 404,00 80.800.000 0,50 100.000
c Center Kalimantan Province 1 city x 20 months 70,50 200.000 14.100.000 69,00 13.800.000 1,00 200.000 200.000 70,00 14.000.000 0,50 100.000
d East Kalimantan Province 7 city x 20 months 443,50 200.000 88.700.000 435,00 87.000.000 3,00 200.000 600.000 438,00 87.600.000 5,50 1.100.000
2.5.2 Office Supply & Consumable 1.014.662.000 988.501.280 11.823.000 1.000.324.280 14.337.720
2.5.2.1 OSP Office 167.624.500 159.376.280 2.498.000 161.874.280 5.750.220
a East Java Province (Surabaya) 1 prov x 20 months 24,00 750.000 18.000.000 24,00 17.578.000 0,00 750.000 0 24,00 17.578.000 0,00 422.000
45,50 849.000 38.629.500 44,00 36.721.800 1,00 849.000 849.000 45,00 37.570.800 0,50 1.058.700
b South Kalimantan Province (Banjarmasin) 1 prov x 20 months 24,00 500.000 12.000.000 24,00 11.754.150 0,00 500.000 0 24,00 11.754.150 0,00 245.850
43,50 566.000 24.621.000 43,00 22.983.980 0,00 566.000 517.000 43,00 23.500.980 0,50 1.120.020
c Center Kalimantan Province (Palangkaraya) 1 prov x 20 months 24,00 500.000 12.000.000 24,00 11.476.250 0,00 500.000 0 24,00 11.476.250 0,00 523.750
43,50 566.000 24.621.000 43,00 22.419.000 0,00 566.000 566.000 43,00 22.985.000 0,50 1.636.000
d East Kalimantan Province (Samarinda) 1 prov x 20 months 24,00 500.000 12.000.000 24,00 11.918.000 0,00 500.000 0 24,00 11.918.000 0,00 82.000
45,50 566.000 25.753.000 44,00 24.525.100 1,00 566.000 566.000 45,00 25.091.100 0,50 661.900
2.5.2.2 City Coordinator Office 623.437.500 611.525.000 5.725.000 617.250.000 6.187.500
a East Java Province 25 city x 20 months 600,00 250.000 150.000.000 600,00 150.000.000 0,00 250.000 0 600,00 150.000.000 0,00 0
KATEGORI -1
1 Korkot Kab. Pacitan (25 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
2 Korkot Kab. Kediri (46 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
3 Korkot Kota Kediri (46 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
4 Korkot Kota Madiun (41 Kel) 43,50 250.000 10.875.000 41,00 10.250.000 1,00 250.000 250.000 42,00 10.500.000 1,50 375.000
5 Korkot Magetan (42 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
6 Korkot Bojonegoro (35 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
7 Korkot Lamongan (37 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
8 Korkot Pasuruan (34 Kel) 36,00 250.000 9.000.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 1,00 250.000
9 Korkot Jember (49 Kel) 44,50 250.000 11.125.000 41,00 10.250.000 1,00 250.000 250.000 42,00 10.500.000 2,50 625.000
10 Korkot Situbondo (41 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
11 Korkot Banywangi (45 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
12 Korkot Trenggalek (13 kel) 3,00 250.000 750.000 3,00 750.000 0,00 250.000 0 3,00 750.000 0,00 0
13 Korkot Kota Probolinggo (29 kel) 11,50 250.000 2.875.000 8,00 2.000.000 1,00 250.000 250.000 9,00 2.250.000 2,50 625.000
14 Korkot Bondowoso (11 Kel) 3,00 250.000 750.000 3,00 750.000 0,00 250.000 0 3,00 750.000 0,00 0
KATEGORI -2
1 Korkot Kab. Ponorogo (50 Kel) 35,00 300.000 10.500.000 35,00 10.500.000 0,00 300.000 0 35,00 10.500.000 0,00 0
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT + AMANDEMEN
23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
2 Korkot Kab. Tulungagung (81 Kel) 46,50 300.000 13.950.000 45,00 13.500.000 1,00 300.000 300.000 46,00 13.800.000 0,50 150.000
3 Korkot Kab. Blitar (58 Kel) 35,00 300.000 10.500.000 35,00 10.500.000 0,00 300.000 0 35,00 10.500.000 0,00 0
4 Korkot Kab. Nganjuk (50 Kel) 33,00 300.000 9.900.000 33,00 9.900.000 0,00 300.000 0 33,00 9.900.000 0,00 0
5 Korkot Kab. Malang (98 Kel) 35,00 300.000 10.500.000 35,00 10.500.000 0,00 300.000 0 35,00 10.500.000 0,00 0
6 Korkot Kota. Malang (81 Kel) 46,50 300.000 13.950.000 45,00 13.500.000 1,00 300.000 300.000 46,00 13.800.000 0,50 150.000
7 Korkot Kab. Pasuruan (91 Kel) 35,00 300.000 10.500.000 35,00 10.500.000 0,00 300.000 0 35,00 10.500.000 0,00 0
8 Korkot Kab. Probolinggo (76 Kel) 35,00 300.000 10.500.000 35,00 10.500.000 0,00 300.000 0 35,00 10.500.000 0,00 0
9 Korkot Kab. Pamekasan (54 Kel) 35,00 300.000 10.500.000 35,00 10.500.000 0,00 300.000 0 35,00 10.500.000 0,00 0
KATEGORI -3
1 Korkot Kab. Jombang (113 kel) 46,50 500.000 23.250.000 45,00 22.500.000 1,00 500.000 500.000 46,00 23.000.000 0,50 250.000
2 Korkot Kab. Gresik (103 kel) 44,50 500.000 22.250.000 43,00 21.500.000 1,00 500.000 500.000 44,00 22.000.000 0,50 250.000
3 Korkot Kab. Mojokerto (118 kel) 35,00 500.000 17.500.000 35,00 17.500.000 0,00 500.000 0 35,00 17.500.000 0,00 0
4 Korkot Kota Surabaya (160 kel) 44,50 500.000 22.250.000 43,00 21.500.000 1,00 500.000 500.000 44,00 22.000.000 0,50 250.000
KATEGORI -4
1 Korkot Kab. Sidoarjo (291 kel) 46,50 725.000 33.712.500 45,00 32.625.000 1,00 725.000 725.000 46,00 33.350.000 0,50 362.500
b South Kalimantan Province 4 citiy x 20 months 96,00 250.000 24.000.000 96,00 24.000.000 0,00 250.000 0 96,00 24.000.000 0,00 0
KATEGORI -1
Korkot 4 Tanah Laut (41 kel) 36,00 250.000 9.000.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 1,00 250.000
Korkot Hulu Sungai Utara (29 Kel) 11,50 250.000 2.875.000 10,00 2.500.000 1,00 250.000 250.000 11,00 2.750.000 0,50 125.000
Korkot Banjar Baru (20 Kel) 11,50 250.000 2.875.000 10,00 2.500.000 1,00 250.000 250.000 11,00 2.750.000 0,50 125.000
Korkot Kota Baru (21 Kel) 11,50 250.000 2.875.000 10,00 2.500.000 1,00 250.000 250.000 11,00 2.750.000 0,50 125.000
KATEGORI -2
Korkot 1 Banjarmasin (62 kel) 46,50 300.000 13.950.000 45,00 13.500.000 1,00 300.000 300.000 46,00 13.800.000 0,50 150.000
Korkot 2 Tabalong (72 kel) 36,00 300.000 10.800.000 35,00 10.500.000 0,00 300.000 0 35,00 10.500.000 1,00 300.000
Korkot 3 Banjar (64 kel) 46,50 300.000 13.950.000 45,00 13.500.000 1,00 300.000 300.000 46,00 13.800.000 0,50 150.000
c Center Kalimantan Province 1 city x 20 months 24,00 250.000 6.000.000 24,00 6.000.000 0,00 250.000 0 24,00 6.000.000 0,00 0
KATEGORI -1
1 Korkot Palangkaraya 46,50 250.000 11.625.000 45,00 11.250.000 1,00 250.000 250.000 46,00 11.500.000 0,50 125.000
d East Kalimantan Province 3 city x 20 months 72,00 250.000 18.000.000 72,00 18.000.000 0,00 250.000 0 72,00 18.000.000 0,00 0
KATEGORI -1
Korkot 2 (Balikpapan, Paser 48 kel) 34,00 250.000 8.500.000 34,00 8.500.000 0,00 250.000 0 34,00 8.500.000 0,00 0
Korkot 3 (Tarakan, Malinau bulungan, Nunukan 44 kel) 32,00 250.000 8.000.000 32,00 8.000.000 0,00 250.000 0 32,00 8.000.000 0,00 0
Korkot 2 (new) (bontang, kukar 36 kel) 11,00 250.000 2.750.000 10,00 2.500.000 1,00 250.000 250.000 11,00 2.750.000 0,00 0
KATEGORI -2
Korkot 1 (Samarinda, Kukar 89 kel) 34,50 300.000 10.350.000 31,00 9.300.000 1,00 300.000 300.000 32,00 9.600.000 2,50 750.000
Korkot 3 (Paser, balikpapan, berau 36 kel) 11,00 250.000 2.750.000 8,00 1.950.000 0,00 250.000 0 8,00 1.950.000 3,00 800.000
2.5.2.3 Assitant CD City Coordinator Office 223.600.000 217.600.000 3.600.000 221.200.000 2.400.000
a East Java Province 11 city x 20 months 954,50 100.000 95.450.000 913,00 91.300.000 27,00 100.000 2.700.000 940,00 94.000.000 14,50 1.450.000
b South Kalimantan Province 6 citiy x 20 months 406,50 100.000 40.650.000 399,00 39.900.000 5,00 100.000 500.000 404,00 40.400.000 2,50 250.000
c Center Kalimantan Province 1 city x 20 months 70,50 100.000 7.050.000 69,00 6.900.000 1,00 100.000 100.000 70,00 7.000.000 0,50 50.000
d East Kalimantan Province 7 city x 20 months 444,50 100.000 44.450.000 435,00 43.500.000 3,00 100.000 300.000 438,00 43.800.000 6,50 650.000
OFFICE OPERATIONAL PERCEPATAN PENYUSUNAN SIAP 12,00 3.000.000 36.000.000 12,00 36.000.000 0,00 3.000.000 0 12,00 36.000.000 0,00 0
BOP TIM PERCEPATAN KOTA
2.5.3 Communication Cost 1.084.980.000 1.065.430.181 13.650.000 1.079.080.181 5.899.819
2.5.3.1 OSP Office 273.000.000 266.780.181 4.000.000 270.780.181 2.219.819
a East Java Province (Surabaya) 1 prov x 20 months 66,50 1.000.000 66.500.000 66,00 64.767.532 0,00 1.000.000 1.000.000 66,00 65.767.532 0,50 732.468
b South Kalimantan Province (Banjarmasin) 1 prov x 20 months 69,50 1.000.000 69.500.000 67,00 67.678.940 0,00 1.000.000 1.000.000 67,00 68.678.940 2,50 821.060
c Center Kalimantan Province (Palangkaraya) 1 prov x 20 months 67,50 1.000.000 67.500.000 67,00 66.405.394 0,00 1.000.000 1.000.000 67,00 67.405.394 0,50 94.606
d East Kalimantan Province (Samarinda) 1 prov x 20 months 69,50 1.000.000 69.500.000 67,00 67.928.315 0,00 1.000.000 1.000.000 67,00 68.928.315 2,50 571.685
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT + AMANDEMEN
23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
2.5.3.2 City Coordinator Office 532.500.000 526.250.000 4.250.000 530.500.000 2.000.000
a East Java Province 25 city x 20 months 600,00 250.000 150.000.000 600,00 150.000.000 0,00 250.000 0 600,00 150.000.000 0,00 0
KATEGORI -1
1 Korkot Kab. Pacitan (25 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
2 Korkot Kab. Kediri (46 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
3 Korkot Kota Kediri (46 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
4 Korkot Kota Madiun (41 Kel) 38,50 250.000 9.625.000 37,00 9.250.000 1,00 250.000 250.000 38,00 9.500.000 0,50 125.000
5 Korkot Magetan (42 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
6 Korkot Bojonegoro (35 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
7 Korkot Lamongan (37 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
8 Korkot Pasuruan (34 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
9 Korkot Jember (49 Kel) 44,50 250.000 11.125.000 43,00 10.750.000 1,00 250.000 250.000 44,00 11.000.000 0,50 125.000
10 Korkot Situbondo (41 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
11 Korkot Banywangi (45 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
12 Korkot Trenggalek (13 kel) 0,00 250.000 0 0,00 0 0,00 250.000 0 0,00 0 0,00 0
13 Korkot Kota Probolinggo (29 kel) 11,50 250.000 2.875.000 10,00 2.500.000 1,00 250.000 250.000 11,00 2.750.000 0,50 125.000
14 Korkot Bondowoso (11 Kel) 6,00 250.000 1.500.000 6,00 1.500.000 0,00 250.000 0 6,00 1.500.000 0,00 0
KATEGORI -2
1 Korkot Kab. Ponorogo (50 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
2 Korkot Kab. Tulungagung (81 Kel) 46,50 250.000 11.625.000 45,00 11.250.000 1,00 250.000 250.000 46,00 11.500.000 0,50 125.000
3 Korkot Kab. Blitar (58 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
4 Korkot Kab. Nganjuk (50 Kel) 33,00 250.000 8.250.000 33,00 8.250.000 0,00 250.000 0 33,00 8.250.000 0,00 0
5 Korkot Kab. Malang (98 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
6 Korkot Kota. Malang (81 Kel) 46,50 250.000 11.625.000 45,00 11.250.000 1,00 250.000 250.000 46,00 11.500.000 0,50 125.000
7 Korkot Kab. Pasuruan (91 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
8 Korkot Kab. Probolinggo (76 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
9 Korkot Kab. Pamekasan (54 Kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
KATEGORI -3
1 Korkot Kab. Jombang (113 kel) 46,50 250.000 11.625.000 45,00 11.250.000 1,00 250.000 250.000 46,00 11.500.000 0,50 125.000
2 Korkot Kab. Gresik (103 kel) 44,50 250.000 11.125.000 43,00 10.750.000 1,00 250.000 250.000 44,00 11.000.000 0,50 125.000
3 Korkot Kab. Mojokerto (118 kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
4 Korkot Kota Surabaya (160 kel) 44,50 250.000 11.125.000 43,00 10.750.000 1,00 250.000 250.000 44,00 11.000.000 0,50 125.000
KATEGORI -4
1 Korkot Kab. Sidoarjo (291 kel) 46,50 250.000 11.625.000 45,00 11.250.000 1,00 250.000 250.000 46,00 11.500.000 0,50 125.000
b South Kalimantan Province 4 citiy x 20 months 96,00 250.000 24.000.000 96,00 24.000.000 0,00 250.000 0 96,00 24.000.000 0,00 0
KATEGORI -1
Korkot 4 Tanah Laut (41 kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
Korkot Hulu Sungai Utara (29 Kel) 11,50 250.000 2.875.000 10,00 2.500.000 1,00 250.000 250.000 11,00 2.750.000 0,50 125.000
Korkot Banjar Baru (20 Kel) 11,50 250.000 2.875.000 10,00 2.500.000 1,00 250.000 250.000 11,00 2.750.000 0,50 125.000
Korkot Kota Baru (21 Kel) 11,50 250.000 2.875.000 10,00 2.500.000 1,00 250.000 250.000 11,00 2.750.000 0,50 125.000
KATEGORI -2
Korkot 1 Banjarmasin (62 kel) 46,50 250.000 11.625.000 45,00 11.250.000 1,00 250.000 250.000 46,00 11.500.000 0,50 125.000
Korkot 2 Tabalong (72 kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
Korkot 3 Banjar (64 kel) 46,50 250.000 11.625.000 45,00 11.250.000 1,00 250.000 250.000 46,00 11.500.000 0,50 125.000
c Center Kalimantan Province 1 city x 20 months 24,00 250.000 6.000.000 24,00 6.000.000 0,00 250.000 0 24,00 6.000.000 0,00 0
KATEGORI -1
1 Korkot Palangkaraya 46,50 250.000 11.625.000 45,00 11.250.000 1,00 250.000 250.000 46,00 11.500.000 0,50 125.000
d East Kalimantan Province 3 city x 20 months 72,00 250.000 18.000.000 72,00 18.000.000 0,00 250.000 0 72,00 18.000.000 0,00 0
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT + AMANDEMEN
23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
KATEGORI -1
Korkot 2 (Balikpapan, Paser 48 kel) 35,00 250.000 8.750.000 35,00 8.750.000 0,00 250.000 0 35,00 8.750.000 0,00 0
Korkot 3 (Tarakan, Malinau bulungan, Nunukan 44 kel) 33,00 250.000 8.250.000 33,00 8.250.000 0,00 250.000 0 33,00 8.250.000 0,00 0
Korkot 2 (new) (bontang, kukar 36 kel) 11,50 250.000 2.875.000 10,00 2.500.000 1,00 250.000 250.000 11,00 2.750.000 0,50 125.000
KATEGORI -2
Korkot 1 (Samarinda, Kukar 89 kel) 46,00 250.000 11.500.000 45,00 11.250.000 1,00 250.000 250.000 46,00 11.500.000 0,00 0
Korkot 3 (Paser, balikpapan, berau 56 kel) 11,00 250.000 2.750.000 10,00 2.500.000 1,00 250.000 250.000 11,00 2.750.000 0,00 0
2.5.3.3 Assitant CD City Coordinator Office 279.480.000 272.400.000 5.400.000 277.800.000 1.680.000
a East Java Province 11 city x 20 months 944,70 150.000 141.705.000 913,00 136.950.000 27,00 150.000 4.050.000 940,00 141.000.000 4,70 705.000
b South Kalimantan Province 6 citiy x 20 months 406,50 150.000 60.975.000 399,00 59.850.000 5,00 150.000 750.000 404,00 60.600.000 2,50 375.000
c Center Kalimantan Province 1 city x 20 months 70,50 150.000 10.575.000 69,00 10.350.000 1,00 150.000 150.000 70,00 10.500.000 0,50 75.000
d East Kalimantan Province 7 city x 20 months 441,50 150.000 66.225.000 435,00 65.250.000 3,00 150.000 450.000 438,00 65.700.000 3,50 525.000
2.5.4 INTERNET 139.502.500 132.196.458 2.945.000 135.141.458 4.361.042
2.5.4.1 OSP OFFICE 139.502.500 132.196.458 2.945.000 135.141.458 4.361.042
250.000,00
a East Java Province (Surabaya) 44,50 995.000 44.277.500 43,00 42.785.000 0,00 995.000 995.000 43,00 43.780.000 1,50 497.500
b South Kalimantan Province (Banjarmasin) 52,50 650.000 34.125.000 52,00 32.575.531 0,00 650.000 650.000 52,00 33.225.531 0,50 899.469
c Center Kalimantan Province (Palangkaraya) 51,50 650.000 33.475.000 51,00 30.835.927 0,00 650.000 650.000 51,00 31.485.927 0,50 1.989.073
d East Kalimantan Province (Samarinda) 42,50 650.000 27.625.000 40,00 26.000.000 0,00 650.000 650.000 40,00 26.650.000 2,50 975.000
TOTAL OF OFFICE OPERATIONAL EXPENSES 4.817.909.000 4.713.294.901 60.703.000 4.773.997.901 43.911.099
2.6. Office Equipment Expenses Februari 2018
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
2.6.1 OSP Office 527.478.573 508.633.410 0 508.633.410 18.845.163
2.6.1.1 East Java Province (Surabaya) Purchase 167.004.815 165.603.410 0 165.603.410 1.401.405a. Desktop Computer 5 unit 5,00 7.500.000 37.500.000 5,00 37.500.000 0,00 7.500.000 0 5,00 37.500.000 0,00 0b. Laptop/Notebook 7 unit 10,00 10.000.000 100.000.000 10,00 100.000.000 0,00 10.000.000 0 10,00 100.000.000 0,00 0c. Printer Laser Jet 3 unit 3,00 1.750.000 5.250.000 3,00 5.250.000 0,00 1.750.000 0 3,00 5.250.000 0,00 0d. Printer Color A3 1 unit 1,00 3.000.000 3.000.000 1,00 3.000.000 0,00 3.000.000 0 1,00 3.000.000 0,00 0e. Digital Camera 1 unit 1,00 1.250.000 1.250.000 1,00 1.250.000 0,00 1.250.000 0 1,00 1.250.000 0,00 0f. GPS tools 1 unit 1,00 1.500.000 1.500.000 1,00 1.500.000 0,00 1.500.000 0 1,00 1.500.000 0,00 0g. LCD Projector 1 unit 1,00 7.500.000 7.500.000 1,00 7.500.000 0,00 7.500.000 0 1,00 7.500.000 0,00 0h. Scanner 2 unit 2,00 1.000.000 2.000.000 2,00 2.000.000 0,00 1.000.000 0 2,00 2.000.000 0,00 0i. Equipment Maintenance (Include existing equipment)1 unit 1,00 9.004.815 9.004.815 1,00 7.603.410 0,00 9.004.815 0 1,00 7.603.410 0,00 1.401.405j Peta Citra Satelit (1:5000) 0,00 100.000.000 0 0,00 0 100.000.000 0 0,00 0 0,00 0
2.6.1.2 South Kalimantan Province (Banjarmasin) Purchase 118.275.000 112.950.000 0 112.950.000 5.325.000a. Desktop Computer 3 unit 3,00 7.500.000 22.500.000 3,00 22.500.000 0,00 7.500.000 0 3,00 22.500.000 0,00 0b. Laptop/Notebook 7 unit 7,00 10.000.000 70.000.000 7,00 70.000.000 0,00 10.000.000 0 7,00 70.000.000 0,00 0c. Printer Laser Jet 2 unit 2,00 1.750.000 3.500.000 2,00 3.500.000 0,00 1.750.000 0 2,00 3.500.000 0,00 0d. Printer Color A3 1 unit 1,00 3.000.000 3.000.000 1,00 3.000.000 0,00 3.000.000 0 1,00 3.000.000 0,00 0e. Digital Camera 1 unit 1,00 1.250.000 1.250.000 1,00 1.250.000 0,00 1.250.000 0 1,00 1.250.000 0,00 0f. GPS tools 1 unit 1,00 1.500.000 1.500.000 1,00 1.500.000 0,00 1.500.000 0 1,00 1.500.000 0,00 0g. LCD Projector 1 unit 1,00 7.500.000 7.500.000 1,00 7.500.000 0,00 7.500.000 0 1,00 7.500.000 0,00 0h. Scanner 1 unit 1,00 1.000.000 1.000.000 1,00 1.000.000 0,00 1.000.000 0 1,00 1.000.000 0,00 0i. Equipment Maintenance (Include existing equipment)1 unit 1,00 8.025.000 8.025.000 0,00 2.700.000 0,00 8.025.000 0 0,00 2.700.000 1,00 5.325.000j Peta Citra Satelit (1:5000) 0,00 100.000.000 0 0,00 0 100.000.000 0 0,00 0 0,00 0
2.6.1.3 Center Kalimantan Province (Palangkaraya)Purchase 124.167.878 119.520.000 0 119.520.000 4.647.878
a. Desktop Computer 5 unit 3,00 7.500.000 22.500.000 3,00 22.500.000 0,00 7.500.000 0 3,00 22.500.000 0,00 0b. Laptop/Notebook 7 unit 7,00 10.000.000 70.000.000 7,00 70.000.000 0,00 10.000.000 0 7,00 70.000.000 0,00 0c. Printer Laser Jet 3 unit 2,00 1.750.000 3.500.000 2,00 3.500.000 0,00 1.750.000 0 2,00 3.500.000 0,00 0d. Printer Color A3 1 unit 1,00 3.000.000 3.000.000 1,00 3.000.000 0,00 3.000.000 0 1,00 3.000.000 0,00 0e. Digital Camera 1 unit 1,00 1.250.000 1.250.000 1,00 1.250.000 0,00 1.250.000 0 1,00 1.250.000 0,00 0f. GPS tools 1 unit 1,00 1.500.000 1.500.000 1,00 1.500.000 0,00 1.500.000 0 1,00 1.500.000 0,00 0g. LCD Projector 1 unit 1,00 7.500.000 7.500.000 1,00 7.500.000 0,00 7.500.000 0 1,00 7.500.000 0,00 0h. Scanner 2 unit 1,00 1.000.000 1.000.000 1,00 1.000.000 0,00 1.000.000 0 1,00 1.000.000 0,00 0i. Equipment Maintenance (Include existing equipment)1 unit 1,00 13.917.878 13.917.878 0,00 9.270.000 0,00 13.917.878 0 9.270.000 1,00 4.647.878
2.6.1.4 East Kalimantan Province (Samarinda) Purchase 118.030.880 110.560.000 0 110.560.000 7.470.880a. Desktop Computer 5 unit 3,00 7.500.000 22.500.000 3,00 22.500.000 0,00 7.500.000 0 3,00 22.500.000 0,00 0b. Laptop/Notebook 7 unit 7,00 10.000.000 70.000.000 7,00 70.000.000 0,00 10.000.000 0 7,00 70.000.000 0,00 0c. Printer Laser Jet 3 unit 2,00 1.750.000 3.500.000 2,00 3.500.000 0,00 1.750.000 0 2,00 3.500.000 0,00 0d. Printer Color A3 1 unit 1,00 3.000.000 3.000.000 1,00 3.000.000 0,00 3.000.000 0 1,00 3.000.000 0,00 0e. Digital Camera 1 unit 1,00 1.250.000 1.250.000 1,00 1.250.000 0,00 1.250.000 0 1,00 1.250.000 0,00 0f. GPS tools 1 unit 1,00 1.500.000 1.500.000 1,00 1.500.000 0,00 1.500.000 0 1,00 1.500.000 0,00 0g. LCD Projector 1 unit 1,00 7.500.000 7.500.000 1,00 7.500.000 0,00 7.500.000 0 1,00 7.500.000 0,00 0h. Scanner 2 unit 1,00 1.000.000 1.000.000 1,00 1.000.000 0,00 1.000.000 0 1,00 1.000.000 0,00 0i. Equipment Maintenance (Include existing equipment)1 unit 1,00 7.780.880 7.780.880 0,00 310.000 0,00 7.780.880 0 0,00 310.000 1,00 7.470.880j Peta Citra Satelit (1:5000) 0,00 100.000.000 0 100.000.000 0 0,00 0 0,00 0
2.6.2 City Coordinator Office 668.250.000 668.250.000 0 668.250.000 0
2.6.2.1 East Java Province (Surabaya) Purchase 506.250.000 506.250.000 0 506.250.000 0a. Laptop/Notebook 25 korkot x 1 unit 25,00 10.000.000 250.000.000 25,00 250.000.000 0,00 10.000.000 0 25,00 250.000.000 0,00 0b. Desktop Computer 25 korkot x 1 unit 25,00 7.500.000 187.500.000 25,00 187.500.000 0,00 7.500.000 0 25,00 187.500.000 0,00 0c. Printer Laser Jet 25 korkot x 1 unit 25,00 1.750.000 43.750.000 25,00 43.750.000 0,00 1.750.000 0 25,00 43.750.000 0,00 0d. Scanner 25 korkot x 1 unit 25,00 1.000.000 25.000.000 25,00 25.000.000 0,00 1.000.000 0 25,00 25.000.000 0,00 0
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
2.6.2.2 South Kalimantan Province (Banjarmasin) Purchase 81.000.000 81.000.000 0 81.000.000 0
a. Laptop/Notebook 4 korkot x 1 unit 4,00 10.000.000 40.000.000 4,00 40.000.000 0,00 10.000.000 0 4,00 40.000.000 0,00 0b. Desktop Computer 4 korkot x 1 unit 4,00 7.500.000 30.000.000 4,00 30.000.000 0,00 7.500.000 0 4,00 30.000.000 0,00 0c. Printer Laser Jet 4 korkot x 1 unit 4,00 1.750.000 7.000.000 4,00 7.000.000 0,00 1.750.000 0 4,00 7.000.000 0,00 0d. Scanner 4 korkot x 1 unit 4,00 1.000.000 4.000.000 4,00 4.000.000 0,00 1.000.000 0 4,00 4.000.000 0,00 0
2.6.2.3 Center Kalimantan Province (Palangkaraya) 20.250.000 20.250.000 0 20.250.000 0a. Laptop/Notebook 1 korkot x 1 unit 1,00 10.000.000 10.000.000 1,00 10.000.000 0,00 10.000.000 0 1,00 10.000.000 0,00 0b. Desktop Computer 1 korkot x 1 unit 1,00 7.500.000 7.500.000 1,00 7.500.000 0,00 7.500.000 0 1,00 7.500.000 0,00 0c. Printer Laser Jet 1 korkot x 1 unit 1,00 1.750.000 1.750.000 1,00 1.750.000 0,00 1.750.000 0 1,00 1.750.000 0,00 0d. Scanner 1 korkot x 1 unit 1,00 1.000.000 1.000.000 1,00 1.000.000 0,00 1.000.000 0 1,00 1.000.000 0,00 0
2.6.2.4 East Kalimantan Province (Samarinda) 60.750.000 60.750.000 0 60.750.000 0a. Laptop/Notebook 3 korkot x 1 unit 3,00 10.000.000 30.000.000 3,00 30.000.000 0,00 10.000.000 0 3,00 30.000.000 0,00 0b. Desktop Computer 3 korkot x 1 unit 3,00 7.500.000 22.500.000 3,00 22.500.000 0,00 7.500.000 0 3,00 22.500.000 0,00 0c. Printer Laser Jet 3 korkot x 1 unit 3,00 1.750.000 5.250.000 3,00 5.250.000 0,00 1.750.000 0 3,00 5.250.000 0,00 0d. Scanner 3 korkot x 1 unit 3,00 1.000.000 3.000.000 3,00 3.000.000 0,00 1.000.000 0 3,00 3.000.000 0,00 0
2.6.3 Assistant CD Mandiri Office 231.250.000 231.250.000 0 231.250.000 0
2.6.3.1 East Java Province (Surabaya) Purchase 101.750.000 101.750.000 0 101.750.000 0a. Desktop Computer 11 korkot x 1 unit 11,00 7.500.000 82.500.000 11,00 82.500.000 0,00 7.500.000 0 11,00 82.500.000 0,00 0b. Printer Laser Jet 11 korkot x 1 unit 11,00 1.750.000 19.250.000 11,00 19.250.000 0,00 1.750.000 0 11,00 19.250.000 0,00 0
0,00 02.6.3.2 South Kalimantan Province (Banjarmasin) Purchase 55.500.000 55.500.000 0 55.500.000 0
a. Desktop Computer 6 korkot x 1 unit 6,00 7.500.000 45.000.000 6,00 45.000.000 0,00 7.500.000 0 6,00 45.000.000 0,00 0b. Printer Laser Jet 6 korkot x 1 unit 6,00 1.750.000 10.500.000 6,00 10.500.000 0,00 1.750.000 0 6,00 10.500.000 0,00 0
2.6.3.3 Center Kalimantan Province (Palangkaraya) 9.250.000 9.250.000 0 9.250.000 0a. Desktop Computer 1 korkot x 1 unit 1,00 7.500.000 7.500.000 1,00 7.500.000 0,00 7.500.000 0 1,00 7.500.000 0,00 0b. Printer Laser Jet 1 korkot x 1 unit 1,00 1.750.000 1.750.000 1,00 1.750.000 0,00 1.750.000 0 1,00 1.750.000 0,00 0
2.6.3.4 East Kalimantan Province (Samarinda) 64.750.000 64.750.000 0 64.750.000 0a. Desktop Computer 7 korkot x 1 unit 7,00 7.500.000 52.500.000 7,00 52.500.000 0,00 7.500.000 0 7,00 52.500.000 0,00 0b. Printer Laser Jet 7 korkot x 1 unit 7,00 1.750.000 12.250.000 7,00 12.250.000 0,00 1.750.000 0 7,00 12.250.000 0,00 0
TOTAL OF OFFICE EQUIPMENT EXPENSES 1.426.978.573 1.408.133.410 0 1.408.133.410 18.845.163
2.7. Rental Expenses Februari 2018
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
2.7.1 OSP Office Space (Including Furniture, AC etc) 853.861.500 826.320.000 7.000.000 833.320.000 20.541.500
2.7.1.1 East Java Province (Surabaya) 216 m x 20 months 14118,40 22.500 317.664.000 14118,40 317.644.000 0,00 22.500 0 14118,40 317.644.000 0,00 20.0002.7.1.2 South Kalimantan Province (Banjarmasin)124 m x 20 months 8523,80 22.500 191.785.500 8507,80 191.425.500 0,00 22.500 0 8507,80 191.425.500 16,00 360.0002.7.1.3 Center Kalimantan Province (Palangkaraya)95 m x 20 months 6783,40 22.500 152.626.500 5747,22 129.312.500 312,00 22.500 7.000.000 6059,22 136.312.500 724,18 16.314.0002.7.1.4 East Kalimantan Province (Samarinda) 124 m x 20 months 8523,80 22.500 191.785.500 8352,80 187.938.000 0,00 22.500 0 8352,80 187.938.000 171,00 3.847.5002.7.1.5 For City Coordinator 33 korkot x 20 months 0,00 150.000 0 0,00 0 0,00 150.000 0 0,00 0 0,00 0
2.7.2 Vehicles (Minimun Y 2010 - Included driver, O & M, Insurance etc) for OSP Office 3.353.125.000 3.300.833.333 50.000.000 3.350.833.333 2.291.667
2.7.2.1 East Java Province (Surabaya) 3 unit x 20 months 194,00 6.250.000 1.212.500.000 191,80 1.198.750.000 2,00 6.250.000 12.500.000 193,80 1.211.250.000 0,20 1.250.0002.7.2.2 South Kalimantan Province (Banjarmasin)2 unit x 20 months 137,10 6.250.000 856.875.000 135,03 843.958.333 2,00 6.250.000 12.500.000 137,03 856.458.333 0,07 416.6672.7.2.3 Center Kalimantan Province (Palangkaraya)1 unit x 20 months 67,30 6.250.000 420.625.000 65,27 407.916.667 2,00 6.250.000 12.500.000 67,27 420.416.667 0,03 208.3332.7.2.4 East Kalimantan Province (Samarinda) 2 unit x 20 months 138,10 6.250.000 863.125.000 136,03 850.208.333 2,00 6.250.000 12.500.000 138,03 862.708.333 0,07 416.667
2.7.3 Vehicles (Minimun Y 2010 - Included driver, O & M, Insurance etc) for City Cord Off. 12.887.500.000 12.708.125.000 106.250.000 12.814.375.000 73.125.000
2.7.3.1 East Java Province 25 korkot x 1 unit x 20 months 1560,00 6.250.000 9.750.000.000 1546,17 9.663.541.667 9,00 6.250.000 56.250.000 1555,17 9.719.791.667 4,83 30.208.3332.7.3.2 South Kalimantan Province 4 korkot x 1 unit x 20 months 288,50 6.250.000 1.803.125.000 281,07 1.756.666.667 5,00 6.250.000 31.250.000 286,07 1.787.916.667 2,43 15.208.3332.7.3.3 Center Kalimantan Province 1 korkot x 1 unit x 20 months 51,50 6.250.000 321.875.000 49,77 311.041.667 1,00 6.250.000 6.250.000 50,77 317.291.667 0,73 4.583.3332.7.3.4 East Kalimantan Province 3 korkot x 1 unit x 20 months 162,00 6.250.000 1.012.500.000 156,30 976.875.000 2,00 6.250.000 12.500.000 158,30 989.375.000 3,70 23.125.000
2.7.4 MOTORCYCLE (Minimun Y 2010 - Included O & M, Insurance etc) 1.297.800.000 1.250.200.000 25.200.000 1.275.400.000 22.400.000For Assistant CD Mandiri of City Coordinators
2.7.4.1 East Java Province 11 korkot x 1 unit x 20 months 954,50 700.000 668.150.000 905,00 633.500.000 27,00 700.000 18.900.000 932,00 652.400.000 22,50 15.750.0002.7.4.2 South Kalimantan Province 6 korkot x 1 unit x 20 months 403,50 700.000 282.450.000 392,00 274.400.000 5,00 700.000 3.500.000 397,00 277.900.000 6,50 4.550.0002.7.4.3 Center Kalimantan Province 1 korkot x 1 unit x 20 months 70,50 700.000 49.350.000 68,00 47.600.000 1,00 700.000 700.000 69,00 48.300.000 1,50 1.050.0002.7.4.4 East Kalimantan Province 7 korkot x 1 unit x 20 months 425,50 700.000 297.850.000 421,00 294.700.000 3,00 700.000 2.100.000 424,00 296.800.000 1,50 1.050.000
2.7.5 RENT FOR PERCEPATAN 218.750.000 217.815.000 0 217.815.000 935.000
Office/Studio (6 Kota/kab) 720,00 50.000 36.000.000 720,00 36.000.000 0,00 50.000 0 720,00 36.000.000 0,00 0Vehicles (6 kota/kab) 9,00 6.250.000 56.250.000 9,00 56.250.000 0,00 6.250.000 0 9,00 56.250.000 0,00 0Laptop 48,00 1.750.000 84.000.000 48,00 84.000.000 0,00 1.750.000 0 48,00 84.000.000 0,00 0PC 20,00 1.250.000 19.000.000 20,00 18.250.000 0,00 1.250.000 0 20,00 18.250.000 0,00 750.000Printer A3 2,00 750.000 1.500.000 2,00 1.500.000 0,00 750.000 0 2,00 1.500.000 0,00 0GPS Navigator, Roll Meter dan Peralatan Survey 1,00 30.000.000 22.000.000 0,00 21.815.000 0,00 30.000.000 0 0,00 21.815.000 1,00 185.000
TOTAL OF RENTAL EXPENSES 18.611.036.500 18.303.293.333 188.450.000 18.491.743.333 119.293.167
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
2.8. Reporting Expenses Februari 2018
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
2.8.1 Regular Report 68.300.000 61.425.000 1.500.000 62.925.000 5.375.000
a. Inception Report 15 eks x 1 times 15,00 50.000 750.000 15,00 750.000 0,00 50.000 0 15,00 750.000 0,00 0b. Monthly Report 15 eks x 12 times 1305,00 25.000 32.625.000 ###### 28.875.000 60,00 25.000 1.500.000 1215,00 30.375.000 90,00 2.250.000c. Quarterly Report 15 eks x 5 times 355,00 35.000 12.425.000 330,00 11.550.000 0,00 35.000 0 330,00 11.550.000 25,00 875.000d. Annual Report 15 eks x 1 times 60,00 75.000 4.500.000 30,00 2.250.000 0,00 75.000 0 30,00 2.250.000 30,00 2.250.000e. Draft Final Report 20 eks x 1 times 20,00 125.000 2.500.000 20,00 2.500.000 0,00 125.000 0 20,00 2.500.000 0,00 0f. Final Report (Indonesia & English) 40 eks x 1 times 40,00 150.000 6.000.000 40,00 6.000.000 0,00 150.000 0 40,00 6.000.000 0,00 0g. Executive Summary (Indonesia & English) 40 eks x 1 times 40,00 200.000 8.000.000 40,00 8.000.000 0,00 200.000 0 40,00 8.000.000 0,00 0
Inception Report II 15,00 100.000 1.500.000 15,00 1.500.000 0,00 100.000 0 15,00 1.500.000 0,00 0
2.8.2 Special Report 64.125.000 49.875.000 1.500.000 51.375.000 12.750.000
a. Performance Evaluation of OSP 15 eks x 6 times 240,00 75.000 18.000.000 170,00 12.750.000 0,00 75.000 0 170,00 12.750.000 70,00 5.250.000b. Training Activity Report 50 eks x 1 times 50,00 75.000 3.750.000 0,00 0 0,00 75.000 0 0,00 0 50,00 3.750.000c. Complaint Resolution Follow-up Report 5 eks x 18 times 545,00 75.000 40.875.000 495,00 37.125.000 20,00 75.000 1.500.000 515,00 38.625.000 30,00 2.250.000d. Workshop Findings and Results 20 eks x 1 times 20,00 75.000 1.500.000 0,00 0 0,00 75.000 0 0,00 0 20,00 1.500.000
TOTAL OF RENTAL EXPENSES 132.425.000 111.300.000 3.000.000 114.300.000 18.125.000
SISA KONTRAKNO KOMPOSISI BIAYA
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
III. TRAINING ACTIVITY EXPENSES
3.1. Training Activity 2012 Februari 2018
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
3.1.1 In Regional Levels (Surabaya) 8.000.000 8.000.000 0 8.000.000 0
a. Rakor OSP 2 times x 2 days x (11 ptcp + 4 intructor) 30,00 250.000 7.500.000 30,00 7.500.000 0,00 250.000 0 30,00 7.500.000 0,00 0b. Kits 16 ptcp 10,00 50.000 500.000 10,00 500.000 0,00 50.000 0 10,00 500.000 0,00 0c. Speaker Honorarium 4 intructor 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0
3.1.2 In Provincial Levels 801.775.000 799.751.000 0 799.751.000 2.024.000
a. OSP Consolidation Jawa Timur 3 times x 1 days x (205 ptcp + 2 intructor) 126,00 100.000 12.600.000 126,00 12.563.900 0,00 100.000 0 126,00 12.563.900 0,00 36.100b. OSP Consolidation Kalimantan Selatan 3 times x 1 days x (42 ptcp + 2 intructor) 124,00 100.000 12.400.000 14,00 12.325.000 0,00 100.000 0 14,00 12.325.000 110,00 75.000c. OSP Consolidation Kalimantan Tengah 3 times x 1 days x (15 ptcp + 2 intructor) 20,00 100.000 2.000.000 17,00 1.700.000 0,00 100.000 0 17,00 1.700.000 3,00 300.000d. OSP Consolidation Kalimantan Timur 3 times x 1 days x (42 ptcp + 2 intructor) 132,00 100.000 13.200.000 79,00 13.200.000 0,00 100.000 0 79,00 13.200.000 53,00 0e. Advance Training/Couching PLPBK for City Coordinator Assistant UP
- East Java Province 1 times x 5 days x (12 ptcp + 2 intructor) 0,00 75.000 0 0,00 0 0,00 75.000 0 0,00 0 0,00 0- South Kalimantan Province 1 times x 5 days x (3 ptcp + 2 intructor) 0,00 75.000 0 0,00 0 0,00 75.000 0 0,00 0 0,00 0- East Kalimantan Province 1 times x 5 days x (1 ptcp + 2 intructor) 0,00 75.000 0 0,00 0 0,00 75.000 0 0,00 0 0,00 0
f. Training for City Coordinators Assistants (Infrastructure, 1 times x 3 days x (188 ptcp + 8 intructor) 588,00 175.000 102.900.000 588,00 102.411.900 0,00 175.000 0 588,00 102.411.900 0,00 488.100Community Dev, MIS, Urban Planner)
g. Special Training for Kelurahan Facilitators (Technic) 1 times x 3 days x (457 ptcp + 19 intructor) 1287,00 175.000 225.225.000 1281,00 224.175.000 0,00 175.000 0 1281,00 224.175.000 6,00 1.050.000h. Special Training for Kelurahan Facilitators (Economic) 1 times x 3 days x (267 ptcp + 11 intructor) 761,00 175.000 133.175.000 761,00 133.175.000 0,00 175.000 0 761,00 133.175.000 0,00 0i. Special Training for Kelurahan Facilitators (Social) 1 times x 3 days x (356 ptcp + 9 intructor) 891,00 175.000 155.925.000 891,00 155.850.200 0,00 175.000 0 891,00 155.850.200 0,00 74.800j. Special Training for Senior Facilitators 1 times x 3 days x (270 ptcp + 7 intructor) 722,00 175.000 126.350.000 722,00 126.350.000 0,00 175.000 0 722,00 126.350.000 0,00 0k. Training of AKP & Planning for Local Goverment 1 times x 5 days x (124 ptcp + 4 intructor) 0,00 175.000 0 0,00 0 0,00 175.000 0 0,00 0 0,00 0l. Special Training for Technical Team of PLPBK 1 times x 4 days x (88 ptcp + 4 intructor) 0,00 175.000 0 0,00 0 0,00 175.000 0 0,00 0 0,00 0
m. Speaker honorarium 74 intructor 36,00 500.000 18.000.000 36,00 18.000.000 0,00 500.000 0 36,00 18.000.000 0,00 00
3.1.3 In City/Regency Levels 40.750.000 39.500.000 0 39.500.000 1.250.000
a. Thematic Discussion / Reflection of KBP 3 times x 1 days x (1160 ptcp + 2 intructor) 35,00 75.000 2.625.000 20,00 1.500.000 0,00 75.000 0 20,00 1.500.000 15,00 1.125.000b. Consolidation of Kelurahan Facilitators, City Coordinators Assistants 0,00 0
and City Coordinators 6 times x 1 days x 1584 ptcp 1525,00 25.000 38.125.000 1520,00 38.000.000 0,00 25.000 0 1520,00 38.000.000 5,00 125.000c. Speaker honorarium 2 intructor 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0
TOTAL OF RENTAL EXPENSES 850.525.000 847.251.000 0 847.251.000 3.274.000
SISA KONTRAKNO KOMPOSISI BIAYA
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
3.3. Training Activity 2013 Februari 2018
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
3.3.1 In Regional Levels (Surabaya) 39.900.000 39.900.000 0 39.900.000 0a. Rakor OSP 2 times x 2 days x (11 ptcp + 4 intructor) 150,00 250.000 37.500.000 150,00 37.500.000 0,00 250.000 0 150,00 37.500.000 0,00 0b. Kits 16 ptcp 48,00 50.000 2.400.000 48,00 2.400.000 0,00 50.000 0 48,00 2.400.000 0,00 0c. Speaker Honorarium 4 intructor 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0
3.3.2 In Provincial Levels 2.018.641.000 2.016.783.303 0 2.016.783.303 1.857.697a. OSP Consolidation Jawa Timur 2 times x 1 days x (205 ptcp + 2 intructor) 194,00 100.000 18.100.000 194,00 18.080.000 0,00 100.000 0 194,00 18.080.000 0,00 20.000b. OSP Consolidation Kalimantan Selatan 2 times x 1 days x (42 ptcp + 2 intructor) 6,00 100.000 600.000 6,00 600.000 0,00 100.000 0 6,00 600.000 0,00 0c. OSP Consolidation Kalimantan Tengah 2 times x 1 days x (15 ptcp + 2 intructor) 47,00 100.000 4.700.000 47,00 4.700.000 0,00 100.000 0 47,00 4.700.000 0,00 0d. OSP Consolidation Kalimantan Timur 2 times x 1 days x (42 ptcp + 2 intructor) 209,00 100.000 20.900.000 209,00 20.879.000 0,00 100.000 0 209,00 20.879.000 0,00 21.000e Advance Training/Couching PLPBK for 1 times x 3 days x (188 ptcp + 8 intructor) 12,00 175.000 2.100.000 12,00 2.100.000 0,00 175.000 0 12,00 2.100.000 0,00 0
City Coordinator Assistant UP 0,00 200.000 0 200.000 Special Training for Kelurahan Facilitators (Technic) 144,00 200.000 28.800.000 144,00 28.800.000 0,00 200.000 0 144,00 28.800.000 0,00 0Special Training for Kelurahan Facilitators (Economic) 693,00 200.000 135.000.000 693,00 134.342.403 0,00 200.000 0 693,00 134.342.403 0,00 657.597Special Training for Kelurahan Facilitators (Social) 104,00 200.000 20.800.000 104,00 20.685.000 0,00 200.000 0 104,00 20.685.000 0,00 115.000Special Training for Senior Facilitators 681,00 200.000 133.000.000 681,00 132.085.800 0,00 200.000 0 681,00 132.085.800 0,00 914.200
j Speaker honorarium 74 intructor 6,00 500.000 3.000.000 6,00 3.000.000 0,00 500.000 0 6,00 3.000.000 0,00 0Pelatihan Penguatan Askot dan fasilitator 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Konsolidasi Pemandu Pelatihan PLPBK 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Pelatihan Dasar PLPBK (Lokasi baru tahun 2012) 0,00 175.000 0 0,00 0 0,00 175.000 0 0,00 0 0,00 0Pelatihan Penguatan PLPBK (Lokasi baru 2012) 0,00 175.000 0 0,00 0 0,00 175.000 0 0,00 0 0,00 0Pelatihan Dasar PLPBK 72,00 200.000 14.400.000 72,00 14.400.000 0,00 200.000 0 72,00 14.400.000 0,00 0pelatihan Penguatan PLPBK 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Pelatihan Tim Teknis PLPBK 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0
30,00 175.000 84.441.000 30,00 84.421.000 0,00 175.000 0 30,00 84.421.000 0,00 20.000
Konsolidasi Pemandu Pelatihan KSB 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Pelatihan Dasar KSB 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Pelatihan Penguatan KSB 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Narasumber 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0
0,00 0Pelatihan ITDA 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0Kits 0,00 75.000 0 0,00 0 0,00 75.000 0 0,00 0 0,00 0
0,00 0Pelatihan Dasar PRBBK (Surabaya) 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Kits 0,00 75.000 0 0,00 0 0,00 75.000 0 0,00 0 0,00 0Narasumber 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0
0,00 0Pelatihan Penguatan PRBBK (Gresik) 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Kits 0,00 75.000 0 0,00 0 0,00 75.000 0 0,00 0 0,00 0Narasumber 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0
0,00 0Pelatihan Penguatan PRBBK (Gresik) 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0Kits 0,00 75.000 0 0,00 0 0,00 75.000 0 0,00 0 0,00 0Narasumber 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0
0,00 077,00 200.000 15.400.000 77,00 15.400.000 0,00 200.000 0 77,00 15.400.000 0,00 0
Pelatihan Penguatan Program Lanjutan 7578,00 200.000 1.508.000.000 7578,00 1.507.890.100 0,00 200.000 0 7578,00 1.507.890.100 0,00 109.900
Konsolidasi Pemandu Pelatihan Pemerintah 0,00 200.000 0 0,00 0 0,00 200.000 0 0,00 0 0,00 0
Pelatihan Pemerintah Daerah 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0
Pelatihan Tim Teknis Pemda 0,00 300.000 0 56,00 0 0,00 300.000 0 56,00 0 -56,00 0
Pelatihan SIM 147,00 200.000 29.400.000 147,00 29.400.000 0,00 200.000 0 147,00 29.400.000 0,00 0
3.3.3 In City/Regency Levels 52.950.000 52.867.000 0 52.867.000 83.000a. Thematic Discussion / Reflection of KBP 3 times x 1 days x (1160 ptcp + 2 intructor) 912,00 75.000 51.000.000 912,00 50.917.000 0,00 75.000 0 912,00 50.917.000 0,00 83.000b. Consolidation of Kelurahan Facilitators, City Coordinators Assistants 0,00 0
and City Coordinators 5 times x 1 days x 1584 ptcp 78,00 25.000 1.950.000 78,00 1.950.000 0,00 25.000 0 78,00 1.950.000 0,00 0c. Speaker honorarium 2 intructor 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0
0,00 0Pelatihan Pemerintah Daerah PRBBK (lokasi filot Gresik) 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0-Kits - 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0-Speaker honorarium 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0
0,00 0
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan
Training for City Coordinators Assistants
(Infrastructure, Economic, Community Dev, MIS,
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
Pelatihan Pemerintah Daerah PRBBK (lokasi filot Gresik) 0,00 300.000 0 0,00 0 0,00 300.000 0 0,00 0 0,00 0-Kits 0,00 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0-Speaker honorarium 0,00 500.000 0 0,00 0 0,00 500.000 0 0,00 0 0,00 0
2.111.491.000 2.109.550.303 0 2.109.550.303 1.940.697
4.3.1 46.600.000 45.695.000 - 45.695.000 905.000
b OSP Consolidation 116 350.000 40.600.000 106,00 39.800.000 0,00 350.000 0 106,00 39.800.000 10,00 800.000 - Kits 35 100.000 3.500.000 34,00 3.395.000 0,00 100.000 0 34,00 3.395.000 1,00 105.000 - Speaker Honorarium 5 500.000 2.500.000 5,00 2.500.000 0,00 500.000 0 5,00 2.500.000 0,00 0
4.3.2 7.935.170.000 7.843.598.827 12.568.100 7.856.166.927 79.003.073
164 350.000 57.400.000 305,00 57.033.000 0,00 350.000 0 305,00 57.033.000 -141,00 367.00030 350.000 10.500.000 28,00 9.112.500 0,00 350.000 0 28,00 9.112.500 2,00 1.387.50026 350.000 9.100.000 26,00 9.100.000 0,00 350.000 0 26,00 9.100.000 0,00 0102 350.000 35.700.000 102,00 35.700.000 0,00 350.000 0 102,00 35.700.000 0,00 0153 50.000 7.650.000 97,00 6.826.041 0,00 50.000 0 97,00 6.826.041 56,00 823.959
173 350.000 60.550.000 173,00 60.550.000 0,00 350.000 0 173,00 60.550.000 0,00 0
7.602 350.000 2.660.700.000 7602,00 2.660.700.000 0,00 350.000 0 7602,00 2.660.700.000 0,00 02.522 350.000 882.700.000 2522,00 882.700.000 0,00 350.000 0 2522,00 882.700.000 0,00 0
41 2.000.000 82.000.000 41,00 82.000.000 0,00 2.000.000 0 41,00 82.000.000 0,00 01.148 50.000 57.400.000 1148,00 57.400.000 0,00 50.000 0 1148,00 57.400.000 0,00 0
1.080 350.000 378.000.000 1080,00 378.000.000 0,00 350.000 0 1080,00 378.000.000 0,00 0360 350.000 126.000.000 360,00 126.000.000 0,00 350.000 0 360,00 126.000.000 0,00 010 2.000.000 20.000.000 10,00 20.000.000 0,00 2.000.000 0 10,00 20.000.000 0,00 0152 50.000 7.600.000 152,00 7.600.000 0,00 50.000 0 152,00 7.600.000 0,00 0
660 350.000 231.000.000 660,00 231.000.000 0,00 350.000 0 660,00 231.000.000 0,00 0220 350.000 77.000.000 220,00 77.000.000 0,00 350.000 0 220,00 77.000.000 0,00 06 2.000.000 12.000.000 6,00 12.000.000 0,00 2.000.000 0 6,00 12.000.000 0,00 0
111 50.000 5.550.000 111,00 5.550.000 0,00 50.000 0 111,00 5.550.000 0,00 0
205 350.000 71.750.000 205,00 71.750.000 0,00 350.000 0 205,00 71.750.000 0,00 068 350.000 23.800.000 68,00 23.800.000 0,00 350.000 0 68,00 23.800.000 0,00 02 2.000.000 4.000.000 2,00 4.000.000 0,00 2.000.000 0 2,00 4.000.000 0,00 050 50.000 2.500.000 50,00 2.500.000 0,00 50.000 0 50,00 2.500.000 0,00 0
14 350.000 4.900.000 14,00 4.900.000 0,00 350.000 0 14,00 4.900.000 0,00 0
512 350.000 179.200.000 512,00 179.200.000 0,00 350.000 0 512,00 179.200.000 0,00 00 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 00 2.000.000 0 0,00 0 0,00 2.000.000 0 0,00 0 0,00 0
120 50.000 6.000.000 115,00 5.747.560 0,00 50.000 0 115,00 5.747.560 5,00 252.440
Percepatan Penyusunan Dok. SiapPelatihan Perencanaan bagi TAPP (Khusus 40 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0
0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
- Jawa Timur (3 kota) 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
- Banjarmasin 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
- Samarinda 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
4.3 Training Activity 2016
TOTAL OF TRAINING ACTIVITY 2013
In class trainingOn the Job training (praktek lapangan)Transport (sewa bus)ATK
In class trainingOn the Job training (praktek lapangan)Transport (sewa bus)ATK
Konsolidasi Pemandu Pelatihan Khusus Fasilitator
Pelatihan Fasilitator Khusus
Pelatihan Penghitungan Luasan Kumuh untuk Fasilitator (Lokasi Penanganan Kumuh 2594
kel/desa) 2 hari
Pelatihan Fasilitator KaltimIn class trainingOn the Job training (praktek lapangan)Transport (sewa bus)ATK
Pelatihan Fasilitator Kalteng
ATK
Pelatihan Fasilitator KalselIn class trainingOn the Job training (praktek lapangan)Transport (sewa bus)ATK
Kits
Konsolidasi Pemandu Pelatihan Fasilitator
Pelatihan Fasilitator JatimIn class trainingOn the Job training (praktek lapangan)Transport (sewa bus)
IN REGIONAL LEVELS (Surabaya)
IN PROVINCIAL LEVELS
OSP Consolidation Jawa TimurOSP Consolidation Kalimantan SelatanOSP Consolidation Kalimantan TengahOSP Consolidation Kalimantan Timur
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
Assesment SF dan Fasilitator (fullday)- Jawa Timur 879 175.000 153.825.000 879,00 153.720.000 0,00 175.000 0 879,00 153.720.000 0,00 105.000- ATK 980 10.000 9.800.000 980,00 9.800.000 0,00 10.000 0 980,00 9.800.000 0,00 0- Sewa ruangan, kursi dan makan siang peserta 40 75.000 3.000.000 40,00 3.000.000 0,00 75.000 0 40,00 3.000.000 0,00 0- ATK 0 10.000 0 0,00 0 10.000 0,00 0 0,00 0
- Kalimantan Selatan 121 175.000 21.175.000 121,00 21.175.000 0,00 175.000 0 121,00 21.175.000 0,00 0- ATK 140 10.000 1.400.000 140,00 1.400.000 0,00 10.000 0 140,00 1.400.000 0,00 0
- Kalimantan Timur 43 175.000 7.525.000 43,00 7.525.000 0,00 175.000 0 43,00 7.525.000 0,00 0- ATK 46 10.000 460.000 46,00 460.000 0,00 10.000 0 46,00 460.000 0,00 0
- Kalimantan Tengah 18 175.000 3.150.000 18,00 3.150.000 0,00 175.000 0 18,00 3.150.000 0,00 0- ATK 18 10.000 180.000 0,00 0 0,00 10.000 0 0,00 0 18,00 180.000
Assesment Askot dan Korkot (fullboard 2 - Jawa Timur 339 350.000 118.650.000 339,00 118.400.000 0,00 350.000 0 339,00 118.400.000 0,00 250.000- ATK 183 10.000 1.830.000 183,00 1.830.000 0,00 10.000 0 183,00 1.830.000 0,00 0
- Kalimantan Selatan 108 350.000 37.800.000 108,00 37.800.000 0,00 350.000 0 108,00 37.800.000 0,00 0- ATK 0 10.000 0 0,00 0 0,00 10.000 0 0,00 0 0,00 0
- Kalimantan Timur 59 350.000 20.650.000 59,00 20.650.000 0,00 350.000 0 59,00 20.650.000 0,00 0- ATK 0 10.000 0 0,00 0 0,00 10.000 0 0,00 0 0,00 0
- Kalimantan Tengah 22 350.000 7.700.000 22,00 7.700.000 0,00 350.000 0 22,00 7.700.000 0,00 0- ATK 0 10.000 0 0,00 0 0,00 10.000 0 0,00 0 0,00 0
Konsolidasi Pemandu Pelatihan Askot & 96 350.000 33.600.000 96,00 33.600.000 0,00 350.000 0 96,00 33.600.000 0,00 0
Pelatihan Askot dan Fasilitator 50 Kota - Jawa Timur 3.850 350.000 1.347.500.000 3850,00 1.347.500.000 0,00 350.000 0 3850,00 1.347.500.000 0,00 0- ATK 496 50.000 24.800.000 496,00 24.800.000 0,00 50.000 0 496,00 24.800.000 0,00 0
- Kalimantan Selatan 980 350.000 343.000.000 980,00 343.000.000 0,00 350.000 0 980,00 343.000.000 0,00 0- ATK 130 50.000 6.500.000 130,00 6.419.726 0,00 50.000 0 130,00 6.419.726 0,00 80.274
- Kalimantan Timur 539 350.000 188.650.000 539,00 188.650.000 0,00 350.000 0 539,00 188.650.000 0,00 0- ATK 77 50.000 3.850.000 77,00 3.850.000 0,00 50.000 0 77,00 3.850.000 0,00 0
- Kalimantan Tengah 189 350.000 66.150.000 189,00 66.150.000 0,00 350.000 0 189,00 66.150.000 0,00 0- ATK 24 50.000 1.200.000 24,00 1.200.000 0,00 50.000 0 24,00 1.200.000 0,00 0
Pelatihan Khusus (SIM)- Jawa Timur 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
- Kalimantan Selatan 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
- Kalimantan Timur 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
- Kalimantan Tengah 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
Konsolidasi Pelatihan Khusus Tim Korkot 18 350.000 6.300.000 0,00 0 0,00 350.000 0 0,00 0 18,00 6.300.000
ToT dan Pelatihan Khusus Tim Korkot - Jawa Timur 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
- Kalimantan Selatan 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0- ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
Konsolidasi Pelatihan Khusus Tim Fasilitator 34 350.000 11.900.000 34,00 11.900.000 0,00 350.000 0 34,00 11.900.000 0,00 0
Pelatihan Khususn Tim Fasilitator- Jawa Timur 650 350.000 227.500.000 650,00 227.500.000 0,00 350.000 0 650,00 227.500.000 0,00 0- ATK 119 50.000 5.950.000 119,00 5.950.000 0,00 50.000 0 119,00 5.950.000 0,00 0
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT +
AMANDEMEN 23INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
- Kalimantan Selatan 285 350.000 99.750.000 285,00 99.750.000 0,00 350.000 0 285,00 99.750.000 0,00 0- ATK 51 50.000 2.550.000 51,00 2.550.000 0,00 50.000 0 51,00 2.550.000 0,00 0
- Kalimantan Timur 135 350.000 47.250.000 115,00 47.250.000 0,00 350.000 0 115,00 47.250.000 20,00 0- ATK 19 50.000 950.000 19,00 950.000 0,00 50.000 0 19,00 950.000 0,00 0
- Kalimantan Tengah 100 350.000 35.000.000 100,00 35.000.000 0,00 350.000 0 100,00 35.000.000 0,00 0- ATK 16 50.000 800.000 16,00 800.000 0,00 50.000 0 16,00 800.000 0,00 0
Coaching Penyiapan kegiatan Infrastruktur 429 175.000 75.075.000 0,00 0 62,00 175.000 10.850.000 62,00 10.850.000 367,00 64.225.000ATK 135 50.000 6.750.000 0,00 0 35,00 50.000 1.718.100 35,00 1.718.100 100,00 5.031.900
4.3.3 579.350.000 446.873.916 - 0 0,00 446.873.916 0,00 132.476.084
1.538 75.000 115.350.000 1538,00 115.350.000 0,00 75.000 0 1538,00 115.350.000 0,00 0
320 75.000 24.000.000 320,00 23.953.600 0,00 75.000 0 320,00 23.953.600 0,00 46.4000,00 0
Pelatihan PKP 0 350.000 0 0,00 0 0,00 350.000 0 0,00 0 0,00 0ATK 0 50.000 0 0,00 0 0,00 50.000 0 0,00 0 0,00 0
Coaching ClinicKab. SIDOARJO 100 175.000 17.500.000 100,00 17.500.000 0,00 175.000 0 100,00 17.500.000 0,00 0KOTA SURABAYA 54 175.000 9.450.000 54,00 9.450.000 0,00 175.000 0 54,00 9.450.000 0,00 0KOTA MOJOKERTO 0 175.000 0 0,00 0 0,00 175.000 0 0,00 0 0,00 0Kab. Gresik 100 175.000 17.500.000 100,00 17.500.000 0,00 175.000 0 100,00 17.500.000 0,00 0Kab. TULUNGAGUNG 80 175.000 14.000.000 80,00 14.000.000 0,00 175.000 0 80,00 14.000.000 0,00 0KOTA MALANG 40 175.000 7.000.000 40,00 7.000.000 0,00 175.000 0 40,00 7.000.000 0,00 0KOTA PROBOLINGGO 80 175.000 14.000.000 80,00 14.000.000 0,00 175.000 0 80,00 14.000.000 0,00 0KOTA PASURUAN 0 175.000 0 0,00 0 0,00 175.000 0 0,00 0 0,00 0KOTA MADIUN 95 175.000 16.625.000 94,86 16.500.000 0,00 175.000 0 94,86 16.500.000 0,14 125.000Kab. Jember 100 175.000 17.500.000 100,00 17.500.000 0,00 175.000 0 100,00 17.500.000 0,00 0Kab. Jombang 100 175.000 17.500.000 100,00 17.500.000 0,00 175.000 0 100,00 17.500.000 0,00 0ATK 609 50.000 30.450.000 608,00 30.358.116 0,00 50.000 0 608,00 30.358.116 1,00 91.884Narasumber 38 300.000 11.400.000 38,00 11.400.000 0,00 300.000 0 38,00 11.400.000 0,00 0
KOTA BARU 45 175.000 7.875.000 45,00 7.875.000 0,00 175.000 0 45,00 7.875.000 0,00 0BANJAR 50 175.000 8.750.000 45,00 8.750.000 0,00 175.000 0 45,00 8.750.000 5,00 0KOTA BANJARMASIN 50 175.000 8.750.000 50,00 8.750.000 0,00 175.000 0 50,00 8.750.000 0,00 0KOTA BANJARBARU 40 175.000 7.000.000 40,00 7.000.000 0,00 175.000 0 40,00 7.000.000 0,00 0BARITO KUALA 0 175.000 0 0,00 0 0,00 175.000 0 0,00 0 0,00 0KOTA HULU SUNGAI UTARA 50 175.000 8.750.000 50,00 8.750.000 0,00 175.000 0 50,00 8.750.000 0,00 0ATK 250 50.000 12.500.000 250,00 12.500.000 0,00 50.000 0 250,00 12.500.000 0,00 0Narasumber 75 300.000 22.500.000 75,00 22.500.000 0,00 300.000 0 75,00 22.500.000 0,00 0
KOTA PALANGKARAYA 50 175.000 8.750.000 50,00 8.750.000 0,00 175.000 0 50,00 8.750.000 0,00 0ATK 50 50.000 2.500.000 50,00 2.500.000 0,00 50.000 0 50,00 2.500.000 0,00 0Narasumber 15 300.000 4.500.000 15,00 4.500.000 0,00 300.000 0 15,00 4.500.000 0,00 0
KOTA BALIKPAPAN 45 175.000 7.875.000 45,00 7.875.000 0,00 175.000 0 45,00 7.875.000 0,00 0KOTA SAMARINDA 45 175.000 7.875.000 45,00 7.875.000 0,00 175.000 0 45,00 7.875.000 0,00 0KOTA BONTANG 55 175.000 9.625.000 45,00 8.225.000 0,00 175.000 0 45,00 8.225.000 10,00 1.400.000ATK 135 50.000 6.750.000 135,00 6.712.200 0,00 50.000 0 135,00 6.712.200 0,00 37.800Narasumber 41 300.000 12.300.000 41,00 12.300.000 0,00 300.000 0 41,00 12.300.000 0,00 0
Coaching Clinic 597 175.000 104.475.000 0,00 0 175.000 0 0,00 0 597,00 104.475.000ATK 526 50.000 26.300.000 0,00 0 50.000 0 0,00 0 526,00 26.300.000
8.561.120.000 8.336.167.743 12.568.100 8.348.735.843 0,00 212.384.157
Thematic Discussion
TOTAL OF TRAINING ACTIVITY 2016
In City/Regency Levels
Consolidation of Kelurahan Facilitators, City Coordinators Assistants & City Coordinators
IV. SOCIALIZATION ACTIVITY EXPENSES
4.1. Februari 2018
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
4.1 405.350.000 402.877.534 - 402.877.534 2.472.466
4.1.1 Lokakarya Review Propinsi/midterm 405.350.000 402.877.534 - 402.877.534 2.472.466
a. Workshop Activities - Propinsi Jawa Timur 1 prov x 2 days x 1 times x 97 ptcp 97,00 250.000 24.250.000 97,00 24.250.000 0,00 250.000 0 97,00 24.250.000 0,00 0 - Propinsi Kalimantan Selatan 1 prov x 2 days x 1 times x 42 ptcp 82,00 250.000 20.500.000 81,34 20.335.080 0,00 250.000 0 81,34 20.335.080 0,66 164.920 - Propinsi Kalimantan Tengah 1 prov x 2 days x 1 times x 26 ptcp 51,00 250.000 9.500.000 51,00 9.500.000 0,00 250.000 0 51,00 9.500.000 0,00 0 - Propinsi Kalimantan Timur 1 prov x 2 days x 1 times x 42 ptcp 0,00 250.000 - 0,00 0 0,00 250.000 0 0,00 0 0,00 0
b. Press Conference 4 prov x 1 days x 1 times x 10 ptcp 30,00 200.000 6.000.000 30,00 6.000.000 0,00 200.000 0 30,00 6.000.000 0,00 0c. Provincial Key Speakers 4 prov x 1 days x 1 times x 3 ptcp 6,00 500.000 3.000.000 6,00 3.000.000 0,00 500.000 0 6,00 3.000.000 0,00 0d. Workshop Kits 1 prov x 1 days x 1 times x 230 ptcp 194,00 50.000 9.700.000 190,00 9.685.500 0,00 50.000 0 190,00 9.685.500 4,00 14.500
Lokakarya Sosialisasi KumuhKegiatan Lokakarya 580,00 300.000 148.000.000 580,00 147.700.000 0,00 300.000 0 580,00 147.700.000 0,00 300.000Press Conference 11,00 200.000 2.200.000 11,00 2.200.000 0,00 200.000 0 11,00 2.200.000 0,00 0Nara Sumber Provinsi 12,00 500.000 6.000.000 11,00 5.500.000 0,00 500.000 0 11,00 5.500.000 1,00 500.000Workshop Kits 400,00 50.000 20.000.000 392,00 19.598.500 0,00 50.000 0 392,00 19.598.500 8,00 401.500
4.1.2 Workshop Media - a. Workshop Activities 4 prov x 2 days x 1 times x 20 ptcp 40,00 250.000 10.000.000 40,00 10.000.000 0,00 250.000 0 40,00 10.000.000 0,00 0b. Provincial Key Speakers 4 prov x 1 days x 1 times x 2 ptcp 2,00 500.000 1.000.000 2,00 1.000.000 0,00 500.000 0 2,00 1.000.000 0,00 0c. Workshop Kits 4 prov x 1 days x 1 times x 25 ptcp 0,00 50.000 - 0,00 0 0,00 50.000 0 0,00 0 0,00 0
4.1.3 Penulisan Artikel / Berita - - a. Penulisan Artikel / Berita 4 prov x 1 days x 2 times x 1 ptcp 2,00 500.000 1.000.000 2,00 1.000.000 0,00 500.000 0 2,00 1.000.000 0,00 0
Penulisan Artikel / Berita 0,00 1.000.000 - 0,00 0 0,00 1.000.000 0 0,00 0 0,00 0
4.1.4 TV Talkshow - - b. TV Talkshow 4 prov x 1 days x 2 times x 1 ptcp 1,00 1.000.000 1.000.000 1,00 1.000.000 0,00 1.000.000 0 1,00 1.000.000 0,00 0
TV Talkshow 0,00 7.500.000 - 0,00 0 0,00 7.500.000 0 0,00 0 0,00 0
Lokakarya ProvinsiAccomodation 0,00 350.000 - 0,00 0 0,00 350.000 0 0,00 0 0,00 0Resources Person 0,00 500.000 - 0,00 0 0,00 500.000 0 0,00 0 0,00 0Kits 0,00 50.000 - 0,00 0 0,00 50.000 0 0,00 0 0,00 0
Lokakarya Provinsi Strategi Komunikasi - Propinsi Jawa Timur 156,00 350.000 54.600.000 156,00 54.600.000 0,00 350.000 0 156,00 54.600.000 0,00 0 - Propinsi Kalimantan Selatan 68,00 350.000 23.800.000 65,00 22.800.254 0,00 350.000 0 65,00 22.800.254 3,00 999.746 - Propinsi Kalimantan Tengah 56,00 350.000 19.600.000 56,00 19.600.000 0,00 350.000 0 56,00 19.600.000 0,00 0 - Propinsi Kalimantan Timur 56,00 350.000 19.600.000 56,00 19.600.000 0,00 350.000 0 56,00 19.600.000 0,00 0Resources Person 16,00 500.000 8.000.000 16,00 8.000.000 0,00 500.000 0 16,00 8.000.000 0,00 0
Kits 176,00 100.000 17.600.000 176,00 17.508.200 0,00 100.000 0 176,00 17.508.200 0,00 91.800
4.2. CITY/REGENCY LEVELS 1.897.200.500 1.895.509.650 - 1.895.509.650 1.690.850 4.2.1 Lokakarya Review /midterm
Workshop Activities 3.620 100.000 362.000.000 3620,00 362.000.000 0,00 100.000 0 3620,00 362.000.000 0,00 0 Press Conference 339 100.000 33.900.000 339,00 33.900.000 0,00 100.000 0 339,00 33.900.000 0,00 0 Provincial Key Speakers 94 300.000 28.200.000 93,00 27.900.000 0,00 300.000 0 93,00 27.900.000 1,00 300.000
Lokakarya Sosialisasi KumuhKegiatan Lokakarya 1348,00 250.000 399.000.000 1348,00 398.775.000 0,00 250.000 0 1348,00 398.775.000 0,00 225.000Press Conference 135,00 100.000 14.000.000 85,00 14.000.000 0,00 100.000 0 85,00 14.000.000 50,00 0Nara Sumber Provinsi 73,00 300.000 24.000.000 47,00 24.000.000 0,00 300.000 0 47,00 24.000.000 26,00 0Workshop Kits 1216,00 50.000 90.000.000 1216,00 89.902.500 0,00 50.000 0 1216,00 89.902.500 0,00 97.500
Lokakarya Orientasi PLPBK Workshop Activities 144 100.000 14.400.000 144,00 14.400.000 0,00 100.000 0 144,00 14.400.000 0,00 0Press Conference - 100.000 - 0,00 0 0,00 100.000 0 0,00 0 0,00 0Provincial Key Speakers - 300.000 - 0,00 0 0,00 300.000 0 0,00 0 0,00 0
4.2.2 Radio Talkshow 139 500.000 69.500.000 139,00 69.500.000 0,00 500.000 0 139,00 69.500.000 0,00 0
- 500.000 - 0,00 0 0,00 500.000 0 0,00 0 0,00 0
PROVINCIAL LEVELS (Prov Jawa Timur, Kalsel, Kalteng, Kalbar)
SISA KONTRAK
Provincial Levels (East Java, South Kalimantan, Center Kalimantan, East
NO URAIANCONTRACT AMOUNT + AMANDEMEN 23 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL
SISA KONTRAKNO URAIAN
CONTRACT AMOUNT + AMANDEMEN 23 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
4.2.3 Media Field Visit 110 500.000 55.000.000 110,00 55.000.000 0,00 500.000 0 110,00 55.000.000 0,00 0
- 500.000 - 0,00 0 500.000 0 0,00 0 0,00 0
4.2.4 Articles/News 100 500.000 50.000.000 100,00 50.000.000 0,00 500.000 0 100,00 50.000.000 0,00 0
- 500.000 - 0,00 0 0,00 500.000 0 0,00 0 0,00 0
4.2.5 Exibithion 8 5.000.000 35.000.000 8,00 34.915.750 0,00 5.000.000 0 8,00 34.915.750 0,00 84.250
- 5.000.000 - 0,00 0 0,00 5.000.000 0 0,00 0 0,00 0
Lokakarya Strategi Komunikasia. Accomodation (Fullday) - 175.000 - 0,00 0 0,00 175.000 0 0,00 0 0,00 0b. Resources Person - 350.000 - 0,00 0 0,00 350.000 0 0,00 0 0,00 0d. Kits - 100.000 - 0,00 0 0,00 100.000 0 0,00 0 0,00 0
Lokakarya Strategi Komunikasia. Accomodation 1.292 350.000 395.000.000 1292,00 394.816.000 0,00 350.000 0 1292,00 394.816.000 0,00 184.000b. Resources Person 90 350.000 31.500.000 90,00 31.050.000 0,00 350.000 0 90,00 31.050.000 0,00 450.000d. Kits 1.850 100.000 173.000.000 1850,00 172.849.900 0,00 100.000 0 1850,00 172.849.900 0,00 150.100
Lokakarya Khususa. Accomodation - 175.000 - 0,00 0 0,00 175.000 0 0,00 0 0,00 0b. Resources Person - 350.000 - 0,00 0 0,00 350.000 0 0,00 0 0,00 0d. Kits - 100.000 - 0,00 0 0,00 100.000 0 0,00 0 0,00 0
Lokakarya Khususa. Accomodation - 350.000 - 0,00 0 0,00 350.000 0 0,00 0 0,00 0b. Resources Person - 350.000 - 0,00 0 0,00 350.000 0 0,00 0 0,00 0d. Kits - 100.000 - 0,00 0 0,00 100.000 0 0,00 0 0,00 0
Penayangan di TV Berita daerah 4 7.500.000 30.000.000 4,00 30.000.000 0,00 7.500.000 0 4,00 30.000.000 0,00 0
Pengembangan Newsletter 15.467 1.500 23.200.500 15334,00 23.000.500 0,00 1.500 0 15334,00 23.000.500 133,00 200.000
Exibithion 4 5.000.000 20.000.000 4,00 20.000.000 0,00 5.000.000 0 4,00 20.000.000 0,00 0
Workshop (Forum Konsultasi)a. Accomodation (fullboard) 105 350.000 36.750.000 105,00 36.750.000 0,00 350.000 0 105,00 36.750.000 0,00 0
b. Resources Person 7 350.000 2.450.000 7,00 2.450.000 0,00 350.000 0 7,00 2.450.000 0,00 0
c. Kits 206 50.000 10.300.000 206,00 10.300.000 0,00 50.000 0 206,00 10.300.000 0,00 0
4.3 Percepatan Penyusunan Dok. SIAP 1.898.000.000 1.898.000.000 - 1.898.000.000 -
Biaya Penyusunan Dokumen Tenaga Ahli Pendamping Masyarakat 107 5.000.000 558.000.000 45,00 558.000.000 0,00 5.000.000 0 45,00 558.000.000 62,00 0
Sosialisasi Tingkat Kelurahan 49 5.000.000 245.000.000 49,00 245.000.000 0,00 5.000.000 0 49,00 245.000.000 0,00 0
Forum Konsultasi dan uji publik 49 5.000.000 215.000.000 28,00 215.000.000 0,00 5.000.000 0 28,00 215.000.000 21,00 0
21 15.000.000 555.000.000 21,00 555.000.000 0,00 15.000.000 0 21,00 555.000.000 0,00 0
39 10.000.000 325.000.000 2,00 325.000.000 0,00 10.000.000 0 2,00 325.000.000 37,00 0
TOTAL OF SOCIAL ACTIVITY 4.200.550.500 4.196.387.184 0 4.196.387.184 4.163.316
Peralatan Survey, dukungan FGD/rembug dan Penggandaan dokumen RPLP Penguatan Masyarakat /TIPP atau DED (Opsional)