TRANSCRIPT
1.0/20/97 09:17 V•603 472 7052 NORMANDEAU. .[00-3.'016OCT 17 '97 01:27PrM US ARrMr ENcri K VI±V
DEPARTMEN-rOF THE ARMYNEW ENGLAND 0IVISION, COAPa OF ENGINEERS
424 TRAPELO FOAOY.JALTHAM M MASSACHUSETTS 02 5 A 914V
Re.gulatory Branch
CENAE-CO-R-62
199702302
Mr. Thomas Oosterhout
Vermont Yankee Nuclear Power Corporation
?.O."Box 157Vernon, Vermont 05354
Dear Mr. Oosterhout:
Enclosed are Two copies of a Department of the Army permit authorizing the work
described therein.
Your signature is necessary to e-.cule this perit. Ifthe conditions are acceptable, please
sign both copies and retumr cne signed copy to us. A fee of S 100.00 is required. Please enclose a
check made payable to "FAO New England Division", and return it with the signed permit copy.
Please ensure your address and social security number, or tax identification number for
businesses, are on the check.
You must post the enclosed ENG forme 4336 (i.e., Notice of Authorization) in a
conspicuous location at the job site whenever.work is ongoing. Also, this permit requires you to
notify us before beginning work and dalow us to inspect the project. Hence, you must complete
and return the atrached Work Start Noti.fication Form to this office no0 later than two weeksbefore the anticipated starning date.
This permit is a limited authorization containing a specific set of conditions. Please read
the permit thoroughly to familiarize yourself with those conditions, including any condilions
cortained on the attached state water quality certification. Ira contractor does the work for you,borb you and the contractor are responsible for ensuring that the work is done in compliance vwiththe permit's terms and conditions.
The proposed work must be performed in compliance with all terms and conditions of the
permit, as violations could result in civil or criminal penalties.
$1JlgonIs AvqtQ'1.
10/20/97 09:13 V603 472 7052
OCr 17 '9? 01:26PM US :•r"R tsici rcw ui-vNORHANDEAU.. . ._•004:016
-2-
If the plans or construction methods (i.e., for work in our jurisdiction) need to be changed,
please contact us immediately to discuss modification of your permit. Before changes may be
undertaken, they must be approved by this office.
Finally, please note that the Department of the Army permit process does not supersede
any other agency's jurisdiction. Hence, if other federal, state, and/or local agencies have
jutisdicton over your project, you must receive all applicable permits before you may begin
work.
If you have any questions regarding this correspondence, please contact Michael S.
Adams at 802 655-0334.
Sincerely,
Wifliam F. Lawless, P.E.Chief, Regulatory Branch
Construction-Operations Division
Enclosures
Copy furnished
"b&. James BajekNormandeau Associates, Inc.
25 Nashua RoadBedford, NH O3110-5500
Proj Mgr:
MAU: I
Sec Chf: 22t/ /r/n 7-
10/20/97 09:18 'Y603 472 7052 NORMANDEAU.. Q005'016OCT 17 '97 01:2SPM US ARMY ENGR REG DIV t.
DEPARTMENT OF THE ARMY PERMIT
PenVite V nt Yankee Nuclear Pc-e-_ Corporation
199702302Permit ,-No._-
Wuig Offe New England District
NOTE: Tme tarm "you" and It& donvatWiv. -usd in -this permit. mILu the permitte or any future tra..uterc). The tar-n
"this office" refers to the approprate district or division office or the Corps of Enginecr havin. ruxadictiot. over tha permittad
activity or the appropriata ofriciz of thlt office Acting under the authorit' of the cornmer.nding officer.
You are authorizad to perform, work in hccordance with L* taerms rand conditions specified bclow'.
Project Description:
Perform maintenance dredging in front of the intake structure at the Vermont Yankee Nuclear
Power Station.- The work will involve the hydraulic dredging of approximately 10,700 cy of
predominantly sandy material over a tlree year perod to a depth of elevation 190' (mean sea
level). The material wvill be pumped into upland containment sites on the property. The primary
site will be constructed on an upland field by construction of an earth berm and have a 9,800 cy
capacity. The water will be allowed xo pond to facilitate settling of particulates prior to
DESCRIPTION OF W1ORK CONTIN'UED ON PAGE 4.
Project Location:
Connecticut River, Vernon, Vermont
Permit CondItions:
0eneral CoditiorLs: 200
1. The time limit for completing the work %'U.'orized ends on 2 •ZIf you (ind that yo'4 nee4
more time to complete the authorized activity, submit your request for a ti.-ne extenilon to his office for consideration a, lea--one month before the above date is reached.'
2. You must inair.uin the '•tivity aUtho rized by this permit In good condItlon and in conformance with týl mtrms and ec.cdi-
Liors of this permit. You are not relieved of this getuirernent If you abandon the perited activity'.' atho•gh you may make
& good faith •'.r&Afcr to a third parzy In complianee with Generil Condition 4 below. Should you Wish to cease to me.!ir-tan
the auLhorized actilv'ity or ho'uld you dcre to abandort it without a good faith transfer, you must obwain a modiflca:ion cf
this permit from this office, which may require rescradton of tNe area.
3, It you di6coaer any previously unknown hmotrlc or archeolcgical rermrnhs while accomplisning the activity authorized -y
this pirmni, you mnat ImmoodltIoly notify this offles of 1rhat you have found. We wvlB Initiate the rederel and ,ta.e eo.--din.-
tion required to determine If the rema•ns warrant a recovery effort or if the siLt ts ei•gibe for listing in the Nationft7 Re"-eitar
or HWitodc Places.
ENO FORtM 1721, No- 88 EITION OF SE.P 2 IS ORSOt.ETE. (33 CF.R 325 (AppendfL- A)
I
10/20/97 09:21 %Y603 472 7052 NORMANDEAU. . Q009:O16
OCT 17 '97 fl:31F'M US PRMrT ENGRiG < •, U-V
4. If you 9t41 the PZope"ty eswaociatad withl thit permit, you must obtain the signature of the new ownert in t.e space prov%ýed
and fcr-wazd a copy of the permit to this office to vaiidst.e the tru-.a'er of this authorization.
5. If a conditioned vatr quil/ty eer-ificatlao has bein lued foryour project, you muit comply -ith the conditiora tpe!iinc-
In the certirication .. special conditions to tbig per-..h. For your convenience. a copy of the certification ir attached It it C2a..
tains such condilions.
6. You must al.low :epresent.ative from dis office to inspect the authorized activitY at any tlrtt deened neeerxa.-y to c.wuue
that it Ls berng or hu 'reen aeomopli,.hed |m accordance with the terms and con.ditions of your •ermit.
Special Condcitions:
a. Adeqcate sedimentation and erosion control devices, such as floating geotextile silt fences or
other devices capable of filtering the fines involved, shall be impiemented and properly
mrintained around the wark in the waterway and disposal site to minimize impacts during
construction. These devices must be removed upon completion or work and stabilization of
disturbed areas. The sediment collected by these devices must also be removed and place upland,
in a manner that will prevent its later erosion and transport into a wZterway or wetland.
SPECLAL CONDITIONS CONTINUED ON ?AGE 4
Further Information:
1. Conmetasonal Autho:lles; You have been authorized to undertake the activity described above pursuamn to:
(X) Section 10 of the ?,ivers and Hirbors Ac: of IRS! (33 U.S.C. 403).
Section 404 ofa te Cloan Water Art (33 U.S.C. 1344).
Seetion 103 of the Marine Protection, R.esea-h =n; Sanctuaries Act of 1q72 (33 U.S.C. 1413).
2.. Limits of this -wthorization,
a. This pernmit does not obviat-e the need to obuain othor Federal, stata, or loca authc.rizations raquired by ln-.
b. This permit does not rrant any property rights or exelusive privileges.
e. This parrnit does not autho.ite any I-ju•y to the property or rights of othem
d. This permit does not authorize Interference with ,-y exis:ing or propoed Fedetal project.
3. Limits at Federal Liability. In issuing thIs permit, the Federal Government does not eoaumq any liability for the follo'wi.z:
L. Damage% to the permitted project at us-s thereof ax a result of other permltted or unpermitted activities or from ratjrai
cuesu .
b. Dara.ges to the permitted project or user thereof as i result of current or future activities u.ndertaken by or en behalf
ot the United States in the public interest.
c. Dam.aget to persorn, proper-y. or to other perm.itted or unpermitted activi:ies or structures caused by the a:tivitY
authorized by thta permit.
d. Design or construction denciencies aodatd with the permitt~ed Work.
2 .
10/20:97 09:19 'U603 472 7052OCT 1.7 '97 01:29PM US RM1Y ENCGP REG DIV
NORMANDEAU..f-. a 00 ' 1
a. Dama;e claims 6ociatd -ith any future modiflcatlin, suspension. or revocation of this ;c:mit.
4. Reliance on Applicant's Data: The determination of this office that isauince of this permit ig nat contrary to the pu*=lic
interest was made in reliance on the information you provided.
S. Reevaluation of Pernit Decsion. This office may reevzluate its decision on this pei.rit at any time the circurn.tan:ze
warran1t. CircumsEances that could require a reevaluation include, but are not limited to, the folli•ong:
a. You Wfl to comply with the terms jrnd conditionz of this permit.
b. The Information provided by you in support of your permit application proves to have been fal;e, incomplete, or
inaccurate (See 4 above).
c. Significant new information surfaces which this office did not consider in reaching thea oriinal public interest decision.
Such a reevaluation may result In a determination that it is appropriate 'o use-'Lhe suspension. modification, and revocation
procedures contained in 33 CFR 325.7 or enfoccemen' procedures such u those contained in. 33 CFR 325.4 and 326.5. T he
referenced enforcement procedure. provide for the Lsuarice of an adminilstrative order requI!,ri you to comply with the terrr.s
and condillons of your..? crrnt and for the initiation of legal acdon wheer approp:i•ate. You will 'be required to pay for any
corrective meas.ares ordered by this office, and if you fall to comply with such directive, this off•ce may in certain situaticns
(such as those $pecified in 33 CFR 209.170) acetrnplIsh the corrective measures by contract or otherwise and bill you for :-e
co t.
6. Extensions. General condition I establishes a time limit for the completion of the activity authorized by this permit. Unless
there are cir.cumsrtances requiring hter a prompt completion of the authorized activity or P :eevaluaticn of the pulic nte:est:
decision, the Corps wi11 normally give favorable consideration to a Tequeat for en extension of this time limit.
•You- signature below, aa permittee, Indicatet that you accept and agree to comply with the te.rms and condittor.s of this parmi:.
(PER ,ITTEE) (DATE)
This permit becomes effective when the Federal offieial, dgsignated To act for the Secretary or the Army, has signed belo-.
4,jDISTLiCe ENGINEER) MoolcrL W. PRATT (DATE)
Lieutenant Coton~l, Corps of En.gineers
When the structures or work authorized by this permit are still In existence at the time the property is traansfeied, the terms and
conditionc of thbh permit -,ill continue to be binding ort the ne- owner(s) of the property. To validace the transfer of this permit
and tle aasceiated liabilities a-sociated with compliance with it& terms and conditions, have the t.rasferee jign and date below.
(TR.ANSFER £5) I(DA TZ)
3 *U.S. GCV' FLX r . :.%TX71,ac?4C! : W IH 18 - r12
10/20/97 09: 19 'U603 472 7052oC)r Viei '97 01t:2Pii US F21-11T K IV
NORIANDEAU.. Z007:016
.IGH4. D
4'
Vermont Yankee Power Plant, Vernon, Vermont.
POPOSED MAILNTErNA.NCE DP.EDGINGSMtr. 16, 1997
10/20/97 09:20 *C603 472 7052 NORMANDEAU..CCT 17 "5t" e1:leP M US RR'rr r m.r'• j, "00-S
PROJECT DESCRIPTION CONTL'UED FROM PAGE I
dewatering. Dewatering will occur through an ovenrlow pipe leading to an existing drainage swale
which re-enters the river. The secondary site consists of an existing concrete containment area
with a capacity of 1,600 cy. This site has an eisting drainage pipe into the river. Neither ofthe
containment sites involve the placement of fill into any waterway or wetland. The purpose of
the project is to restore adequate water flow to the cooling intake for the power plant.
This authprization is made in accordance with the attached plans, in eight.sheets, entitled
"PROPOSED LAIN'TENANCE DREDGING". dated "SEPT. 16, 1997".
SPECLAL CONDrrIONS CONTfluED PROM PAGE 2
b. The perraittee shall assure that a copy of th'is permit is at the work site'whenever work is
being performed and that all personnel performring work at the site of the work authorized by thispermi are fully aware of the terms and conditions of the permit. This permit, including its
drawings and any appendices and other attachments, shall be made a-par- of any and all contracts
and sub-contracts for work which affects areas of Corps of Entineers' jurisdiction at -he site of
the work authorized by this permit, This shall be done by includins the entire permit in the
specifications for the work. If the permit is issued after the construction specifications but
before receipt of bids or quotes, the entire permit shall be included as an addendum to the
specifications. If the permit is issued after receiptof bids or quo:es, the entire permit shall be
included in the contract or sub-contract as a change order. The term "entire permit" includes
permit amendments. Although the perrnnitee may assign various aspects of the work to differe't
contractors or sub-contractors, all contrac ors and sub;contractors shall be oblgated by contract
to comply with all en*virorr nental proiectiorn provisions ofthe entire permit, and no Conitract or
sub-contract shall require or allow'unauthorized work in areas of Corps of Engineers'jurisdiction.
c*. All-.dredged material shall be disposed of at an upland, non-wetland location.
d. Periodic maintenance dredging tothe area and depth limits described herein is authorized for
ten years from the date of issuance of this perrnit, provided disposal of the dredged material is at
an upland site. However, the permnitee must hotify this office, in writing, 60 days before the
intended date of any such dredging and shall not begin such dredging unti written authorization
has been obtained. A separate individual permit shall be required for such dredging if the material
to be dredged is to be deposited in open or ocean waters and/or wetlands.
4
10.,20/97 09:2L TT603 472 7032CCT 17 '97 0S1:BPrl US P~vrl u'-M<
NORMANDEAU.. fJi.ot
'I(
1om OW 090ce -;.
1 00
ralf )\C,ýý *PROPOSE-D MAIN~TENANCE DREDGITNG
PROPOSED SITE A DREDC IG DEWATERING BASIN
C~3) VrRI1CN YANYKr NUCLEAR POWER CORP.__ ERIIONT YANKEE NUCLEAR PVR. STA,
vc;NGN vcppCPr
NORMANEA U ASSOCIA TES INC.ENVIRONMENTAL CONSULTANTS25 NoShIJ Road B9dfar4. No-. gtmpshlr 03t11-S500
f
10/20/. 97 09:22 %T603 472 7052 NOR 3L ANDEAU.OCT 17 '97 01:3aPnl US FRiRY EN•GH ,R,. DEv"] .0
AFPIWCskNI;..,
PROPOSED. DREDGING -AREA AT INTAXE STRUCTLY](VERMONT YANKEE -NUCLEAR POWER CORP.i~)VERM1ONT YANk~.E NUCLEAR PVR. STA, NOA'MANDEA U-A SSO C/A ES INC.
ENVIRONMENTAL CONSULTANT-SI25 )Xashui R044 ~uldtra. Now Hcrnpohli.. 051 . -SsOc
SHErrT 2 CV 7 V.PT, t6. t997sHECT Z Cr 7
10,'20,:97 09:23 Z'603 472 7052OCT 17? 97 01:3-'P UtiT _,lt3: m.3 ujiw NORMANDEAU. . , -%..012--016
MATCH LINE
ID,Z
PROPOSMD SITS B DREDGING DEWATERING BASIN~ VERMONT TANXCE NUCLEAR ?QV5R CORP.
____VERMUNT YANKEE NUCLEAR P'JR, STA.YER~NCR VUIN l NORMA NDEA U A SSO CMA 7ES INC.ENVIRONMENTAL CONSULTANTS
25 Sashua Road i.dford, N.v' 4cm ,sh!it 03110,-5500VECT 3 V 7 ZtT. 16. 0997
10:20/97 09:23 "603 472 7052
OCT 17 '97 01:33P' US ARMIY EtNGR REG DIVNGANDEAL
~ 0i.i:oj ~r-. ~
n'2ow
COQ/, 71"CU 7- o -,204 ~ - T t
.)!
WINGEXISTING SHEET WALLFROM 204 - 195.1 E i
I2ROPOSE-D kAIMN.EANCEF DREDGrIN a
APPLICANT:pROPOSEID DREflG[NG AT INTAKE STRUCTURPE
(~ N VERMON~T YANXEE NUCLEAR POWER CORP.
CtA VERMONT YANKEE NUCLEAR PWR. STA~.
i I . 0 =A E.,.-40'
I i'* ~ c
NORMA NDEA U A SSO CIA 7ES INC.
IENVIFRON'MENTAL CONSULTAN'iS2S N4athuý3 Rcod 6adfora, Now iqrb:r ostt-50
tO/20/97 09:24 "'603 472 7052OCT 17 "97 Gi:3PM U5RF4flrTGR
. -914--016
".0/,!0.q7 09:24 Z'603 472 7052OCT 17 '97 01:::Pp1M US PRrlY EtiGR REG XJIV LNORXIUNDEAU.. -f-. Ala 01.3.01
--I
AWEST
A;EAST
'NVITELEV. 553
RIP RAP BED FOR 15 FT.INTO EXISTINQ SWALE
STRUCTUREPRIMARY OUTFLOWII
NTS
PROPOSED MITEXAN'CE DREDGING
APPLICANT:SITE A OUTLET STRUCTURE
VERMONT YANKEE NUCLEAR POVER CORP.VERMONT YANKEE NUCLEAR PWR. STA.
VCPNOH. VE2A:NTýI NORMA NDEA U A SSOCIA TES PIC.ENVIRONMENTAL CONSULTANTS2. Nashua 'Road Bedford. Noe Hampshirg 031 1c-550",
•,, I"1" I¢.-sIr? L. t! 7 SEPT. 16. 19
10/20/97 09:24 'V603 472 7052OCT 17 -57 ~ i L7 INORHANDEAU. .
QoL6.oI6
II!
BWEST
STACgED HAYBALESTO FILTER VATER
- 24' X 24'CONCRETE BLOCKS\JITH 4' GAPS.TO ALLOW WATERFLOW
--20 +
EAST
a.6 FT, HIGHEXISTINGCONCIZETE: CONTAIN~rZNTSITE B.
EXISTINGCATCHBASIN
FA
-- - -PUNDED WdATER
PRIMARY OUTFLOW STRUCTURENTS
'p:opO0SED M-AITENANCF-IED 1JBlýt
APPLICANT:SITE B OUTLEAT STRUCTURS
~~~~rRMONT YANK4EE NUCLEAR POVER CORP. S~iTS1ýEHOT ANSENUCLEAR P'JR, T. NORMA NDEA U1-ASO I E
STA.M4 ENVIRONMENTAL CONSULTA1%
3~~707 S?7 t~ ~ 25 Nashua 030 S.Afrd. Saw tNorip~ire 03110,