SECTION 1006 1150 SECTION 1006 PORTLAND CEMENT CONCRETE: 1006-1 General Requirements: Portland cement concrete shall consist of a mixture of hydraulic cement, fine aggregate, coarse aggregate, and water. It may also contain chemical admixtures, additives, and supplementary cementitious materials meeting the requirements herein. The contractor shall determine the mix proportions and shall furnish concrete which conforms to the requirements of the specifications. All concrete shall be sufficiently workable, at the slump proposed by the contractor within the specified range, to allow proper placement of the concrete without segregation, bleeding, or incomplete consolidation. It shall be the responsibility of the contractor to proportion, mix, place, finish, and cure the concrete properly in accordance with the requirements of the specifications. 1006-2 Materials: 1006-2.01 Cementitious Material: (A) General: Cementitious material is defined as an inorganic material or a mixture of inorganic materials that sets and develops strength by chemical reaction with water by formation of hydrates and is capable of doing so under water. In this specification, cementitious materials are defined as hydraulic cement (Portland cement or Portland-pozzolan cement) and supplementary cementitious materials (fly ash, natural pozzolan, or silica fume). (B) Hydraulic Cement: Hydraulic cement shall consist of either Portland cement or Portland- pozzolan cement. Portland cement shall conform to the requirements of ASTM C150 for Type II, III, or V, and shall not contain more than 0.60 percent total equivalent alkalies. Portland-pozzolan cement shall conform to the requirements of ASTM C595 for blended hydraulic cement with moderate sulfate resistance, Type IP (MS). Cement of different types or brands shall not be intermingled or used in the same batch. The contractor shall provide suitable means for storing and protecting the cement against dampness. Cement which has become partially set or which contains caked lumps shall not be used.

Upload: others

Post on 21-Feb-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1150

SECTION 1006 PORTLAND CEMENT CONCRETE:

1006-1 Genera l Requirements:

Por t land cement concre te sha l l cons is t o f a mix tu re o f hydrau l ic cement , f ine aggregate , coarse aggregate , and water . I t may a lso conta in chemica l admix tures , add i t ives , and supp lementary cement i t ious mater ia ls meet ing the requ i rements here in .

The cont rac tor sha l l de termine the mix p ropor t ions and sha l l fu rn ish concre te wh ich conforms to the requ i rements o f the spec i f i ca t ions . A l l concre te sha l l be su f f ic ien t ly workab le , a t the s lump proposed by the cont rac tor wi th in the spec i f ied range, to a l low proper p lacement o f the concre te wi thout segregat ion , b leed ing, o r incomple te conso l ida t ion . I t sha l l be the respons ib i l i ty o f the cont rac tor to p ropor t ion , mix , p lace , f in ish , and cure the concre te p roper ly in accordance wi th the requ i rements o f the spec i f i ca t ions .

1006-2 Mater ia ls :

1006-2 .01 Cement i t ious Mater ia l :

(A) Genera l :

Cement i t ious mater ia l i s de f ined as an inorgan ic mater ia l o r a mix tu re o f inorgan ic mater ia ls tha t se ts and deve lops s t rength by chemica l reac t ion wi th water by fo rmat ion o f hydra tes and is capab le o f do ing so under water . In th is spec i f i ca t ion , cement i t ious mater ia ls a re de f ined as hydrau l ic cement (Por t land cement o r Por t land-pozzo lan cement ) and supp lementary cement i t ious mater ia ls ( f l y ash , na tura l pozzo lan , or s i l i ca fume) .

(B) Hydraul ic Cement:

Hydrau l ic cement sha l l cons is t o f e i ther Por t land cement o r Por t land-pozzo lan cement .

Por t land cement sha l l con form to the requ i rements o f ASTM C150 fo r Type I I , I I I , o r V, and sha l l no t con ta in more than 0 .60 percent to ta l equ iva len t a lka l ies .

Por t land-pozzo lan cement sha l l con form to the requ i rements o f ASTM C595 fo r b lended hydraul ic cement wi th modera te su l fa te res is tance, Type IP (MS) .

Cement o f d i f fe ren t types or b rands sha l l no t be in te rmingled or used in the same batch . The cont rac tor sha l l p rov ide su i tab le means fo r s to r ing and pro tec t ing the cement aga ins t dampness . Cement wh ich has become par t ia l l y se t o r wh ich conta ins caked lumps sha l l no t be used.

Page 2: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1151

The use o f e i ther sacked cement o r bu lk cement is permiss ib le . The use o f f rac t iona l bags o f sacked cement wi l l no t be permi t ted un less the cont rac tor e lec ts to we igh the cement in to each ba tch .

(C) Supplementary Cement i t ious Mater ia ls :

(1 ) Genera l :

Supp lementary cement i t ious mater ia ls may be used in add i t ion to hydrau l ic cement . Supp lementary cement i t ious mater ia ls sha l l be approved pr io r to the i r use . When e i ther modera te o r h igh su l fa te res is tan t concre te is spec i f ied in the Spec ia l Provis ions , the proposed hydrau l ic cement /supp lementary cement i t ious mater ia l b lend sha l l be tes ted fo r su l fa te expansion in accordance wi th ASTM C1012. When modera te su l fa te res is tance is spec i f ied , the max imum expans ion sha l l be 0 .10 percent a t s ix months . When h igh su l fa te res is tance is spec i f ied , the max imum expans ion sha l l be 0 .05 percent a t s ix months or 0 .10 percent a t one year .

(2 ) Fly Ash and Natura l Pozzolan:

Fly ash and na tura l pozzolan sha l l con form to the requ i rements o f ASTM C618 fo r Class C, F, o r N, except tha t the loss on ign i t ion fo r Class F and Class C sha l l no t exceed 3 percent .

(3 ) Si l ica Fume:

Si l ica fume sha l l con form to the requ i rements o f ASTM C1240. Cer t i f i ca t ion o f s i l i ca fume wi l l be based on a Cer t i f i ca te o f Compl iance conforming to the requ i rements o f Subsec t ion 106.05 o f the spec i f i ca t ions submi t ted fo r each lo t o f s i l i ca fume.

(D) Acceptance of Cement i t ious Mater ia ls :

The cer t i f i ca t ion and acceptance o f cement i t ious mater ia ls wi l l be on the bas is o f the mater ia ls o r ig ina t ing f rom an Approved Mater ia ls Source . Approved Mater ia ls Sources L is ts fo r cement i t ious mater ia ls a re main ta ined by the ADOT Mater ia ls Group, St ruc tura l Mater ia ls Tes t ing Sec t ion .

Source approva l o f hydrau l ic cement , f ly ash , and na tura l pozzo lan producers /supp l ie rs wi l l be based on month ly submi t ta ls to the ADOT Mater ia ls Group, St ruc tura l Mater ia ls Test ing Engineer , a t cer t@azdot .gov . The fo l lowing documenta t ion sha l l be submi t ted :

(1 ) A Cer t i f i ca te o f Compl iance wh ich l is ts the lo ts p roduced dur ing tha t month ; and

Page 3: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1152

(2 ) A separa te Cer t i f i ca te o f Ana lys is fo r each lo t shown on the cor respond ing Cer t i f i ca te o f Compl iance fo r tha t month .

1006-2 .02 Water :

Water sha l l meet the requ i rements o f ASTM C1602, except tha t i t sha l l con ta in no more than 1 ,000 par ts per mi l l ion o f ch lo r ides as Cl and no more than 1 ,000 par ts per mi l l ion o f su l fa tes as SO4. The water used sha l l be f ree o f in ju r ious amounts o f o i l , ac id , a lka l i , c lay , vegetab le mat te r , s i l t , or o ther harmfu l mat te r . Po tab le water ob ta ined f rom pub l ic u t i l i t y d is t r ibu t ion l ines wi l l be acceptab le .

1006-2 .03 Aggregates:

(A) Genera l Requirements:

When concre te is to be p laced a t e leva t ions above 4 ,500 fee t , the f ine aggregate and the coarse aggregate sha l l be sub jec ted to f i ve cyc les o f the sod ium su l fa te soundness tes t , and the we igh ted percentage loss de termined separa te ly fo r each, in accordance wi th the requ i rements o f ASTM C88. The we igh ted percentage loss de termined fo r each sha l l no t exceed 10 percent . Tes ts fo r soundness may be wa ived when aggregates f rom the same source have been approved and the approved tes t resu l ts app ly to the cur ren t p roduc t ion f rom tha t source .

Mi l l ta i l ings or mater ia l f rom mine dumps sha l l no t be used in the produc t ion o f f ine or coarse aggregate .

The fo l lowing tes t methods may be used to eva lua te the qua l i ty o f aggregates fo r concre te :

TABLE 1006-1 Test Methods for Qual i ty of Aggregates

Sampl ing Ar izona Tes t Method 105 Reduc ing f ie ld samples to tes t ing s ize AASHTO R 76 Poten t ia l fo r Alka l i S i l i ca React ion (ASR)

ASTM C1260, C1567, o r ASTM C1293

Clay lumps and f r iab le par t ic les AASHTO T 112 L igh twe igh t par t ic les (Spec i f i c grav i ty less than 2 .0)

AASHTO T 113 (See Note1)

Organ ic impur i t ies AASHTO T 21 Aggregate gradat ion Ar izona Tes t Method 201 Soundness (Sod ium Su l fa te ) ASTM C88

Mor ta r St rength AASHTO T 71 (See Note1)

Sand equ iva len t AASHTO T 176 L .A. abras ion AASHTO T 96 Frac tured Coarse Aggregate Par t ic les Ar izona Tes t Method 212

Page 4: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1153

TABLE 1006-1 Test Methods for Qual i ty of Aggregates

Note :

(1 ) AASHTO T 113 and T 71 are mod i f ied as spec i f ied in Subsec t ions 1006-2 .03(B) and 1006-2 .03(C) o f the spec i f i ca t ions .

(B) Fine Aggregate:

Fine aggregate sha l l be a na tura l o r manufac tured sand, o r o ther approved iner t mater ia l wi th s imi la r charac ter is t ics, composed o f c lean, hard , s t rong, durab le , uncoated par t ic les . The aggregate sha l l be washed and sha l l con form to the requ i rements o f AASHTO M 6 , wi th the fo l lowing except ions :

The amount o f de le te r ious subs tances in the washed f ine aggregate sha l l no t exceed the fo l lowing l imi ts by d ry we igh t , when tes ted in accordance wi th the fo l lowing tes t methods :

TABLE 1006-2 Deleter ious Substances in Fine Aggregate

Clay lumps and f r iab le par t ic les AASHTO T 112 0 .5%

L igh twe igh t par t ic les (Spec i f ic grav i ty less than 2 .0)

AASHTO T 113 (Except tha t the percent o f

l igh twe igh t par t ic les sha l l be repor ted to the

neares t 0 .01%.)

1 .25% (0 .25%

Max. Coa l and

L ign i te* ) Note : *On ly mater ia l tha t is b rown ish-b lack , o r b lack , sha l l be cons idered coa l o r l ign i te .

F ine Aggregate sha l l meet the fo l lowing gradat ion requ i rements when tes ted in accordance wi th Ar izona Tes t Method 201.

TABLE 1006-3 Gradat ion of Fine Aggregate

Sieve Size Percent Passing 3/8 in . 100 No. 4 95 - 100

No. 16 45 - 80 No. 50 0 - 30

No. 100 0 - 10 No. 200 0 - 4 .0

F ine aggregate sha l l have a sand equ iva len t va lue o f no t less than 75 . F ine aggregates sha l l be sub jec ted to tes t ing under AASHTO T 21 fo r o rgan ic impur i t ies . F ine aggregate produc ing a co lo r darker than the s tandard co lo r sha l l be re jec ted un less the mater ia l passes the mor ta r s t rength requ i rements spec i f ied in the fo l lowing paragraph:

Page 5: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1154

F ine aggregate no t meet ing the requ i rements fo r o rgan ic impur i t ies sha l l be made in to mor ta r and sub jec ted to tes t ing in accordance wi th AASHTO T 71 , except tha t the mor ta r sha l l deve lop a compress ive s t rength a t seven and 28 days o f no t less than 90 percent o f that deve loped by a mor ta r p repared in the same manner wi th the same Type I I cement and graded sand conforming to the requ i rements o f ASTM C778.

(C) Coarse Aggregate:

Coarse aggregate sha l l cons is t o f c rushed s tone, grave l , c rushed grave l , o r o ther approved iner t mater ia l o f s imi la r charac ter is t ics , inc lud ing c inders when spec i f ied , hav ing hard , s t rong and durab le p ieces f ree o f c lay and o ther de le te r ious subs tances . The aggregate sha l l be washed. The aggregate gradat ion , when tes ted in accordance wi th Ar izona Tes t Method 201, sha l l con form to the appropr ia te s ize des ignat ion o f AASHTO M 43.

The amount o f de le te r ious subs tances in the washed coarse aggregate sha l l no t exceed the fo l lowing l imi ts by d ry we igh t , when tes ted in accordance wi th the fo l lowing tes t methods , except as no ted :

TABLE 1006-4 Deleter ious Substances in Coarse Aggregate

Clay lumps and f r iab le par t ic les AASHTO T 112 0 .3%

L igh twe igh t par t ic les (Spec i f ic grav i ty less than 2 .0)

AASHTO T 113 (Except tha t the percent o f

l igh twe igh t par t ic les sha l l be repor ted to the

neares t 0 .01%.)

1 .25% (0 .25%

Max. Coa l and

L ign i te* ) Mater ia l pass ing No. 200 s ieve

Ar izona Tes t Method 201 1 .0%

Note : * On ly mater ia l tha t is b rown ish-b lack , o r b lack , sha l l be cons idered coa l o r l ign i te .

The percent o f wear o f coarse aggregate a t 500 revo lu t ions , when tes ted in accordance wi th the requ i rements o f AASHTO T 96 , sha l l no t exceed 40 . The percent o f one face f rac tured coarse aggregate par t ic les sha l l be a t leas t 30 when tested in accordance wi th the requ i rements o f Ar izona Tes t Method 212.

1006-2 .04 Admixtures and Addi t ives:

(A) Genera l Requirements:

A l is t o f approved admix tu res and add i t ives is ma in ta ined on the Depar tment ’s Approved Produc ts L is t (APL) . Cop ies o f the most recent

Page 6: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1155

vers ion o f the APL are ava i lab le on the Depar tment ’s webs i te f rom the ADOT Research Center th rough i ts Produc t Eva lua t ion Program. Admix tu res and add i t ives o ther than those l i s ted on the APL may be cons idered fo r use as spec i f ied in Subsec t ion 106.14 o f the spec i f i ca t ions .

Cer t i f i ca tes o f Compl iance sha l l be submi t ted wh ich c lear ly s ta te the t ime per iod in wh ich the produc t ion o f the produc t meets the appropr ia te ASTM s tandard and tha t fo rmula t ion o f the produc t has no t changed dur ing the s ta ted t ime per iod . The t ime per iod sha l l be l imi ted to 12 months pr io r to the da te o f s ignature on the cer t i f ica te . The cer t i f i ca te sha l l be submi t ted to the ADOT Mater ia ls Group, St ruc tura l Mater ia ls Tes t ing Sec t ion , and re ta ined fo r record .

Concre te admix tu res and add i t ives sha l l be un i fo rm th roughout the i r use in the work . Al l concre te admix tu res and add i t ives sha l l be s to red in su i tab le conta iners in accordance wi th the manufac turer 's recommendat ions . A l l l iqu id admix tu res sha l l be pro tec ted f rom f reez ing. L iqu id admix tu res tha t have f rozen sha l l no t be used. I f more than one admix tu re is used, the admix tu res sha l l be compat ib le wi th each o ther so tha t the des i red e f fec ts o f a l l admix tu res used are rea l ized .

Admix tu res and add i t ives hav ing a ch lo r ide concent ra t ion o f 10 ,000 par ts per mi l l ion (1 percent by we igh t o f the admix tu re) o r less , as de termined in accordance wi th Ar izona Tes t Method 738 or Tes t Method BS EN 480-10:2009, a re acceptab le un less o therwise spec i f ied . Ca lc ium ch lo r ide as a separa te admix tu re sha l l no t be used. At no t ime sha l l mater ia ls wi th ch lo r ides be incorpora ted in to any precas t b r idge members , p recas t concre te p roduc t , o r concre te p ipe produc t .

(B) Chemical Admixtures:

Air -en t ra in ing admix tu res sha l l con form to the requ i rements o f ASTM C260.

Water reduc ing, re ta rd ing, hydra t ion s tab i l i z ing, and acce le ra t ing admix tu res sha l l con form to the requ i rements o f ASTM C494 fo r the appropr ia te type .

Spec i f ic per fo rmance admix tu res fo r p recas t i tems, pa tch ing mater ia ls , o r o ther p roduc ts sha l l a lso conform to the requ i rements o f ASTM C494, inc lud ing da ta to subs tan t ia te the spec i f i c per fo rmance charac ter is t ics .

(C) Addi t ives:

Pigments incorpora ted in to the approved concre te mix des ign fo r in tegra l ly co lo red concre te sha l l meet the requ i rements o f ASTM C979.

Page 7: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1156

F ibers incorpora ted in to the approved concre te mix sha l l meet the requ i rements o f ASTM C1116. The spec i f i c type , s ize , and quant i ty of f iber sha l l be de termined by the mix des igner .

Mic ro f iber add i t ive may be used fo r p las t ic shr inkage cont ro l , sub jec t to approva l by the Engineer .

1006-3 Design of Mixtures:

1006-3 .01 Design Cr i ter ia :

Por t land cement concre te sha l l con form to the requ i rements spec i f ied in Tab le 1006-5 fo r each o f the c lasses l i s ted there in . Un less o therwise spec i f ied , the cement i t ious mater ia l con ten t sha l l be as shown:

TABLE 1006-5 Design Cr i ter ia

Class of Concrete

Minimum 28-Day

Compressive Strength

Required: ps i (ASTM C39)

Hydraul ic Cement

Content : Lbs. per Cu Yd.

Minimum-

Maximum

Maximum Water -

Cement i t ious Mater ia l

Rat io (w/cm): Lb. /Lb.

Slump Range: Inches

B 2 ,500 470 – 658 None

Chosen by cont rac tor S

2 ,500 520 – 752

0 .55

3 ,000 3 ,500 4 ,000 4 ,500 564 – 752 0 .50

Greater than 4 ,500 564 – 800 0 .45

P 4 ,000 564 – 658 None 0 – 4 .5

H High per fo rmance concre te as spec i f ied in p ro jec t spec ia l p rov is ions .

(A) Supplementary Cement i t ious Mater ia l Limitat ions and

Requirements:

Supp lementary cement i t ious mater ia ls ( f l y ash , na tura l pozzo lan , o r s i l i ca fume) conforming to the requ i rements o f Subsec t ion 1006-2 .01 o f the spec i f i ca t ions may be used, as spec i f ied in the paragraphs be low:

(1 ) When Por t land cement is used, a max imum of 25 percent , by we igh t o f the cement i t ious mater ia l , may be an approved f ly ash or na tura l pozzo lan , except as spec i f ied in paragraphs (4 ) , (5 ) , and (6 ) be low;

Page 8: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1157

(2 ) When Por t land pozzo lan cement [Type lP (MS) ] is used, f l y ash or na tura l pozzolan is no t a l lowed, except as spec i f ied in paragraphs (4 ) , (5 ) , and (6 ) be low;

(3 ) When s i l i ca fume is used, a max imum of 10 percent , by we igh t o f the cement i t ious mater ia ls , may be used;

(4 ) When a compress ive s t rength grea ter than 4 ,500 pounds per square inch is requ i red , supp lementary cement i t ious mater ia ls may be added in excess o f the max imum cement i t ious mater ia l con ten t . F ly ash or na tura l pozzo lan may exceed 25 percent and s i l i ca fume may exceed 10 percent , by we igh t o f the cement i t ious mater ia l , i f approved by the Engineer ;

(5 ) When increased su l fa te res is tance is spec i f ied, the requ i red amount o f f l y ash or na tura l pozzo lan sha l l be incorpora ted in to the concre te and may exceed 25 percent , by we igh t o f the cement i t ious mater ia l ; and

(6 ) For Class S concre te used in b r idge decks , a min imum of 20 percent , by we igh t o f the cement i t ious mater ia l , sha l l be an approved Class F f ly ash or na tura l pozzo lan , un less o therwise approved by the Engineer .

(B) Alka l i -Si l ica React iv i ty Limitat ions and Requirements:

For any concre te mix , other than fo r p recas t or p res t ressed br idge members , wi th a Por t land cement conten t grea ter than 545 pounds per cub ic yard , one o f the op t ions spec i f ied in the paragraphs be low fo r the mi t iga t ion o f a po ten t ia l a lka l i s i l i ca reac t ion (ASR) sha l l be used:

(1 ) A min imum of 20 percent Class F f ly ash or na tura l pozzo lan , by we igh t o f the cement i t ious mater ia l , sha l l be used;

(2 ) Ins tead o f us ing Por t land cement , Type IP (MS) Por t land-pozzo lan cement wi th a Class F f ly ash or na tura l pozzo lan conten t o f a t leas t 20 percent , by we igh t o f the cement i t ious mater ia l , sha l l be used;

(3 ) L imi t the to ta l equ iva len t a lka l ies to a max imum of 3 .00 pounds per cub ic yard o f concre te , when ca lcu la ted as fo l lows:

Page 9: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1158

(4 ) In t roduce a l i th ium n i t rate admix tu re , wh ich has been approved by the Engineer, a t a min imum dosage o f 0 .55 ga l lons o f 30 percent l i th ium n i t ra te so lu t ion per pound o f to ta l equ iva len t a lka l ies per cub ic yard o f concre te . The requ i red amount o f l i th ium n i t ra te is ca lcu la ted as fo l lows:

(5 ) The coarse aggregate and the f ine aggregate sha l l be tes ted separa te ly in accordance wi th ASTM C1260 to de termine the po ten t ia l fo r a lka l i s i l i ca reac t ion (ASR) . When aggregates show the po ten t ia l fo r ASR, as ind ica ted by expans ions o f 0 .10 percent o r grea ter a t 16 days a f te r cas t ing, su f f ic ien t mi t iga t ion fo r the expans ion sha l l be de termined in accordance wi th ASTM C1567. The use o f f l y ash or natura l pozzo lan may exceed 25 percent , by we igh t o f the cement i t ious mater ia l when used to mi t iga te the po ten t ia l fo r ASR.

(C) Class B and Class S Concrete Slump Limitat ions and Requirements:

The proposed s lump fo r Class B and Class S concre te sha l l be chosen by the cont rac tor . The permiss ib le var ia t ion fo r the proposed s lump sha l l be as spec i f ied in Subsec t ion 1006-7 .03 of the spec i f i ca t ions . Concre te a t the proposed s lump sha l l be su f f ic ien t ly workab le to a l low proper p lacement wi thout harmfu l segregat ion , b leed ing, o r incomple te conso l ida t ion .

(D) High Performance Concrete Limitat ions and Requirements:

For Class H concre te , i f the max imum cement i t ious mater ia l con ten t is exceeded in o rder to achieve h igh ear ly s t rength requ i rements , and i f requ i red by the Engineer , the mix des ign sha l l be accompan ied by shr inkage tes t ing demonst ra t ing tha t shr inkage is less than 0 .04 percent

Page 10: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1159

when tes ted in accordance wi th ASTM C157. However , the cond i t ion ing per iod sha l l be mod i f ied to cons is t o f an in i t ia l seven day wet cur ing per iod fo l lowed by a 21 day dry cur ing per iod .

(E) Air Entra inment Requirements:

Air -en t ra in ing admix tu res are requ i red fo r a l l c lasses o f concre te p laced a t an e leva t ion o f 3 ,000 fee t o r above and may be used in o ther s i tua t ions a t the cont rac tor ’s d isc re t ion . For a i r -en t ra ined concre te p laced a t an e leva t ion of 3 ,000 fee t o r above, a spec i f i c a i r con ten t ta rge t sha l l be es tab l ished in the mix des ign wi th a va lue wi th in the range o f the appropr ia te cr i te r ia f rom Tab le 1006-10 in Subsec t ion 1006-7 .03 (A) o f the spec i f i ca t ions .

No a i r -en t ra inment wi l l be requ i red fo r minor p recast s t ruc tu res , p recast p ipe , and precas t , p res t ressed s t ruc tu ra l members suppor t ing a concre te deck s lab or imperv ious over lay . A lso , no a i r -en tra inment is requ i red fo r any precas t i tems cons t ruc ted us ing the dry pack or no-s lump method.

(F) Water -Reducing Admixtures:

Unless spec i f ica l ly requ i red , water - reduc ing admix tu res may be used a t the op t ion o f the cont rac tor .

(G) Coarse Aggregate Size Determinat ion:

The coarse aggregate s ize des ignat ion fo r Class S or Class B concre te sha l l be chosen by the cont rac tor and approved by the Engineer and sha l l con form to the s ize des ignat ion and grad ing requ i rements o f AASHTO M 43. In choos ing the s ize des ignat ion , the max imum s ize o f coarse aggregate sha l l not be la rger than 1 /5 o f the nar rowest d imens ion be tween the s ides o f ad jacent fo rms, o r 2 /3 o f the min imum c lear spac ing be tween re in fo rc ing bars , o r 2 /3 o f the min imum c lear spac ing be tween re in fo rc ing bars and the s ides o f ad jacent fo rms, o r 1 /3 o f the depth o f the s lab , wh ichever is leas t . I f two or more s tockp i les a re u t i l i zed to manufac ture an AASHTO M 43 s ize des ignat ion , a t the t ime o f p ropor t ion ing fo r mix ing, the aggregate f rom each s tockp i le sha l l be measured by we igh t and propor t ioned so tha t the resu l t ing mix tu re o f coarse aggregate meets the requ i rements fo r the chosen s ize des ignat ion .

Coarse aggregate fo r Class P concre te used to cons t ruc t Por t land cement concre te pavement wi thout load t rans fer dowels sha l l be separa ted in to two or more s tockp i les . At the t ime o f p ropor t ion ing fo r mix ing, the aggregate f rom each s tockp i le sha l l be measured by we igh t and propor t ioned so tha t the resu l t ing mix tu re o f coarse aggregate meets the requ i rements fo r s ize des ignat ion No. 467, as spec i f ied in AASHTO M 43. Coarse aggregate fo r Class P concre te p laced in pavement ramp tapers no t exceed ing a wid th o f 10 fee t and in pavement gore areas may be s ize des ignat ion No. 57 , as spec i f ied in AASHTO M 43. The use o f

Page 11: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1160

s ize des ignat ion No. 57 coarse aggregate may be used in concre te p laced in o ther inaccess ib le pavement a reas when approved in wr i t ing by the Engineer .

Coarse aggregate fo r C lass P concre te used to cons t ruc t Por t land cement concre te pavement wi th load t rans fer dowels and ad jacent shou lders sha l l meet the requ i rements fo r s ize des ignat ion No. 57 , as spec i f ied in AASHTO M 43.

1006-3 .02 Mix Design Submit ta l Procedures:

At leas t two weeks pr io r to the appropr ia te concre t ing opera t ion , the cont rac tor sha l l submi t concre te mix des igns to the Engineer fo r rev iew and approva l . More than one mix des ign fo r each c lass o f concre te and each s trength o f Class S concre te may be submi t ted fo r approval p rov ided spec i f i c i tems and loca t ions o f in tended uses accompany each mix des ign . For mix des igns wi thout h is tor ica l da ta in ADOT f i les , the cont rac tor sha l l subs tan t ia te the mix des ign(s ) by fu rn ish ing su f f ic ient mix h is to ry o r t r ia l ba tch tes t ing da ta as spec i f ied in Subsec t ion 1006-3 .03 o f the spec i f i ca t ions and prov id ing a l l de ta i ls o f the mix tu res proposed fo r use . The cont rac tor sha l l submi t a l l mix des igns wi th a separa te cover sheet (s ) wh ich inc ludes the fo l lowing in fo rmat ion :

(A) Cover Sheet :

(1 ) Pro jec t name; (2 ) Pro jec t number ; (3 ) ADOT pro jec t number ; (4 ) Cont rac tor ; (5 ) Subcont rac tor ( i f app l icable ) ; (6 ) Mater ia l supp l ie r ; and (7 ) A l i s t o f the submi t ted mix des igns ident i f ied by produc t

code, des ign s t rength , ba tch p lan t , c lass , and in tended use(s ) .

I f supp l ied by a commerc ia l ready-mix supp l ie r , the ba tch p lan t number and address sha l l be provided on the cover sheet as we l l as the da te o f the most recent ba tch p lan t cer t i f i ca t ion and the name o f the inspec t ing and cer t i fy ing organ iza t ion or agency .

(B) Mix Designer:

Mix des igns sha l l be prepared by or under the d i rect superv is ion o f , and s igned by a person hav ing bo th exper ience in the deve lopment o f mix des igns , inc lud ing the respec t ive type o f concre te , and sa t is fy ing one o f the fo l lowing c r i te r ia :

(1 ) Regis te red Pro fess iona l Engineer ; (2 ) Cer t i f ied Nat iona l Inst i tu te fo r Cer t i f i ca t ion in

Engineer ing Techno logies (NICET) Leve l I I I Techn ic ian or h igher ;

Page 12: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1161

(3 ) Cer t i f ied Nat iona l Ready Mix Assoc ia t ion (NRMCA) Leve l 3 Concre te Techno logis t ; o r

(4 ) Cer t i f ied Amer ican Concre te Ins t i tu te (ACI) Concre te Labora tory Tes t ing Technic ian Leve l 2 o r Grade I I

Mix des igns fo r p recas t or p res t ressed concre te sha l l be prepared by or under the d i rec t superv is ion o f , and s igned by , a Regis te red Pro fess ional Engineer o r a PCI Qua l i ty Cont ro l Techn ic ian / Inspec tor Leve l I I o r h igher .

(C) Mix Design Submit ta l Requirements:

Concre te mix des igns shal l be propor t ioned on the bas is o f a cub ic yard o f concre te . The complete so l id vo lume mix design(s ) submi t ted fo r approva l sha l l be prov ided to the Engineer by the cont rac tor and sha l l inc lude a l l o f the fo l lowing:

(1 ) Produc t Code; (2 ) ADOT pro jec t number ; (3 ) Plan t Ident i f i ca t ion and Locat ion ; (4 ) Class o f Concre te ; (5 ) Des ign s t rength and age; (6 ) Des ign a i r con ten t and range (±) ; (7 ) Des ign s lump range fo r Class P (as spec i f ied in Tab le

1006-5) or des ign s lump and permiss ib le var ia t ion (as spec i f ied in Subsec t ion 1006-7 .03 o f the spec i f i ca t ions) fo r Class S and Class B concre te ;

(8 ) Des ign spread and permiss ib le var ia t ion fo r se l f -conso l ida t ing concre te (SCC) (as spec i f ied in Subsec t ion 1006-4 .05(E) o f the spec i f i ca t ions) ;

(9 ) Des ign water -cement i t ious mater ia ls ra t io ; (10) Des ign un i t we igh t in pounds per cub ic foo t ; (11) Name and type o f each mater ia l inc lud ing admix tu res and

add i t ives ; (12) Supp l ie r o f each mater ia l inc lud ing admix tu res and

add i t ives ; (13) Source o f cement i t ious mater ia ls , water , and aggregates

inc lud ing the assoc ia ted commerc ia l mater ia ls (CM) source number(s) ;

(14) Weigh t o f each mater ia l measured to the neares t pound; (15) Spec i f ic grav i ty o f each mater ia l (de termined wi th in las t

12 months) to the neares t thousandth ; (16) Vo lume o f each mater ia l measured to the neares t

hundredth o f a cub ic yard; (17) Dosage ra te o f each chemica l admix tu re o r add i t ive o r

manufac turer - recommended dosage range when app l icab le ;

(18) To ta l vo lume measured to the neares t hundredth o f a cub ic yard ;

(19) To ta l we igh t per cub ic yard measured to the neares t pound; and

Page 13: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1162

(20) Pr in ted name and s ignature o f the ind iv idua l respons ib le fo r deve lopment o f the mix des ign .

A s ingle mix des ign produc t code may inc lude mul t ip le sources of cement , f l y ash , na tura l pozzo lan , and s i l i ca fume. When mul t ip le sources o f mater ia l a re used under one produc t code, documenta t ion sha l l be prov ided wh ich shows s imi la r per fo rmance us ing mater ia ls f rom each source . Mu l t ip le sources o f mater ia l sha l l be l i s ted on the mix des ign as a l te rna t ive sources .

1006-3 .03 Approval of Concrete Mix Designs:

Al l mix des igns sha l l be approved by the Engineer p r io r to use . A l l mix des igns fo r p recas t o r p res t ressed concre te sha l l be approved by the Mater ia ls St ruc tura l Tes t ing Sec t ion pr io r to use . Mix des igns meet ing the c r i te r ia here in and ident i f ied as one o f the fo l lowing wi l l be cons idered fo r approva l :

A mix des ign tha t has been prev ious ly approved or used success fu l ly on an ADOT pro jec t wi th in the pas t 24 months and is on f i le wi th the Depar tment .

A mix des ign s imi la r to tha t spec i f ied tha t has been used success fu l ly on a non-ADOT pro jec t and su f f ic ien t mix h is to ry no o lder than 24 months sha l l be inc luded wi th the mix des ign submi t ta l . The mix h is to ry sha l l inc lude da tes p laced, compress ive s t rength tes t records , and o ther per t inent da ta .

A new mix des ign tha t does no t meet the c r i te r ia fo r a p rev ious ly used mix des ign requ i res a t r ia l ba tch f rom e i ther the f ie ld ba tch p lan t o r an ADOT approved tes t ing labora tory .

In no case sha l l the approva l o f a mix des ign re l ieve the cont rac tor o f the respons ib i l i t y fo r the resu l ts ob ta ined by the use o f such approved mix des ign .

(A) Previously Used Mix Design Approval :

(1 ) Previously Used on ADOT Projects:

Mix tures hav ing been ADOT approved or used prev ious ly wi th sa t is fac tory compress ive s t rength h is to ry wi th in the pas t 24 months may be acceptab le p rov ided a l l o f the fo l lowing app ly :

(a ) The mix code, des ign s lump, and a i r con ten t have no t changed, and the water -cement i t ious mater ia ls ra t io has no t inc reased;

Page 14: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1163

(b ) The coarse aggregate s ize des ignat ion(s ) and source remain unchanged and the to ta l coarse aggregate quant i ty has no t changed by more than 5 percent ;

(c ) The f ine aggregate source remains unchanged and the quant i ty has no t changed by more than 5 percent ;

(d ) The source and type o f each cement i t ious mater ia l remains unchanged and the quant i ty o f each has no t changed by more than 2 percent ;

(e ) The quant i ty o f water has no t changed by more than 2 percent ;

( f ) Coarse and f ine aggregate spec i f i c grav i t ies have been measured and updated wi th in the las t 12 months ; and

(g) The dosage o f chemica l admix tu res remain wi th in manufac turer ’s recommended ranges.

(2 ) Previously Used on Non-ADOT Projects:

When submi t t ing a concre te mix used success fu l ly on a non-ADOT pro jec t , mix h is to ry sha l l be requ i red fo r cons iderat ion and approva l o f the mix . Us ing s t rength tes t records f rom an ADOT approved labora tory , wh ich are no t more than 24 months o ld , a sample s tandard dev ia t ion (ss) may be used to es tab l ish the requ i red over -des ign . Tes t records sha l l comply wi th the fo l lowing c r i te r ia :

(a ) Representa t ive o f mater ia ls , qua l i ty con t ro l p rocedures , and cond i t ions s imi la r to those expec ted on the pro jec t ;

(b ) Representa t ive o f concre te p roduced to meet a compress ive s t rength , or s t rengths , wi th in 1000 pounds per square inch be low or 1000 pounds per square inch above the spec i f ied des ign compress ive s t rength ;

(c ) Sha l l inc lude the da te , compress ive s t rength , s lump, a i r con ten t (when app l icab le ) , and ca lcu la ted resu l ts f rom Tab le 1006-6 and Tab le 1006-7 ; and

(d ) Cons is t o f a t leas t 15 consecut ive compress ive s t rength tes ts tha t span a per iod o f no t less than 45 days . I f the tes t record cons is ts o f a t leas t 30 consecut ive tes ts , the sample s tandard dev ia t ion (ss ) o f those tes ts is used. I f the tes t record cons is ts o f 15 to 29 consecut ive tes ts , the s tandard dev ia t ion o f

Page 15: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1164

those tes ts sha l l be mod i f ied in accordance wi th Tab le 1006-6 .

TABLE 1006-6 Standard Deviat ion Modi f icat ion Factor

No. of tests * Modi f icat ion factor for sample standard deviat ion (k )

< 15 Min imum 20% over -des ign 15 1 .16 20 1 .08 25 1 .03

30 or more 1 .00 Note : * For 15 to 29 tes ts , in te rpo la te fo r in te rmed ia te number o f tes ts . k = Mod i f ica t ion fac to r (mu l t ip l ie r ) by wh ich ss sha l l be mul t ip l ied to be used to de termine the requ i red min imum over -des ign compress ive s t rength , f ' c r , in Tab le 1006-7 .

The requ i red min imum over -des ign compress ive s t rength sha l l be de termined by the equat ions shown in Tab le 1006-7 .

Table 1006-7 Over-Design Compressive Strength Equat ions

Speci f ied design compressive strength, ps i

Required minimum over design compressive strength,

ps i

f ' c ≤ 5000

Use the la rger va lue computed f rom these two equat ions :

f ' c r = f ' c + 1 .34k × s s

f ' c r = f ' c + 2 .33k × s s - 500

f ' c > 5000

Use the la rger va lue computed f rom these two equat ions :

f ' c r = f ' c + 1 .34k × s s

f ' c r = 0 .90 f ' c + 2 .33k × s s Legend:

f ' c= Spec i f ied des ign compress ive s t rength .

f ’ c r= Requ i red min imum over -des ign compress ive s t rength

s s= Sample s tandard devia t ion

k= Mod i f ica t ion fac to r f rom Tab le 1006-6 i f app l icab le To be cons idered fo r approva l by the Engineer , the average s t rength o f the prov ided tes t da ta shal l be grea ter than f ’c r , and the mix h is to ry sha l l be f rom a mix deemed to be su f f ic ien t ly representat ive o f the mater ia ls and propor t ions proposed fo r use in the submi t ted mix des ign .

Page 16: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1165

(B) New Mix Design Approval :

The over -des ign requ i rement fo r new mix des igns sha l l be a min imum of 20 percent o f the spec i f ied des ign compress ive st rength and sha l l be subs tan t ia ted by t r ia l ba tches . Tr ia l ba tch resu l ts may be f rom labora tory t r ia l ba tches or fu l l -sca le t r ia l ba tches .

(1 ) Labora tory t r ia l ba tches are de f ined as “p ropor t iona l ly reduced quant i t ies o f the mater ia ls tha t a re to be used in p roduc t ion , mixed in a por tab le o r labora tory concre te mixer a t an ADOT App roved Labora tory ” . Such t r ia l ba tches sha l l be overseen and ver i f ied by a Pro fess iona l Engineer wi th exper ience in concre te mix des igns .

(2 ) Fu l l -sca le t r ia l ba tches are de f ined as “u t i l i z ing the mater ia ls , mix ing equ ipment , and procedures tha t a re the same as those to be used in p roduc t ion . ” Fu l l -sca le t r ia l ba tches sha l l cons is t o f a t leas t 4 cub ic yards o f concre te and sha l l be overseen and ver i f ied by a Pro fessiona l Engineer wi th exper ience in concre te mix des igns . The Engineer reserves the r igh t to wi tness the fu l l -sca le t r ia l ba tch ac t iv i t ies .

(3 ) Al l t r ia l ba tches fo r precas t o r p res t ressed concre te wi l l be observed, tes ted , and documented by the ADOT Mater ia ls St ruc tura l Tes t ing Sec t ion and approved by the Engineer .

Tr ia l ba tches sha l l have s lump resu l ts wi th in the range spec i f ied fo r the proposed work . When a i r -en t ra ined concre te is spec i f ied , the a i r con ten t sha l l be in compl iance wi th the spec i f ied requ i rements . Compress ive s t rength tes t ing samples sha l l be cured and tes ted by an ADOT Approved Labora tory .

Tr ia l ba tch tes t resu l ts , p r io r to the spec i f ied compress ive s trength acceptance age, may be used fo r ear ly approva l i f the compress ive s t rength tes t resu l ts meet the min imum over -des ign requ i rement fo r the spec i f ied acceptance age.

When approved by the Engineer , concre te f rom t r ia l ba tches may be used in the work a t loca t ions where concre te o f a lower s t rength is requ i red and such concrete sha l l meet the requ i rements o f the c lass o f concre te a t tha t loca t ion .

1006-4 Concrete Product ion:

1006-4 .01 Genera l Requirements:

The cont rac tor may ob ta in concre te fo r each c lass o f concre te and fo r each s t rength o f Class S concre te f rom a source approved by the Engineer in l ieu o f es tab l ish ing a ba tch p lan t a t the pro jec t s i te .

Page 17: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1166

1006-4 .02 Measur ing Mater ia ls :

(A) Cement i t ious Mater ia l :

Cement i t ious mater ia l sha l l be measured by we igh t . When supp lementary cement i t ious mater ia ls a re used in the concre te mix tu res , the cumula t ive we igh t is permi t ted to be measured wi th hydrau l ic cement , and on a sca le wh ich is separa te and d is t inc t f rom those used fo r o ther mater ia ls . The we igh t o f the hydraul ic cement sha l l be measured be fore supp lementary cement i t ious mater ia ls . When the quant i ty o f cement i t ious mater ia l exceeds 30 percent o f the fu l l capac i ty o f the sca le , the measured quant i ty o f the hydrau l ic cement sha l l be wi th in 1 percent o f the requ i red we igh t , and the cumula t ive measured quant i ty o f hydrau l ic cement p lus supp lementary cement i t ious mater ia ls sha l l a lso be wi th in 1 percent o f the requ i red cumula t ive we igh t a t each in te rmed ia te we igh ing. For smal le r ba tches o f less than 30 percent of the fu l l capac i ty o f the sca le , the measured quant i ty o f the hydrau l ic cement and the measured cumula t ive quant i ty o f hydrau l ic cement p lus supp lementary cement i t ious mater ia ls used sha l l no t be less than the requ i red amount o r more than 4 percent in excess o f the requ i red amount . In spec i f ic cases, cement i t ious mater ia ls in bags may be used wi th p r io r approva l o f the Engineer .

(B) Water :

Mix ing water is de f ined as the to ta l amount o f water in a ba tch less the water absorbed by the aggregates and is used to ca lcu la te the water -cement i t ious mater ia ls rat io (w/cm) . Mix ing water sha l l cons is t o f ba tch water (water we ighed or metered a t the p lan t ) , i ce, f ree mois tu re on the aggregates , wash water re ta ined in the mixer be fore ba tch ing, and water added a t the jobs i te in accordance wi th Subsec t ion 1006-7 .03 o f the spec i f i ca t ions . The ba tch water sha l l be measured by mass or vo lume to an accuracy o f ± 1 .5 percent o f the ta rge t ba tch water . I f the quant i ty o f water in t roduced f rom admix tu res inc reases the water -cement i t ious mater ia ls ra t io by more than 0 .01 , i t sha l l a lso be inc luded in the to ta l amount o f mix ing water . In the case o f t ruck mixers , any wash water re ta ined in the drum fo r use in the nex t ba tch o f concre te sha l l be measured; i f th is p roves imprac t ica l the wash water sha l l be d ischarged be fore load ing the nex t ba tch o f concre te . The to ta l quant i ty o f mix ing water sha l l no t exceed the mix des ign ta rge t quant i ty by more than 3 percent .

(C) Aggregates:

Aggregate sha l l be measured by we igh t . The quant i ty o f aggregate we ighed sha l l be the requi red dry we igh t p lus the to ta l mo is tu re conten t (absorbed and sur face) o f the aggregate .

When aggregates are measured in an ind iv idua l o r cumula t ive we igh ba tcher and the requ i red we igh t o f aggregate is equa l to o r grea ter than 30 percent o f the sca le capac i ty , the to ta l quant i ty o f aggregate sha l l be wi th in 2 percent o f the requ i red we igh t . In add i t ion , i f a cumula t ive we igh

Page 18: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1167

ba tcher is used, the quant i ty o f aggregate a t each success ive we igh ing sha l l be wi th in 2 percent o f the requ i red we igh t .

When aggregates are measured in ind iv idua l o r cumula t ive we igh ba tchers , and the requ i red in te rmed ia te o r f ina l we igh t is less than 30 percent o f the sca le capac i ty , the aggregate we igh t sha l l be wi th in 3 percent o f the requ i red we igh t .

(D) Admixtures and Addi t ives:

Chemica l admix tu res in powdered fo rm or o ther add i t ives in so l id fo rm (such as f ibers o r co lo r ) sha l l be measured by we igh t . L iqu id chemica l admix tu res sha l l be ba tched by we igh t o r vo lume. Admix tu res measured by e i ther we igh t o r vo lume, sha l l be ba tched wi th an accuracy o f ± 3 percent o f the to ta l requi red amount . For l iqu id chemica l admix tu res , d ispensers o f a mechan ica l type capab le o f ad jus tment fo r var ia t ion o f dosage, and o f s imp le ca l ib ra t ion , a re requ i red , un less approved by the Engineer .

1006-4 .03 Batching of Concrete:

(A) Genera l Requirements:

Concre te may be ba tched in a s tandard ba tch p lant o r a cent ra l mix ing p lan t . The p lan t may be s i tua ted a t the pro jec t s i te , o r i t may be loca ted o f f -s i te o r a t a commerc ia l supp l ie r . A l l mater ia ls u t i l i zed in the ba tch ing o f concre te sha l l be f rom an approved source or supp l ie r .

(B) Concrete Plant Requirements:

(1 ) Al l Concrete Plants:

The hand l ing and s to rage o f concre te aggregate sha l l be such as to ma in ta in them a t o r above a sa tura ted-sur face-dry (SSD) mois tu re cond i t ion and to min imize segregat ion or the in te rmix ing and contaminat ion wi th fo re ign mater ia ls . The Engineer may requ i re tha t aggregate be s to red separa te ly . Di f fe ren t s izes of aggregate sha l l be separa ted by bu lkheads or s to red in separa te s tockp i les su f f ic ien t ly removed f rom each o ther to p revent the mater ia ls f rom becoming in te rmixed. When aggregates are s to red on the ground, the s i tes fo r the s tockp i les sha l l be leve l and c lear o f a l l vegeta t ion . The bo t tom 1 foo t layer o f aggregate sha l l no t be d is turbed or used.

A l l concre te ba tch p lan ts and ba tch ing opera t ions sha l l have been inspec ted and sa t is fy app l icab le c r i te r ia be fore be ing used to p roduce concre te . As an a l terna t ive to an ADOT inspec t ion o f the concre te ba tch p lan ts and ba tch ing opera t ions , the supp l ie r may submi t cer t i f i ca t ion of the i r concre te p roduc t ion fac i l i t ies f rom NRMCA or Ar izona Rock Produc ts Assoc ia t ion (ARPA) to the Engineer . Concre te ba tch p lan ts sha l l be inspec ted a min imum of once every two years . ADOT may inspec t concre te ba tch p lan ts a t any t ime.

Page 19: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1168

Each ba tch p lan t sha l l be equ ipped to cont ro l the t ime when the water en ters the mixer dur ing the mix ing cyc le . Batch and mix ing t ime sha l l be ca lcu la ted f rom the t ime cement i t ious mater ia l i s f i rs t combined wi th water o r aggregates .

(2 ) Project Speci f ic Plants for Class P Concrete:

The hand l ing and s to rage o f concre te aggregate fo r Class P concre te a t the job s i te o r a p ro jec t spec i f i c p lan t s i te sha l l be such as to min imize segregat ion . Stockp i les sha l l be neat and regu la r in fo rm and sha l l occupy as smal l an area as poss ib le .

Contaminat ion o f concre te aggregate fo r Class P concre te by contac t wi th the ground a t the job s i te sha l l be prevented . The cont rac tor sha l l take the necessary measures to prevent such contaminat ion . Such prevent ive measures inc lude p lac ing aggregate on hardened sur faces cons is t ing o f Por t land cement concre te , aspha l t ic concre te , o r cement t rea ted mater ia l .

The cont rac tor sha l l ma inta in a t leas t two fu l l days’ wor th o f p roduc t ion o f f ine and coarse aggregate s tockp i led a t the batch p lan t fo r Class P concre te p r io r to s ta r t ing and th roughout the dura t ion o f Por t land cement concre te pav ing opera t ions . Th is requ i rement is waived fo r the las t two days o f p roduc t ion .

(C) Concrete Plant Operat ion and Documentat ion:

Concre te ba tch p lan ts sha l l be opera ted in accordance wi th the manufac turer ’s gu ide l ines and recommendat ions . The amount o f mater ia l measured fo r each ba tch o f concre te sha l l no t exceed the p lan t ’s ra ted capac i ty . A record o f cer t i f i ca t ion cur ren t to wi th in the last s ix months fo r a l l sca les , ba lances , load ce l ls , o r water measur ing sys tems used in the produc t ion o f concre te sha l l be main ta ined a t the ba tch p lan t and sha l l be made ava i lab le to the Engineer upon request .

When requested by the Engineer , the cont rac tor sha l l supp ly a separa te record fo r each ba tch o f concre te wh ich shows the ba tch we igh t o r quant i ty o f each ind iv idua l ingred ien t . The amount o f water in t roduced in to the ba tch inc lud ing tha t con ta ined on the aggregate sha l l be ver i f iab le .

(D) Concrete T icket ing Systems:

For each c lass o f concre te and each s t rength o f Class S concre te , except fo r Class P concre te p roduced in a ba tch p lan t a t the pro jec t s i te and used exc lus ive ly fo r Class P work , the cont rac tor sha l l fu rn ish a de l ivery t i cke t fo r each ba tch o f concre te , inc lud ing any t r ia l ba tches . The min imum in fo rmat ion to be shown on each de l ivery t i cke t sha l l be :

(1 ) Date ; (2 ) T ime batched;

Page 20: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1169

(3 ) Truck ident i f i ca t ion number ; (4 ) Name or ident i f i ca t ion o f ba tch p lan t ; (5 ) Name o f con t rac tor ; (6 ) Name and loca t ion o f p ro jec t ; (7 ) Quant i ty o f concre te ; (8 ) Mix des ign produc t code; and (9 ) Amount o f permiss ib le add i t iona l water to meet the

des ign water -cement i t ious mater ia l ra t io

Any manua l ly added add i t ives or admix tu res prev ious ly approved by the Engineer to be added to an ex is t ing mix des ign , wh ich cannot go th rough the p lan t o r ba tch ing sys tem, sha l l be recorded and shown on the de l ivery t i cke t .

In add i t ion , the number o f revo lu t ions tha t the concre te has been mixed a t mix ing speed in a t ruck mixer sha l l be no ted on the de l ivery t i cke t .

An au thor ized representat ive o f the cont rac tor shal l be respons ib le for each de l ivery t i cke t and sha l l s ign each de l ivery t i cke t accept ing the cont rac tor 's respons ib i l i ty fo r the concre te . The representa t ive sha l l fu rn ish a copy o f the de l ivery t i cke t to the Engineer a f te r d ischarge o f the concre te is comple te .

1006-4 .04 Mix ing and Transport of Concrete:

(A) Genera l Requirements:

Al l concre te sha l l be homogeneous and thorough ly mixed, and there sha l l be no lumps or ev idence o f un-d ispersed cement . Equ ipment hav ing components made o f a luminum or magnes ium a l loys , wh ich wou ld have contac t wi th p las t ic concre te dur ing mix ing and t ranspor t ing, sha l l no t be used.

(B) Mix ing in a Stat ionary Mixer (Centra l Mix Plant or Drum Mix Plant ) :

The vo lume o f concre te mixed per ba tch sha l l no t exceed the capac i ty o f the mixer as shown on the manufac turer 's p la te or documenta t ion . No sp i l lage o f concre te is a l lowed dur ing the process o f mix ing.

Whi le mix ing, the mixer sha l l be opera ted a t the speed shown on the manufac turer 's p la te as the mix ing speed.

The mix ing t ime sha l l no t be less than 60 seconds per ba tch fo r Class P concre te and the mix ing t ime sha l l be inc reased i f d i rec ted by the Engineer . The mix ing t ime sha l l be no t less than 60 seconds fo r 1 cub ic yard and sha l l be inc reased 15 seconds fo r each add i t iona l cub ic yard or f rac t ion thereo f fo r Class S or Class B concre te .

The mixer sha l l have an au tomat ic t iming dev ice wh ich locks the d ischarge equ ipment un t i l the requ i red mix ing t ime has been comple ted .

Page 21: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1170

The mixer sha l l be opera t ing a t mix ing speed a t the t ime tha t a l l ingred ien ts en ter the mixer to ensure the immedia te beginn ing o f the mix ing cyc le . Mix ing t ime sha l l end when the d ischarge chute opens. The conten ts o f the mixer sha l l be comple te ly d ischarged be fore the succeed ing ba tch is p laced in the mixer .

Any concre te d ischarged be fore the mix ing t ime is comple ted sha l l be d isposed o f by the cont rac tor a t no add i t iona l cos t to the Depar tment .

Cent ra l mixers sha l l be equ ipped wi th au tomat ic ba tch meters for count ing the ba tches fo r Class P concre te . The cont rac tor sha l l fu rn ish the ba tch count da i ly to the Engineer .

In the case o f mix ing in a centra l mixer , when f ibers a re incorpora ted in to the concre te , mix ing t ime and revo lu t ion ra te is per fo rmed the same way as p la in concre te because there is su f f ic ient shear p rov ided to un i fo rmly d isperse the f ibers . A tes t o r t r ia l mix ing is a lways recommended to ensure tha t the mix tu re suppor ts the f iber type and dosage and tha t there are no prob lems wi th the ba tch ing sequence.

Mixed concre te sha l l be t ranspor ted in t ruck mixers , t ruck agi ta to rs o r in non-agi ta t ing t rucks .

When t ruck mixers o r t ruck agi ta to rs a re used, the concre te sha l l be cont inuous ly agi ta ted f rom the t ime o f load ing un t i l the t ime o f d ischarge. Agi ta t ion sha l l be by ro ta t ion o f the drum a t the speed shown on the manufac turer 's p la te as agi ta t ing speed. The t ruck mixer o r t ruck agi ta to r sha l l be loaded and opera ted wi th in a capac i ty no t to exceed 80 percent o f the gross vo lume o f the drum. The ra te o f d ischarge sha l l be cont ro l led by the speed o f ro ta t ion o f the drum in the d ischarge d i rec t ion wi th the d ischarge ga te fu l ly opened.

Bod ies o f non-agi ta t ing t rucks sha l l be smooth , mor ta r - t igh t , meta l con ta iners and sha l l be capab le o f d ischarging the concre te a t a sa t is fac tory cont ro l led ra te wi thout segregat ion . I f d ischarge o f concre te is accompl ished by t i l t ing the body , the sur face o f the load sha l l be re ta rded by a su i tab le ba f f le . Covers sha l l be prov ided when needed for p ro tec t ion .

Discharge f rom non-agi ta t ing t rucks sha l l be comple ted wi th in 45 minu tes f rom the t ime concre te is ba tched.

Concre te hau led in open- top veh ic les sha l l be pro tec ted aga ins t ra in . When the ambien t tempera ture exceeds 85 degrees F the concre te sha l l be covered i f i t cou ld be exposed to the sun fo r more than 30 minu tes .

(C) Mix ing in Truck Mixers:

Al l concre te t ruck mixers sha l l be inspec ted and sa t is fy app l icab le c r i te r ia be fore be ing used to mix and de l iver concrete . As an a l te rna t ive to the annua l ADOT inspec t ion o f t ruck mixers , the t rucks may be

Page 22: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1171

inspec ted in accordance wi th the requ i rements o f the NRMCA and/or ARPA inspec t ion programs. Such inspec t ions sha l l be per formed in accordance wi th NRMCA’s “Sec t ion 5 o f Qua l i ty Cont ro l Manua l , Sec t ion 3 , Inspec t ion & Cer t i f i ca t ion o f De l ivery Veh ic les” or ARPA’s “Cer t i f i ca t ion o f Ready Mixed De l ivery F lee t ” check l is t and gu ide l ine. Upon sa t is fac to ry complet ion o f inspec t ion , an inspec t ion s t icker sha l l be app l ied in a c lear ly v is ib le loca t ion to the ins ide o f the dr iver ’s s ide door o f the t ruck , o r an NRMCA card sha l l be read i ly ava i lab le . Truck mixers tha t do no t have a va l id NRMCA card , o r ADOT or ARPA s t icker ind ica t ing the da te o f inspec t ion are no t a l lowed to supp ly concre te to ADOT pro jec ts . Truck mixers sha l l be inspec ted annua l ly a t a min imum and may be inspec ted a t any t ime.

Each mixer sha l l meet the spec i f ied requ i rements fo r type and s ize and sha l l have a t tached in a prominent p lace a manufacturer 's p la te showing the gross vo lume o f the mixer and the recommended speeds o f the mixer fo r mix ing and fo r agi ta t ing. Truck mixers sha l l be opera ted wi th in a capac i ty no t to exceed 63 percent o f the gross vo lume o f the drum and a t speeds shown on the manufac turer 's p la te as mix ing and agi ta t ing speeds.

Truck mixers sha l l be equ ipped wi th an e lec t r ica l ly o r mechan ica l ly ac t iva ted revo lu t ion counter by wh ich the number o f d rum revo lu t ions may be ver i f ied . The counter sha l l accura te ly regis te r the number of revo lu t ions . I t sha l l be mounted on the t ruck mixer o r ins ide the t ruck cab, so tha t i t may be sa fe ly and conven ien t ly read. The revo lu t ion counter sha l l be rese t to zero a f te r a l l mater ia ls have been loaded in to the drum a t the p lan t .

Truck-mixed concre te shal l be mixed en t i re ly in the t ruck mixer . Mix ing sha l l begin a f te r the cement has been combined wi th e i ther the aggregate or water . Each ba tch o f concre te sha l l be mixed fo r no t less than 70 nor more than 100 revo lu t ions o f the drum, a t mix ing speed, a f te r a l l mater ia ls have been loaded in to the drum a t the p lan t , except tha t when approved by the Engineer , the max imum of 100 revo lu t ions may be inc reased. Any revo lv ing o f the drum beyond the max imum number o f revo lu t ions shal l be a t the agi ta t ing speed.

When f ibers a re incorpora ted in to the concre te , i t i s recommended to add the f ibers in a cont inuous manner . A mix ing speed o f 10 to 12 rpm is typ ica l ly used fo r the ra te o f add i t ion in t rucks . A min imum of 40 revo lu t ions ( four to f i ve minu tes) a f te r a l l the f ibers a re added is recommended fo r p roper mix ing and d ispers ion o f f ibers in t rucks .

Mixers sha l l be c leaned a t su i tab le in te rva ls . Water used fo r c lean ing the mixer sha l l be d ischarged pr io r to fu r ther ba tch ing.

(D) Mix ing in Volumetr ic Mixers:

Concre te mix ing in vo lumet r ic mixers fo r Class S or Class B concre te sha l l be per fo rmed in accordance wi th the requ i rements o f ASTM C685.

Page 23: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1172

1006-4 .05 Manufactur ing Precast I tems:

(A) Genera l :

Manufac turers p roposed by the cont rac tor to manufac ture precas t i tems sha l l be on the “Approved Precas t Concre te Produc ts Manufac turers L is t ” o r the “Approved Precas t /Pres t ressed Br idge Members Manufac turers L is t ” on the St ruc tura l Mater ia ls Tes t ing Sec t ion webs i te . On ly the manufac turers on the approved l i s t (s) sha l l manufac ture precas t concre te p roduc ts o r p recas t b r idge members fo r ADOT cons t ruc t ion pro jec ts .

(B) Schedul ing:

Shop drawings sha l l be submi t ted and approved as requ i red in Subsec t ion 105.03 o f the spec i f i ca t ions . The rev iewer sha l l no ta te the i r fu l l f i rs t and las t name and contac t phone number on the approved shop drawings . The cont rac tor sha l l submi t a copy o f the approved shop drawings to the St ruc tura l Mater ia ls Tes t ing Sec t ion a t leas t f i ve work ing days in advance o f the s ta r t o f p roduc t ion o f the precas t i tems. Any changes to shop drawings must be approved by the Engineer . These updated and approved shop drawings sha l l be sent to the St ruc tura l Mater ia ls Tes t ing Sec t ion a t leas t 24 hours in advance o f the s ta r t of p roduc t ion .

(C) Plant and Personnel Cert i f icat ions:

Al l p recas t b r idge members sha l l be manufac tured in a p lan t cer t i f ied by the Precas t /Pres t ress Concre te Ins t i tu te (PCI) . The manufac turer sha l l be , a t a min imum, cer t i f ied fo r Produc t Group “B” - Br idge Produc ts , Category B4. Erec t ion of p recas t /p res t ress br idge members sha l l be per fo rmed by a cont rac tor , manufac tur ing p lan t , o r e rec tor wh ich has an ind iv idua l on s ta f f who has a t tended and rece ived a “Cer t i f i ca t ion o f Comple t ion” f rom the PCI “ Indus t ry Erec t ion Standards Schoo l ” o r is cer t i f ied by PCI as a “Cert i f ied Fie ld Aud i to r ” .

A l l p recas t concre te p roduc ts , o ther than concre te p ipe , sha l l be manufac tured in a p lan t cer t i f ied by the Nat iona l Precas t Concre te Assoc ia t ion (NPCA) or PCI .

A l l p recas t concre te p ipe produc ts and precas t concre te box cu lver ts sha l l be manufac tured in a p lan t cer t i f ied by the Amer ican Concre te Pipe Assoc ia t ion (ACPA) or NPCA.

Al l p lan t cer t i f i ca t ions sha l l be main ta ined throughout the produc t ion o f a l l p recas t concre te i tems. Produc t ion fo r p ro jec ts sha l l s top immedia te ly i f a t any t ime the manufac turer ’s cer t i f i ca t ion is revoked, regard less o f the s ta tus o f comple t ion o f con t rac ted work . Produc t ion sha l l no t p roceed un t i l cer t i f i ca t ion has been re -es tab l ished.

Page 24: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1173

Each p lan t reques t ing to be added to the “Approved Precas t Concre te Produc ts Manufac turers L is t ” o r the “Approved Precas t /Pres t ressed Br idge Members Manufac turers L is t ” sha l l do so in wr i t ing to the St ruc tura l Mater ia ls Tes t ing Sec t ion . The request sha l l inc lude a copy o f the compl iance cer t i f ica te issued by the ACPA, NPCA, o r PCI , a copy o f the most recent aud i t conducted in accordance wi th the ACPA, NPCA, o r PCI cer t i f i ca t ion programs, a copy o f the response to de f ic ienc ies o f the aud i t upon request , a copy o f the Qua l i ty Sys tem Manua l (QSM), and the des ignated Qua l i ty Cont ro l (QC) Manager fo r the p lan t .

The cont rac tor sha l l p rovide documenta t ion to the St ruc tura l Mater ia ls Tes t ing Sec t ion fo r any changes to the manufac turer ’s QSM, cer t i f ied personne l , o r p lan t cer t i f i ca t ions wi th in 10 days o f the respec t ive change.

The QSM sha l l con ta in , a t a min imum, the methods o f p roduc t ion and qua l i ty con t ro l po l ic ies and procedures used by the p lan t . The QSM sha l l be in accordance wi th ACPA, NPCA, o r PCI Plan t Cer t i f i ca t ion requ i rements and the i r respec t ive programs.

Each manufac turer on the “Approved Precas t Concre te Produc ts Manufac turers L is t ” o r the “Approved Precast /Pres t ressed Br idge Members Manufac turers L is t ” i s requ i red to submi t to the St ruc tura l Mater ia ls Tes t ing Sec t ion , a copy o f the annua l aud i t and the response to de f ic ienc ies o f the audi t , i f app l icab le , to ver i fy compl iance wi th the ACPA, NPCA, o r PCI cer t i f i ca t ion programs.

I f an aud i t i s no t comple ted or aud i t documents a re no t submi t ted wi th in a per iod o f 16 months o f the las t aud i t da te , the p lan t wi l l be removed f rom the approved l i s t fo r a min imum of two months . Af te r the two months , the manufac turer can app ly to have the p lan t re ins ta ted to the approved l i s t . Re ins ta tement is sub jec t to rev iew and compl iance wi th the St ruc tura l Mater ia ls Tes t ing Sec t ion .

In the event o f a change in ownersh ip o f an approved manufac turer , the manufac turer sha l l no t i fy St ruc tura l Mater ia ls Tes t ing Sec t ion o f the change in ownersh ip a min imum of 30 days pr io r to the da te a t wh ich the change o f ownersh ip takes e f fec t . Approva l wi l l expi re i f the Depar tment is no t no t i f ied o f the change in ownersh ip . The new ownersh ip may avo id exp i ra t ion by submi t t ing a s ta tement to the St ruc tura l Mater ia ls Tes t ing Sec t ion ind ica t ing recogn i t ion o f the de ta i ls o f the approval requ i rements , any changes to personne l and cer t i f i ca t ions , and ver i f i ca t ion tha t the p lan t is in accordance wi th the ACPA, NPCA or PCI cer t i f i ca t ion program requ i rements .

The Engineer may conduct annua l aud i ts on a random bas is o f each approved precas t manufac turer .

For p recas t concre te p roduc ts , the manufac turer sha l l have e i ther a Regis te red Pro fess iona l Engineer o r a QC Manager who has a t leas t one o f the fo l lowing cer t i f i ca t ions :

Page 25: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1174

(1 ) PCI QC Leve l I I ; (2 ) NPCA Produc t ion & Qua l i ty Schoo l (PQS) Leve l I I QA/QC

and Produc t ion ; o r (3 ) ACPA Q-schoo l .

For p recas t b r idge members , the manufac turer sha l l have a Regis te red Pro fess iona l Engineer o r QC Manager who is cer t i f ied by PCI as QC Leve l I I o r h igher . In add i t ion , the QC Manager sha l l be cer t i f ied , o r have a techn ic ian(s ) per fo rming QC tes t ing, as an ACI Concre te F ie ld Tes t ing Techn ic ian Grade I and ACI Concre te St rength Tes t ing Techn ic ian Grade I .

In the event o f a change in QC Manager o r cer t i f ied QC Techn ic ian , the manufac turer sha l l no t i fy the St ruc tura l Mater ia ls Tes t ing Sec t ion o f the change wi th in 30 days . Fa i lu re to no t i fy the Depar tment o f the change wi l l resu l t in the exp i ra t ion o f the approva l . Exp i ra t ion may be avo ided by no t i fy ing the St ruc tura l Mater ia ls Tes t ing Sec t ion o f any changes to personne l and inc lude thei r cer t i f i ca t ions , and ver i f i ca t ion tha t the p lant is in accordance wi th the ACPA, NPCA or PCI cer t i f i ca t ion program requ i rements .

(D) Plant Qual i ty Control :

The cont rac tor sha l l submi t the concre te mix des ign(s ) a long wi th shop drawings to the St ruc tura l Mater ia ls Tes t ing Sec t ion fo r approva l .

The shop drawings sha l l con ta in a t the min imum:

(1 ) Concre te s t rength requ i rements ; (2 ) Method o f concre te p lacement ; (3 ) Method o f concre te v ib ra t ion ; (4 ) Method o f cur ing; (5 ) Tens ion ing method and ca lcu la t ions , inc lud ing s t ress ing

jacks and pumps, gauge pressure va lues and theore t ica l e longat ions ;

(6 ) Detens ion ing method; (7 ) Concre te f in ish ing requ i rements and method o f f in ish ing;

and (8 ) Storage method.

When Requests fo r In fo rmat ion (RFI ) a re submi t ted to the Engineer , a copy o f the RFI sha l l a l so be submi t ted to the St ruc tura l Mater ia ls Tes t ing Sec t ion .

The manufac turer sha l l fabr ica te concre te tes t cy l inders fo r each produc t , s t rength requ i rement , and mix des ign per each day o f p roduc t ion . When “d ry cas t ” o r “zero s lump” concre te is used, the concre te tes t cy l inders wi l l be fabr ica ted per ASTM C497. For “wet cas t ” concre te , the concre te tes t cy l inders wi l l be fabr ica ted per AASHTO T 23 . When “Se l f Conso l i da t ing Concre te” (SCC) i s used, the concre te tes t cy l inders sha l l be fabr ica ted , and un i t we igh t and a i r con ten t tes ts

Page 26: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1175

sha l l be per fo rmed as descr ibed in Subsec t ion 1006-4 .05 (E) o f the spec i f i ca t ions .

Re lease s t rength sha l l be met p r io r to de tens ion ing. At the d isc re t ion o f the Engineer , re lease s t rength tes t ing may be per fo rmed a t the p lan t under the observa t ion o f the Engineer , i f no t per fo rmed by the Engineer .

Concre te tes t resu l ts sha l l be made ava i lab le upon request .

(E) Precast Concrete Operat ions:

When requested , the precas t manufac turer sha l l supp ly a month ly concre te compress ive s trength repor t , wh ich conta ins the fo l lowing in fo rmat ion :

Da i ly average concre te compress ive s t rength ;

Month ly average concre te compress ive s t rengths , wi th the h igh tes t resu l t , the low tes t resu l t , and the s tandard dev ia t ion o f concre te compress ive s t rength resu l ts ;

Week ly aggregate gradat ion and sand equ iva lent tes t resu l ts ; and

For SCC, resu l ts o f “Co lumn Segregat ion Tes t ” , when requested by the Engineer .

(1 ) Precast Br idge Members Concrete Operat ions:

Concre te mix des igns sha l l be submi t ted and comply wi th the requ i rements o f Subsec t ion 1006-3 .01 o f the spec i f i ca t ions , and the requ i rements l i s ted here in . Ca l ib ra t ion repor ts for ba tch p lan ts sca les and measur ing dev ices sha l l be supp l ied to the Engineer upon request .

A l l concre te used in the produc t ion o f p recas t b r idge members a t the manufac turer ’s p lan t o r purchased f rom a Ready Mix supp l ie r sha l l be ba tched wi th load ce l l ind ica t ing dev ices prov id ing a d ig i ta l readout and pr in ted we igh ts . Pr in ted cop ies sha l l be ava i lab le upon request by the Engineer .

The ra te o f concre te p lacement and conso l ida t ion sha l l be such tha t the fo rmat ion o f co ld jo in ts wi th in mono l i th ic sec t ions of any br idge member sha l l no t occur , bu t a t no t ime sha l l concre te p lacement be less than 25 cub ic yards per hour .

When conso l ida t ing concre te tha t inc ludes epoxy coated re in fo rcement wh ich requ i res v ib ra t ion dur ing p lacement , methods o f v ib ra t ion sha l l be equ ipped wi th neoprene or rubber boots o r l i ke mater ia l tha t p ro tec ts the epoxy coat ings f rom damage and/or abras ion .

Page 27: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1176

When concre te p lacement is in te rrup ted by ra in, the fo rms sha l l be covered wi th ta rps or p last ic . I f i t i s de termined tha t concre te p lacement can proceed dur ing ra in , ta rps or p las t ic sha l l be used to cover the forms ahead o f and beh ind the concre te p lacement .

(2 ) Precast Concrete Products Concrete Operat ions:

Cal ib ra t ion repor ts fo r batch p lan t sca les and measur ing dev ices sha l l be supp l ied to the St ruc tura l Mater ia ls Tes t ing Sec t ion when requested. Each precas t p lan t sha l l submi t a “Hot Weather ” and/or a “Co ld Weather ” concre te ba tch ing and p lacement p lan wh ich addresses the s teps tha t wi l l be taken to ensure concre te tempera ture and cur ing meets the spec i f i ca t ions . The p lan sha l l spec i fy p rocedures de ta i l ing how the concre te tempera ture wi l l be mon i to red th roughout each day ’s p roduc t ion . The St ruc tura l Mater ia ls Tes t ing Sec t ion may tes t concre te tempera ture a t any t ime. Concre te fa i l ing to meet the spec i f i ca t ion wi l l be re jec ted a long wi th any precas t p roduc ts produced tha t day .

The precas t manufac turer sha l l supp ly annua l tes t resu l ts fo r aggregate as requ i red per ASTM C33, and a lso an annual absorp t ion tes t on manufac tured produc ts .

A l l concre te ba tched a t the manufac turer ’s p lan t , o r purchased f rom a ready mix supp l ie r , sha l l be ba tched wi th load cel l ind ica t ing dev ices prov id ing a d ig i ta l readout and pr in ted we igh ts. Cop ies sha l l be ava i lab le when requested by the St ruc tura l Mater ia ls Tes t ing Sec t ion .

The ra te o f concre te p lacement and conso l ida t ion sha l l be such tha t the fo rmat ion o f co ld jo in ts wi th in mono l i th ic sec t ions wi l l no t occur .

When conso l ida t ing concre te tha t inc ludes epoxy coated re in fo rcement wh ich requ i res v ib ra t ion dur ing p lacement , methods o f v ib ra t ion sha l l be equ ipped wi th neoprene or rubber boots o r l i ke mater ia l tha t p ro tec ts the epoxy coat ings f rom damage and/or abras ion .

When a s t r ipp ing s t rength is spec i f ied , the manufacturer may de termine the concre te s t rength us ing Ar izona Tes t Method 318, “Es t imat ing the Deve lopment o f Concre te St rength by Matur i ty Method. ”

When concre te p lacement is in te rrup ted by ra in, the fo rms sha l l be covered wi th ta rps or p last ic . I f i t i s de termined tha t concre te p lacement can proceed dur ing ra in , ta rps or p las t ic sha l l be used to cover the forms ahead o f and beh ind the concre te p lacement .

(3 ) Sel f Consol idat ing Concrete (SCC):

SCC sha l l be f lowab le under i ts own we igh t and comple te ly f i l l the fo rmwork , even in the presence o f dense re in fo rcement , wi thout the need o f any v ib ra t ion , wh i le ma in ta in ing homogene i ty . P lacement is to be accompl ished in one l i f t , w i th the p lacement equ ipment wi th in 25 fee t o f the ro l l ing edge tha t the SCC crea tes .

Page 28: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1177

Tr ia l mixes sha l l be observed by an ADOT representa t ive . Tr ia l mixes may inc lude an inver ted s lump spread tes t in accordance wi th ASTM C1611, L -box , J -box , J - r ing, Co lumn Segregat ion Tes t , o r o ther tes ts as deemed necessary by the Engineer fo r the concre te mix approva l . In add i t ion , the fo l lowing is requ i red :

(a ) The v isua l s tab i l i t y index (VSI ) , per fo rmed in accordance wi th ASTM C1611, sha l l be de termined fo r each precas t concre te p roduc t be ing produced;

(b ) Any v iscos i ty mod i fy ing agents (VMA) sha l l be ident i f ied fo r the mix tu re ; and

(c ) The spread sha l l be wi th in ± 3 inches o f the des ign spread de f ined in the mix des ign .

Concre te s t rength tes t cy l inders sha l l be fabr ica ted in accordance wi th ASTM C31, bu t f i l l ing the molds sha l l be done in accordance wi th ASTM C1758.

Concre te un i t we igh t and a i r con ten t tes ts sha l l be per fo rmed in accordance wi th ASTM C138 and ASTM C231, respec t ive ly , bu t f i l l ing the cy l inder mo lds sha l l be done in accordance wi th ASTM C1758.

1006-5 Weather and Placement Limitat ions:

1006-5 .01 Genera l Requirements:

Concre te sha l l no t be p laced dur ing adverse cond i t ions , wh ich may inc lude bu t a re no t l imi ted to ra in , snow, f reez ing weather , uns tab le s i te cond i t ions , excess ive ly h igh ambien t tempera ture , and h igh winds , un less approved by the Engineer .

Under ra iny cond i t ions , p lac ing o f concre te sha l l be s topped be fore the quant i ty o f sur face water is su f f ic ien t to cause a f low or wash o f the concre te sur face or have a de t r imenta l e f fec t on the f in ished concre te and acceptance parameters .

P lac ing o f concre te sha l l immedia te ly cease i f the hau l ing veh ic les o r any equ ipment o r pedes tr ian t ra f f i c t racks mud on the prepared base or changes the a l lowab le subgrade d imens iona l to le rances fo r Class P concre te and s labs p laced on subgrade fo r Class S or Class B concre te .

1006-5 .02 Hot Weather Concret ing:

Forms, subgrade, and re in fo rc ing s tee l sha l l be l igh t ly spr ink led wi th coo l water jus t pr io r to the p lacement o f concre te .

Page 29: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1178

Ch i l led mix water o r we l l c rushed ice (subs t i tu ted as a par t o f the mix water on a pound fo r pound bas is ) may be used to cont ro l the concre te tempera ture .

Aggregate may be coo led by sys temat ic spr ink l ing o f aggregate s tockp i les fo r evapora t ive coo l ing or by the use o f l iqu id n i t rogen sys tems.

I f requ i red by the Engineer , windscreens sha l l be used to reduce the evapora t ion ra te when cur ing methods a lone are no t su f f ic ien t to ma in ta in the evapora t ion ra te wi th in acceptab le l imi ts . On br idge decks , windscreens sha l l p ro jec t a t leas t 6 fee t above the prepared br idge deck sur face . Windscreens may be made o f any cons truc t ion mater ia l that p rov ides su f f ic ien t s t rength to res is t the fo rce o f the wind .

I f dur ing f in ish ing an unexpected env i ronmenta l change or de lay occurs , a monomolecu la r f i lm produc t tha t a ids in re ta rd ing the evapora t ion may be used pr io r to f in ish ing wi th the Engineer ’s approva l . The monomolecu la r f i lm sha l l be app l ied in accordance wi th the manufac turer ’s recommendat ions . The evapora t ion re tarder sha l l be app l ied in a f ine mis t us ing su i tab le sprayers ; i t sha l l no t impact the p las t ic concre te sur faces in a s t ream.

Concre te sur faces to wh ich an evapora t ive re ta rdant has been app l ied sha l l no t be sub jec ted to f in ish ing wh ich mixes the re ta rdant in to the p las t ic concre te . App l ica t ion o f an evapora t ion re tardant sha l l no t de lay the p lacement o f cur ing compound as descr ibed in Subsec t ion 1006-6 .01(C) o f the spec i f i ca t ions .

1006-5 .03 Cold Weather Concret ing:

Concre te sha l l no t be p laced on or aga ins t ice-coated fo rms, re in fo rc ing s tee l , s t ruc tu ra l s tee l , condu i ts , o r cons truc t ion jo in ts ; nor on or aga ins t snow, ice , o r f rozen ear th mater ia ls . Immedia te ly p r io r to p lac ing concre te , the tempera ture o f fo rms, re in fo rc ing s tee l , ear then mater ia l , o r any o ther mater ia l that wi l l come in contac t wi th the f resh ly p laced concre te sha l l be a min imum tempera ture o f 40 degrees F. I f a r t i f i c ia l heat is used to ad jus t the tempera ture o f the i tems tha t wi l l come in contac t wi th the f resh ly mixed concre te , the tempera ture o f these i tems sha l l no t exceed 10 degrees F grea ter than tha t of the concre te be ing p laced.

Concre te opera t ions sha l l be d iscont inued when a descend ing ambien t tempera ture in the shade and away f rom ar t i f ic ia l heat fa l ls be low 40 degrees F. Concre te opera t ions sha l l no t be resumed unt i l an ascend ing ambien t tempera ture in the shade and away f rom ar t i f i c ia l heat exceeds 35 degrees F un less o therwise approved by the Engineer .

Mix ing and p lac ing concrete sha l l con t inue no la te r than tha t t ime o f day wh ich a l lows su f f ic ien t t ime to p lace and pro tec t the concre te a l ready poured be fore the ambient tempera ture drops to 35 degrees F.

Page 30: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1179

Concre te sha l l be pro tec ted in a manner to ma in ta in a l l concre te sur face tempera tures a t no t less than 50 degrees F fo r a per iod o f 72 hours a f te r p lacement and a t no t less than 40 degrees F fo r an add i t iona l 96 hours .

The cont rac tor may use equ ipment to heat the aggregates or water , o r bo th , p r io r to mix ing. I f aggregates are heated , the min imum tempera ture o f the heated aggregate sha l l be 60 degrees F and the aggregates sha l l have no chunks o f ice o r f rozen aggregate present . Equ ipment used to heat the aggregates sha l l be such tha t cons is ten t tempera tures are ob ta ined th roughout the aggrega te wi th in each ba tch and f rom one ba tch to another . Water sha l l no t be heated in excess of 150 degrees F un less the water is mixed wi th the aggregate pr io r to the add i t ion o f cement to the ba tch . Dur ing the heat ing or mix ing process , cement sha l l no t be added to water and aggregate combina t ions wh ich exceed 100 degrees F.

When weather fo recas ts ind ica te a p robab i l i t y tha t ambien t tempera tures are to fa l l be low 35 degrees F dur ing the p lacement o r cur ing per iods , the cont rac tor sha l l submi t a co ld weather concre t ing p lan to the Engineer fo r approva l p r io r to concre te p lacement. The co ld weather concre t ing p lan sha l l de ta i l methods and equ ipment wh ich are to be used to ensure tha t the requ i red concre te tempera tures are main ta ined. The cont rac tor sha l l p rov ide adequate co ld weather p rotec t ion in the fo rm o f insu la t ion and/or heated enc losures to p ro tec t the concre te a f te r p lacement . For b r idge decks and suspended s t ruc tu res , the co ld weather concre t ing p lan sha l l inc lude pro tec t ion measures fo r bo th the top and bo t tom sur faces o f the concre te . Th is p rotec t ion sha l l ma in ta in concre te sur face temperatures as spec i f ied above a t a l l loca t ions in the s t ruc tu re . When ar t i f i c ia l heat ing is requ i red , the heat ing un i ts sha l l not loca l ly heat o r d ry the surface o f the concre te .

When a co ld weather concre t ing p lan is requ i red, the Engineer may requ i re concre te tempera tures to be measured and cont inuous ly recorded by the use o f tempera ture sens ing dev ices dur ing the en t i re cur ing per iod . The contrac tor sha l l p rov ide the tempera ture sens ing dev ices , inc lud ing i ts manufac turer ’s cer t i f i ca t ion wh ich sha l l be in accordance wi th ASTM C1074, and record ing ins t ruments . The cont rac tor sha l l ins ta l l tempera ture sens ing dev ices near the sur face o f the concre te a t loca t ions and depths des ignated by the Engineer . When concre te is p laced on a b r idge deck or suspended s t ruc tu re , bo th the bo t tom sur face and the top sur face sha l l be mon i tored wi th tempera ture sens ing dev ices . Tempera ture sens ing dev ices and record ing ins t ruments sha l l be approved by the Engineer . The cont rac tor sha l l con t inuous ly mon i tor the concre te tempera ture and prov ide the recorded da ta to the Engineer upon request .

I f the sur face concre te tempera ture a t any loca t ion in the s t ruc tu re fa l ls be low 35 degrees F dur ing the cur ing per iod , the Engineer may d i rec t the cont rac tor to core the areas in ques t ion a t the loca t ions ind ica ted by the Engineer . The cont rac tor sha l l submi t the cores to a pe trographer fo r examinat ion in accordance wi th ASTM C856. Concre te damaged by f ros t , as de termined by the pe t rographer , sha l l be removed and rep laced

Page 31: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1180

a t no add i t iona l cos t to the Depar tment . A l l cos ts assoc ia ted wi th cor ing, t ransmi t ta l o f cores , and pe t rograph ic examinat ion sha l l be a t no add i t iona l cos t to the Depar tment regard less o f the ou tcome o f the pe t rograph ic examinat ion .

The p lac ing o f concre te wi l l no t be permi t ted un t i l the Engineer is sa t is f ied tha t a l l the necessary p ro tec t ion equ ipment and mater ia ls a re on hand a t the s i te and in sa t is fac to ry work ing cond i t ion .

Concre te requ i r ing co ld weather p ro tec t ion sha l l have such pro tec t ion removed a t the end o f the requ i red cur ing per iod in such a manner tha t wi l l permi t a gradua l d rop in the concre te tempera tures .

1006-6 Cur ing Concrete:

1006-6 .01 Cur ing Cast - in-Place Concrete:

(A) Genera l Requirements:

Al l cas t - in -p lace concre te sha l l be cured by one, o r by a combina t ion o f more than one, o f the methods spec i f ied here in and cur ing sha l l begin immedia te ly a f te r complet ion o f mach ine or hand f in ish ing o f the f resh concre te .

Cur ing sha l l be cont inued fo r a per iod o f a t leas t seven days a f ter p lac ing i f e i ther Type I I Por t land cement o r Por t land pozzo lan cement has been used, o r fo r a t leas t th ree days i f Type I I I Por t land cement has been used.

Sur faces requ i r ing a Class I I f in ish sha l l no t be cured by the L iqu id -Membrane Forming Compound Method un t i l a f te r the f in ish ing opera t ions are comple ted .

No t ra f f i c , hau l ing, s to r ing o f mater ia l or o ther work sha l l be a l lowed on any concre te sur face dur ing the requ i red cur ing per iods .

(B) Water Cur ing Method:

Al l sur faces no t covered by reasonab ly waterproo f fo rms sha l l be kept damp by app ly ing water wi th a nozz le tha t so a tomizes the f low o f the water tha t a fog mis t and no t a spray is fo rmed unt i l the sur face o f the concre te is covered wi th a cur ing med ium or spr ink l ing o f the sur face is permi t ted . The mois tu re f rom the nozz le sha l l no t be app l ied under p ressure d i rec t ly upon the concre te and sha l l no t be a l lowed to accumula te on the concre te in a quant i ty su f f ic ien t to cause a f low or wash the sur face .

I f a cur ing med ium is used, the concre te sha l l be kept cont inuous ly wet by spr ink l ing wi th water fo r the en t i re cur ing per iod . Bur lap , rugs , carpe ts , o r ear th o r sand b lankets may be used as a cur ing med ium to

Page 32: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1181

re ta in the mois tu re dur ing the cur ing per iod . Appl ica t ion o f the cur ing med ium sha l l no t begin un t i l such t ime tha t p lacement can be made wi thout marr ing the sur faces o f the concre te . App l ica t ion o f a non-a tomized spray o f water , water by b rushes , o r any o ther non-approved method wi l l no t be permi t ted .

Fogging equ ipment sha l l cons is t o f a mechan ica l ly opera ted pressur ized sys tem us ing inc rementa l ly spaced t r ip le headed nozz les or equ iva len ts . The nozz les sha l l be po int ing hor izon ta l ly , para l le l to the sur face o f the concre te and a t a d is tance no t to exceed 36 inches above the concre te sur face .

The fogging equ ipment sha l l be mounted such tha t i t i s s ta t ionary . Each nozz le sha l l be equ ipped wi th an eas i ly access ib le cont ro l capab le o f vary ing the vo lume o f water f low and immedia te ly shut t ing o f f the water when in the o f f pos i t ion. Hand-he ld fogging equ ipment wi l l no t be a l lowed.

I f a cur ing med ium is no t used, the en t i re sur face o f the concre te sha l l be kept damp by the appl ica t ion o f water wi th an a tomiz ing nozz le as spec i f ied above un t i l the concre te has se t , a f te r which the en t i re sur face o f the concre te sha l l be spr ink led cont inuous ly wi th water fo r the en t i re cur ing per iod .

In no case sha l l cur ing be in te r rup ted by more than one hour dur ing the cur ing per iod .

(C) Liquid-Membrane Forming Compound Method:

L iqu id membrane fo rming compound sha l l con form to the requ i rements o f ASTM C309 and a lso meet the c r i te r ia in Tab le 1006-8 . Approva l o f cur ing compound wi l l be based on a Cer t i f i ca te o f Ana lys is conforming to the requ i rements o f Subsec t ion 106.05 o f the spec i f i ca t ions submi t ted fo r each lo t . Cur ing compound sha l l no t be used on a p ro jec t p r io r to approva l .

Any cur ing compounds not p rev ious ly approved fo r use on a cur ren t o r pas t ADOT pro jec t sha l l be tes ted fo r p re-approva l by the St ruc tura l Mater ia ls Tes t ing Sec t ion pr io r to the submi t ta l o f the Cer t i f i ca te o f Ana lys is . The pre-approva l tes t ing sha l l be de termined by the Engineer and in accordance wi th the requ i rements in Tab le 1006-8 .

The approva l o f Type 2 (wh i te p igmented) cur ing compounds sha l l be e f fec t ive fo r a max imum of s ix months f rom the produc t ion da te . The approva l o f Type 1-D (c lear o r t rans lucent wi th fugi t i ve dye) cur ing compounds sha l l be e f fec t ive fo r a max imum of 12 months f rom the produc t ion da te .

Page 33: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1182

TABLE 1006-8 Test ing Cr i ter ia for Liquid Membrane Forming Compound

Procedure Cr i ter ia Color Clear (Type 1-D) Whi te (Type 2) De le te r ious React ion w/ Concre te No React ion No React ion

Dry ing Time Tes t Less than 4 hours Less than 4 hours

Mois tu re Loss (72 hours) Less than 0 .55 kg/m²

Less than 0 .55 kg/m²

Ref lec tance Tes t N/A 60% or grea ter Three-Day Set t lement Tes t (MNDOT Procedure)

Less than 2 ml a f te r 3 days

Less than 2 ml a f te r 3 days

Non-vo la t i le Conten t Tes t (D2369 Method A) Min imum 25% Min imum 25%

The Engineer sha l l reserve the r igh t to sample cur ing compound a t the source to per fo rm tes ts spec i f ied in ASTM C309 fo r ver i f i ca t ion purposes . Sampl ing f requency wi l l be a t the d isc re t ion o f the Engineer . Cur ing compound wi th fa i l ing ver i f i ca t ion tes t resu l ts sha l l no t be used.

Al l sur faces no t covered by waterproo f fo rms sha l l be cured by the l iqu id -membrane fo rming compound method. The cur ing compound sha l l be app l ied to the concre te immedia te ly fo l lowing the sur face f in ish ing opera t ion in one or more app l ica t ions to ta l ing a ra te o f a t leas t 1 ga l lon per 100 square fee t . The cont rac tor sha l l no t exceed the coverage ra te spec i f ied in ASTM C309.

The cur ing compound shal l fo rm a cont inuous unbroken sur face .

Type 2 compound wi th e i ther a Class A or Class B veh ic le sha l l be used fo r concre te pavement , br idge decks , and approach s labs . Type 1-D compound wi th e i ther a Class A or Class B veh ic le sha l l be used for o ther concre te i tems.

I f the membrane f i lm is b roken dur ing the cur ing per iod , the broken area sha l l be g iven a new app l ica t ion o f compound a t a ra te su f f ic ien t to ensure un i fo rm coverage.

In no case sha l l cur ing be in te r rup ted by more than one hour dur ing the cur ing per iod .

(D) Forms in Place Method:

Formed sur faces o f concre te may be cured by reta in ing the fo rms in p lace . The fo rms sha l l remain in p lace fo r the en t i re cur ing per iod .

Al l jo in ts in the fo rms and the jo in ts be tween the end o f fo rms and concre te sha l l be kept mo is tu re- t igh t dur ing the cur ing per iod .

Cracks in the fo rms and c racks be tween the fo rms and the concre te sha l l be resea led by methods approved by the Engineer .

Page 34: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1183

(E) Cur ing Br idge Decks, Approach Slabs, and Anchor Slabs:

The top sur face o f b r idge decks , approach s labs , and anchor s labs sha l l be cured by the l iqu id -membrane fo rming compound method and by the water cur ing method. The cur ing compound sha l l be app l ied progress ive ly immedia te ly fo l lowing the sur face f in ish ing opera t ion .

Water cur ing sha l l be app l ied no t la te r than four hours a f te r the comple t ion o f the sur face f in ish ing opera t ions and sha l l be app l ied as spec i f ied here in .

The top sur face o f b r idge decks , approach s labs , and anchor s labs that wi l l be covered wi th a spec ia l r id ing sur face or waterproo f ing membrane sha l l be cured by the water cur ing method on ly . Water cur ing sha l l be app l ied progress ive ly immedia te ly fo l lowing the sur face f in ish ing opera t ion as spec i f ied here in .

1006-6 .02 Cur ing Precast Concrete:

(A) Genera l Requirements:

The cont rac tor may cure precas t concre te in accordance wi th the requ i rements spec i f ied above fo r cur ing cas t - in -p lace concre te o r the cur ing o f p recas t concre te may be per fo rmed by ex terna l heat ing. Th is may be accompl ished by the use o f low-pressure steam or rad ian t heat wi th mo is tu re .

I f cur ing o f the concre te is accompl ished by low-pressure s team or rad ian t heat wi th mo is tu re , cur ing wi l l be cons idered comple ted a f te r te rmina t ion o f s team or rad ian t heat cur ing. Rap id tempera ture changes in the concre te sha l l be avo ided dur ing the coo l ing per iod .

I f cur ing o f the concre te is accompl ished by the water cur ing method, the l iqu id -membrane fo rming compound method, o r the fo rms- in -p lace method, such cur ing sha l l be cont inued fo r a per iod o f a t leas t seven days a f ter p lacement o f the concre te . The cur ing t ime may be reduced to a min imum of th ree days when a Type I I I Por t land cement has been used.

For p recas t i tems, when a concre te mix conta ins s i l i ca fume, a cur ing p lan acceptab le to the Engineer sha l l be submi t ted fo r approva l .

Concre te tes t cy l inders sha l l be in i t ia l l y cured wi th , and in the same manner as the precas t concre te p roduc ts . F ina l cur ing wi l l be per AASHTO T 23 /ASTM C31.

Page 35: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1184

(B) Low-Pressure Steam Cur ing:

Af te r p lacement o f the concre te , p recas t i tems sha l l be he ld fo r a min imum two-hour p res teaming per iod . I f the ambien t a i r tempera ture is be low 50 degrees F, s team sha l l be app l ied dur ing the pres teaming per iod to ho ld the a i r sur round ing the precas t i tem a t a tempera ture be tween 50 and 90 degrees F. When the ambien t tempera ture fa l ls be low 50 degrees F, s team or rad ian t heat may be used to keep the enc losure a t a tempera ture o f no t more than 90 degrees F un t i l the acce le ra ted cur ing per iod begins .

Acce le ra ted cur ing sha l l no t commence un t i l one hour a f te r in i t ia l se t or th ree hours a f te r p lacement o f concre te , wh ichever is longer . In i t ia l se t wi l l be de termined in accordance wi th ASTM C403 and the resu l ts submi t ted wi th each mix des ign .

To prevent mo is tu re loss on exposed sur faces dur ing the pres teaming per iod , p recas t i tems sha l l be covered as soon as poss ib le a f ter cas t ing or the exposed sur faces sha l l be kept wet by fog spray or wet b lankets .

Enc losures fo r s team cur ing sha l l a l low f ree c i rcu la t ion o f s team about the member and sha l l be cons t ruc ted to conta in the l i ve s team wi th a min imum mois tu re loss . The use o f ta rpau l ins o r s imi la r f lex ib le covers wi l l be permi t ted , p rov ided they are kept in good repa i r and secured in such a manner to p revent the loss o f s team and mois tu re .

Steam a t the je ts sha l l be low pressure and in a sa tura ted cond i t ion. Steam je ts sha l l no t imp inge d i rec t ly on the concre te , tes t cy l inders o r fo rms. Dur ing app l ica t ion o f the s team, the ambien t a i r tempera ture r ise wi th in the enc losure sha l l no t exceed 40 degrees F per hour . The average cur ing tempera ture th roughout the enc losure sha l l no t exceed 160 degrees F and sha l l be main ta ined a t a cons tan t leve l fo r a su f f ic ien t length o f t ime so as to ensure the deve lopment o f the requ i red compress ive s t rength by the age o f 28 days in concre te i tems wh ich are no t be pres t ressed. The concre te tempera ture dur ing acce le ra ted cur ing sha l l no t exceed 170 degrees F. The manufac turer sha l l have a tempera ture measur ing dev ice(s ) tha t a l lows the Depar tment to mon i tor the concre te cur ing tempera ture a t a l l t imes. For i tems wh ich are to be pres t ressed, the cons tan t tempera ture sha l l be main ta ined fo r su f f ic ien t t ime necessary to deve lop the concre te compress ive s t rength requ i red fo r p res t ress ing. The ambien t cur ing tempera ture sha l l no t exceed 175 degrees F a t any po in t . Cont ro l cy l inders sha l l be covered to p revent mo is tu re loss and sha l l be p laced in a loca t ion where tempera ture is representa t ive o f the average tempera ture o f the enc losure .

Tempera ture record ing dev ices tha t wi l l p rov ide an accura te cont inuous permanent record o f the ambien t cur ing tempera ture sha l l be prov ided. A min imum of two tempera ture record ing dev ices or one fo r every 200 fee t o f con t inuous bed length a re requ i red fo r check ing tempera ture . The loca t ion o f each tempera ture measur ing dev ice wi l l be chosen by the Engineer . The enc losure around each precas t concre te i tem sha l l be

Page 36: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1185

adequate to ensure a cons is ten t concre te cur ing tempera ture . Once the cur ing enc losure procedure is es tab l ished, the concre te cur ing tempera ture sha l l be mon i to red a t one loca t ion fo r each precas t i tem. A tempera ture measur ing dev ice sha l l be p laced in each precas t b r idge member . The d i f ference in the concre te cur ing tempera ture a t the ends o f each precas t b r idge member sha l l no t exceed 20 degrees F. Forms sha l l no t be cons idered a component o f the enc losure dur ing acce le ra ted cur ing. A tempera ture measur ing dev ice sha l l be p laced in a t leas t two precas t concre te p roducts . The d i f fe rence in the concre te cur ing tempera ture a t any loca t ion wi th in the enc losure fo r a p recas t concre te p roduc t sha l l no t exceed 20 degrees F. When box g i rders o r vo ided s lab lengths are less than 60 fee t , the concre te cur ing tempera ture sha l l be measured on every o ther b r idge member . The manufac turer sha l l supp ly a repor t o f the concre te cur ing tempera tures fo r each concre te cas t ing.

In the event the s ide fo rms are removed be fore the precas t un i t has a t ta ined the requ i red re lease compress ive s t rength, the cur ing method sha l l be cont inuous in ma in ta in ing the tempera ture and mois tu re leve l as descr ibed above, wi th in the enc losure , as near ly as p rac t ica l . There sha l l no t be a de lay in re -cover ing the g i rder o r p res t ress member .

(C) Radiant Heat With Moisture:

Radian t heat sha l l be app l ied by means o f p ipes c i rcu la t ing s team, ho t o i l o r ho t water , or by heat ing e lements o r e lec t r ic b lankets on the forms. P ipes , b lankets o r e lements sha l l no t be in contac t wi th the concre te sur faces .

Mo is tu re sha l l be app l ied in such a manner as to keep the top sur face o f the precas t un i t con t inuous ly mo is t dur ing the cur ing per iod by fogging or spray ing. Mo is tu re shal l be main ta ined by a cover o f bur lap or co t ton mat t ing and fu r ther covered by a waterproo f ta rpaul in wi th an insu la t ing cover .

Tempera ture l imi ts and the use o f record ing thermometers sha l l be the same as cur ing wi th low-pressure s team. App l ica t ion o f the heat cyc le may be acce le ra ted to meet c l imat ic cond i t ions upon the approva l o f the Engineer . A tempera ture sens ing dev ice sha l l be p laced 2 ± 1 /2 inches f rom the heated fo rm.

1006-7 Acceptance Sampl ing and Test ing:

1006-7 .01 Genera l :

Sampl ing and tes t ing o f concre te wi l l occur to de termine the acceptab i l i t y o f the concre te in accordance wi th the tes t methods and c r i te r ia ident i f ied be low. Concre te sa t is fy ing the cr i te r ia shown in the fo l lowing sec t ions is acceptab le fo r use in the work . Re jec t ion of concre te de l ivered to the s i te may occur due to fa i lu re to sa t is fy or ach ieve the spec i f ied c r i te r ia inc lud ing, bu t no t l imi ted to : improper tempera ture , s lump, a i r con ten t , o r ba tch quant i t ies tha t excess ive ly

Page 37: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1186

dev ia te f rom the mix des ign . The Engineer may a l low def ic ien t concre te mix tu res a l ready p laced to remain in p lace sub jec t to f ina l acceptance by the 28 day compress ive s t rength tes t ing prov ided there is con f i rmat ion tha t the p lacement had adequate conso l ida t ion th roughout the pour . Def ic ien t concre te mix tu res due to insu f f ic ien t a i r con ten t , o r improper s lump wh ich exh ib i t the appearance o f segregat ion or lack o f adequate conso l ida t ion , wi l l no t be accepted and sha l l be removed a t no add i t iona l cos t to the Depar tment .

For the mix tu re de l ivered to the s i te , the we igh ts and vo lumes sha l l be wi th in the to le rances descr ibed in Subsec t ion 1006-4 .02 o f the spec i f i ca t ions fo r each component .

Acceptance and pena l t ies fo r p laced concre te wh ich meets the spec i f ied mix tu re requ i rements o r is a l lowed to remain in p lace sha l l be de termined by the resul ts o f the 28-day compress ive s trength as spec i f ied in Subsec t ion 1006-7 .03 o f the spec i f i ca t ions , and add i t iona l ly in the case o f Class P concre te , on the measured th ickness o f concre te pavement in p lace as spec i f ied in Sec t ion 401 o f the spec i f i ca t ions. Sampl ing and tes t ing fo r compress ive s t rength wi l l be per fo rmed on a l l c lasses o f concre te furn ished, inc lud ing each s t rength spec i f ied on the pro jec t p lans fo r Class S concre te .

1006-7 .02 Fie ld Sampl ing and Test ing:

(A) Genera l :

A sample o f concre te for de termina t ion o f tempera ture , s lump, un i t we igh t (when requ i red) , and a i r con ten t (when requ i red) as we l l as fo r fabr ica t ion o f tes t cy l inders fo r compress ive s t rength de terminat ion a t 28 days wi l l be taken a t random a t the spec i f ied sampl ing f requency fo r each type o f concre te .

When “Se l f Conso l ida t ing Concre te” (SCC) is used, the concre te tes t cy l inders sha l l be fabr ica ted , and un i t we igh t and a i r con ten t tes ts sha l l be per fo rmed as descr ibed in Subsec t ion 1006-4 .05(E) o f the spec i f i ca t ions .

Al l sampl ing and tes t ing sha l l be done by a cer t i f ied techn ic ian meet ing the requ i rements o f the ACI Concre te F ie ld Tes t ing Techn ic ian , Grade I o r equ iva len t .

Requ i red tes t ing o f concre te wi l l be per fo rmed in accordance wi th the methods shown in Tab le 1006-9 .

Page 38: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1187

TABLE 1006-9 Sampl ing and Test ing Test Procedures

Tempera ture ASTM C1064 Slump ASTM C143 Ai r Conten t ASTM C231 or C173 Sampl ing ASTM C172 Mak ing and Cur ing Cy l inders ASTM C31 Compress ive St rength ASTM C39 Un i t Weigh t and Yie ld ASTM C138

Concre te sha l l be sampled in accordance wi th ASTM C172 fo r acceptance tes t ing o f tempera ture , s lump, un i t we igh t and y ie ld (when requ i red) and a i r con ten t (when requ i red) as we l l as fo r fabr ica t ion of tes t cy l inders fo r compress ive s t rength de terminat ion a t 28 days except tha t the concre te sha l l be sampled once dur ing d ischarge a t the midd le por t ion o f the ba tch . Suf f ic ien t care sha l l be taken to ob ta in a representa t ive sample by d iver t ing the en t i re s t ream o f the concre te to p revent segregat ion . Samples sha l l be o f su f f ic ien t s ize to per fo rm a l l the requ i red tes ts and fabr ica te the necessary test cy l inders bu t in no case less than 1 cub ic foo t .

I f the proper t ies o f the concre te do no t appear to be wi th in the spec i f i ca t ion mix des ign l imi ts fo r s lump, o r a i r con ten t , a p re l iminary sample may be ob ta ined a f te r d ischarge o f 1 /4 cub ic yards fo r in i t ia l check tes t ing. I f the pre l iminary measurement fa l ls ou ts ide the spec i f ied l imi ts , concre te p lacement sha l l be d iscont inued and addressed as fo l lows:

(1 ) When the measured s lump or a i r con ten t , o r bo th is grea ter than the spec i f ied mix des ign upper l imi t , another check tes t sha l l be made immedia te ly on a new tes t sample . In the event the second check tes t fa i ls , the concre te sha l l be cons idered to have fa i led the requ i rements o f 1006-7 .03(A) and sha l l be re jec ted ;

(2 ) When the measured s lump is be low the mix des ign spec i f ied lower l imi t , addi t iona l water may be added in accordance wi th the requ i rements o f 1006-7 .03(A) . In p lace o f the add i t ion o f water to ad jus t the s lump, an approved water reduc ing admix tu re may be added to inc rease workab i l i t y . Af te r any add i t ions , the drum sha l l be tu rned a t leas t 30 revo lu t ions a t mix ing speed and a check tes t sha l l be made on a new sample o f the adjus ted concre te to ver i fy compl iance wi th 1006-7 .03(A) ; and

(3 ) When the measured a i r con ten t fa l ls be low the mix des ign spec i f ied l imi t , an approved a i r en t ra inment admix tu re may be added to inc rease the a i r con ten t by an au thor ized representa t ive o f the ready mix supp l ier tha t has been approved by the Engineer . Af te r any add i t ions , the drum sha l l be tu rned at leas t 30 revo lu t ions a t mix ing speed and a check tes t sha l l be made on a new sample

Page 39: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1188

o f the ad jus ted concre te to ver i fy compl iance wi th the mix 1006-7 .03(A) .

Pre l iminary samples fo r check tes t ing do no t take the p lace o f acceptance samples . Once any add i t ions , ad jus tments , and assoc ia ted mix ing are comple te , another sample f rom the midd le por t ion o f the ba tch sha l l be taken fo r acceptance tes t ing.

Al l compress ive s t rength tes t spec imens sha l l be made, cured , hand led , p ro tec ted , and t ranspor ted in accordance wi th the requ i rements o f ASTM C31. A sa fe s to rage loca t ion(s ) / fac i l i t ies sha l l be secured for the use o f the tes t ing labora tory ( ies ) / techn ic ian(s ) to ensure proper cur ing o f concre te tes t cy l inders on the pro jec t s i te , inc lud ing su f f ic ien t access on weekends and ho l idays to a l low the t ime ly p ick -up o f cy l inders spec imens. Upon ar r iva l a t the tes t ing labora tory , a l l compress ive tes t spec imens sha l l be hand led , cured , and tes ted in accordance wi th the requ i rements o f ASTM C39. Any and a l l dev ia t ions f rom the s tandard procedure o f any tes t method sha l l be prompt ly ident i f ied and correc ted . Any dev ia t ions sha l l be c lear ly no ted by the tes t ing techn ic ian on repor ts . Shou ld an ind iv idua l cy l inder show evidence o f improper sampl ing, mo ld ing, cur ing , o r tes t ing, the resu l ts sha l l be d iscarded and the compress ive s t rength sha l l be the resu l t o f the average o f the remain ing cy l inder (s) .Tes t ing resu l ts ob ta ined f rom non-s tandard tes t ing procedures sha l l be cons idered inva l id and d iscarded by the Engineer .

I f approved by the Engineer , and un less o therwise spec i f ied , Ar izona Tes t Method 318 may be used to es t imate concre te s t rength by the matur i ty method. The matur i ty method sha l l no t subs t i tu te fo r compress ive s t rength acceptance tes t ing (28-day cy l inders ) . The cont rac tor sha l l submi t a wr i t ten reques t to the Engineer p r io r to us ing the matur i ty method. I f i t s use is approved by the Engineer , the cont rac tor sha l l deve lop a s t rength-matur i ty re la t ionsh ip and sha l l a lso prov ide the matur i ty meter (s ) and d ig i ta l da ta loggers necessary , as we l l as per fo rming a l l requ i red tes t ing, a l l a t no add i t iona l cos t to the Depar tment .

(B) Class S and Class B Concrete:

Concre te pumped to fac i l i ta te p lacement shal l be sampled fo r acceptance a t the f ina l po in t o f p lacement . Samples sha l l be taken dur ing cont inuous d ischarge o f concre te wi thout in te r rup t ion a t the normal p roduc t ion ra te . In accordance wi th Subsec t ion 601-3 .03 (C) o f the spec i f i ca t ions , where f reeze- thaw durab i l i t y is o f concern (such as in b r idge decks , over lays , approach s labs , and bar r ie r wa l ls ) , the concre te sha l l a lso be sampled a t the t ruck to de termine a i r loss through the pump. I f the loss o f a i r as measured be tween the supp ly t ruck and the po in t o f p lacement exceeds 2 percent , the cont rac tor sha l l employ measures acceptab le to the Engineer to reduce the loss o f a i r to less than 2 percent . I f sampl ing a t the po in t o f p lacement is no t p rac t ica l , as de termined by the Engineer , o r c rea tes a sa fe ty concern , the concre te sha l l be sampled fo r acceptance a t the t ruck . When acceptance sampl ing can on ly be per fo rmed a t the t ruck , the acceptab le range o f a i r

Page 40: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1189

conten t o f the supp l ied mix wi l l be ad jus ted to no t less than 5 percent bu t no more than 8 percent in accordance wi th Tab le 1006-10.

For Class S concre te wi th a compress ive s t rength requ i rement less than 4000 pounds per square inch , o r Class B concre te , a s t rength tes t wi l l cons is t o f the average s trength o f two tes t cy l inders . However , i f the compress ive s t rengths of the two tes t cy l inders d i f fe r by more than 10 percent f rom the average o f the two, the s t rength tes t resu l t sha l l be the cy l inder wi th the h ighes t compress ive s t rength .

For Class S concre te wi th a compress ive s t rength requ i rement equa l to o r grea ter than 4000 pounds per square inch , o r Class P concre te , the compress ive s t rength o f each sample sha l l be de termined by averaging the resu l ts o f the th ree tes t cy l inders . However , i f the compress ive s t rength o f any one o f the th ree tes t cy l inders d i f fe rs by more than 10 percent f rom the average o f the th ree , i ts resul t sha l l be d iscarded and the compress ive s t rength sha l l be the average o f the remain ing two cy l inders . Shou ld the indiv idua l compress ive s t rength o f any two o f the th ree remain ing cy l inders d i f fe r by more than 10 percent f rom the average o f the three , the resu l ts wi l l be d iscarded and the compress ive s t rength sha l l be the s t rength o f the remain ing cy l inder .

(C) Class P Concrete:

Samples o f concre te sha l l be taken in accordance wi th the requ i rements o f ASTM C172, except concre te fo r Class P sha l l be sampled immedia te ly be fore go ing in to the paver o r fo rms, o r as o therwise d i rec ted by the Engineer .

(D) Precast Concrete

(1 ) Major Precast Concrete Structures

The concre te wi l l be f ie ld sampled and compress ive s t rength tes ted by the Engineer in accordance wi th the requ i rements in 1006-7 .02 fo r Class S wi th the add i t ion o f the fo l lowing:

Fabr ica t ion o f tes t cy l inders fo r compress ive s t rength de terminat ion sha l l be done for one day ( fo r re lease breaks) , seven days , and 28 days . The acceptance samples sha l l represent one member , one day ’s p roduc t ion , o r as de termined by the Engineer .

(2 ) Minor Precast Concrete Structures

A s t rength tes t on each precas t un i t p roduced wi l l cons is t o f the average rebound number as de termined f rom read ings taken on the precas t un i t wi th a rebound hammer . The average rebound number wi l l be de termined in accordance wi th the requ i rements o f ASTM C805.

The compress ive s t rength o f the concre te wi l l be de termined f rom the average rebound number and the ca l ib ra t ion chart es tab l ished fo r the

Page 41: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1190

spec i f i c rebound hammer be ing used. The ca l ib ra t ion char t wi l l be es tab l ished f rom rebound read ings taken on concre te tes t cy l inders fabr ica ted a t the precas t p lan t and the ac tua l compress ive s t rength o f the cy l inders .

1006-7 .03 Acceptance Cr i ter ia :

Concre te acceptance tes t resu l ts and ver i f i ca t ions sha l l be eva lua ted for acceptance us ing the c r i te r ia es tab l ished in th is sec t ion .

(A) Plast ic Concrete

Plas t ic concre te is concre te wh ich has been de l ivered to the pro jec t , i s s t i l l in a workab le s ta te , and has no t ye t ach ieved in i t ia l se t . The c r i te r ia used fo r accept ing p las t ic concre te a re as fo l lows:

(1 ) Elapsed T ime

The batch t ime is de f ined as the t ime a t wh ich cement i t ious mater ia l i s combined wi th water o r aggregate . Discharge f rom the t ruck mixer o r t ruck agi ta to r sha l l be comple ted wi th in 90 minu tes f rom batch ing. The Engineer may a l low concre te p lacement to cont inue in excess o f the 90 minu tes i f the concre te is o f such s lump, workab i l i t y , and/or tempera ture tha t i t can be p laced wi thout the add i t ion o f water to the ba tch . Add i t iona l d ischarge t ime sha l l a lso be a l lowed prov ided a hydra t ion s tab i l i z ing admix tu re is shown on the approved mix des ign and has been inc luded in the ba tch , sub jec t to the fo l lowing:

(a ) The concre te remains o f su f f ic ien t s lump and workab i l i t y to fac i l i ta te adequate conso l ida t ion dur ing p lacement , and;

(b ) The hydra t ion s tab i l i z ing admix tu re conforms to the requ i rements o f subsec t ion 1006-2 .04 o f the spec i f i ca t ions and re tards hydra t ion by a hydra t ion s tab i l i z ing mechan ism, and;

(c ) The dosage ra te is ident i f ied in the approved mix des ign , and the add i t iona l amount o f ba tch to d ischarge t ime exceed ing the 90 minu te l imi t has been requested by the cont rac tor fo r approva l by the Engineer and acknowledged on the mix des ign by the Engineer , o r ;

(d ) I f dur ing p lacement , the dosage range is iden t i f ied in the approved mix des ign and the app l ica t ion-spec i f i c dosage and add i t iona l t ime has been requested by the cont rac tor and approved by the Engineer .

Page 42: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1191

(2 ) Temperature:

The tempera ture o f the concre te mix tu re immedia te ly be fore p lacement sha l l no t be less than 50 degrees F nor grea ter than 90 degrees F. The Engineer may a l low concre te p lacement to cont inue in excess o f the max imum tempera ture i f the concre te is o f such s lump or workab i l i t y tha t i t can be p laced wi thout the add i t ion o f water to the ba tch . The Engineer may a lso approve concrete mix tu res wi th a tempera ture less than 50 degrees F or grea ter than 90 degrees F i f o therwise spec i f ied or p re-approved by a mix des ign tha t accounts fo r the tempera ture dev ia t ion . Otherwise , concre te tha t fa i ls to conform to th is tempera ture requ i rement wi l l be re jec ted pr io r to p lacement .

(3 ) Consistency:

The cont rac tor sha l l fu rn ish Class P Concre te hav ing a s lump wi th in the range spec i f ied in Tab le 1006-5 .

The cont rac tor sha l l fu rn ish Class S and Class B concre te hav ing the s lump shown on the approved mix des ign , wi th a permiss ib le var ia t ion o f ± 1 inch when the s lump shown on the approved mix des ign is 4 inches or less , and a permiss ib le var ia t ion o f ±1½ inches when the s lump shown on the approved mix des ign is grea ter than 4 inches . However , when an approved h igh range water reduc ing chemica l admix tu re (ASTM C494, Type F or Type G) conforming to the requ i rements o f Subsec t ion 1006-2 .04 is used, the permiss ib le var ia t ion wi l l be ± 2 inches , un less o therwise requ i red by the Spec ia l Prov is ions . Concre te tha t fa i ls to conform to the cons is tency requ i rements wi l l be re jec ted .

When concre te is pumped, samples fo r cons is tency wi l l be taken bo th as the concre te leaves the mixer and a t the pump hose d ischarge. I f the Engineer de termines tha t there is a favorab le cor re la t ion be tween the resu l ts o f cons is tency tes ts on samples ob ta ined f rom the mixer and f rom the pump hose, the Engineer may d iscont inue sampl ing f rom one o f the sources . I f a favorab le corre la t ion is no t ma in ta ined, the cont rac tor sha l l employ cor rec t ive measures acceptab le to the Engineer and sampl ing wi l l con t inue f rom both sources to ver i fy the cor re lat ion o f tes t resu l ts .

I f the workab i l i t y o f the concre te needs to be ad jus ted (o r i f add i t iona l mix ing water is requ i red to ma in ta in the mix des ign water -cement i t ious mater ia l ra t io ) , add i t iona l mix ing water may be added as long as i t does no t exceed the amount of permiss ib le water to meet the approved mix des ign max imum water to le rance, as no ted on the de l ivery t i cke t . The concre te sha l l be mixed by a min imum of 30 revo lu t ions o f the drum a t mix ing speed a f te r the water has been added, p r io r to d ischarge o f any concre te fo r p lacement . The cont rac tor sha l l ensure tha t any add i t iona l mix ing water and requ i red mix ing revo lu t ions sha l l be recorded on the de l ivery t i cke t as spec i f ied in Subsec t ion 1006-4 .03(D) o f the spec i f i ca t ions . Th is add i t iona l mix ing may be in excess o f the max imum revo lu t ions a t mix ing speed prev ious ly spec i f ied .

Page 43: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1192

(4 ) Air Content :

Where a i r -en t ra inment is u t i l i zed as ident i f ied in Sec t ion 1006-3 .01(E) o f the spec i f i ca t ions , the a i r con ten t o f the concre te mix tu re a t the po in t o f p lacement sha l l meet the requ i rements in the fo l lowing tab le :

TABLE 1006-10 Air Entra inment Requirements

Elevat ion Freeze-Thaw & Air Loss

Concern

Air Entra inment

Required

Required Air Content by Volume

(%) 3,000 fee t o r above No Yes 4 to 7 3 ,000 fee t o r above Yes Yes 5 to 8*

Be low 3 ,000 fee t N/A Cont rac tor ’s Opt ion ≤ 7

Note : * In accordance wi th Subsec t ion 1006-7 .02 (A) o f the spec i f i ca t ions , when the concre te is pumped and acceptab le sampl ing can on ly be per fo rmed a t the t ruck .

Concre te tha t fa l ls be low the min imum may be ad jus ted wi th the add i t ion o f an approved a i r en t ra inment admix tu re in accordance wi th 1006-7 .02(A) . Concre te tha t fa i ls to conform to the max imum a i r con tent requ i rements l i s ted above fo r the respec t ive e leva t ion as de termined by the Engineer , sha l l be re jec ted pr io r to p lacement .

(B) Hardened Concrete:

(1 ) Class P Concrete:

Class P concre te wi l l be accepted fo r compress ive s t rength in accordance wi th the prov is ions o f Sec t ion 401 o f the spec i f i ca t ions . A l l concre te fa i l ing to meet the compress ive s t rength requ i rement o r o therwise re jec ted in accordance wi th Sec t ion 401 or Subsec t ion 1006-7 .01 o f the spec i f ica t ions, sha l l be rep laced wi th concre te meet ing the requ i rements o f these spec i f i ca t ions .

I f the cont rac tor chooses to contes t the compress ive s t rength resu l ts o f any sample fo r purposes o f acceptab i l i t y or improv ing a negat ive pay fac to r , the cont rac tor may e lec t to re ly on the resu l ts o f compress ive s t rengths o f cores . Three cores sha l l be ob ta ined a t no add i t iona l cos t to the Depar tment , a t the approx imate loca t ion where the contes ted tes t cy l inders were ob ta ined. Such cores sha l l be ob ta ined and tes ted in accordance wi th the requ irements o f ASTM C42. Co res must be ob ta ined under the observa t ion o f an ADOT representa t ive and de l ivered to the Engineer in t ime to a l low comple te tes t ing wi th in 48 days o f p lacement . Tes t ing sha l l be per fo rmed by the Depar tment . The cont rac tor may e lect to have a representa t ive present dur ing tes t ing. Compress ive s t rength sha l l be the average o f the resu l ts o f the th ree cores . However , i f the compress ive s t rength o f any one o f the th ree cores d i f fe rs by more than

Page 44: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1193

10 percent f rom the average o f the th ree , i ts resul t sha l l be d iscarded and the compress ive s t rength sha l l be the average o f the remain ing two cores . Shou ld the ind iv idua l compress ive s t rength o f any two o f the th ree cores d i f fe r by more than 10 percent f rom the average o f the th ree, the resu l ts o f bo th sha l l be d iscarded and the compress ive s t rength sha l l be the resu l t o f the remain ing core . Resu l ts o f the core tes t ing wi l l be b ind ing on bo th the cont rac tor and the Depar tment, and wi l l rep lace the resu l ts o f the tes t cy l inders fo r tha t sample .

(2 ) Class S and Class B Concrete:

Class S and Class B concre te wi l l be accepted for compress ive s trength and pa id fo r in accordance wi th the fo l lowing tab le . Concre te wi l l be pa id fo r by the l inear foo t o r by the cub ic yard , comple te in p lace , except tha t an ad jus tment in the cont rac t un i t p r ice , to the neares t cen t , wi l l be made fo r the quant i ty o f concre te represented by 28-day compress ive s t rength tes t resu l ts less than the spec i f ied requ i rement .

Concre te fa i l ing to meet a t leas t 85 percent o f the 28-day compress ive s t rength fo r spec i f ied s t rengths o f 3 ,000 pounds per square inch and be low, 90 percent fo r a spec i f ied s t rength o f 3 ,500 pounds per square inch , o r 95 percent fo r spec i f ied s t rengths o f 4 ,000 pounds per square inch and above, o r any concre te fa i l ing to meet the o ther requ i rements o f Subsec t ion 1006-7 .01 o f the spec i f i ca t ions , wi l l be re jec ted and removed a t no add i t ional cos t to the Depar tment and rep laced wi th concre te wh ich meets the spec i f ied requ i rements , un less the cont rac tor can submi t ev idence tha t wi l l ind ica te to the Engineer tha t the s t rength

Adjustment in Contract Uni t Pr ice for Compressi ve Strength of Class S and Class B Concre te

3000 psi and Below 3500 psi 4000 psi and Above Percent o f

Spec i f ied 28-Day

Compress ive S t rengt h

A t ta ined, to the Neares t 1

Percent

Percent Reduc t ion

in Cont rac t

Un i t P r ice (See Note

1)

Percent o f Spec i f ied 28-

Day Compress ive

S t rengt h A t ta ined, to

the Neares t 1 Percent

Percent Reduc t ion

in Cont rac t

Un i t P r ice (See Note

1)

Percent o f Spec i f ied 28-

Day Compress ive

S t rengt h A t ta ined, to

the Neares t 1 Percent

Percent Reduc t ion

in Cont rac t

Un i t P r ice (See Note

1)

100 or More 0 100 or More 0 100 or More 0 97 – 99 3 98 – 99 2 99 1 94 – 96 6 96 – 97 4 98 2 91 – 93 9 94 – 95 6 97 3 88 – 90 12 92 – 93 8 96 4 85 – 87 15 90 – 91 10 95 5

Less than 85

30 (See Note 2 )

Less than 90

30 (See Note 2 )

Less than 95

30 (See Note 2 )

Notes : (1 ) For i tems measured and pa id fo r by the cub ic yard , the reduc t ion sha l l

no t exceed $150.00 pe r cub ic yard .

(2) I f a l lowed to remain in p lac e.

Page 45: 1006 Portland Cement Concrete - azdot.gov

SECTION 1006

1194

and qua l i ty o f the concre te is such tha t the concre te shou ld be cons idered acceptab le and be a l lowed to remain in p lace .

I f such ev idence cons is ts o f cores , the cont rac tor sha l l ob ta in th ree cores f rom the concre te represented by the fa i l ing cy l inder s t rength tes t . The cores sha l l be ob ta ined a t no add i t iona l cos t to the Depar tment , under the observa t ion o f an ADOT representa t ive , and de l ivered to the Engineer in t ime to a l low comple te tes t ing o f such cores wi th in 48 days a f te r the p lacement o f the concre te . A l l cores sha l l be ob ta ined and tes ted in accordance wi th the requ i rements o f ASTM C42. Tes t ing sha l l be per fo rmed by the Depar tment . The cont rac tor may e lec t to have a representa t ive present dur ing tes t ing. The concre te represented by the cores wi l l be cons idered fo r acceptance, in accordance wi th the requ i rements o f the tab le above. I f the average compress ive s t rength does no t meet the spec i f ied requ i rement , a l l concre te so represented sha l l be removed a t no add i t iona l cos t to the Depar tment un less permi t ted to remain in p lace by the Engineer . Resu l ts o f the core tes t ing wi l l be b ind ing on bo th the cont rac tor and the Depar tment , and wi l l rep lace the resu l ts o f the tes t cy l inders fo r tha t sample .

1006-7 .04 Sampl ing Frequency for Cast - In-place Concrete:

(A) Class S and Class B Concrete:

For Class S concre te wi th a compress ive s t rength requ i rement less than 4000 pounds per square inch , a sample o f concre te fo r the requ i red tes ts , as spec i f ied in Subsec t ion 1006-7 .02 o f the spec i f i ca t ions , wi l l be taken on a da i ly bas is fo r each 100 cub ic yards , o r f rac t ion thereo f , o f con t inuous ly p laced concre te f rom each ba tch p lan t . For Class S concre te wi th a compress ive s t rength requ i rement equa l to o r grea ter than 4000 pounds per square inch , a sample o f concre te fo r the requ i red tes ts , as spec i f ied in Subsec t ion 1006-7 .02 o f the spec i f i ca t ions , wi l l be taken on a da i ly bas is for each 50 cub ic yards , o r f rac t ion thereo f , o f con t inuous ly p laced concre te f rom each ba tch p lan t . For Class B concre te , a sample o f concre te fo r the requ i red tes ts , as spec i f ied in Subsec t ion 1006-7 .02 o f the spec i f i ca t ions , wi l l be taken fo r each 100 cub ic yards p laced f rom each ba tch p lan t . For Class S or Class B concre te p laced a t e leva t ions o f 3 ,000 fee t o r above, a i r con ten t tes t ing sha l l be per fo rmed fo r each 50 cub ic yards p laced, regard less o f the compress ive s t rength requ i rement . An add i t iona l sample or samples fo r any o f the requ i red tes ts may be taken a t an in terva l o f less than the sampl ing f requency spec i f ied above, a t the d isc re t ion o f the Engineer , on any ba tch or load o f concre te . A sample fo r the requ i red tes ts on da i ly p lacements o f 10 cub ic yards or less may be taken a t the d iscre t ion o f the Engineer .

(B) Class P Concrete:

Class P concre te sha l l be sampled and tes ted fo r compress ive s t rength by the lo t . A lo t sha l l be cons idered to be one sh i f t ’ s p roduc t ion; however , a new lo t sha l l begin when the mix des ign is changed. For par t ia l sh i f ts due to weather o r o ther reasons , more than one day ’s

Page 46: 1006 Portland Cement Concrete - azdot.gov

1195

SECTION 1007

produc t ion may be inc luded in a lo t . When such par t ia l sh i f ts occur , the cont rac tor and the Engineer wi l l jo in t ly de termine the lo t l imi ts . F ive samples sha l l be ob ta ined f rom each lo t a t random loca t ions as d i rec ted by the Engineer . The Engineer may exc lude cer ta in loca t ions f rom random sampl ing i f the Engineer de termines tha t the loca t ion o f the work p rec ludes normal cons t ruc t ion opera t ions . Three tes t cy l inders sha l l be fabr ica ted f rom each sample and tes ted fo r 28-day compress ive s t rength in accordance wi th Subsec t ion 1006-7 .02 o f the spec i f i ca t ions .

Class P concre te sha l l be sampled and tes ted fo r tempera ture , s lump, and a i r con ten t ( i f app l icab le ) a min imum of f i ve t imes per lo t . The f requency may be reduced fo r par t ia l sh i f ts wi th the approva l o f the Engineer . Add i t iona l samples fo r any o f the requ i red tes ts may be taken a t the d iscre t ion o f the Engineer .

(C) Precast Concrete:

A sample o f concre te fo r the requ i red tests as spec i f ied in Subsec t ion 1006-7 .02 o f the spec i f i ca t ions wi l l be taken fo r e i ther each precas t concre te member o r fo r each day 's p roduct ion a t the d isc re t ion o f the Engineer .

An add i t iona l sample or samples fo r any o f the requ i red tes ts may be taken a t the d isc re t ion o f the Engineer . The Engineer wi l l de termine the quant i ty o f concre te represented by each sample o f concre te fo r any test per fo rmed.

When a sample o f concre te fo r the requ i red compress ive s t rength tes t i s taken to represent a s ingle day 's p roduc t ion and no t each precas t member , the degree o f acceptance fo r a l l p recas t concre te members in tha t day 's p roduc t ion wi l l be es tab l ished by the resu l ts o f such compress ive s t rength tes t .