100 scale nc 105 from us 321 to nc 105 bypass …...oct 09, 2018 · -y6- pot sta. 10+00.00-l- pot...
TRANSCRIPT
BOONE MUNICIPAL BOUNDARY
BOONE MUNICIPAL BOUNDARY
BO
ON
E M
UNIC
IPA
L B
OU
ND
AR
Y
BOONE MUNICIPAL BOUNDARY
BOONE MUNICIPAL BOUNDARY
PROJECT 45831.1.2 (U-5603)
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
DESIGN DATA
ROLL OF 2
(4 LANE TRADITIONAL ALT.)
INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
F. A. PROJECT
FUNCTIONAL CLASSIFICATION = URBAN MAJOR ARTERIAL
0’ 100’ 200’
50’
100’
(GRAPHIC SCALE)
WATAUGA COUNTY
DESIGN SPEED = 40 MPH
MAX. SUPERELEV. = 0.04
NC 105 FROM US 321 TO NC 105 BYPASS
PROPOSED UPGRADE OF
PUBLIC MEETING MAP
MARCH 10, 2014
NC ONE MAP IMAGERY DATE:
OCTOBER 2018
WLBWLB
10
15
-Y2- PC Sta. 16+38.81
-Y2- POT Sta. 10+00.00
-Y2- PC Sta. 10+20.39
-Y2- PT Sta. 10+91.51
-Y2- PC Sta. 11+62.03
-Y2- PT Sta. 13+08.55
-Y2- PC Sta. 13+55.63
-Y2- PT Sta. 14+32.63
-Y2- PT Sta. 17+82.28
1
ROADWAY TYPICAL
NC 105 BYPASS
-Y1-
POPLAR GROVE RD
SR 1552
-Y2-
AMBLING WAY
-Y3-
SR 1102 POPLAR GROVE RD
-Y4-
SR 1148 HOMESPUN HILLS RD
-Y5-
COMERCIAL DW
-L- NC 105 -L- NC 105
142
172
11
12
131
160170
258
290
406
271
389
13
20
2
6
11
14
31
40
6
20
37
60
39
89
13
21
26
68
9
10
6
7
1
1
1
1
3
3
2
2
305
417
292
370
253
320
256
324
TRAFFIC VOLUMES IN HUNDREDS
EST. 2015/2040
0.02
GRADE
POINT
0.02
2’-0"12’-0"12’-0"
0.02
1’-6"
0.02 0.02
1’-6"6’-0"
LANE
BIKE
5’-0"2’-0"
12’-0" 12’-0"
0.02
6’-0"
LANE
BIKE
5’-0"
CL -L- NC 105
2:1
2:1
2:1
2:1
VARIES 23’ to 6’
LEGEND
0000
0000
AND GUTTER
PROPOSED STRUCTURES, ISLAND, CURB
PROPOSED ROADWAY
EXISTING ROADWAY TO BE RESURFACED
EXISTING ROADWAY
EXISTING ROADWAY
PROPOSED RIGHT OF WAY
EXISTING RIGHT OF WAY
BUILDINGS
TO BE REMOVED
LAKES, RIVER, STREAMS AND PONDS
PROPOSED CONTROL OF ACCESS
PRESENT ADT
FUTURE ADT
PROPERTY LINES
EXISTING TRAFFIC SIGNAL
PROPOSED TRAFFIC SIGNAL
WETLAND LIMITS BOUNDARY
AND UTILITY)PROPOSED EASEMENTS (DRAINAGE, CONSTRUCTION,
C
A
PROPOSED RETAINING WALL
MUNICIPAL BOUNDARY
EXISTING STRUCTURES, ISLAND, CURB
TO BE RETAINEDAND GUTTER
PI Sta 71+43.50
D
L = 320.18’
T = 160.24’
R = 3,000.00’
15
20
25
30
35
40
45
50
55
60
65
70
-L- PT Sta. 17+60.35
-L- POT Sta. 26+86.08
-Y1- POT Sta. 19+85.02
-L- POT Sta. 33+25.56
-Y2- POT Sta. 18+60.92
-Y3- POT Sta. 15+78.05
-Y3- PT Sta. 15+29.51
-Y3- PC Sta. 13+10.96
-Y3- PT Sta. 12+32.88
-Y3- PC Sta. 11+06.64
-L- POT Sta. 33+31.25
-Y3- POT Sta. 10+00.00
-L- PC Sta. 35+80.89
-Y4- PT Sta. 12+59.12
-Y4- PI Sta. 13+80.59
-Y4- PC Sta. 14+83.13
-Y4- PT Sta. 16+38.08
-Y4- PC Sta. 16+92.29
-Y4- PT Sta. 17+77.43
-L- POC Sta. 39+67.48
-Y4- POT Sta. 18+14.82
-L- PT Sta. 45+11.46
-L- PC Sta. 45+58.89
-L- POT Sta. 46+25.95
-Y5- POT Sta. 15+33.16
-Y5- PT Sta. 13+64.65
-Y5- POT Sta. 10+00.00
-Y5- PC Sta. 10+90.17
-L- PT Sta. 58+40.33
-Y6- POT Sta. 10+00.00
-L- POT Sta. 60+27.74
-Y6- POT Sta. 12+66.71
-Y7- POT Sta. 10+00.00
-Y7- PC Sta. 10+91.45
-Y7- PT Sta. 12+80.56
-L- POT Sta. 62+64.38
-Y7- POT Sta. 14+54.87
-Y8- POT Sta. 10+00.00
-Y8- PC Sta. 11+80.77
-Y8- PT Sta. 12+53.19
-L- POT Sta. 69+27.02
-Y8- POT Sta. 12+61.10
-L- PC Sta. 69+83.25
-L- PT Sta. 73+03.44
-Y7- Sta. 13+00.00
BEGIN CONSTRUCTION
45
45
-Y5- Sta. 13+15.00
BEGIN CONSTRUCTION
BEGIN CONSTRUCTION
-Y3- Sta. 12+60.00
BEGIN CONSTRUCTION
-Y2- Sta. 14+00.00
BEGIN CONSTRUCTION
-Y1- Sta. 11+90.00
-Y8- Sta. 10+50.00
BEGIN CONSTRUCTION
-Y6- Sta. 10+00.00
BEGIN CONSTRUCTION
-Y4- Sta. 12+39.75
BEGIN CONSTRUCTION
-L- Sta. 15+00.00
BEGIN CONSTRUCTION
STA 74+
00.0
0
MATC
HLIN
E SH
EET 2
15
20
25
30
35
40
45
50
55
60
65
70
10
15
10
15
10
15
10
15
10
15
10
10PI Sta 13+83.36
D
L = 760.35’
T = 383.36’
R = 2,410.00’
PI Sta 40+63.19
D
L = 930.56’
R = 1,435.00’
PI Sta 52+02.63
D
L = 1,281.44’
T = 643.74’
R = 5,400.00’
PI Sta 10+56.19
D
L = 71.13’
T = 35.80’
R = 250.00’
PI Sta 12+45.99
D
L = 146.53’
T = 83.97’
R = 120.00’
PI Sta 13+94.44
D
L = 77.00’
T = 38.81’
R = 250.00’
PI Sta 16+04.85
D
L = 143.47’
T = 87.24’
R = 100.00’
PI Sta 11+79.73
D
L = 126.24’
T = 73.09’
R = 100.00’
PI Sta 14+32.59
D
L = 218.54’
T = 121.62’
R = 200.00’
10
PI Sta 12+03.60
D
L = 189.12’
T = 112.15’
R = 140.00’
-Y1- POT Sta. 10+00.00
45
-L-
-Y2-
-Y2-
PI Sta 11+43.10
D
L = 232.30’
T = 116.28’
R = 2,000.00’
PI Sta 15+61.38
D
L = 154.95’
T = 78.25’
R = 450.00’
PI Sta 17+35.51
D
L = 85.14’
T = 43.23’
R = 200.00’
-Y4-
PI Sta 12+27.96
D
L = 274.48’
T = 137.79’
R = 1,250.00’
-Y5- -Y7-
PI Sta 12+17.04
D
L = 72.42’
T = 36.28’
R = 500.00’
-Y8-
POPL
AR GRO
VE R
OAD SO
UTH
NC 10
5 BYPASS
NC 105
NC 105
AM
BLIN
G
WAY
PO
PLA
R
GR
OVE R
OA
D
HO
MESPU
N
HIL
LS RO
AD
MARYAH DRIVE
SNAGGY MOUNTAIN BOULEVARD
DO
GW
OO
D
RO
AD
BUILDING SUPPLYNEW RIVER
CONSIGNMENTCURIOSITY
EXPRESSKANGAROO CAR WASH
BUBBLES
TOWNHOMES
FORREST EDGE
WHEELS
FUN ’N’
HILLS MOTEL
HIGHLAND
SPEEDWAY
KEDNEY CARE
FRESENIUS
BB&T
PROPERTIES
HERITAGE COURT
JEEP DODGE
ROSS CHRYSLER
SUPER 8
COMMONS
HIGHLAND
FURNITURE
BADCOCK HOME
TO FOSCOE
-L- POC Sta. 15+00.00BEGIN TIP PROJECT U-5603
~32 LENGTHPROPOSED (2) 78" CMP
RCBC 1’PROPOSED (2) 7’X5’
~32’ LENGTHEXTEND CULVERT
PROPOSED (2) 84"RCP
92’
110’
81’
81’
93’
50’
45’
53’
53’
60’
NEW RIVER BUILDING SUPPLY
WWW HOLDINGS LLC
DEWEY C WRIGHTMARGIE WRIGHT
ANDREW F DINKINS
E. F. C
OE
LEE Q McMILLAN
JOHN H CAMPBELL
SHELLY M CAMPBELL
GARY W DEITZ
HJRR HOLDINGS LLC
DEWEY C WRIGHT
MARGIE WRIGHT
HIGH COUNTRY LLCCHANDLER CONCRETE
DEWEY C WRIGHTMARJORIE WRIGHT
FRANK E PROCTOR
APPALACHIAN STUDENT HOUSING
TP LAND HOLDINGS LLC
DANIELLE S WADEANDREW B WADE
POPLAR 105 LLC
JOHN R HOUSER
BETTY T LITTLE
FRANCES H HENSON
BARBARA A DEAL
INVESTMENTS LLCCOLUMBUS HOWARD
LYNN R HUBBARDGLADYS BIDDIX BROWN
IRREVOCABLE TRUST FOR
L BLAIR JRFREDERICK
OWNERS ASSOCIATION INCHERITAGE COURT PROPERTIES
JKL PROPERTIES LLC
B L ROBINSON LLC
INVESTMENTS LLCCOLUMBUS HOWARD
PROPERTIES LLCA&R MOUNTAIN
DATED 03-29-1994REVOCABLE TRUST
JAMES H LESTER
JOHN P FIDLER
BARBETTA LLC
JILL A PATEL
BARBARA B DE LEO
SAM ABDIN
RAMSEY W ABDIN
HIGHLAND COMMONS BOONE LLC
NOCHE LLC
LUCIANO LUZI
TEMPLETON PROPERTIES LP
TEMPLETON PROPERTIES LP
GARY M HENSON
JOYCE C HENSON
HAROLD M HENSON
GARY M HENSONJOYCE C HENSON
HAL S VANNOYNELL ABSHER
ROBERT D LEE
SHARON J LEETEMPLETON PROPERTIES LP
KENNETH D HAYES
BETTY S HAYES
VULCAN LANDS INC
GOODMANFREDA R
ENTERPRISES INCPAUL BROWN
HENSONHAROLD M
JOHNSON JRHOWARD B
ASSOCIATION INCCONDO
DOGWOOD PLAZA
HARWOODYVETTE
PIPESLENORE N
LLCPROPERTIES
KES
10-26-2005TRUST DATEDREVOCABLE
FISCHER JOHN WARREN
RICEJOHN E
RICEMARY J
RICEJOHN E
RICEJOHN E
RICEMARY J
ROCK RD LLC644 BLOWING
PROPERTIES LLCBOONE MEDICAL
ENTERPRISES INCAMP
INVESTMENTS IISODALIS
INVESTORSRSP
100 Scale34"x60"
and are subject to change.The designs shown on these maps, including utility easements, are preliminary maps is limited to locations of major existing and potential utility easements. on these maps or on other displays. The utility information shown on these To provide greater visual clarity, existing and proposed utilities are not shown UTILITY INFORMATION:
F
C
F
C
F
C
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
F
C
F
C
C F
C
F
C
C
F
F
C
F
C
F
C
C
C
F
C
F
C
F
C
F
C
F
C
C
C
C
C
C
C
F
C
C
F
C
F
C
C
C
C
C
C
C
C
C
C F
F
F
C
C
C
C
C
C
C
C
F
C
F
C
F
C
F
C
F
F
C
F
C
F
C
F
C
C
C
F
C
C
F
C
F
F
F
F
C
F
F
F
F
F
F
F
F
F
C
F
C
FF
F
F
F
F
FF
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
CC
F
C
F
C
F
C
F
C
F
C
F
F
FF F
F
F F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
F
F
F
F
F
F
F
F
F
F
C
F
C
F
C
F
C
F
C
F
C
F
F
F
C
F
C
F
C
F
C
F
C
F
C
F
C
F
C
F
C
F
C
F
C
F
C
C
C
C
C
F
C
F
C
F
C
F
C
F
C
F
C
F
C
F
C
F
C
F
C
C
C
F
C
F
C
F
C
F
C
F
C
C
C
F
C
F
C
C
C
C
C
C
C
F
F
F
F
F
F
F
F
F
C
C
F
F
F
F
F
F
F
F
F
C
C
F
F
F