I-91 Interchange 19 ImprovementsNorthampton, MAI-91 Interchange 19 ImprovementsNorthampton, MA
Project Advisory Committee
Meeting 4May 10, 2010
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
2/79
I-91 Interchange 19May 10, 2010
Meeting AgendaMeeting Agenda
Evaluation Criteria Discussion
Alternatives Evaluation Discussion
Discussion of Public Informational MeetingNext Steps
Comments/Questions
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
3/79
I-91 Interchange 19May 10, 2010
Evaluation CriteriaEvaluation Criteria
Traffic
Delays (LOS)
Travel Time
Queueing
Multi-modal
Pedestrian Accommodation
Bike Accommodation
Transit Access
Safety
Crash Rates
Crash Sites
Emergency Vehicle Access
Traffic Calming
Community Impacts
Property
Recreation Impacts/Access
Community Cohesion
AgriculturalAesthetics
Airport Impacts
Environmental Impacts
Noise Wetland (SF)
Flood Plain
Rare Species
Open Space
Air Quality
LightConstruction
Costs
Duration (Years)
Impacts during Construction
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
4/79
I-91 Interchange 19May 10, 2010
Evaluation CriteriaEvaluation Criteria
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
5/79
I-91 Interchange 19May 10, 2010
Evaluation of AlternativesEvaluation of Alternatives
Alternatives Evaluated:
No Build
10 Roadway AlternativesTransportation Demand Management (TDM) Package
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
6/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
No Build
I-91
Dam
onRd
Rt9
Traffic
Delay
Travel Time
Queueing
Safety
Crash Rates
Emerg. Veh. Access
Traffic Calming
Construction
Costs: N/A
Duration: N/A
Impacts During Const.
Norw
ottuck
Rail
Trail
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
7/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
No Build
I-91
Dam
onRd
Rt9
Community Impacts
PropertyRecreation
Community Cohesion
Agriculture
AestheticsAirport Impacts
Multi-Modal
Ped. Accommodation
Bike AccommodationTransit Access
Environmental Impacts
Noise
WetlandsFlood Plain
Rare Species
Open Space
Air Quality
Light
Norw
ottuck
Rail
Trail
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
8/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 12
Concept 12 - Roundabout
Converts Route 9/Damon Rd.Intersection to a 2 LaneRoundabout
Generally stays within
existing roadway layoutIntroduces a degree of trafficcalming
Needs to be carefullydesigned to make sure it iscompatible with Bicycles andPedestrians
I-91
Dam
onRd
Rt9
Norw
ottuck
Rail
Trail
D
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
9/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 12
Concept 12 - Roundabout
Converts Route 9/Damon Rd.Intersection to a 2 LaneRoundabout
Generally stays within
existing roadway layoutIntroduces a degree of trafficcalming
Needs to be carefullydesigned to make sure it iscompatible with Bicycles andPedestrians
I-91
Dam
onRd
Rt9
Norw
ottuck
Rail
Trail
D
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
10/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 12
Traffic
Delay
Travel Time
Queueing
Safety
Crash Rates
Emerg. Veh. Access
Traffic Calming
Construction
Costs: $1.10M
Duration: 1 yrs
Impacts During Const.
I-91
Dam
onRd
Rt9
Norw
ottuck
Rail
Trail
D
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
11/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 12
I-91
Dam
onRd
Rt9
Community Impacts
Property
Recreation
Community Cohesion
Agriculture
Aesthetics
Airport Impacts
Norw
ottuck
Rail
Trail
D
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
12/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
I-91
Dam
onRd
Rt9
Concept 12
Multi-Modal
Ped. Accommodation
Bike Accommodation
Transit Access
Norw
ottuck
Rail
Trail
Legend
Bicycle Path of TravelPedestrian Path of Travel
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
13/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 12
Environmental Impacts
Noise
Wetlands
Flood Plain
Rare Species
Open Space
Air Quality
Light
Norw
ottuckR
ailTrail
Norw
ottuck
Rail
Trail
D
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
14/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13
Concept 13 Intersection
& Ramp Improvements
Modified to add additional WBleft turn onto SB on-ramp
Modified to add additional NB
through lane to Damon Roadfrom NB off-ramp
Left turn lane extended underbridge by relocating sidewalkor replacing the structures
Improves on and off-ramps
Does not provide a fullaccess interchange
I-91
Dam
onRd
Rt9
Norw
ottuck
Rail
Trail
D
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
15/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13
Concept 13 Intersection
& Ramp Improvements
Modified to add additional WBleft turn lane onto SB on-ramp
Modified to add additional NB
through lane to Damon Roadfrom NB off-ramp
Left turn lane extended underbridge by relocating sidewalkor replacing the structures
Improves on and off-ramps
Does not provide a fullaccess interchange
I-91
Dam
onRd
Rt9
Norw
ottuck
Rail
Trail
D
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
16/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13
Traffic
Delay
Travel Time
Queueing
Safety
Crash Rates
Emerg. Veh. Access
Traffic Calming
Construction
Costs: $2.60M
Duration: 1 yr
Impacts During Const.
I-91
Dam
onRd
Rt9
Norw
ottuck
Rail
Trail
D
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
17/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13
Community Impacts
Property
Recreation
Community Cohesion
Agriculture
AestheticsAirport Impacts
I-91
Dam
onRd
Rt9
Norw
ottuck
Rail
Trail
D
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
18/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13
Multi-Modal
Ped. Accommodation
Bike Accommodation
Transit Access
I-91
Dam
onRd
Rt9
Norw
ottuck
Rail
Trail
Legend
Bicycle Path of TravelPedestrian Path of Travel
C
C
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
19/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13
Environmental Impacts
Noise
Wetlands
Flood Plain
Rare Species
Open SpaceAir Quality
Light
Norw
ottuckR
ailTrail
Norw
ottuck
Rail
Trail
Cli k di M
C 13AD
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
20/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13A
Concept 13A Inter. &
Ramp Improvements w/
Roundabout
Adds additional WB left turnonto SB on-ramp
Converts Damon Road/Route9 intersection to a roundabout
Left turn lane extended underbridge by relocating sidewalk
or replacing the structuresImproves on and off-ramps
Does not provide a fullaccess interchange
I-91
Dam
onRd
Rt9
Norw
ottuck
Rail
Trail
Cli k t dit M t
C t 13AD
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
21/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13A
Concept 13A Inter. &
Ramp Improvements w/
Roundabout
Adds additional WB left turnlane onto SB on-ramp
Converts Damon Road/Route9 intersection to a roundabout
Left turn lane extended underbridge by relocating sidewalk
or replacing the structuresImproves on and off-ramps
Does not provide a fullaccess interchange
I-91
Dam
onRd
Rt9
Norw
ottuck
Rail
Trail
Cli k t dit M t
C t 13ADa
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
22/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13A
Traffic
Delay
Travel Time
Queueing
Safety
Crash Rates
Emerg. Veh. Access
Traffic Calming
Construction
Costs: $2.62 M
Duration: 2 yr
Impacts During Const.
I-91
Dam
onRd
Rt9
Norw
ottuck
Rail
Trail
Cli k t dit M t
C t 13ADa
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
23/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13A
Community Impacts
Property
Recreation
Community Cohesion
Agriculture
AestheticsAirport Impacts
I-91
Dam
onRd
Rt9
Norw
ottuck
Rail
Trail
Cli k t dit M t
C t 13ADa
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
24/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13A
Multi-Modal
Ped. Accommodation
Bike Accommodation
Transit Access
I-91
amonR
d
Rt9
Norw
ottuck
Rail
Trail
Legend
Bicycle Path of TravelPedestrian Path of Travel
Cli k t dit M t
C t 13A
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
25/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13A
Environmental Impacts
Noise
Wetlands
Flood Plain
Rare Species
Open SpaceAir Quality
Light
Norw
ottuckR
ailTrail
Norw
ottuck
Rail
Trail
Cli k t dit M t
C t 13BDa
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
26/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13B
Concept 13B Inter. &
Ramp Improvements w/
Double Roundabout
Converts Damon Road/Route9 & Route 9/SB On-Ramp
intersection to roundaboutsBypass lane used for WBRoute 9 traffic at westernroundabout
Improves on and off-rampsDoes not provide a fullaccess interchange
I-91
amonR
d
Rt9
Norw
ottuck
Rail
Trail
Cli k t dit M t
C t 13BDa
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
27/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13B
Concept 13B Inter. &
Ramp Improvements w/
Double Roundabout
Converts Damon Road/Route9 & Route 9/SB On-Ramp
intersections to roundaboutsBypass lane used for WBRoute 9 traffic at westernroundabout
Improves on and off-rampsDoes not provide a fullaccess interchange
I-91
amonR
d
Rt9
Norw
ottuck
Rail
Trail
Click to edit Master
Concept 13BDam
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
28/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13B
Traffic
Delay
Travel Time
Queueing
Safety
Crash Rates
Emerg. Veh. Access
Traffic Calming
Construction
Costs $2.64 M
Duration: 2 yr
Impacts During Const.
I-91
amonR
d
Rt9
Norw
ottuck
Rail
Trail
Click to edit Master
Concept 13BDaml
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
29/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13B
Community Impacts
Property
Recreation
Community Cohesion
Agriculture
AestheticsAirport Impacts
I-91
amonR
d
Rt9
Norw
ottuck
Rail
Trail
Click to edit Master
Concept 13BDaml
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
30/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13B
Multi-Modal
Ped. Accommodation
Bike Accommodation
Transit Access
I-91
amonR
d
Rt9
Norw
ottuck
Rail
Trail
Legend
Bicycle Path of TravelPedestrian Path of Travel
Click to edit Master
Concept 13B
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
31/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13B
Environmental Impacts
Noise
Wetlands
Flood Plain
Rare Species
Open SpaceAir Quality
Light
Norw
ottuckR
ailTrail
Norw
ottuck
Rail
Trail
Click to edit Master
Concept 13CDam
il
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
32/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13C
Concept 13C Inter. &
Ramp Improvements w/
Roundabout & Relocated
Damon Road
Converts Damon Road/Route
9 intersection to a roundabout
Shifts Damon Road eastwardonto old alignment (betterspacing between
intersections)Left turn lane extended underbridge by relocating sidewalkor replacing the structures
Improves on and off-ramps
Does not provide a fullaccess interchange
I-91
amonR
d
Rt9
Norw
ottuck
Rail
Trail
Click to edit Master
Concept 13CDam
il
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
33/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13C
Concept 13C Inter. &
Ramp Improvements w/
Roundabout & Relocated
Damon Road
Converts Damon Road/Route
9 intersection to a roundabout
Shifts Damon Road eastwardonto old alignment (betterspacing between
intersections)Left turn lane extended underbridge by relocating sidewalkor replacing the structures
Improves on and off-ramps
Does not provide a fullaccess interchange
I-91
amonRd
Rt9
Norw
ottuck
Rail
Trail
Click to edit Master
Concept 13C ilDam
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
34/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13C
Traffic
Delay:
Travel Time:
Queueing
SafetyCrash Rates
Emerg. Veh. Access
Traffic Calming
Construction
Costs $2.99 M
Duration: 2 yr
Impacts During Const.
I-91
Rt9
Norw
ottuck
Rail
Trail
monRd
Click to edit Master
Concept 13C ilDamo
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
35/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13C
Community Impacts
Property
Recreation
Community Cohesion
Agriculture
AestheticsAirport Impacts
I-91
Rt9
Norw
ottuck
Rail
Trail
monRd
Click to edit Master
Concept 13C ilDamo
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
36/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13C
Multi-Modal
Ped. AccommodationBike Accommodation
Transit Access
I-91
Rt9
Norw
ottuck
Rail
Trail
Legend
Bicycle Path of TravelPedestrian Path of Travel
monRd
Click to edit Master
Concept 13C
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
37/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 13C
Environmental Impacts
NoiseWetlands
Flood Plain
Rare Species
Open SpaceAir Quality
Light
Norw
ottuckR
ailTrail
Norw
ottuck
Rail
Trail
Click to edit Master
Concept 15
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
38/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 15
Concept 15 Full Access
InterchangePreferred concept fromprevious studySB Off-Ramp constructedas loop ramp
SB On-Ramp relocatedwesterlyNB Off-Ramp converted toright turn onlySecond NB Off-Rampconnects directly to DamonRoad (for Damon Road &WB Route 9 movements)NB On-Ramp constructedoff of Damon RoadDamon Road raised by
approximately 5 toaccommodate rampsProvides full accessinterchange for allmovements
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Click to edit Master
Concept 15
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
39/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 15
Concept 15 Full Access
InterchangePreferred concept fromprevious studySB Off-Ramp constructedas loop ramp
SB On-Ramp relocatedwesterlyNB Off-Ramp converted toright turn onlySecond NB Off-Rampconnects directly to DamonRoad (for Damon Road &WB Route 9 movements)NB On-Ramp constructedoff of Damon RoadDamon Road raised by
approximately 5 toaccommodate rampsProvides full accessinterchange for allmovements
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Click to edit Master
Concept 15
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
40/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 15
Traffic
Delay:Travel Time:
Queueing
SafetyCrash Rates
Emerg. Veh. Access
Traffic Calming
Construction
Costs $16.50 M
Duration: 3 yr
Impacts During Const.
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Click to edit Master
Concept 15
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
41/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 15
Community Impacts
PropertyRecreation
Community Cohesion
Agriculture
AestheticsAirport Impacts
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Click to edit Master
Concept 15
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
42/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth level
Fifth level
I-91 Interchange 19May 10, 2010
Concept 15
Multi-Modal
Ped. AccommodationBike Accommodation
Transit Access
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Legend
Bicycle Path of TravelPedestrian Path of Travel
Click to edit Master
Concept 15
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
43/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
Concept 15
Environmental Impacts
NoiseWetlands
Flood Plain
Rare Species
Open SpaceAir Quality
Light
Norw
ottuck
RailT
rail
Norw
ottuck
Rail
Trail
Click to edit Master
Concept 15A
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
44/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
Concept 15A
Concept 15A - Full
Access InterchangeSB Off-Ramp constructed asloop ramp
SB On-Ramp relocated
westerlyAdditional through lane addedto NB Off-Ramp
Eliminates 2nd NB Off-Rampfrom C15
NB On-Ramp constructed offof Damon Road
Provides full accessinterchange for all
movementsSignificant property impacts
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Click to edit Master
Concept 15A
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
45/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
Concept 15A
Concept 15A - Full
Access InterchangeSB Off-Ramp constructed asloop ramp
SB On-Ramp relocated
westerlyAdditional through lane addedto NB Off-Ramp
Eliminates 2nd NB Off-Rampfrom C15
NB On-Ramp constructed offof Damon Road
Provides full accessinterchange for all
movementsSignificant property impacts
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Click to edit Master
Concept 15A
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
46/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
Concept 15A
Traffic
Delay:Travel Time:
Queueing
SafetyCrash Rates
Emerg. Veh. Access
Traffic Calming
Construction
Costs $12.80 M
Duration: 3 yr
Impacts During Const.
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Click to edit Master
Concept 15A
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
47/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title style
Click to edit Mastertext styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
Concept 15A
Community Impacts
PropertyRecreation
Community Cohesion
Agriculture
AestheticsAirport Impacts
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Click to edit Master
Concept 15A
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
48/79
I-91 Interchange 19May 10, 2010
Click to edit Master
title styleClick to edit Master
text styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
Concept 15A
Multi-Modal
Ped. AccommodationBike Accommodation
Transit Access
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Legend
Bicycle Path of TravelPedestrian Path of Travel
Click to edit Master
Concept 15A
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
49/79
I-91 Interchange 19May 10, 2010
C c o ed as e
title styleClick to edit Master
text styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
Co cep 5
Environmental Impacts
NoiseWetlands
Flood Plain
Rare Species
Open SpaceAir Quality
Light
Norw
ottuck
RailT
rail
Norw
ottuck
Rail
Trail
Click to edit Master
Concept 16
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
50/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
p
Concept 16 Single
FlyoverFlyover ramp constructedfrom WB Route 9 to SB On-Ramp
Improves operations byremoving large portion of leftturning traffic from Route 9
All other elements generallyunchanged
Flyover would haveundesirable horizontal andvertical alignments
Flyover would be on 3rd
level of interchange
Does not provide full accessinterchange
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Click to edit Master
Concept 16
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
51/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
p
Concept 16 Single
FlyoverFlyover ramp constructedfrom WB Route 9 to SB On-Ramp
Improves operations byremoving large portion of leftturning traffic from Route 9
All other elements generallyunchanged
Flyover would haveundesirable horizontal andvertical alignments
Flyover would be on 3rd
level of interchange
Does not provide full accessinterchange
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Click to edit Master
Concept 16
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
52/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
p
Traffic
Delay:Travel Time:
Queueing
SafetyCrash Rates
Emerg. Veh. Access
Traffic Calming
Construction
Costs $23.60 M
Duration: 2 yr
Impacts During Const.
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Click to edit Master
Concept 16
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
53/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
p
Community Impacts
PropertyRecreation
Community Cohesion
Agriculture
AestheticsAirport Impacts
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Click to edit Master
Concept 16
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
54/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
p
Multi-Modal
Ped. AccommodationBike Accommodation
Transit Access
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Legend
Bicycle Path of TravelPedestrian Path of Travel
Click to edit Master
Concept 16
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
55/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
p
Environmental Impacts
NoiseWetlands
Flood Plain
Rare Species
Open SpaceAir Quality
Light
Norw
ottuck
RailT
rail
Norw
ottuck
Rail
Trail
Click to edit Master
Concept 17
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
56/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
p
Concept 17 Double
FlyoverFlyover ramp constructedfrom WB Route 9 to SB On-Ramp
Improves operations byremoving large portion of leftturning traffic from Route 9
2nd Flyover from WB Route 9to NB I-91
All other elements generallyunchanged
Flyover would haveundesirable horizontal andvertical alignments
Flyover would be on 3rdlevel of interchange
Does not provide full accessinterchange
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Click to edit Master
Concept 17
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
57/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
Concept 17 Double
FlyoverFlyover ramp constructedfrom WB Route 9 to SB On-Ramp
Improves operations byremoving large portion of leftturning traffic from Route 9
2nd Flyover from WB Route 9to NB I-91
All other elements generallyunchanged
Flyover would haveundesirable horizontal andvertical alignments
Flyover would be on 3rdlevel of interchange
Does not provide full accessinterchange
I-91
Rt9
DamonRd
Norw
ottuckRa
ilTrail
Click to edit Master
Concept 17
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
58/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
Traffic
Delay:Travel Time:
Queueing
SafetyCrash Rates
Emerg. Veh. Access
Traffic Calming
Construction
Costs $38.00 M
Duration: 3 yr
Impacts During Const.
I-91
Rt9
DamonRd
Norw
ottuckR
ailTrail
Click to edit Master
Concept 17
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
59/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third levelFourth levelFifth level
I-91 Interchange 19May 10, 2010
Community Impacts
PropertyRecreation
Community Cohesion
Agriculture
AestheticsAirport Impacts
I-91
Rt9
DamonRd
Norw
ottuckR
ailTrail
Click to edit Master
Concept 17
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
60/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third level
Fourth levelFifth level
I-91 Interchange 19May 10, 2010
Multi-Modal
Ped. AccommodationBike Accommodation
Transit Access
I-91
Rt9
DamonRd
Norw
ottuckR
ailTrail
Legend
Bicycle Path of TravelPedestrian Path of Travel
Click to edit Master
Concept 17
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
61/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third level
Fourth levelFifth level
I-91 Interchange 19May 10, 2010
Environmental Impacts
NoiseWetlands
Flood Plain
Rare Species
Open SpaceAir Quality
Light
Norw
ottuck
Rail
Trail
Norw
ottuck
Rail
Trail
Click to edit Master
Concept 18
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
62/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third level
Fourth levelFifth level
I-91 Interchange 19May 10, 2010
Concept 18
Compressed DiamondI-91 SB shifted to median
New SB off-ramp constructedon portion of existing I-91 SB
roadway footprintSB on-ramp shifted easterly
NB on-ramp constructed offof Damon Road (similar toConcept 15)
Requires at least 3 newbridges on I-91
Provides full accessinterchange
Special treatment required forDamon Road accepting lanes
I-91
Rt9
DamonRd
Norw
ottuckR
ailTrail
Click to edit Master
Concept 18
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
63/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third level
Fourth levelFifth level
I-91 Interchange 19May 10, 2010
Concept 18
Compressed DiamondI-91 SB shifted to median
New SB off-ramp constructedon portion of existing I-91 SB
roadway footprintSB on-ramp shifted easterly
NB on-ramp constructed offof Damon Road (similar toConcept 15)
Requires at least 3 newbridges on I-91
Provides full accessinterchange
Special treatment required forDamon Road accepting lanes
I-91
Rt9
DamonRd
Norw
ottuckR
ailTrail
Click to edit Master
Concept 18
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
64/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third level
Fourth levelFifth level
I-91 Interchange 19May 10, 2010
Traffic
Delay:Travel Time:
Queueing
SafetyCrash Rates
Emerg. Veh. Access
Traffic Calming
Construction
Costs $35.00 M
Duration: 4 yr
Impacts During Const.
I-91
Rt9
DamonRd
Norw
ottuckR
ailTrail
Click to edit Master
Concept 18
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
65/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third level
Fourth levelFifth level
I-91 Interchange 19May 10, 2010
Community Impacts
PropertyRecreation
Community Cohesion
Agriculture
AestheticsAirport Impacts
I-91
Rt9
DamonRd
Norw
ottuckR
ailTrail
Click to edit Master
Concept 18D
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
66/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third level
Fourth levelFifth level
I-91 Interchange 19May 10, 2010
Multi-Modal
Ped. AccommodationBike Accommodation
Transit Access
I-91
Rt9
DamonRd
Norw
ottuckR
ailTrail
Legend
Bicycle Path of TravelPedestrian Path of Travel
Click to edit Master
Concept 18
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
67/79
I-91 Interchange 19May 10, 2010
title styleClick to edit Master
text styles
Second level
Third level
Fourth levelFifth level
I-91 Interchange 19May 10, 2010
Environmental Impacts
NoiseWetlands
Flood Plain
Rare Species
Open SpaceAir Quality
Light
Norw
ottuck
Rail
Trail
Norw
ottuck
Rail
Trail
Transit and TDM Recommended ConceptsTransit and TDM Recommended Concepts
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
68/79
I-91 Interchange 19May 10, 2010
Transit and TDM Recommended ConceptsTransit and TDM Recommended Concepts
Goal: divert vehicle trips that would otherwise go throughthe Route 9, Damon Rd, and Interchange 19 intersection.
TDM projects identified in Connecticut River Crossing Study
(2004)
Update to reflect projects implemented or planned since
then.Taking into account:
License plate survey
Intersection delay dataAvailable transit, bicycle, and pedestrian data
Transit and TDM Concepts-Route 9 Express BusTransit and TDM Concepts-Route 9 Express Bus
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
69/79
I-91 Interchange 19May 10, 2010
Transit and TDM Concepts Route 9 Express Busp p
M40 - Route 9 Express
1. Afternoon service is overcrowded. Increasing frequency fromevery 30 minutes to every 20 minutes is warranted.
2. Sheldon Field lot is not yet at capacity.
3. Extending service to V.A. Hospital in Leeds would not attractridership while Sheldon Field lot has space available, especially
since all-day service would not be available at the new P&R.
4. Alternate route via Bridge Road-Damon Road would not savemuch travel time and would bypass major ridership generators.
Transit and TDM Concepts-Route 9 Local BusTransit and TDM Concepts-Route 9 Local Bus
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
70/79
I-91 Interchange 19May 10, 2010
a s t a d Co cepts oute 9 oca usp
B43 Route 9 Local Bus
1. Reduce headway between trips to reduce crowding and improveservice:
20 minutes to 10 minutes 6 am to 5 pm
30 minutes to 15 minutes 5 pm to 8 pm
45 minutes to 20 minutes 8 pm to end of service
2. Extension west to serve Cooley Dickinson Hospital Not recommended because there is not much demand from employees
and other potential riders in Hadley & Amherst
Other riders already served by route R42 (frequency could be improvedto hourly)
Transit and TDM Concepts-Transit Signal Priority (TSP)Transit and TDM Concepts-Transit Signal Priority (TSP)
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
71/79
I-91 Interchange 19May 10, 2010
p g y ( )p g y ( )
Implement TSP
Every intersection on Rt 9 from Rts 5 & 10 in Northampton toUniversity Drive in Amherst
Assume aggressive TSP reduces average bus delay to 5seconds per signal
Do not implement TSP
Prospect St to New South St/ State St, Northampton
Closely spaced signals are coordinated.
Time SavingsBus routes B43 and M40: 5 min
Bus route 39: 2 min (turns at Bay Road)
Transit and TDM Concepts-Supporting ImprovementsTransit and TDM Concepts-Supporting Improvements
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
72/79
I-91 Interchange 19May 10, 2010
p pp g pp pp g p
Enhanced bus shelter program
Next bus information accessible via cell phone
Improved bus service planning and operations control usingcomputer-collected travel time data and passenger counts
Expand Universal Pass program to employers
Other improvements already plannedAutomated stop announcements
Automated fare collection
Articulated bus grant application
Transit and TDM Concepts-Supporting ImprovementsTransit and TDM Concepts-Supporting Improvements
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
73/79
I-91 Interchange 19May 10, 2010
p pp g pp pp g p
Winter maintenance of Norwottuck Rail Trail
To improve bicycle access to businesses, add signal, Rt 9 at
West St, Hadley, to permit movement from Norwottuck Trail
to south side of West St and Route 9
To improve bicycle access to Hampshire Mall, reconfigure
South Maple St, Norwottuck Trail to Rt 9, from 4 to 3 lanes (1wide in each direction plus center left turn).
Evaluation MatrixEvaluation Matrix
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
74/79
I-91 Interchange 19May 10, 2010
Evaluation MatrixEvaluation Matrix
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
75/79
I-91 Interchange 19May 10, 2010
Evaluation MatrixEvaluation Matrix
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
76/79
I-91 Interchange 19May 10, 2010
Evaluation MatrixEvaluation Matrix
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
77/79
I-91 Interchange 19May 10, 2010
Next StepsNext Steps
-
8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements
78/79
I-91 Interchange 19May 10, 2010
p
Hold Public Informational Meeting
Narrow Down List of Alternatives
Identify Preferred AlternativeHold Public Informational Meeting
Comments & QuestionsComments & Questions
-