10-5-10 project advisory commitee i-91 exit 19 improvements

Upload: owenfd

Post on 07-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    1/79

    I-91 Interchange 19 ImprovementsNorthampton, MAI-91 Interchange 19 ImprovementsNorthampton, MA

    Project Advisory Committee

    Meeting 4May 10, 2010

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    2/79

    I-91 Interchange 19May 10, 2010

    Meeting AgendaMeeting Agenda

    Evaluation Criteria Discussion

    Alternatives Evaluation Discussion

    Discussion of Public Informational MeetingNext Steps

    Comments/Questions

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    3/79

    I-91 Interchange 19May 10, 2010

    Evaluation CriteriaEvaluation Criteria

    Traffic

    Delays (LOS)

    Travel Time

    Queueing

    Multi-modal

    Pedestrian Accommodation

    Bike Accommodation

    Transit Access

    Safety

    Crash Rates

    Crash Sites

    Emergency Vehicle Access

    Traffic Calming

    Community Impacts

    Property

    Recreation Impacts/Access

    Community Cohesion

    AgriculturalAesthetics

    Airport Impacts

    Environmental Impacts

    Noise Wetland (SF)

    Flood Plain

    Rare Species

    Open Space

    Air Quality

    LightConstruction

    Costs

    Duration (Years)

    Impacts during Construction

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    4/79

    I-91 Interchange 19May 10, 2010

    Evaluation CriteriaEvaluation Criteria

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    5/79

    I-91 Interchange 19May 10, 2010

    Evaluation of AlternativesEvaluation of Alternatives

    Alternatives Evaluated:

    No Build

    10 Roadway AlternativesTransportation Demand Management (TDM) Package

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    6/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    No Build

    I-91

    Dam

    onRd

    Rt9

    Traffic

    Delay

    Travel Time

    Queueing

    Safety

    Crash Rates

    Emerg. Veh. Access

    Traffic Calming

    Construction

    Costs: N/A

    Duration: N/A

    Impacts During Const.

    Norw

    ottuck

    Rail

    Trail

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    7/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    No Build

    I-91

    Dam

    onRd

    Rt9

    Community Impacts

    PropertyRecreation

    Community Cohesion

    Agriculture

    AestheticsAirport Impacts

    Multi-Modal

    Ped. Accommodation

    Bike AccommodationTransit Access

    Environmental Impacts

    Noise

    WetlandsFlood Plain

    Rare Species

    Open Space

    Air Quality

    Light

    Norw

    ottuck

    Rail

    Trail

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    8/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 12

    Concept 12 - Roundabout

    Converts Route 9/Damon Rd.Intersection to a 2 LaneRoundabout

    Generally stays within

    existing roadway layoutIntroduces a degree of trafficcalming

    Needs to be carefullydesigned to make sure it iscompatible with Bicycles andPedestrians

    I-91

    Dam

    onRd

    Rt9

    Norw

    ottuck

    Rail

    Trail

    D

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    9/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 12

    Concept 12 - Roundabout

    Converts Route 9/Damon Rd.Intersection to a 2 LaneRoundabout

    Generally stays within

    existing roadway layoutIntroduces a degree of trafficcalming

    Needs to be carefullydesigned to make sure it iscompatible with Bicycles andPedestrians

    I-91

    Dam

    onRd

    Rt9

    Norw

    ottuck

    Rail

    Trail

    D

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    10/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 12

    Traffic

    Delay

    Travel Time

    Queueing

    Safety

    Crash Rates

    Emerg. Veh. Access

    Traffic Calming

    Construction

    Costs: $1.10M

    Duration: 1 yrs

    Impacts During Const.

    I-91

    Dam

    onRd

    Rt9

    Norw

    ottuck

    Rail

    Trail

    D

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    11/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 12

    I-91

    Dam

    onRd

    Rt9

    Community Impacts

    Property

    Recreation

    Community Cohesion

    Agriculture

    Aesthetics

    Airport Impacts

    Norw

    ottuck

    Rail

    Trail

    D

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    12/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    I-91

    Dam

    onRd

    Rt9

    Concept 12

    Multi-Modal

    Ped. Accommodation

    Bike Accommodation

    Transit Access

    Norw

    ottuck

    Rail

    Trail

    Legend

    Bicycle Path of TravelPedestrian Path of Travel

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    13/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 12

    Environmental Impacts

    Noise

    Wetlands

    Flood Plain

    Rare Species

    Open Space

    Air Quality

    Light

    Norw

    ottuckR

    ailTrail

    Norw

    ottuck

    Rail

    Trail

    D

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    14/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13

    Concept 13 Intersection

    & Ramp Improvements

    Modified to add additional WBleft turn onto SB on-ramp

    Modified to add additional NB

    through lane to Damon Roadfrom NB off-ramp

    Left turn lane extended underbridge by relocating sidewalkor replacing the structures

    Improves on and off-ramps

    Does not provide a fullaccess interchange

    I-91

    Dam

    onRd

    Rt9

    Norw

    ottuck

    Rail

    Trail

    D

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    15/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13

    Concept 13 Intersection

    & Ramp Improvements

    Modified to add additional WBleft turn lane onto SB on-ramp

    Modified to add additional NB

    through lane to Damon Roadfrom NB off-ramp

    Left turn lane extended underbridge by relocating sidewalkor replacing the structures

    Improves on and off-ramps

    Does not provide a fullaccess interchange

    I-91

    Dam

    onRd

    Rt9

    Norw

    ottuck

    Rail

    Trail

    D

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    16/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13

    Traffic

    Delay

    Travel Time

    Queueing

    Safety

    Crash Rates

    Emerg. Veh. Access

    Traffic Calming

    Construction

    Costs: $2.60M

    Duration: 1 yr

    Impacts During Const.

    I-91

    Dam

    onRd

    Rt9

    Norw

    ottuck

    Rail

    Trail

    D

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    17/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13

    Community Impacts

    Property

    Recreation

    Community Cohesion

    Agriculture

    AestheticsAirport Impacts

    I-91

    Dam

    onRd

    Rt9

    Norw

    ottuck

    Rail

    Trail

    D

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    18/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13

    Multi-Modal

    Ped. Accommodation

    Bike Accommodation

    Transit Access

    I-91

    Dam

    onRd

    Rt9

    Norw

    ottuck

    Rail

    Trail

    Legend

    Bicycle Path of TravelPedestrian Path of Travel

    C

    C

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    19/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13

    Environmental Impacts

    Noise

    Wetlands

    Flood Plain

    Rare Species

    Open SpaceAir Quality

    Light

    Norw

    ottuckR

    ailTrail

    Norw

    ottuck

    Rail

    Trail

    Cli k di M

    C 13AD

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    20/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13A

    Concept 13A Inter. &

    Ramp Improvements w/

    Roundabout

    Adds additional WB left turnonto SB on-ramp

    Converts Damon Road/Route9 intersection to a roundabout

    Left turn lane extended underbridge by relocating sidewalk

    or replacing the structuresImproves on and off-ramps

    Does not provide a fullaccess interchange

    I-91

    Dam

    onRd

    Rt9

    Norw

    ottuck

    Rail

    Trail

    Cli k t dit M t

    C t 13AD

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    21/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13A

    Concept 13A Inter. &

    Ramp Improvements w/

    Roundabout

    Adds additional WB left turnlane onto SB on-ramp

    Converts Damon Road/Route9 intersection to a roundabout

    Left turn lane extended underbridge by relocating sidewalk

    or replacing the structuresImproves on and off-ramps

    Does not provide a fullaccess interchange

    I-91

    Dam

    onRd

    Rt9

    Norw

    ottuck

    Rail

    Trail

    Cli k t dit M t

    C t 13ADa

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    22/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13A

    Traffic

    Delay

    Travel Time

    Queueing

    Safety

    Crash Rates

    Emerg. Veh. Access

    Traffic Calming

    Construction

    Costs: $2.62 M

    Duration: 2 yr

    Impacts During Const.

    I-91

    Dam

    onRd

    Rt9

    Norw

    ottuck

    Rail

    Trail

    Cli k t dit M t

    C t 13ADa

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    23/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13A

    Community Impacts

    Property

    Recreation

    Community Cohesion

    Agriculture

    AestheticsAirport Impacts

    I-91

    Dam

    onRd

    Rt9

    Norw

    ottuck

    Rail

    Trail

    Cli k t dit M t

    C t 13ADa

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    24/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13A

    Multi-Modal

    Ped. Accommodation

    Bike Accommodation

    Transit Access

    I-91

    amonR

    d

    Rt9

    Norw

    ottuck

    Rail

    Trail

    Legend

    Bicycle Path of TravelPedestrian Path of Travel

    Cli k t dit M t

    C t 13A

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    25/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13A

    Environmental Impacts

    Noise

    Wetlands

    Flood Plain

    Rare Species

    Open SpaceAir Quality

    Light

    Norw

    ottuckR

    ailTrail

    Norw

    ottuck

    Rail

    Trail

    Cli k t dit M t

    C t 13BDa

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    26/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13B

    Concept 13B Inter. &

    Ramp Improvements w/

    Double Roundabout

    Converts Damon Road/Route9 & Route 9/SB On-Ramp

    intersection to roundaboutsBypass lane used for WBRoute 9 traffic at westernroundabout

    Improves on and off-rampsDoes not provide a fullaccess interchange

    I-91

    amonR

    d

    Rt9

    Norw

    ottuck

    Rail

    Trail

    Cli k t dit M t

    C t 13BDa

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    27/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13B

    Concept 13B Inter. &

    Ramp Improvements w/

    Double Roundabout

    Converts Damon Road/Route9 & Route 9/SB On-Ramp

    intersections to roundaboutsBypass lane used for WBRoute 9 traffic at westernroundabout

    Improves on and off-rampsDoes not provide a fullaccess interchange

    I-91

    amonR

    d

    Rt9

    Norw

    ottuck

    Rail

    Trail

    Click to edit Master

    Concept 13BDam

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    28/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13B

    Traffic

    Delay

    Travel Time

    Queueing

    Safety

    Crash Rates

    Emerg. Veh. Access

    Traffic Calming

    Construction

    Costs $2.64 M

    Duration: 2 yr

    Impacts During Const.

    I-91

    amonR

    d

    Rt9

    Norw

    ottuck

    Rail

    Trail

    Click to edit Master

    Concept 13BDaml

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    29/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13B

    Community Impacts

    Property

    Recreation

    Community Cohesion

    Agriculture

    AestheticsAirport Impacts

    I-91

    amonR

    d

    Rt9

    Norw

    ottuck

    Rail

    Trail

    Click to edit Master

    Concept 13BDaml

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    30/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13B

    Multi-Modal

    Ped. Accommodation

    Bike Accommodation

    Transit Access

    I-91

    amonR

    d

    Rt9

    Norw

    ottuck

    Rail

    Trail

    Legend

    Bicycle Path of TravelPedestrian Path of Travel

    Click to edit Master

    Concept 13B

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    31/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13B

    Environmental Impacts

    Noise

    Wetlands

    Flood Plain

    Rare Species

    Open SpaceAir Quality

    Light

    Norw

    ottuckR

    ailTrail

    Norw

    ottuck

    Rail

    Trail

    Click to edit Master

    Concept 13CDam

    il

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    32/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13C

    Concept 13C Inter. &

    Ramp Improvements w/

    Roundabout & Relocated

    Damon Road

    Converts Damon Road/Route

    9 intersection to a roundabout

    Shifts Damon Road eastwardonto old alignment (betterspacing between

    intersections)Left turn lane extended underbridge by relocating sidewalkor replacing the structures

    Improves on and off-ramps

    Does not provide a fullaccess interchange

    I-91

    amonR

    d

    Rt9

    Norw

    ottuck

    Rail

    Trail

    Click to edit Master

    Concept 13CDam

    il

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    33/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13C

    Concept 13C Inter. &

    Ramp Improvements w/

    Roundabout & Relocated

    Damon Road

    Converts Damon Road/Route

    9 intersection to a roundabout

    Shifts Damon Road eastwardonto old alignment (betterspacing between

    intersections)Left turn lane extended underbridge by relocating sidewalkor replacing the structures

    Improves on and off-ramps

    Does not provide a fullaccess interchange

    I-91

    amonRd

    Rt9

    Norw

    ottuck

    Rail

    Trail

    Click to edit Master

    Concept 13C ilDam

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    34/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13C

    Traffic

    Delay:

    Travel Time:

    Queueing

    SafetyCrash Rates

    Emerg. Veh. Access

    Traffic Calming

    Construction

    Costs $2.99 M

    Duration: 2 yr

    Impacts During Const.

    I-91

    Rt9

    Norw

    ottuck

    Rail

    Trail

    monRd

    Click to edit Master

    Concept 13C ilDamo

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    35/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13C

    Community Impacts

    Property

    Recreation

    Community Cohesion

    Agriculture

    AestheticsAirport Impacts

    I-91

    Rt9

    Norw

    ottuck

    Rail

    Trail

    monRd

    Click to edit Master

    Concept 13C ilDamo

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    36/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13C

    Multi-Modal

    Ped. AccommodationBike Accommodation

    Transit Access

    I-91

    Rt9

    Norw

    ottuck

    Rail

    Trail

    Legend

    Bicycle Path of TravelPedestrian Path of Travel

    monRd

    Click to edit Master

    Concept 13C

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    37/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 13C

    Environmental Impacts

    NoiseWetlands

    Flood Plain

    Rare Species

    Open SpaceAir Quality

    Light

    Norw

    ottuckR

    ailTrail

    Norw

    ottuck

    Rail

    Trail

    Click to edit Master

    Concept 15

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    38/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 15

    Concept 15 Full Access

    InterchangePreferred concept fromprevious studySB Off-Ramp constructedas loop ramp

    SB On-Ramp relocatedwesterlyNB Off-Ramp converted toright turn onlySecond NB Off-Rampconnects directly to DamonRoad (for Damon Road &WB Route 9 movements)NB On-Ramp constructedoff of Damon RoadDamon Road raised by

    approximately 5 toaccommodate rampsProvides full accessinterchange for allmovements

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Click to edit Master

    Concept 15

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    39/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 15

    Concept 15 Full Access

    InterchangePreferred concept fromprevious studySB Off-Ramp constructedas loop ramp

    SB On-Ramp relocatedwesterlyNB Off-Ramp converted toright turn onlySecond NB Off-Rampconnects directly to DamonRoad (for Damon Road &WB Route 9 movements)NB On-Ramp constructedoff of Damon RoadDamon Road raised by

    approximately 5 toaccommodate rampsProvides full accessinterchange for allmovements

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Click to edit Master

    Concept 15

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    40/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 15

    Traffic

    Delay:Travel Time:

    Queueing

    SafetyCrash Rates

    Emerg. Veh. Access

    Traffic Calming

    Construction

    Costs $16.50 M

    Duration: 3 yr

    Impacts During Const.

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Click to edit Master

    Concept 15

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    41/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 15

    Community Impacts

    PropertyRecreation

    Community Cohesion

    Agriculture

    AestheticsAirport Impacts

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Click to edit Master

    Concept 15

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    42/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth level

    Fifth level

    I-91 Interchange 19May 10, 2010

    Concept 15

    Multi-Modal

    Ped. AccommodationBike Accommodation

    Transit Access

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Legend

    Bicycle Path of TravelPedestrian Path of Travel

    Click to edit Master

    Concept 15

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    43/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Concept 15

    Environmental Impacts

    NoiseWetlands

    Flood Plain

    Rare Species

    Open SpaceAir Quality

    Light

    Norw

    ottuck

    RailT

    rail

    Norw

    ottuck

    Rail

    Trail

    Click to edit Master

    Concept 15A

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    44/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Concept 15A

    Concept 15A - Full

    Access InterchangeSB Off-Ramp constructed asloop ramp

    SB On-Ramp relocated

    westerlyAdditional through lane addedto NB Off-Ramp

    Eliminates 2nd NB Off-Rampfrom C15

    NB On-Ramp constructed offof Damon Road

    Provides full accessinterchange for all

    movementsSignificant property impacts

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Click to edit Master

    Concept 15A

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    45/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Concept 15A

    Concept 15A - Full

    Access InterchangeSB Off-Ramp constructed asloop ramp

    SB On-Ramp relocated

    westerlyAdditional through lane addedto NB Off-Ramp

    Eliminates 2nd NB Off-Rampfrom C15

    NB On-Ramp constructed offof Damon Road

    Provides full accessinterchange for all

    movementsSignificant property impacts

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Click to edit Master

    Concept 15A

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    46/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Concept 15A

    Traffic

    Delay:Travel Time:

    Queueing

    SafetyCrash Rates

    Emerg. Veh. Access

    Traffic Calming

    Construction

    Costs $12.80 M

    Duration: 3 yr

    Impacts During Const.

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Click to edit Master

    Concept 15A

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    47/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title style

    Click to edit Mastertext styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Concept 15A

    Community Impacts

    PropertyRecreation

    Community Cohesion

    Agriculture

    AestheticsAirport Impacts

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Click to edit Master

    Concept 15A

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    48/79

    I-91 Interchange 19May 10, 2010

    Click to edit Master

    title styleClick to edit Master

    text styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Concept 15A

    Multi-Modal

    Ped. AccommodationBike Accommodation

    Transit Access

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Legend

    Bicycle Path of TravelPedestrian Path of Travel

    Click to edit Master

    Concept 15A

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    49/79

    I-91 Interchange 19May 10, 2010

    C c o ed as e

    title styleClick to edit Master

    text styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Co cep 5

    Environmental Impacts

    NoiseWetlands

    Flood Plain

    Rare Species

    Open SpaceAir Quality

    Light

    Norw

    ottuck

    RailT

    rail

    Norw

    ottuck

    Rail

    Trail

    Click to edit Master

    Concept 16

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    50/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    p

    Concept 16 Single

    FlyoverFlyover ramp constructedfrom WB Route 9 to SB On-Ramp

    Improves operations byremoving large portion of leftturning traffic from Route 9

    All other elements generallyunchanged

    Flyover would haveundesirable horizontal andvertical alignments

    Flyover would be on 3rd

    level of interchange

    Does not provide full accessinterchange

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Click to edit Master

    Concept 16

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    51/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    p

    Concept 16 Single

    FlyoverFlyover ramp constructedfrom WB Route 9 to SB On-Ramp

    Improves operations byremoving large portion of leftturning traffic from Route 9

    All other elements generallyunchanged

    Flyover would haveundesirable horizontal andvertical alignments

    Flyover would be on 3rd

    level of interchange

    Does not provide full accessinterchange

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Click to edit Master

    Concept 16

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    52/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    p

    Traffic

    Delay:Travel Time:

    Queueing

    SafetyCrash Rates

    Emerg. Veh. Access

    Traffic Calming

    Construction

    Costs $23.60 M

    Duration: 2 yr

    Impacts During Const.

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Click to edit Master

    Concept 16

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    53/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    p

    Community Impacts

    PropertyRecreation

    Community Cohesion

    Agriculture

    AestheticsAirport Impacts

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Click to edit Master

    Concept 16

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    54/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    p

    Multi-Modal

    Ped. AccommodationBike Accommodation

    Transit Access

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Legend

    Bicycle Path of TravelPedestrian Path of Travel

    Click to edit Master

    Concept 16

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    55/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    p

    Environmental Impacts

    NoiseWetlands

    Flood Plain

    Rare Species

    Open SpaceAir Quality

    Light

    Norw

    ottuck

    RailT

    rail

    Norw

    ottuck

    Rail

    Trail

    Click to edit Master

    Concept 17

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    56/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    p

    Concept 17 Double

    FlyoverFlyover ramp constructedfrom WB Route 9 to SB On-Ramp

    Improves operations byremoving large portion of leftturning traffic from Route 9

    2nd Flyover from WB Route 9to NB I-91

    All other elements generallyunchanged

    Flyover would haveundesirable horizontal andvertical alignments

    Flyover would be on 3rdlevel of interchange

    Does not provide full accessinterchange

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Click to edit Master

    Concept 17

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    57/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Concept 17 Double

    FlyoverFlyover ramp constructedfrom WB Route 9 to SB On-Ramp

    Improves operations byremoving large portion of leftturning traffic from Route 9

    2nd Flyover from WB Route 9to NB I-91

    All other elements generallyunchanged

    Flyover would haveundesirable horizontal andvertical alignments

    Flyover would be on 3rdlevel of interchange

    Does not provide full accessinterchange

    I-91

    Rt9

    DamonRd

    Norw

    ottuckRa

    ilTrail

    Click to edit Master

    Concept 17

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    58/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Traffic

    Delay:Travel Time:

    Queueing

    SafetyCrash Rates

    Emerg. Veh. Access

    Traffic Calming

    Construction

    Costs $38.00 M

    Duration: 3 yr

    Impacts During Const.

    I-91

    Rt9

    DamonRd

    Norw

    ottuckR

    ailTrail

    Click to edit Master

    Concept 17

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    59/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third levelFourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Community Impacts

    PropertyRecreation

    Community Cohesion

    Agriculture

    AestheticsAirport Impacts

    I-91

    Rt9

    DamonRd

    Norw

    ottuckR

    ailTrail

    Click to edit Master

    Concept 17

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    60/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third level

    Fourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Multi-Modal

    Ped. AccommodationBike Accommodation

    Transit Access

    I-91

    Rt9

    DamonRd

    Norw

    ottuckR

    ailTrail

    Legend

    Bicycle Path of TravelPedestrian Path of Travel

    Click to edit Master

    Concept 17

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    61/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third level

    Fourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Environmental Impacts

    NoiseWetlands

    Flood Plain

    Rare Species

    Open SpaceAir Quality

    Light

    Norw

    ottuck

    Rail

    Trail

    Norw

    ottuck

    Rail

    Trail

    Click to edit Master

    Concept 18

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    62/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third level

    Fourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Concept 18

    Compressed DiamondI-91 SB shifted to median

    New SB off-ramp constructedon portion of existing I-91 SB

    roadway footprintSB on-ramp shifted easterly

    NB on-ramp constructed offof Damon Road (similar toConcept 15)

    Requires at least 3 newbridges on I-91

    Provides full accessinterchange

    Special treatment required forDamon Road accepting lanes

    I-91

    Rt9

    DamonRd

    Norw

    ottuckR

    ailTrail

    Click to edit Master

    Concept 18

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    63/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third level

    Fourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Concept 18

    Compressed DiamondI-91 SB shifted to median

    New SB off-ramp constructedon portion of existing I-91 SB

    roadway footprintSB on-ramp shifted easterly

    NB on-ramp constructed offof Damon Road (similar toConcept 15)

    Requires at least 3 newbridges on I-91

    Provides full accessinterchange

    Special treatment required forDamon Road accepting lanes

    I-91

    Rt9

    DamonRd

    Norw

    ottuckR

    ailTrail

    Click to edit Master

    Concept 18

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    64/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third level

    Fourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Traffic

    Delay:Travel Time:

    Queueing

    SafetyCrash Rates

    Emerg. Veh. Access

    Traffic Calming

    Construction

    Costs $35.00 M

    Duration: 4 yr

    Impacts During Const.

    I-91

    Rt9

    DamonRd

    Norw

    ottuckR

    ailTrail

    Click to edit Master

    Concept 18

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    65/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third level

    Fourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Community Impacts

    PropertyRecreation

    Community Cohesion

    Agriculture

    AestheticsAirport Impacts

    I-91

    Rt9

    DamonRd

    Norw

    ottuckR

    ailTrail

    Click to edit Master

    Concept 18D

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    66/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third level

    Fourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Multi-Modal

    Ped. AccommodationBike Accommodation

    Transit Access

    I-91

    Rt9

    DamonRd

    Norw

    ottuckR

    ailTrail

    Legend

    Bicycle Path of TravelPedestrian Path of Travel

    Click to edit Master

    Concept 18

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    67/79

    I-91 Interchange 19May 10, 2010

    title styleClick to edit Master

    text styles

    Second level

    Third level

    Fourth levelFifth level

    I-91 Interchange 19May 10, 2010

    Environmental Impacts

    NoiseWetlands

    Flood Plain

    Rare Species

    Open SpaceAir Quality

    Light

    Norw

    ottuck

    Rail

    Trail

    Norw

    ottuck

    Rail

    Trail

    Transit and TDM Recommended ConceptsTransit and TDM Recommended Concepts

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    68/79

    I-91 Interchange 19May 10, 2010

    Transit and TDM Recommended ConceptsTransit and TDM Recommended Concepts

    Goal: divert vehicle trips that would otherwise go throughthe Route 9, Damon Rd, and Interchange 19 intersection.

    TDM projects identified in Connecticut River Crossing Study

    (2004)

    Update to reflect projects implemented or planned since

    then.Taking into account:

    License plate survey

    Intersection delay dataAvailable transit, bicycle, and pedestrian data

    Transit and TDM Concepts-Route 9 Express BusTransit and TDM Concepts-Route 9 Express Bus

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    69/79

    I-91 Interchange 19May 10, 2010

    Transit and TDM Concepts Route 9 Express Busp p

    M40 - Route 9 Express

    1. Afternoon service is overcrowded. Increasing frequency fromevery 30 minutes to every 20 minutes is warranted.

    2. Sheldon Field lot is not yet at capacity.

    3. Extending service to V.A. Hospital in Leeds would not attractridership while Sheldon Field lot has space available, especially

    since all-day service would not be available at the new P&R.

    4. Alternate route via Bridge Road-Damon Road would not savemuch travel time and would bypass major ridership generators.

    Transit and TDM Concepts-Route 9 Local BusTransit and TDM Concepts-Route 9 Local Bus

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    70/79

    I-91 Interchange 19May 10, 2010

    a s t a d Co cepts oute 9 oca usp

    B43 Route 9 Local Bus

    1. Reduce headway between trips to reduce crowding and improveservice:

    20 minutes to 10 minutes 6 am to 5 pm

    30 minutes to 15 minutes 5 pm to 8 pm

    45 minutes to 20 minutes 8 pm to end of service

    2. Extension west to serve Cooley Dickinson Hospital Not recommended because there is not much demand from employees

    and other potential riders in Hadley & Amherst

    Other riders already served by route R42 (frequency could be improvedto hourly)

    Transit and TDM Concepts-Transit Signal Priority (TSP)Transit and TDM Concepts-Transit Signal Priority (TSP)

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    71/79

    I-91 Interchange 19May 10, 2010

    p g y ( )p g y ( )

    Implement TSP

    Every intersection on Rt 9 from Rts 5 & 10 in Northampton toUniversity Drive in Amherst

    Assume aggressive TSP reduces average bus delay to 5seconds per signal

    Do not implement TSP

    Prospect St to New South St/ State St, Northampton

    Closely spaced signals are coordinated.

    Time SavingsBus routes B43 and M40: 5 min

    Bus route 39: 2 min (turns at Bay Road)

    Transit and TDM Concepts-Supporting ImprovementsTransit and TDM Concepts-Supporting Improvements

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    72/79

    I-91 Interchange 19May 10, 2010

    p pp g pp pp g p

    Enhanced bus shelter program

    Next bus information accessible via cell phone

    Improved bus service planning and operations control usingcomputer-collected travel time data and passenger counts

    Expand Universal Pass program to employers

    Other improvements already plannedAutomated stop announcements

    Automated fare collection

    Articulated bus grant application

    Transit and TDM Concepts-Supporting ImprovementsTransit and TDM Concepts-Supporting Improvements

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    73/79

    I-91 Interchange 19May 10, 2010

    p pp g pp pp g p

    Winter maintenance of Norwottuck Rail Trail

    To improve bicycle access to businesses, add signal, Rt 9 at

    West St, Hadley, to permit movement from Norwottuck Trail

    to south side of West St and Route 9

    To improve bicycle access to Hampshire Mall, reconfigure

    South Maple St, Norwottuck Trail to Rt 9, from 4 to 3 lanes (1wide in each direction plus center left turn).

    Evaluation MatrixEvaluation Matrix

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    74/79

    I-91 Interchange 19May 10, 2010

    Evaluation MatrixEvaluation Matrix

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    75/79

    I-91 Interchange 19May 10, 2010

    Evaluation MatrixEvaluation Matrix

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    76/79

    I-91 Interchange 19May 10, 2010

    Evaluation MatrixEvaluation Matrix

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    77/79

    I-91 Interchange 19May 10, 2010

    Next StepsNext Steps

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    78/79

    I-91 Interchange 19May 10, 2010

    p

    Hold Public Informational Meeting

    Narrow Down List of Alternatives

    Identify Preferred AlternativeHold Public Informational Meeting

    Comments & QuestionsComments & Questions

  • 8/4/2019 10-5-10 Project Advisory Commitee I-91 Exit 19 Improvements

    79/79