1 | bim getting started – a case study karen alford bim/gsl programme manager environment agency...

9
1 | WWW.BENTLEY.COM BIM Getting started – a case study Karen Alford BIM/GSL Programme Manager Environment Agency April 2015

Upload: barry-black

Post on 04-Jan-2016

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 2: 1 |  BIM Getting started – a case study Karen Alford BIM/GSL Programme Manager Environment Agency April 2015

2 | WWW.BENTLEY.COM

• Creating common languages applicable to all• Using data and embracing efficient use of technology to

deliver benefits to the whole industry• Enable decisions to be data driven via a single version

of the truth• Brings process, people and technology together

Government BIM is about modernising an industry

UNCLASSIFIED

Page 5: 1 |  BIM Getting started – a case study Karen Alford BIM/GSL Programme Manager Environment Agency April 2015

5 | WWW.BENTLEY.COM

The BS/PAS 1192 Tool kit

• Creates the framework for digital working

• Align the commercial ask with your own business requirements (Project and AIM/FM Systems)

• Data management protocols– Impose naming conventions– Open standards

• Minimise opportunity to change– Government Soft Landings

Supplier CDEFrom PAS1192-2

Matched with an Employer CDEPAS1192-3

an Employer

Page 6: 1 |  BIM Getting started – a case study Karen Alford BIM/GSL Programme Manager Environment Agency April 2015

6 | WWW.BENTLEY.COM

Start to build (or adopt) an object library

FeatureAttributes

COBieFeature

FeatureComponents

or Assemblies

Zone: Feature

Collection

Asset Classification

Asset Performance Evaluation

Page 7: 1 |  BIM Getting started – a case study Karen Alford BIM/GSL Programme Manager Environment Agency April 2015

7 | WWW.BENTLEY.COM

• Getting the full understanding challenging• Starting with what we know• Pilot / Early Adopter• Flipping the coin• Support from our suppliers but still unsure• Big change

So how is it going?