1 to 7 fibres in240 fibres out 25 into sc01 sc01 read out with 25 stephenson preamps nichia nspb500s...

12
1 to 7 fibres in 240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara, Bob, Dave Diffusing sphere

Upload: arlene-brooks

Post on 28-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,

1 to 7 fibres in 240 fibres out25 into SC01 SC01 read out with

25 stephenson preamps

NichiaNSPB500SLEDs

LED stability pulser tests at RAL

Paul, Barbara, Bob, Dave

Diffusing sphere

Page 2: 1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,

Fibres to inject into diffusing sphere

Quartz fibre Supplied by Applied Photonics, manufactured by Laser Components.The Laser Components reference is CF01493-43. The fibre has 550um inner silica core,600um including silica cladding,  630um including a 'hard coating' (for mechanical strength)750um including the plastic buffer.  Note that the plastic is EFTE ETFE (Ethylene TetrafluoroEthylene), a fluorocarbon-based polymer

500m

750m

Page 3: 1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,

SC01CRISTAL ABL #

1 5

2 6

3 11

4 16

5 21

6 4

7 7

8 12

9 17

10 22

11 3

12 8

13 13

14 18

15 23

16 2

17 9

18 14

19 19

20 24

21 1

22 10

23 15

24 20

25 25

RMB xls, 21.2.07 at 19.08

Not usedFront fibre data, ABL ch 3 & 4, <0.1 normal sizePlastic fibre data ABL ch 7, appears double normalAll data, ABL ch 18: very high p*g=2.7, g=15.0

Page 4: 1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,

Stephenson preamp calibration

Indicates preamp gains are all close to each other

Signal from fibres out of diffusing sphere

Narrow width indicates good uniform illumination of fibres with sphere

Page 5: 1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,

Fibre signal versus VPT P*G

1) Into front directly via LED + single fibre only

2) Single Quartz fibre to sphere – fibres from sphere into back of SC01

3) Ditto Single Plastic fibre

4) Ditto Plastic re-measured in Sep

Page 6: 1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,

Fibre signal normalised to VPT P*G

1) Into front directly via LED + single fibre

2) Single Quartz fibre to sphere – fibres from sphere into back of SC01

3) Ditto Single plastic fibre to sphere

4) Ditto plastic re-measured in Sep

Page 7: 1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,

Fibre signal versus VPT signal at 1.8T

1) Into front directly via LED + single fibre

2) Single Quartz fibre to sphere – fibres from sphere into back of SC01

3) Ditto Single plastic fibre to sphere

4) Ditto plastic re-measured in Sep

Slope 0.08 GeV per e/MeV

Page 8: 1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,

Fibre signal normalised to VPT signal at 1.8T

1) Into front directly via LED + single fibre

2) Single Quartz fibre to sphere – fibres from sphere into back of SC01

3) Ditto Single plastic fibre to sphere

4) Ditto plastic re-measured in Sep

Page 9: 1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,

To estimate yield of LED stability pulser system in GeV at 1.8T

1) Assume SC01 stephenson preamps have same gain as those used in testbeam in 1999: Preamp input of 1.4.106 electrons gives 104mV peak O/P into 50To be checked asap

2) That 7 quartz fibres into sphere = 7 times output of one quartz fibre into sphere

3) That the quartz fibres are those for CMS

4) Use measured response with quartz fibre calibrated againstVPT yield at 1.8T of:0.08 GeV per e/MeV

Comment

Drive pulse via Dmitri box at present – expect to do better in future

Page 10: 1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,

LED stability pulser system. Energyequivalent output in GeV

a) Measured VPT yields at 1.8T at RAL in e/MeV

b) LED signals with one quartz fibre into diffusing sphere

c) LED signals with 7 quartz fibres into diffusing sphere

Target:Mean output 120 GeV

Some way to go!

Page 11: 1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,

Conclusions

With 7 quartz fibres into sphere, mean signal size 20 GeV

Want 120 GeV

Must account for crystal and VPT darkening at LHC

Should start with a system capable of delivering 200 GeV

Page 12: 1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,

University of Virginia offer/contribution, Brad Cox email Feb 3, 2007

Mike A. be named the "VPT Stability system coordinator". This is part of a bigger issue.

Be an ESSENTIAL part of design of the blue LED stability/backup calibration system.

Mike has make a preliminary sketch of the functionality that one needs Hirosky and Andelin are working with him on the design of driving electronics to optimize the blue LED light yield and will take over from Dave Phillips the remainder of the testing as soon as Dave finishes his note on the present results.

Mike's work: in UVa to finish the burn-in boxes for FPIX. We delivered two boxes to Fermilab and they are working fine so he can put systems together.

Plus he has the UVa group already involved with the LED work and feeling that they have some stake in it.