THE PORI DELIVERY MODEL
SPAR OVERVIEWApril 2003
Euronext13170
2
WELCOME
TECHNIP-COFLEXIP FINLAND
MW YARD
3
MÄNTYLUOTO WORKS – FINLAND
TECHNIP-COFLEXIP FINLAND
4
MÄNTYLUOTO WORKS – FINLAND
n Covered fabrication area 48000 square metersn Total yard area 11 hectaresn Steel fabrication capacity 18000 tonnes per annumn Heavy Lift Capacity 2400 tonnesn Multiwheeler transportation capacity 2300 tonnesn The yard layout&loading facilities fits well for Spar Fabricationn Competitive Advantages
l Reliability and Flexibilityl Short delivery times; successful concurrent engineering&fabricationl Proven infrastructure managementl Cost effective and innovative construction methodsl Schedule according to contract, but not compromising QA/HSEl Reference list
TECHNIP-COFLEXIP FINLAND
5
ProjectProject Delivery DateDelivery DateContractContract ActualActual
Sleipner Vest M12 ModDeck Sections Nov 7, 94 Nov 6, 94
Neptune OryxSpar Hull Jun 26, 96 Jun 19, 96
GenesisSpar Hull Feb 15, 98 Feb 14, 98
GeminiSpar Hull Feb 2, 98 Jan 20, 98
DianaDDCV Hull Jun 2, 99 May 26, 99
NansenTruss Spar Hull Jul 27, 01 Jul 27, 01
Boomvang Truss Spar Hull Sep 23, 01 Oct 12, 01
BP Horn MountainTruss Spar Hull Apr 12, 02 Apr 18, 02
GunnisonTruss Spar Hull Jun 1, 03
HolsteinHard Tank & Mooring Sep 13, 03
Mad DogTruss Spar Hull Dec 16, 03
ProjectProject Delivery DateDelivery DateContractContract ActualActual
Gullfaks C, Gravity BaseGBS/MMO May 18, 88 May 1, 88
Snorre TLP TopsidesM1 Deck Part Apr 7, 90 Apr 12, 90
Sleipner CondensateModules Apr 27, 92 Apr 27, 92
Brage M10 ModulesDeck Sections Apr 3, 92 Apr 15, 92
Troll Phase 1 M2 PartTroll Deck May 20, 93 May 20, 93
Troll OljeBox Girders Oct 7, 93 Sep 20, 93
Deepsea BergenSponsons Mar 1, 94 Feb 26, 94
Heidrun M30 ModuleGrillage Apr 5, 94 Apr 6, 94
Troll Olje MOCorbel Rings Jul 2, 94 Jul 2, 94
TECHNIP-COFLEXIP FINLAND
REFERENCE LIST
6
Three Businesses:TECHNIP RAUMA OFFSHORETECHNIP RAUMA OFFSHORE••Staff 2000 Staff 2000 -- 100 people100 people••Staff 2001 Staff 2001 -- 120 people120 people••Staff 2002 Staff 2002 -- 130 people130 people Project ManagementProject Management
MÄNTYLUOTO WORKSMÄNTYLUOTO WORKS••Staff 2000 Staff 2000 -- 580 people580 people••Staff 2001 Staff 2001 -- 650 people650 people••Staff 2002 Staff 2002 -- 800 people800 people FabricationFabrication
PIPI--RAUMARAUMA••Staff 2000 Staff 2000 -- 180 people180 people••Staff 2001 Staff 2001 -- 200 people200 people••Staff 2002 Staff 2002 -- 200 people200 people EngineeringEngineering
TECHNIP-COFLEXIP FINLAND
7SPAR CAPABILITIES
n Water depth 1,000 to 10,000 ft
n Well slots up to 40
n Oil throughout to 400 Mbod
n Gas throughout to 750 MMscfd
n Topside payloads 1,500 to 45,000 s. tons
n Hull diameters 20 to 200 ft
n Hull drafts 280 to 800 ft
n Storage 5 to 10 days production
8SPAR ADVANTAGES
èProven Concept
èProven Delivery Record
èFlexible to Late Changes
èCAPEX Competitivel T-C Delivers on Timel T-C Delivers on Budget
èOPEX Superiorl More Drilling/Workover Up-Time due to Seafloor Riser Anglel Smaller Marine Crew
èSafest Floater on the Market
èConcept for the Future Deep Water Activities World Wide
9
è Unconditional Stability
è Center of Gravity always below Center of Buoyancy
è Derives No Stability from Mooring System
è Failsafe Ballast Systeml Filling all Ballast Tanks does not Sink the Spar
è No Licensed Marine Crew Required
è High Reserve Buoyancyl Spar remains Afloat with 3 Buoyancy Compartments
è Good Tolerance for Topside Eccentricity
è Good Tolerance for Change in Topside Weight
è Stable in all Phases of Installation
è Can be Towed Vertically with Topside Installed
SPAR STABILITY
10SPAR OPERATIONS
n Drilling/Workoverè Can start Well Deviation at Seafloorè Pre-Drill with MODU
l Complete with MODUl Complete with Spar WO Rig
è Drill and Complete with Sparl Drilling Rig
è Phased Drilling with MODUl Pre-Drill Phase 1 Wells with MODUl Complete and Produce Phase 1 with Sparl Offset Spar with Mooring Systeml Drill Phase 2 Wells with MODU while Spar is Offset and Producing Phase 1 Wellsl Complete and Produce Phase 2 Wells with Spar
n Ballastingè Unconditional Stabilityè Failsafe Systemè No Licensed Marine Crew Requiredè Operators Option
l Trim for Rig Offsetl Trim for Load Changes
è Adjust Variable Ballast if Significant Weight Changes in the Futurel Neptune increased Topside Weight 17% after installation
11
è Designl Robust Conceptl Can adopt Changes at late Stage§ Increase hard Tank Depth§ Utilize Variable Ballast Margin
è Hull Fabricationl Mantyluoto Works Experienced Yard Dedicated to Spar Hull Fabricationl Proven Track Record
è Mooringsl Simple and Rugged
è Topside Fabricationl Gulf Marine Experienced Yardl Proven Track Record
è Risersl TOI Design and Delivery Capabilityl Proven Track Record
è Marine Operationsl Heavy Lift Vessel Requiredl Topside Lift Critical
SUCCESSFUL PROJECT EXECUTION
12
SUCCESSFUL PROJECT EXECUTION
ISO 9001Quality Standard
Supply Chain
ManagementInfrastructure
Project
ManagementProject
Customer Relationship
ManagementRESULTS
DELIVERY
CAPACITY
PROCESS
TECHNIP-COFLEXIP FINLAND
13
CompanyProcedures
StandardProject Management
Procedures
Project Specific Plans
Sub
stan
ce
ProjectManagementPlan - PMP
PROJECT MANAGEMENT PLAN
SUCCESSFUL PROJECT EXECUTION
TECHNIP-COFLEXIP FINLAND
14
TechnicalSpecification
ProjectManagement
Plan
Pricing
Proposal
Delivery Commitment
PROPOSALBASIS
SUCCESSFUL PROJECT EXECUTION
TECHNIP-COFLEXIP FINLAND
15
PROJECT COST DRIVERS
OwnershipStructure
ManagementSystems
Price
Track Record
ExecutionPlan
CONTRACTOR
RISK COST
Contingency
CUSTOMER
• Innovation• Productivity• Profit Expectations• Currency Rate• Labor cost
•• InnovationInnovation•• ProductivityProductivity•• Profit ExpectationsProfit Expectations•• Currency RateCurrency Rate•• Labor costLabor cost
• Commitment• Communication
•• CommitmentCommitment•• CommunicationCommunication
SUCCESSFUL PROJECT EXECUTION
TECHNIP-COFLEXIP FINLAND
16
ALL PROJECTS AREALL PROJECTS ARESCHEDULE DRIVENSCHEDULE DRIVEN
ENGINEERING SERVESENGINEERING SERVESFABRICATIONFABRICATION
THE ONE WHO DOES THE WORKTHE ONE WHO DOES THE WORKIS THE BEST EXPERTIS THE BEST EXPERT
OF HIS WORKOF HIS WORK
• Clear goals• Clear responsibilities• Meaningful work
FABRICATION ORIENTED
SUCCESSFUL PROJECT EXECUTION
TECHNIP-COFLEXIP FINLAND
17
KEY SUCCESS FACTOR
Engineering
Fabrication
CONCURRENT
• Knowledge Sharing• Controlled Risk Decisions
Fabrication
Engineering
SEQUENTIAL
• InformationTransfer
TECHNIP-COFLEXIP FINLAND
18CAISSON SPAR VS. TRUSS SPAR
19SPAR DRILLING OPTIONS
20
RING SECTION ASSEMBLY
TECHNIP-COFLEXIP FINLAND
21
MATING TRUSS TO HULL
TECHNIP-COFLEXIP FINLAND
22
DRY TRANSPORT
TECHNIP-COFLEXIP FINLAND
23PRE-UPEND
24TOPSIDE LIFT
25
NEPTUNE ROC-32 GENESIS ARO-33 DIANA ARO-45
Main dimensions:Hull diameter 21,95 mHull height 214,88 mHull light weight 11 699 tons
Delivery year 1996Client Oryx
Main dimensions:Hull diameter 37,19 mHull height 214,88 mHull light weight 25 923 tons
Delivery year 1998Client Chevron
Main dimensions:Hull diameter 37,19 mHull height 214,89 mHull light weight 31 224 tons
Delivery year 1999Client Exxon
TECHNIP-COFLEXIP FINLAND
26
NANSEN ARO-55Main dimensions:Hull diameter 27,43 mHull height 165,51 mHull light weight 10 521 tons
Delivery year 2001Client SII
BOOMVANG ARO-56Main dimensions:Hull diameter 27,43 mHull height 165,51 mHull light weight 10 540 tons
Delivery year 2001Client SII
HORN MOUNTAIN ARO-58Main dimensions:Hull diameter 32,21 mHull height 169,16 mHull light weight 13 278 tons
Delivery year 2002Client AMI
TECHNIP-COFLEXIP FINLAND
27
n Water depth: 4,344 ft. (1,324 m)
n Topsides payload: 28,000 ST (25,400 metric tons)
n Diameter: 146 ft. (44.5 m)
n Length: 780 ft. (HT: 256 ft., T: 493 ft., ST: 22 ft.)
n (237.7 / 78.0 / 150.3 / 6.7 m)
n Center-well: 75 ft. x 75 ft. (22.9 m)
n Top tensioned risers: 16
n Hard tank weight: 20,700 ST (21,500 metric tons)
n Truss and soft tank weight: 9,000 ST (8,200 metric tons)
n Mooring: 16 lines with suction anchors
BP HOLSTEIN SPAR
28
Status of projectsProject Section
fabricationHalf sectionassembling
Hull erection Outfitting Delivery
Gunnison 100 % 100 % 100 % 80 % June 1.2003
Holstein 100 % 70 % 30 % 20 % Sep 9.2003
Mad Dog 60 % 40 % 10 % 10 % Dec 16.2003
TECHNIP-COFLEXIP FINLAND
29TECHNIP-COFLEXIP FINLAND
SPAR PROGRESSION
30