Page 1: 1. Session structure Overview Actions Outputs Challenges Exercises Module 6 Monitoring control measures 2

1

Page 2: 1. Session structure Overview Actions Outputs Challenges Exercises Module 6 Monitoring control measures 2

Session structure

•Overview

•Actions

•Outputs

•Challenges

•Exercises

Module 6 Monitoring control measures

2

Page 3: 1. Session structure Overview Actions Outputs Challenges Exercises Module 6 Monitoring control measures 2

Overview

• Define and validate the monitoring of control measures

• Assess if the control measures are working

• Know what corrective actions are needed when things go wrong

Module 6 Monitoring control measures

3

Control measures: what/how/when

should be monitored?where/who?

Monitoring results: Is the control measure

working?

What corrective actions are needed?

Y

N

Page 4: 1. Session structure Overview Actions Outputs Challenges Exercises Module 6 Monitoring control measures 2

Actions

•Effective monitoring:

•What is being monitored

•How

•What time / frequency

•Where

•Who will monitor

•Who will analyse

•Who gets results

Module 6 Monitoring control measures

4

Page 5: 1. Session structure Overview Actions Outputs Challenges Exercises Module 6 Monitoring control measures 2

Module 6 Monitoring control measures

Control measure

Critical limit

What Where When How Who Corrective action

Chlorination at water treatment

>0.5 & < 1.5 mg/l

Disinfectant residual

Entry to distribution

On-line Analyser WQ officer

See non compliance protocol

5

Page 6: 1. Session structure Overview Actions Outputs Challenges Exercises Module 6 Monitoring control measures 2

Outputs

Module 6 Monitoring control measures

6

Picture source: http://hubpages.com/hub/How-to-put-up-a-chain-link-fence

Accurate assessment of the performance of control measures

Explicit corrective actions where needed

Broken fence – failing control

Fix it

Page 7: 1. Session structure Overview Actions Outputs Challenges Exercises Module 6 Monitoring control measures 2

Challenges

•Absent or ineffective evaluation of data

•Staff expectations / attitude

•Lack of resources for monitoring and corrective actions –

human and financial

Module 6 Monitoring control measures

7

/

Page 8: 1. Session structure Overview Actions Outputs Challenges Exercises Module 6 Monitoring control measures 2

Module 6 Monitoring control measures

8

Exercise•In small groups•45 minutes•Walkerton case study

• Prepare a timeline of events and indicate the opportunities for intervention that could have prevented or reduced the scope of the outbreak.

• What actions should the operators of this facility have taken that could have prevented this outbreak?

• Who was to blame?