Drain pipe MUST slope away from the foundation box. Drain pipe can connect to an existing drain pipe or be routed to a good drainage area. A deep hole filled with “good” gravel is an acceptable drainage source. Check local building codes for further information before installation. Important: Foundation Box MUST be level and flush with driveway! QUICKSTART “BASIC” GUIDELINES FOR MODEL 6400 - FOR A GATE UP TO 10 FEET, 300 Lbs. AND OPENING CLOCKWISE Copyright 2021 DoorKing ® , Inc. All rights reserved. 6400-066-N-1-21 Apply Grease 2 3/4” DoorKing Heavy-Duty Hinges P/N 1200-039 Foundation Box Position The gate weight is NOT on the gate operator. U-channel welded to gate arm Gate Arm Good Drainage Gate hinges and operator pivot point MUST be plumb. Drive Motor Position 3” Post Driveway Drive Motor Drive motor must be unbolted and flipped 180° to open gate CLOCKWISE as shown. Important Note: Operator drive motor and limit sensors are factory set to open gate COUNTER-clockwise. Locking Bracket Drive Arm Linking Arm Limit Plate Foundation Box Depth of the concrete is determined by specific installation requirements, soil conditions and local building codes. Unlock and pull release handle from either side of the gate to manually operate the gate. Coaxial Cable Antenna Kit P/N 1514-073 (Sold separately) Closed Position Gate Arm Release Handle Fabricated U-Channel (Not Supplied) Gate fits into U-Channel (Not Welded) Weld U-Channel to Gate Arm U-channel NOT welded to gate. The gate can move in the U-channel during operation. Operator Loops Input Power Securely mount a control box near the operator using appropriate hardware (Not supplied). Open Position 1 1/2” to Drain Power Conduit 3/4” Sweeps 1 1/2” to Drain (Not Supplied) Loops Conduit 3” 3” 3” Drain Pipe Foundation Box Control Box 115VAC or Solar Model 6400 is intended for installation only on swing gates used for vehicles. Pedestrians must be supplied with a separate access opening. For safety and installation instructions, please refer to the 6400 Actuator Arm and Control Box Mounting manual, 115 VAC or Solar Control Box Wiring/Owner’s manuals. Plumb 120 S. Glasgow Avenue Inglewood, California 90301 U.S.A. 1 7 8 6 5 4 3 2 Blue wire Brown wire Orange wire Red wire Yellow wire Green wire Green/Yellow wire Not Used SECONDARY Secondary operator MUST be connected to the secondary operator connection and MOTOR wires MUST be reversed from the primary operator when used. Brown wire Blue wire Orange wire Red wire Yellow wire Green wire Green/Yellow wire NOT USED 7-Wire Operator Cable Single Operator connects to PRIMARY connection ONLY. Connect to the 115 VAC OR Solar control box circuit board. 1 7 8 6 5 4 3 2 PRIMARY 4302 Secondary Operator ONLY The limit sensors must be slid 90° to open gate CLOCKWISE from factory setting. Limit Plate Open Close Gray - Open (3 LED) Purple - Slow Down (4 LED) White - Common for each. Yellow - Close (5 LED) Brown - Slow Down (6 LED) White - Common for each. OPEN Limit Position CLOSE Limit Position Circuit board power must be ON to adjust limit sensors, LEDs will light. Photo Sensors Height Open Beam Outside Property Inside Property 5” or less Gate Closed CLOSE Beam 21” Typical 27.5” Max Open Beam Close Beam Reversing Edge Photo Sensor Photo Sensor Potential Entrapment Area Gate Closed Gate Open DO NOT cycle operator before limit sensors and DIP-switches have been adjusted, damage could occur. THIS PRODUCT IS TO BE INSTALLED AND SERVICED BY A TRAINED GATE SYSTEMS TECHNICIAN ONLY. Visit www.dkslocator.com to find a professional installing and servicing dealer in your area. Installation Same Drive Motor Orientation Open Open Closed Open Open Closed Same Drive Motor Orientation Opening Direction DIP-Switch 1 (SW 1) Refer to YOUR chosen 115 VAC OR Solar powered control box manuals for complete DIP-switch settings. 4302 4302 Manually move the gate to the desired open or closed position. Loosen the limit nuts and slowly slide the limit assemblies until the LIMIT LEDs on the circuit board light up. Limit Sensors Adjustment Manual Key Release Reversing Edge is mounted along ENTIRE end of gate. 4302 Wiring to Circuit Board Note: Only 1 monitored Device can be connected for each cycling direction. An OPTIONAL Expansion Kit (sold separately) will allow connection for additional devices. Refer to YOUR chosen 115 VAC OR Solar powered control box manuals to wire entrapment protection devices. Opens as Shown Opens as Shown The operator MUST OPEN GATE upon initial power up and OPEN command. If the operator closes gate after giving open command, shut off power and reverse this switch setting otherwise operator will NOT function correctly. External Entrapment Protection Devices Entrapment Protection must be provided for the gate system where the risk of entrapment or obstruction exists. The operator will not run without one or more monitored type B1 or B2 entrapment protection devices in EACH entrapment area. UL 325 August 2018 Standard Switch 1 OFF Switch 1 OFF Switch 1 ON Switch 1 ON Note: If factory wired jumpers are on operator terminal, they MUST be removed. SW 1 1 ON 2 3 4 5 6 7 8

Upload: others

Post on 16-Oct-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Drain pipe MUST slope away from the foundation box.

Drain pipe can connect to an existing drain pipe or be routed to a good drainage area.A deep hole filled with “good” gravel is an acceptable drainage source. Check local building codes for further information before installation.

Important:Foundation Box MUST be level and flush with driveway!

QUICKSTART “BASIC” GUIDELINES FOR MODEL 6400 - FOR A GATE UP TO 10 FEET, 300 Lbs. AND OPENING CLOCKWISE

Copyright 2021 DoorKing®, Inc. All rights reserved. 6400-066-N-1-21

Apply Grease

2 3/4”

DoorKing Heavy-Duty Hinges P/N 1200-039

Foundation Box PositionThe gate weight is NOT on the gate operator.

U-channel welded to gate arm

Gate Arm

Good Drainage

Gate hinges and operator pivot point MUST be plumb.

DriveMotor

Position

3”Post

Driveway

DriveMotor

Drive motor must be unbolted and flipped 180° to open gate

CLOCKWISE as shown.

Important Note: Operator drive motor and limit sensors are factory set to open gate COUNTER-clockwise.

LockingBracket

DriveArm

Linking Arm

Limit Plate

FoundationBox

Depth of the concrete

is determined by specific

installation requirements,

soil conditions and local

building codes.

Unlock and pull release handle from either side of the gate to manually operate the gate.

Coaxial Cable Antenna Kit

P/N 1514-073 (Sold separately)

Closed Position

Gate Arm

ReleaseHandle

Fabricated U-Channel (Not Supplied)

Gate fits into U-Channel (Not Welded)

Weld U-Channel to Gate Arm

U-channel NOT welded to gate. The gate can move in the U-channel during operation.

Oper

ator

Loop

s

Inpu

t Pow

er

Securely mount a

control box near the

operator usingappropriate hardware

(Not supplied).

Open Position

1 1/2” to Drain

Power Conduit

3/4” Sweeps1 1/2” to Drain (Not Supplied)

Loops Conduit

3”3”

3”

Drain Pipe

FoundationBox

Control Box115VAC or Solar

Model 6400 is intended for installation only on swing gates used for vehicles.Pedestrians must be supplied with a separate access opening. For safety and installation instructions, please refer to the 6400 Actuator Arm and Control Box Mounting manual, 115 VAC or Solar Control Box Wiring/Owner’s manuals.

Plumb

120 S. Glasgow AvenueInglewood, California 90301

U.S.A.

1

78

65432

Blue wireBrown wire

Orange wire

Red wire

Yellow wire

Green wire

Green/Yellow wire

Not Used

SECONDARY

Secondary operator MUST be connected to the secondary operator connection and MOTOR wires MUST be reversed from the primary operator when used.

Brown wire

Blue wire

Orange wire

Red wire

Yellow wire

Green wire

Green/Yellow wire

NOT USED

7-WireOperator Cable

Single Operator connects to PRIMARY connection ONLY.

Connect to the 115 VAC OR Solar control box circuit board.

1

78

65432

PRIMARY

4302 Secondary Operator ONLY

The limit sensors must be slid 90° to open gate CLOCKWISE from factory setting.

Limit Plate

Open Close

Gray - Open (3 LED)Purple - Slow Down (4 LED)White - Common for each.

Yellow - Close (5 LED)Brown - Slow Down (6 LED)

White - Common for each.

OPENLimit Position

CLOSELimit Position

Circuit board power must be ON to adjust limit sensors, LEDs will light.

Photo Sensors Height

Open Beam

OutsideProperty

InsideProperty

5” or less

Gate

Clo

sed

CLOSE Beam

21”Typical

27.5”Max

Open Beam

Close Beam

Reversing EdgePhoto Sensor

Photo Sensor

PotentialEntrapment

Area

Gate Closed

Gate Open

DO NOT cycle operator before limit sensors andDIP-switches have been adjusted, damage could occur.

THIS PRODUCT IS TO BE INSTALLED AND SERVICED BY A TRAINED GATE SYSTEMS TECHNICIAN ONLY. Visit www.dkslocator.com to find a professional installing and servicing dealer in your area.

Installation

Same Drive MotorOrientation

Open Open

Closed

Open Open

ClosedSame Drive Motor

Orientation

Opening Direction DIP-Switch 1 (SW 1)

Refer to YOUR chosen 115 VAC OR Solar powered control box manuals for complete DIP-switch settings.

4302

4302

Manually move the gate to the desired open or closed position. Loosen the limit nuts and slowly slide the limit assemblies until the LIMIT LEDs on the circuit board light up.

Limit Sensors Adjustment

ManualKey Release

Reversing Edge is mounted

along ENTIRE end of gate.

4302

Wiring to Circuit Board

Note: Only 1 monitored Device can be connected for each cycling direction. An OPTIONAL Expansion Kit (sold separately) will allow connection for additional devices.Refer to YOUR chosen 115 VAC OR Solar powered control box manuals to wire entrapment protection devices.

Opens as Shown

Opens as Shown

The operator MUST OPEN GATE upon initial power up and OPEN command.If the operator closes gate after giving open command, shut off power and reverse this switch setting otherwise operator will NOT function correctly.

ExternalEntrapmentProtection

DevicesEntrapment Protection must be provided for the gate system where the risk of entrapment or obstruction exists. The operator will not run without one or more monitored type B1 or B2 entrapment protection devices in EACH entrapment area.

UL 325 August2018 Standard

Switch 1 OFF

Switch 1 OFF

Switch 1 ON

Switch 1 ON

Note: If factory wired jumpers are on operator terminal, they MUST be removed.

SW 1

1 ON2

34