1 russian federation. iap capacity building as а tool for regional and local planning unep...

25
1 Russian Federation. IAP Capacity Building As а Tool For Regional and Local Planning UNEP Initiative on Capacity Building for Integrated Assessment and Planning for Sustainable Development Mid-term Review Meeting Geneva, February 16-17, 2005

Post on 19-Dec-2015

223 views

Category:

Documents


0 download

TRANSCRIPT

1

Russian Federation. IAP Capacity Building As а Tool For Regional

and Local Planning

UNEP Initiative on Capacity Building for Integrated Assessment and Planning for Sustainable Development

Mid-term Review MeetingGeneva, February 16-17, 2005

2MeetingGeneva, February 16-17, 2005

Deputy Head of Tomsk Administration (Government) О.

KoslovskayaUNEP Initiative on Capacity building for

Intergrated Assessment and Planning for Sustainable Development 1

Tomsk

MeetingGeneva, February 16-17, 2005

Deputy Head of Tomsk Administration (Government) О.

KoslovskayaUNEP Initiative on Capacity building for

Intergrated Assessment and Planning for Sustainable Development 1

Tomsk

3

Tomsk region at the map of Russia Tomsk region at the map of Russia

The region’s population is around one million - 0,7 % in Russia.For every two urban dwellers there is one rural dweller.

The region’s population is around one million - 0,7 % in Russia.For every two urban dwellers there is one rural dweller.

The Tomsk region occupies an area of 316,9 sq. km –

2% territory of Russia More than 85 territories of area

concern to the remote areas equal to districts of the Far North

The Tomsk region occupies an area of 316,9 sq. km –

2% territory of Russia More than 85 territories of area

concern to the remote areas equal to districts of the Far North

6 cities20 municipal districts576 villages

6 cities20 municipal districts576 villages

The Tomsk region is

a geographical center of Russia

Regional center is Tomsk city

4

3

Competitive advantages

Mid-term MeetingGeneva, February 16-17, 2005

UNEP Initiative on Capacity building for Intergrated Assessment and Planning for

Sustainable Development

The Tomsk region has two main competitive advantages

The total value of natural resources is 931,3 trillion $ including non-renewable resources is 930 trillion$.

RAW materials:

1 in 3 Tomsk natives has higher education, (1in 5 in the Russian Federation)

INTELLECTUAL resources:

1. Hydrocarbon resources (oil, gas, condensate);2. Minerals (titanium, zirconium, gold,peat, etc.)3. Timber resources (cedar, fir, pine tree, silver fir, etc.)4. Non-timber forest resources(nuts, mushrooms, herbs)5. Water resources (artesian water supply, thermal and medicinal water )

1. 8 institutes of higher education2. More than 100 000 students 3. Amount of academics and

scientists is 3522 people

5

4

Strategic plans and initiatives

Mid-term MeetingGeneva, February 16-17, 2005

UNEP Initiative on Capacity Building for Intergrated Assessment and Planning for

Sustainable Development

1 Programme for Socio-Economic Development of

Tomsk region for 2005 September,11, 2003 put into the register of

Programs of SED of the RF by MEDAT

2. Strategy for innovative

development of the Tomsk region

Adopted by the Ministry of Education of the RF

and World Bank

3. Strategy for Poverty

Alleviation of the Tomsk region

Adopted by the Ministry of Health,

experts of Foundation “Institute of Economic of the City” and

Foundation “Independent Institute on Social Politic”

There are 5 Programs for SED

Tomski, Krivosheinski, Molchanovski, Shegarski

districts and Seversk, urban settlement

2003

Being developed are

4 Programs for SED for Tomsk city and

Stregevoi, Asinovski and Kolpashevo districts

2004

It is planned to develop

4 Programs for SEDPervomaiski,

Kargasokski, Verkhneketski and Kogevnikovski

2005

In the short -term of

formulation

a Program for socio-economic

development for settlements

Regional levelMunicipal level

Urban and rural

settlements

6

6

Robust strategy – pre-requisite for the successful development of the region

MeetingGeneva, February 16-17, 2005

UNEP Initiative on Capacity Building for Intergrated Assessment and Planning for

Sustainable Development

Regions compete among themselves and with other territories (countries) in terms of markets and resources

The added value migrates and it is important to have a clear concept as to where it will be concentrated in the future?Regional Administration resources are always limited

It is necessary to have well defined priorities, plans of actions and purposeful guidelines

Strategy establishes a fruitful basis for negotiation between authorities and society

Serves to build the regional Administration as a strategic and robust organisation

7

7

Strategic goals

MeetingGeneva, February 16-17, 2005

UNEP Initiative on capacity Building for Intergrated Assessment and Planning for

Sustainable Development

Prosperity of Prosperity of populationpopulation

Competitiveness of the region

Productivity of regional corporations

Favorable conditions for business development

Qualitative resources (territorial capital)

8

Planning process in transition: main gaps

MeetingGeneva, February 16-17, 2005

UNEP Initiative on capacity Building for Intergrated Assessment and Planning for

Sustainable Development

• Lack of consistency of the planning process• Lack of participation• Lack of integration • Lack of strategic view, poor planning capacity in

market environment– PPP are budget-oriented rather then objectives oriented– Lack of stakeholders involvement

9

Regional/Local Development: existing process

MeetingGeneva, February 16-17, 2005

UNEP Initiative on capacity Building for Intergrated Assessment and Planning for

Sustainable Development

Regional Program of Socio-EconomicDevelopment for 5 years (has been never

implemented)

Regional Development Programs for 2001-2005.

1990

1995

2000

2002

2006

O n e -ye a rD is tr ic t

p la n

O ne-year Regional Development P lan

O n e -ye a rD is tr ic t

p la n

O n e -ye a rD is tr ic t

p la n

O n e -ye a rD is tr ic t

p la n

O ne-year Regional Development P lan

O n e -ye a rD is tr ic t

p la n

O n e -ye a rD is tr ic t

p la n

3 -ye a rsD is tr ic t

p la n

3 -ye a rsD is tr ic t

p la n

3 -ye a rsD is tr ic t

p la n

10

Regional/Local Development: desirable process

MeetingGeneva, February 16-17, 2005

UNEP Initiative on capacity Building for Intergrated Assessment and Planning for

Sustainable Development

Program of Socio-Economic Development of Tomskoblast on 2001-2005 (adopted in 2002)

Program of Socio-Economic Development ofTomsk oblast on 2006-2020. Integrated

Assessment/Pllanning

TomskiyDistrict

2002

2003

2005

City ofTomsk

AsinskiDistrict

Integ

rated

Ass

essm

ent/P

lannin

g

Program of Socio-Economic Development ofTomsk oblast on 2006-2020. Adoption and start

2004

Integrated assessment of the current Program ofSocio-Economic Development of Tomsk oblast

on 2001-2005

Figure 3. Integrated assessment/planning process in Tomsk region

11

Project Description and key Results

12

Project objectives

MeetingGeneva, February 16-17, 2005

UNEP Initiative on capacity Building for Intergrated Assessment and Planning for

Sustainable Development

• Raise the stakeholders’ awareness of IAP benefits;

• Enhance the stakeholders capacity to use IAP; • Enhance the involvement of ‘non-traditional’

stakeholders into the planning/policy-making process;

• Strengthen cooperation within the planning/policy-making hierarchy: vertical and horizontal tiers;

• Facilitate the design of integrated programmes on the regional & local levels (ESE integration).

13

Expected outcomes

MeetingGeneva, February 16-17, 2005

UNEP Initiative on capacity Building for Intergrated Assessment and Planning for

Sustainable Development

• Enhanced understanding of integrating social, economic and environmental objectives to tackle urgent problems of regional / local development;

• Improved institutional and human capacities of key stakeholders for undertaking IAP for sustainable development within the Tomsk region;

• Strengthened cooperation between key stakeholders;

• Consistent planning process/coherent policy-making hierarchy.

14

Institutional Framework

MeetingGeneva, February 16-17, 2005

UNEP Initiative on capacity Building for Intergrated Assessment and Planning for

Sustainable Development

• The project is leading by Tomsk Regional Administration

• National Implementation Agency: Ecoline EA Center

• The institutions involved:– MED&T– MNR– Rostechnadzor (newly established structure to

be involved)

15

Initiation of the Project

MeetingGeneva, February 16-17, 2005

UNEP Initiative on capacity Building for Intergrated Assessment and Planning for

Sustainable Development

• National IAP workshop and inception meeting (Moscow, December, 2003) sponsored and organized by UNEP;

• National EA/IAP international conference partly sponsored by UNEP (Vologda, December, 2003)

16

Pilot municipalities

The City of Tomsk

TomskiDistrict

Asinovski District

Tomsk Region

17

Tomsk District Case Study

MeetingGeneva, February 16-17, 2005

UNEP Initiative on capacity Building for Intergrated Assessment and Planning for

Sustainable Development

#

#

#

#

#

#

#

#

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

##

##

#

##

#

#

#

#

#

#

#

#

#

#

##

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

##

## #

#

#

#

##

#

#

#

##

#

#

#

#

# #

##

#

#

#

#

# #

#

#

#

##

#

#

##

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

#

$T#S

#S

$T

$T

$T$T$T

$T#S #0

$T

$T%U%U%U

%U%U$T

$T

$T$T $T#S $T

$T $T$T

%U

#S$T%U

$T#S

#S$T

$T%U#0#0

%U$T

$T

$T

$T$T

$T$T$T

$T$T%U $T$T

%U $T $T$T$T

%U

#0$T

$T

#S

ÇÀÒÎ Ñåâåðñê

ã. Òî ì ñê

ß ð

Ãàð ü

Êè ðå ê

Ýóø òà

Þ æí û é

Óù åð á

Êóð ëå ê

Êà ø òà ê

Ì è ðí û é

Ãóá èí î

Áû êî âî

Áî ðè êè

Ñàì óñ ü

Èòàòêà

Ëà âð î âî

Ï åòð î âî

Êà çàí êà

Èï à òî âî

Ëÿ çãè í î

Í àä åæä à

Î ðë î â êà

Ñâå òëû é

Ðà ññâ åò

Î ì óòí î å

Ï åð î âêà

Êî çþ ë èí î

Êà í ä èí êà

Êî ëà ðî âî

Áà òóð èí î

Ðû áà ëî âî

Êè ñëî âêà

Áî ãà ø å âî

Î âð àæí î å

Ëó ÷àí î â î

Çà ðå ÷í û éÑóõà ðåâ î

Ï åòóõ î âî

Ï åõó òî âî

Àð êàø åâ î

Ï î ð î ñè í îÍ åë þ á èí î

Êî ëî ì èí î

Èãë àêî âî

Êè æèð î âî

Áî áð î â êà

Çà ðå ÷í û é

Êè ðãèçêàÂî ðî í è í î

Êî ï û ë î â î

Õà ë äå åâî

Í àóì î âêà

Î ë üãî âêà

Ï î ä ëî ì ñê

Ì à çàë î â î

Êà ðá û ø å âî

Ï î ë î â èí êà

Âå ðø èí èí î

Áå ðå çêèí î

Áå ëî óñî âî

Í åêð àñî âî

Ëî ñêóòî âî

Êî ðí è ë î âî

Çà âàð çèí î

Ñóõî ðå÷ üå

Êóçî âë åâ î

Ñåì è ëóæêè

Ì à ëè í î âêà

Ì è ëî í î âêà

Áà ðà í ö åâ î

Ðî ì àí î â êà

Ãî ð üêî âêà

Êà ðþ êè í êà

×å ðí û ø åâêà

Ñóåòè ëî âêà

Ñòåï àí î âêà

Ãî ñ êî í þ ø í ÿ

Áà ñà í ä àé êà

Ï ëî òí è êî â î

Ãåî ðãèå âêà

Ì î ëî äå æí û é

Í èêî ëà åâêà

Òóð óí òà åâ î

Êà ðàêî çî â î

Áå ðå çî ð å÷êà

Í î â î èãë î âñ ê

Ñàë òàí àêî âî

Òà õòàì û ø å âî

Çî ðêà ëüö åâ î

Ì å æåí èí î âêà

Ï î ï àä åé êèí î

Î êòÿá ðü ñêèé

Ãðè ãî ðè åâ êà

Í î â î ñòð î é êà

86- é êâàð òàë

Êà ô òà í ÷è êî â î

×å ðí àÿ Ðå÷ êà

Í èæí èé Ñêë àä

×å ðí àÿ Ðå÷ êà

Ñï à ñî - ÿé ñêî å

Òè ì èð ÿçå âñêè é

Ñî þ çï ë î ä î òà ðà

Ï åòð î ï àâë î â ñê

×å ðí èë üù èêî âî

Áî ëü ø è å Ãî ð êè

Í àãî ð í û é Èø òàí

Î ë üãî -Ñ àï å æåí êà

Àë å êñ àí äð î âñ êî å

Çî í à ëüí àÿ Ñòà í ö èÿ

Ì î ðÿêî âñêè é Çà òî í

Í î â î àð õà í ãåë üñêî å

Ï åòð î âñ êèé Ó÷à ñòî ê

Êóä ðè í ñ êè é Ó÷àñ òî êÍ î â î ðî æäå ñòâ åí ñ êî å

Ñàô ðî í î âî

7

3

5

6

4

2

1

31

42

84

67

6068

71

7233

82

11

2021

86

85

5977

28

579953

29

12

9627

35

6554

51

48

5298

61

6355

16 66

7092

112

143

113

103100

104

114

109145142

133

130

131

129115

144

Òî ì ñêèé ô åäåðàëüí û é ï ðèðî äí û é çàêàçí èê

Êàëòàéñêèé ðåãèî í àëüí ûé ï ðèðî äí ûé çàêàçí èê

Ëàðèí ñêèé ðåãèî í àëüí û é ï ðèðî äí ûé çàêàçí èê

Áåðåãî âî é ñêëî í ðåêè Òî ì èì åæäó ã.Òî ì ñêî ì è Êî ëàðî âî

91

32

Êèðååâñêî å

Èãëî âñêî å

Óñòüåâî å

Ì î í àñòûðñêî å

Êî çþëèí ñêî å

Äèêàÿ êî ñà

Ï ðî òî êà åëüöî âàÿ

The Tomski District

The City of Tomsk The City of Seversk

18

Stakeholders’ Involvement

MeetingGeneva, February 16-17, 2005

UNEP Initiative on capacity Building for Intergrated Assessment and Planning for

Sustainable Development

#

#

#

#

#

#

#

#

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

##

##

#

##

#

#

#

#

#

#

#

#

#

#

##

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

##

## #

#

#

#

##

#

#

#

##

#

#

#

#

# #

##

#

#

#

#

# #

#

#

#

##

#

#

##

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

#

$T#S

#S

$T

$T

$T$T$T

$T#S #0

$T

$T%U%U%U

%U%U$T

$T

$T$T $T#S $T

$T $T$T

%U

#S$T%U

$T#S

#S$T

$T%U#0#0

%U$T

$T

$T

$T$T

$T$T$T

$T$T%U $T$T

%U $T $T$T$T

%U

#0$T

$T

#S

ÇÀÒÎ Ñåâåðñê

ã. Òî ì ñê

ßð

Ãàðü

Êè ðå ê

Ýóøòà

Þ æí û é

Óù åð á

Êóðëåê

Êà øòà ê

Ì è ðí û é

Ãóá èí î

Áû êî âî

Áî ðèêè

Ñàì óñ ü

Èòàòêà

Ëà âð î âî

Ï åòð î âî

Êà çàí êà

Èï àòî âî

Ëÿ çãè í î

Í àä åæäà

Î ðë î âêà

Ñâå òëûé

Ðà ññâåò

Î ì óòí î å

Ï åð î âêà

Êî çþë èí î

Êà í äèí êà

Êî ëà ðî âî

Áà òóðèí î

Ðû áà ëî âî

Êèñëî âêà

Áî ãà øåâî

Î âðàæí î å

Ëó ÷àí î â î

Çà ðå ÷í û éÑóõàðåâ î

Ï åòóõ î âî

Ï åõó òî âî

Àð êàø åâ î

Ï î ð î ñè í îÍ åë þ áèí î

Êî ëî ì èí î

Èãë àêî âî

Êèæèð î âî

Áî áð î â êà

Çàðå÷í û é

ÊèðãèçêàÂî ðî í è í î

Êî ï û ë î â î

Õàë äå åâî

Í àóì î âêà

Î ë üãî âêà

Ï î äëî ì ñê

Ì à çàë î â î

Êà ðá ûøå âî

Ï î ë î â èí êà

Âå ðø èí èí î

Áåðåçêèí î

Áå ëî óñî âî

Í åêð àñî âî

Ëî ñêóòî âî

Êî ðí èë î âî

Çàâàð çèí î

Ñóõî ðå÷ üå

Êóçî âë åâ î

Ñåì è ëóæêè

Ì à ëè í î âêà

Ì èëî í î âêà

Áàðà í öåâ î

Ðî ì àí î â êà

Ãî ðüêî âêà

Êà ðþ êè í êà

×å ðí ûø åâêà

Ñóåòèëî âêà

Ñòåï àí î âêà

Ãî ñ êî í þ øí ÿ

Áà ñà í ä àé êà

Ï ëî òí èêî â î

Ãåî ðãèå âêà

Ì î ëî äåæí û é

Í èêî ëàåâêà

Òóðóí òàåâ î

Êà ðàêî çî â î

Áå ðå çî ðå÷êà

Í î â î èãë î âñê

Ñàëòàí àêî âî

Òà õòàì û øå âî

Çî ðêà ëüö åâ î

Ì å æåí èí î âêà

Ï î ï àäåéêèí î

Î êòÿá ðü ñêèé

Ãðè ãî ðèåâêà

Í î â î ñòð î é êà

86-é êâàð òàë

Êà ôòà í ÷è êî â î

×å ðí àÿ Ðå÷ êà

Í èæí èé Ñêë àä

×åðí àÿ Ðå÷ êà

Ñï àñî -ÿéñêî å

Òè ì èð ÿçå âñêè é

Ñî þ çï ë î ä î òàðà

Ï åòð î ï àâë î â ñê

×å ðí èë üù èêî âî

Áî ëü øèå Ãî ðêè

Í àãî ð í û é Èø òàí

Î ë üãî -Ñ àï åæåí êà

Àë åêñàí äð î âñêî å

Çî í àëüí àÿ Ñòà í öèÿ

Ì î ðÿêî âñêèé Çàòî í

Í î â î àðõà í ãåë üñêî å

Ï åòð î âñêèé Ó÷àñòî ê

Êóäðè í ñêè é Ó÷àñ òî êÍ î â î ðî æäå ñòâåí ñêî å

Ñàô ðî í î âî

Êî ëá èõà

7

3

5

6

4

2

1

31

42

84

67

6068

71

7233

82

11

2021

86

85

5977

28

579953

29

12

9627

35

6554

51

48

5298

61

6355

16 66

7092

112

143

113

103100

104

114

109145142

133

130

131

129115

144

Òî ì ñêèé ô åäåðàëüíû é ï ðèðîäí û é çàêàçí èê

Êàëòàéñêèé ðåãèî í àëüí ûé ï ðèðî äí ûé çàêàçíèê

Ëàðèí ñêèé ðåãèî í àëüíû é ï ðèðî äí ûé çàêàçí èê

Áåðåãî âîé ñêëî í ðåêè Òî ì èì åæäó ã.Òî ì ñêî ì è Êî ëàðî âî

91

32

Êèðååâñêî å

Èãëî âñêî å

Óñòüåâî å

Ì î í àñòû ðñêî å

Êî çþ ëèí ñêî å

Äèêàÿ êî ñà

Ï ðî òî êà åëüöî âàÿ

• Tomsk Regional Administration;• Tomsk District Administration • District Duma (responsible for approving);• Village Administrations• Local citizens, including poorest lays; • Pensioners • Regional enterprises• Local SME• Farmers• Local NGOs• Tomsk State University (planners)

19

Tools and methods used

• Situation Analysis - SWOT. • Analysis of the Programme structure; consistency

analysis• Analysis of the goals’ system (Gap-analysis);• Environmental screening and brief Impact analysis. • Public consultations:

– Stakeholders Mapping;

– Informal meetings in villages

#

#

#

#

#

#

#

#

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

##

##

#

##

#

#

#

#

#

#

#

#

#

#

##

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

##

## #

#

#

#

##

#

#

#

##

#

#

#

#

# #

##

#

#

#

#

# #

#

#

#

##

#

#

##

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

#

$T#S

#S

$T

$T

$T$T$T

$T#S #0

$T

$T%U%U%U

%U%U$T

$T

$T$T $T#S $T

$T $T$T

%U

#S$T%U

$T#S

#S$T

$T%U#0#0

%U$T

$T

$T

$T$T

$T$T$T

$T$T%U $T$T

%U $T $T$T$T

%U

#0$T

$T

#S

ÇÀÒÎ Ñåâåðñê

ã. Òî ì ñê

ßð

Ãàð ü

Êè ðå ê

Ýóøòà

Þ æí û é

Óù åð á

Êóð ëå ê

Êà øòà ê

Ì è ðí û é

Ãóá èí î

Áû êî âî

Áî ðè êè

Ñàì óñ ü

Èòàòêà

Ëà âð î âî

Ï åòð î âî

Êà çàí êà

Èï à òî âî

Ëÿ çãè í î

Í àä åæä à

Î ðë î â êà

Ñâå òëû é

Ðà ññâ åò

Î ì óòí î å

Ï åð î âêà

Êî çþ ë èí î

Êà í ä èí êà

Êî ëà ðî âî

Áà òóð èí î

Ðû áà ëî âî

Êè ñëî âêà

Áî ãà øå âî

Î âð àæí î å

Ëó ÷àí î â î

Çà ðå ÷í û éÑóõà ðåâ î

Ï åòóõ î âî

Ï åõó òî âî

Àð êàø åâ î

Ï î ð î ñè í îÍ åë þ á èí î

Êî ëî ì èí î

Èãë àêî âî

Êè æèð î âî

Áî áð î â êà

Çà ðå ÷í û é

Êè ðãèçêàÂî ðî í è í î

Êî ï û ë î â î

Õà ë äå åâî

Í àóì î âêà

Î ë üãî âêà

Ï î ä ëî ì ñê

Ì à çàë î â î

Êà ðá û øå âî

Ï î ë î â èí êà

Âå ðø èí èí î

Áå ðå çêèí î

Áå ëî óñî âî

Í åêð àñî âî

Ëî ñêóòî âî

Êî ðí è ë î âî

Çà âàð çèí î

Ñóõî ðå÷ üå

Êóçî âë åâ î

Ñåì è ëóæêè

Ì à ëè í î âêà

Ì è ëî í î âêà

Áà ðà í ö åâ î

Ðî ì àí î â êà

Ãî ð üêî âêà

Êà ðþ êè í êà

×å ðí û ø åâêà

Ñóåòè ëî âêà

Ñòåï àí î âêà

Ãî ñ êî í þ øí ÿ

Áà ñà í ä àé êà

Ï ëî òí è êî â î

Ãåî ðãèå âêà

Ì î ëî äå æí û é

Í èêî ëà åâêà

Òóð óí òà åâ î

Êà ðàêî çî â î

Áå ðå çî ð å÷êà

Í î â î èãë î âñ ê

Ñàë òàí àêî âî

Òà õòàì û øå âî

Çî ðêà ëüö åâ î

Ì å æåí èí î âêà

Ï î ï àä åé êèí î

Î êòÿá ðü ñêèé

Ãðè ãî ðè åâ êà

Í î â î ñòð î é êà

86- é êâàð òàë

Êà ô òà í ÷è êî â î

×å ðí àÿ Ðå÷ êà

Í èæí èé Ñêë àä

×å ðí àÿ Ðå÷ êà

Ñï à ñî - ÿé ñêî å

Òè ì èð ÿçå âñêè é

Ñî þ çï ë î ä î òà ðà

Ï åòð î ï àâë î â ñê

×å ðí èë üù èêî âî

Áî ëü øè å Ãî ð êè

Í àãî ð í û é Èø òàí

Î ë üãî -Ñ àï å æåí êà

Àë å êñ àí äð î âñ êî å

Çî í à ëüí àÿ Ñòà í ö èÿ

Ì î ðÿêî âñêè é Çà òî í

Í î â î àð õà í ãåë üñêî å

Ï åòð î âñ êèé Ó÷à ñòî ê

Êóä ðè í ñ êè é Ó÷àñ òî êÍ î â î ðî æäå ñòâ åí ñ êî å

Ñàô ðî í î âî

Òàøì à

Áå ðå çî âà ÿ

Êî ëá èõà

7

3

5

6

4

2

1

31

42

84

67

6068

71

7233

82

11

2021

86

85

5977

28

579953

29

12

9627

35

6554

51

48

5298

61

6355

16 66

7092

112

143

113

103100

104

114

109145142

133

130

131

129115

144

Òî ì ñêèé ô åäåðàëüí û é ï ðèðî äí û é çàêàçí èê

Êàëòàéñêèé ðåãèî í àëüí ûé ï ðèðî äí ûé çàêàçí èê

Ëàðèí ñêèé ðåãèî í àëüí û é ï ðèðî äí ûé çàêàçí èê

Áåðåãî âî é ñêëî í ðåêè Òî ì èì åæäó ã.Òî ì ñêî ì è Êî ëàðî âî

91

32

Êèðååâñêî å

Èãëî âñêî å

Óñòüåâî å

Ì î í àñòû ðñêî å

Êî çþ ëèí ñêî å

Äèêàÿ êî ñà

Ï ðî òî êà åëüöî âàÿ

MeetingGeneva, February 16-17, 2005

UNEP Initiative on capacity Building for Intergrated Assessment and Planning for

Sustainable Development

20

Existing gaps and IAP tools for addressing

Lack of strategic view Scenario Development

Vision development

SWOT

Environmental screening

Lack of participation Informal group meetings with village residents (in rural area)

Stakeholders workshops and round tables (in urban area)

Stakeholders mapping

Lack of integration Vision development

Scenario Development

Comparative trend development

Sustainability indicators

Multi-criteria analysis

Lack of consistency Formal analysis of the Programme structure and cross-linkages

21

Addressing narrative issues

Priority Tool to addressStabilizing of agricultural production,

(appropriate economic assessment tools)

Lack of investment attractiveness, poor image of the District

Properly addressed (expert analysis)

Inter-municipal relations Negotiations and stakeholders involvement

Sustainable nature use for the benefit of local residents

Sustainability indicators

Improving social service Sustainability indicators

Social Assessment

Municipal (and social) reforms Social Assessment

#

#

#

#

#

#

#

#

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

##

##

#

##

#

#

#

#

#

#

#

#

#

#

##

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

##

## #

##

#

##

#

#

#

##

#

#

#

#

# #

##

#

#

#

#

# #

#

#

#

##

#

#

##

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

#

$T#S

#S

$T

$T

$T$T$T

$T#S #0

$T

$T%U%U%U

%U%U$T

$T

$T$T $T#S $T

$T $T$T

%U

#S$T%U

$T#S

#S$T

$T%U#0#0

%U$T

$T

$T

$T$T

$T$T$T

$T$T%U $T$T

%U $T $T$T$T

%U

#0$T

$T

#S

ÇÀÒÎ Ñåâåðñê

ã. Òî ì ñê

ßð

Ãàðü

Êè ðå ê

Ýóøòà

Þ æí û é

Óù åð á

Êóðëåê

Êà øòà ê

Ì è ðí û é

Ãóá èí î

Áû êî âî

Áî ðèêè

Ñàì óñ ü

Èòàòêà

Ëà âð î âî

Ï åòð î âî

Êà çàí êà

Èï àòî âî

Ëÿ çãè í î

Í àä åæäà

Î ðë î âêà

Ñâå òëûé

Ðà ññâåò

Î ì óòí î å

Ï åð î âêà

Êî çþë èí î

Êà í äèí êà

Êî ëà ðî âî

Áà òóðèí î

Ðû áà ëî âî

Êèñëî âêà

Áî ãà øåâî

Î âðàæí î å

Ëó ÷àí î â î

Çà ðå ÷í û éÑóõàðåâ î

Ï åòóõ î âî

Ï åõó òî âî

Àð êàø åâ î

Ï î ð î ñè í îÍ åë þ áèí î

Êî ëî ì èí î

Èãë àêî âî

Êèæèð î âî

Áî áð î â êà

Çàðå÷í û é

ÊèðãèçêàÂî ðî í è í î

Êî ï û ë î â î

Õàë äå åâî

Í àóì î âêà

Î ë üãî âêà

Ï î äëî ì ñê

Ì à çàë î â î

Êà ðá ûøå âî

Ï î ë î â èí êà

Âå ðø èí èí î

Áåðåçêèí î

Áå ëî óñî âî

Í åêð àñî âî

Ëî ñêóòî âî

Êî ðí èë î âî

Çàâàð çèí î

Ñóõî ðå÷ üå

Êóçî âë åâ î

Ñåì è ëóæêè

Ì à ëè í î âêà

Ì èëî í î âêà

Áàðà í öåâ î

Ðî ì àí î â êà

Ãî ðüêî âêà

Êà ðþ êè í êà

×å ðí ûø åâêà

Ñóåòèëî âêà

Ñòåï àí î âêà

Ãî ñ êî í þ øí ÿ

Áà ñà í ä àé êà

Ï ëî òí èêî â î

Ãåî ðãèå âêà

Ì î ëî äåæí û é

Í èêî ëàåâêà

Òóðóí òàåâ î

Êà ðàêî çî â î

Áå ðå çî ðå÷êà

Í î â î èãë î âñê

Ñàëòàí àêî âî

Òà õòàì û øå âî

Çî ðêà ëüö åâ î

Ì å æåí èí î âêà

Ï î ï àäåéêèí î

Î êòÿá ðü ñêèé

Ãðè ãî ðèåâêà

Í î â î ñòð î é êà

86-é êâàð òàë

Êà ôòà í ÷è êî â î

×å ðí àÿ Ðå÷ êà

Í èæí èé Ñêë àä

×åðí àÿ Ðå÷ êà

Ñï àñî -ÿéñêî å

Òè ì èð ÿçå âñêè é

Ñî þ çï ë î ä î òàðà

Ï åòð î ï àâë î â ñê

×å ðí èë üù èêî âî

Áî ëü øèå Ãî ðêè

Í àãî ð í û é Èø òàí

Î ë üãî -Ñ àï åæåí êà

Àë åêñàí äð î âñêî å

Çî í àëüí àÿ Ñòà í öèÿ

Ì î ðÿêî âñêèé Çàòî í

Í î â î àðõà í ãåë üñêî å

Ï åòð î âñêèé Ó÷àñòî ê

Êóäðè í ñêè é Ó÷àñ òî êÍ î â î ðî æäå ñòâåí ñêî å

Ñàô ðî í î âî

Îñïà

Òàøì à

Áå ðå çî âà ÿ

Êî ëá èõà

×àí ãàðà

7

3

5

6

4

2

1

31

42

84

67

6068

71

7233

82

11

2021

86

85

5977

28

579953

29

12

9627

35

6554

51

48

5298

61

6355

16 66

7092

112

143

113

103100

104

114

109145142

133

130

131

129115

144

Òî ì ñêèé ô åäåðàëüí û é ï ðèðî äí û é çàêàçí èê

Êàëòàéñêèé ðåãèî í àëüí ûé ï ðèðî äí ûé çàêàçí èê

Ëàðèí ñêèé ðåãèî í àëüí û é ï ðèðî äí ûé çàêàçí èê

Áåðåãî âî é ñêëî í ðåêè Òî ì èì åæäó ã.Òî ì ñêî ì è Êî ëàðî âî

91

32

Êèðååâñêî å

Èãëî âñêî å

Óñòüåâî å

Ì î í àñòûðñêî å

Êî çþëèí ñêî å

Äèêàÿ êî ñà

Ï ðî òî êà åëüöî âàÿ

22

Challenges

• Valuable improving of the local planning capacity;

• Turning the palling to the needs of local residents;

• Strengthening relationships and co-operation on the local level

MeetingGeneva, February 16-17, 2005

UNEP Initiative on capacity Building for Intergrated Assessment and Planning for

Sustainable Development

#

#

#

#

#

#

#

#

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

##

##

#

##

#

#

#

#

#

#

#

#

#

#

##

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

##

## #

##

#

##

#

#

#

##

#

#

#

#

# #

##

#

#

#

#

# #

#

#

#

##

#

#

##

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

#

$T#S

#S

$T

$T

$T$T$T

$T#S #0

$T

$T%U%U%U

%U%U$T

$T

$T$T $T#S $T

$T $T$T

%U

#S$T%U

$T#S

#S$T

$T%U#0#0

%U$T

$T

$T

$T$T

$T$T$T

$T$T%U $T$T

%U $T $T$T$T

%U

#0$T

$T

#S

ÇÀÒÎ Ñåâåðñê

ã. Òî ì ñê

ßð

Ãàðü

Êè ðå ê

Ýóøòà

Þ æí û é

Óù åð á

Êóðëåê

Êà øòà ê

Ì è ðí û é

Ãóá èí î

Áû êî âî

Áî ðèêè

Ñàì óñ ü

Èòàòêà

Ëà âð î âî

Ï åòð î âî

Êà çàí êà

Èï àòî âî

Ëÿ çãè í î

Í àä åæäà

Î ðë î âêà

Ñâå òëûé

Ðà ññâåò

Î ì óòí î å

Ï åð î âêà

Êî çþë èí î

Êà í äèí êà

Êî ëà ðî âî

Áà òóðèí î

Ðû áà ëî âî

Êèñëî âêà

Áî ãà øåâî

Î âðàæí î å

Ëó ÷àí î â î

Çà ðå ÷í û éÑóõàðåâ î

Ï åòóõ î âî

Ï åõó òî âî

Àð êàø åâ î

Ï î ð î ñè í îÍ åë þ áèí î

Êî ëî ì èí î

Èãë àêî âî

Êèæèð î âî

Áî áð î â êà

Çàðå÷í û é

ÊèðãèçêàÂî ðî í è í î

Êî ï û ë î â î

Õàë äå åâî

Í àóì î âêà

Î ë üãî âêà

Ï î äëî ì ñê

Ì à çàë î â î

Êà ðá ûøå âî

Ï î ë î â èí êà

Âå ðø èí èí î

Áåðåçêèí î

Áå ëî óñî âî

Í åêð àñî âî

Ëî ñêóòî âî

Êî ðí èë î âî

Çàâàð çèí î

Ñóõî ðå÷ üå

Êóçî âë åâ î

Ñåì è ëóæêè

Ì à ëè í î âêà

Ì èëî í î âêà

Áàðà í öåâ î

Ðî ì àí î â êà

Ãî ðüêî âêà

Êà ðþ êè í êà

×å ðí ûø åâêà

Ñóåòèëî âêà

Ñòåï àí î âêà

Ãî ñ êî í þ øí ÿ

Áà ñà í ä àé êà

Ï ëî òí èêî â î

Ãåî ðãèå âêà

Ì î ëî äåæí û é

Í èêî ëàåâêà

Òóðóí òàåâ î

Êà ðàêî çî â î

Áå ðå çî ðå÷êà

Í î â î èãë î âñê

Ñàëòàí àêî âî

Òà õòàì û øå âî

Çî ðêà ëüö åâ î

Ì å æåí èí î âêà

Ï î ï àäåéêèí î

Î êòÿá ðü ñêèé

Ãðè ãî ðèåâêà

Í î â î ñòð î é êà

86-é êâàð òàë

Êà ôòà í ÷è êî â î

×å ðí àÿ Ðå÷ êà

Í èæí èé Ñêë àä

×åðí àÿ Ðå÷ êà

Ñï àñî -ÿéñêî å

Òè ì èð ÿçå âñêè é

Ñî þ çï ë î ä î òàðà

Ï åòð î ï àâë î â ñê

×å ðí èë üù èêî âî

Áî ëü øèå Ãî ðêè

Í àãî ð í û é Èø òàí

Î ë üãî -Ñ àï åæåí êà

Àë åêñàí äð î âñêî å

Çî í àëüí àÿ Ñòà í öèÿ

Ì î ðÿêî âñêèé Çàòî í

Í î â î àðõà í ãåë üñêî å

Ï åòð î âñêèé Ó÷àñòî ê

Êóäðè í ñêè é Ó÷àñ òî êÍ î â î ðî æäå ñòâåí ñêî å

Ñàô ðî í î âî

Îñïà

Òàøì à

Áå ðå çî âà ÿ

Êî ëá èõà

×àí ãàðà

7

3

5

6

4

2

1

31

42

84

67

6068

71

7233

82

11

2021

86

85

5977

28

579953

29

12

9627

35

6554

51

48

5298

61

6355

16 66

7092

112

143

113

103100

104

114

109145142

133

130

131

129115

144

Òî ì ñêèé ô åäåðàëüí û é ï ðèðî äí û é çàêàçí èê

Êàëòàéñêèé ðåãèî í àëüí ûé ï ðèðî äí ûé çàêàçí èê

Ëàðèí ñêèé ðåãèî í àëüí û é ï ðèðî äí ûé çàêàçí èê

Áåðåãî âî é ñêëî í ðåêè Òî ì èì åæäó ã.Òî ì ñêî ì è Êî ëàðî âî

91

32

Êèðååâñêî å

Èãëî âñêî å

Óñòüåâî å

Ì î í àñòûðñêî å

Êî çþëèí ñêî å

Äèêàÿ êî ñà

Ï ðî òî êà åëüöî âàÿ

23

Lessons learned

• IAP creates good basis for Programme implementation, monitoring and correction

• Integration is realistic approach on the local level• Public involvement is an exciting tool on both the

planning and implementation stages• Appropriate forms of public involvement should

be used. Forms are differed in rural and urban areas

#

#

#

#

#

#

#

#

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

##

##

#

##

#

#

#

#

#

#

#

#

#

#

##

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

##

## #

#

#

#

##

#

#

#

##

#

#

#

#

# #

##

#

#

#

#

# #

#

#

#

##

#

#

##

#

#

#

#

#

#

##

#

#

#

#

#

#

#

#

#

$T#S

#S

$T

$T

$T$T$T

$T#S #0

$T$T%U%U

%U

%U%U$T

$T

$T$T $T#S $T

$T $T$T

%U

#S$T%U

$T#S

#S$T

$T%U#0#0

%U$T

$T

$T

$T$T

$T$T$T

$T$T%U $T$T

%U $T $T$T$T

%U

#0$T

$T

#S

ÇÀÒÎ Ñåâåðñê

ã. Òî ì ñê

ßð

Ãàð ü

Êè ðå ê

Ýóøòà

Þ æí û é

Óù åð á

Êóð ëå ê

Êà øòà ê

Ì è ðí û é

Ãóá èí î

Áû êî âî

Áî ðè êè

Ñàì óñ ü

Èòàòêà

Ëà âð î âî

Ï åòð î âî

Êà çàí êà

Èï à òî âî

Ëÿ çãè í î

Í àä åæä à

Î ðë î â êà

Ñâå òëû é

Ðà ññâ åò

Î ì óòí î å

Ï åð î âêà

Êî çþ ë èí î

Êà í ä èí êà

Êî ëà ðî âî

Áà òóð èí î

Ðû áà ëî âî

Êè ñëî âêà

Áî ãà øå âî

Î âð àæí î å

Ëó ÷àí î â î

Çà ðå ÷í û éÑóõà ðåâ î

Ï åòóõ î âî

Ï åõó òî âî

Àð êàø åâ î

Ï î ð î ñè í îÍ åë þ á èí î

Êî ëî ì èí î

Èãë àêî âî

Êè æèð î âî

Áî áð î â êà

Çà ðå ÷í û é

Êè ðãèçêàÂî ðî í è í î

Êî ï û ë î â î

Õà ë äå åâî

Í àóì î âêà

Î ë üãî âêà

Ï î ä ëî ì ñê

Ì à çàë î â î

Êà ðá û øå âî

Ï î ë î â èí êà

Âå ðø èí èí î

Áå ðå çêèí î

Áå ëî óñî âî

Í åêð àñî âî

Ëî ñêóòî âî

Êî ðí è ë î âî

Çà âàð çèí î

Ñóõî ðå÷ üå

Êóçî âë åâ î

Ñåì è ëóæêè

Ì à ëè í î âêà

Ì è ëî í î âêà

Áà ðà í ö åâ î

Ðî ì àí î â êà

Ãî ð üêî âêà

Êà ðþ êè í êà

×å ðí û ø åâêà

Ñóåòè ëî âêà

Ñòåï àí î âêà

Ãî ñ êî í þ øí ÿ

Áà ñà í ä àé êà

Ï ëî òí è êî â î

Ãåî ðãèå âêà

Ì î ëî äå æí û é

Í èêî ëà åâêà

Òóð óí òà åâ î

Êà ðàêî çî â î

Áå ðå çî ð å÷êà

Í î â î èãë î âñ ê

Ñàë òàí àêî âî

Òà õòàì û øå âî

Çî ðêà ëüö åâ î

Ì å æåí èí î âêà

Ï î ï àä åé êèí î

Î êòÿá ðü ñêèé

Ãðè ãî ðè åâ êà

Í î â î ñòð î é êà

86-é êâàð òàë

Êà ô òà í ÷è êî â î

×å ðí àÿ Ðå÷ êà

Í èæí èé Ñêë àä

×å ðí àÿ Ðå÷ êà

Ñï à ñî - ÿé ñêî å

Òè ì èð ÿçå âñêè é

Ñî þ çï ë î ä î òà ðà

Ï åòð î ï àâë î â ñê

×å ðí èë üù èêî âî

Áî ëü øè å Ãî ð êè

Í àãî ð í û é Èø òàí

Î ë üãî -Ñ àï å æåí êà

Àë å êñ àí äð î âñ êî å

Çî í à ëüí àÿ Ñòà í ö èÿ

Ì î ðÿêî âñêè é Çà òî í

Í î â î àð õà í ãåë üñêî å

Ï åòð î âñ êèé Ó÷à ñòî ê

Êóä ðè í ñ êè é Ó÷àñ òî êÍ î â î ðî æäå ñòâ åí ñ êî å

Ñàô ðî í î âî

Òàøì à

Áå ðå çî âà ÿ

Êî ëá èõà

7

3

5

6

4

2

1

31

42

84

67

6068

71

7233

82

11

2021

86

85

5977

28

579953

29

12

9627

35

6554

51

48

5298

61

6355

16 66

7092

112

143

113

103100

104

114

109145142

133

130

131

129115

144

Òî ì ñêèé ô åäåðàëüí û é ï ðèðî äí û é çàêàçí èê

Êàëòàéñêèé ðåãèî í àëüí ûé ï ðèðî äí ûé çàêàçí èê

Ëàðèí ñêèé ðåãèî í àëüí û é ï ðèðî äí ûé çàêàçí èê

Áåðåãî âî é ñêëî í ðåêè Òî ì èì åæäó ã.Òî ì ñêî ì è Êî ëàðî âî

91

32

Êèðååâñêî å

Èãëî âñêî å

Óñòüåâî å

Ì î í àñòûðñêî å

Êî çþëèí ñêî å

Äèêàÿ êî ñà

Ï ðî òî êà åëüöî âàÿ

24

Planned Activities and Next Steps• Continue the public consultation process• Continue IAP case studies:

– IAP of the DP for Asino and Tomsk City municipalities

– IAP of the Tomsk Oblast Development Programme (2006-2020)

• Basing on IAP results, contribute to evaluation process of Tomsk District DP

• Expand IAP approach to the village planning process– Small-scale IAP for Moryakovka village

MeetingGeneva, February 16-17, 2005

UNEP Initiative on capacity Building for Intergrated Assessment and Planning for

Sustainable Development

25

IAP methodsMethods used Methods to be used

SWOT Vision development

Sustainability indicators Scenario Development

‘Consistency analysis’ Comparative trend development

Stakeholders analysis and mapping

Multi-criteria analysis

Appropriate forms of public involvement

Environmental screening