A/E Emergency Generator Upgrade Building
Outstanding Engineering Achievement Award
Selection Criteria in Order of Importance
1.Demonstrate engineering challenges and innovative solutions
2.Demonstrate the importance of the engineering profession to society
3.Demonstrate a clear and tangible benefit to the Delaware Valley Region
3
Demonstrate engineering challenges and innovative solutions
Present Facility Site Plan
Work Statement
1.Provide all design services including investigating surveys and verification of as-built conditions as required to fully develop construction documents for the construction of a new Emergency Generator Building to Service Buildings 1,2 and 21.
4
Demonstrate engineering challenges and innovative solutions
Construction Area Site Plan
5
Demonstrate engineering challenges and innovative solutions
Work Statement
2.Copy of a previous study and preliminary and 35% drawings were be provided.
Job # 1 – Convince client to start over!
Provide new approach: Using 13.2 KV Generators Using Modular Prefab Generator Bldgs Emergency Power Feeders are always
energized providing better reliability.
6
Demonstrate engineering challenges and innovative solutions
New Functional System Diagram
7
Demonstrate engineering challenges and innovative solutions
Work Statement
3.Mission Critical – Capable of Continuing Operation during times if War, National Security Emergencies and of mitigating the effects of natural and man made disasters
The Physical Security Design Manual has the requirement for 96 hour fuel supply, as does NFPA 110 for Seismic Design Category C installations.
Provide N + 1 power source on site for critical loads.
8
Demonstrate engineering challenges and innovative solutions
Work Statement
4. System should not raise the noise level or disturb the tranquility of the neighbors.
9
Demonstrate engineering challenges and innovative solutions
Work Statement
5. Develop phasing plan to maintain emergency power during construction.
10
Demonstrate engineering challenges and innovative solutions
Work Statement
6.Keep N+1 to Critical Loads during construction.
11
Demonstrate engineering challenges and innovative solutions
Work Statement
7.Provide 96 Hours of back up fuel that will only be used if both MV Services are lost.
12
Demonstrate engineering challenges and innovative solutions
Work Statement
8.Meet requirements for Seismic Design Category – “C”
13
Demonstrate engineering challenges and innovative solutions
Work Statement
9.Provide Control and Monitoring Systems with documents for Joint Commission.
14
Demonstrate engineering challenges and innovative solutions
Work Statement
10.LEED Certification!
15
Demonstrate engineering challenges and innovative solutions
Work Statement
11.Power System and Arc Flash Studies
16
Demonstrate engineering challenges and innovative solutions
Work Statement
12.Complete Conceptual and Detail Designs and Specifications in 16 Weeks!
17
Design Team
• Maida Engineering, Inc • Metcalfe Architecture and Design• Hunt Engineering Company• Mark J. Kucirka• Urban Technologies, Inc.
Demonstrate the importance of the engineering profession to society
18
Demonstrate the importance of the engineering profession to society
Final Product
Demo and Installation – Building 6
19
Final Product
Demo and Installation – Building 16
Demonstrate the importance of the engineering profession to society
20
Final Product
Demo and Installation – Building 2 and 8
Demonstrate the importance of the engineering profession to society
21
Final Product
Modifications throughout the Entire Hospital
Demonstrate the importance of the engineering profession to society
22
Final Product
Installation – New Emergency Power Source
Demonstrate the importance of the engineering profession to society
23
Power Loads and Priority Load Shedding
• Critical Loads – Priority 1 – 1,328.82 KW
• Equipment Loads – Priority 2 – 1,348.15 KW
• Energy Center Loads (Building 6 and 8) – Priority 1 – Not listed, estimated to be 120 KW
• Chiller Plant Equipment Load – Priority 3 – 1,000 KW
• Total of all Essential Emergency Loads is 3,998 KW
Demonstrate the importance of the engineering profession to society
24
Demonstrate the importance of the engineering profession to society
• Project was based on the creativity, experience and knowledge of engineers.
• Project was led by engineers
• Construction will be controlled by engineers
• Commissioning will be performed by engineers
25
Demonstrate the importance of the engineering profession to society
•Functional requirements were defined by engineers
•Life Safety was enhanced by engineers
•Systems will or have been designed by engineers
•System programming will be done by engineers
26
Demonstrate a clear and tangible benefit to the Delaware Valley Region
•Stimulus money paid local architect and engineers
•Construction will be in the Delaware Valley
•The local VA hospital can better serve an expanding number of veterans
•The facility was designed to be Mission Critical
Questions?
Joseph Maida, PEPresident