Learning Outcomes
Pada akhir pertemuan ini, diharapkan mahasiswa
akan mampu :
• Menunjukkan hubungan antara kebutuhan kontrol dengan current architecture
3
Outline Materi
• Step Three: Chart The Course
• Isolating and Decoupling Legacy System through Data Hubs
4
Step Three: Chart The Course
Establishing the course may seem to be a simple thing to do.
5
Step Three: Chart The Course
A straight line in laying out the tactical plan to replace the legacy of architecture with
the future state.
6
Step Three: Chart The Course
The Steps to Chart:
• Isolating and Decoupling Legacy System through Data Hubs.
• Warehouse and Decision Support System as interim integrators
7
Isolating and Decoupling Legacy System through Data Hubs
The first time you create a hub, you actually make the job a little harder, which makes it difficult to gain support for this approach.
8
Isolating and Decoupling Legacy System through Data Hubs
Direct Connection Replace direct link between house #1 and #3 Replace
direct link between house #2 and #5 All directs link removed.
9
Isolating and Decoupling Legacy System through Data Hubs
Since we have to rewrite the links anyway, we just write ht links to the hub instead of
to each other.
10
Isolating and Decoupling Legacy System through Data Hubs
Legacy system change into directly connected architecture by eliminating,
simplifying and replacing.
11