1 nyc green infrastructure program the sustainable city: roundtable on science, urban ecosystem...
TRANSCRIPT
1
NYC Green Infrastructure Program
The Sustainable City: Roundtable on Science, Urban Ecosystem Services, and Green Infrastructure
May 19, 2015
1
2
NYC Combined Sewered Area
7,400 miles of sewers
• 3,337 miles of combined
• 2,271 miles of sanitary
• 1,801 miles of storm
• 400 acres of Bluebelts (draining 14,500 acres)
Combined sewers in 60% of the city
*Above statistics in process of being updated
NYC’s Combined Sewer Area
3
Water Quality in New York City Harbor
= does not meet water quality standards
(pathogens/DO)
75% of Harbor meets pathogen standards for swimming
19% meets standards for boating and fishing
7% of our Harbor is made up of tributaries that do not meet secondary contact standards
4
GI Application Rates and Milestone Schedule
2010 2015 2020 2025 20300%
1%
2%
3%
4%
5%
6%
7%
8%
9%
10%
Initial 1.5%
Additional 2.5%
Additional 3.0%
Final 3%
DEP has committed to spend $1.5 billion in green infrastructure projects through 2030.
Overall Goal: To manage 1” of stormwater runoff from 10% of impervious surfaces in combined sewer areas by 2030
5
GI Program OverviewProgrammatic Areas:
• Right of Way GI Design/Construction:
• Area-wide implementation of Bioswales and Stormwater Greenstreets
• Adding GI to scope of existing capital highway and sewer projects
• Public Property Retrofits:• School yards, playgrounds, public housing, parklands, parking lots
• Green Infrastructure Grant Program:
• $ 11.5M committed to 29 projects
• Additional Program Areas:
• Research and Development
• Neighborhood Demonstration Areas
• O&M/Asset Management Program
• Outreach and Engagement Program
6
Area-wide Right of Way Construction
Example: 26th Ward/Jamaica Bay CSO Area Anticipated construction completion December 2015
7
Right-of-way Bioswale
8
Stormwater Greenstreet
9
Public Property
Retrofit Projects
9
10
Hope Gardens Houses, Brooklyn - Before
11
Hope Gardens Houses, Brooklyn - After
12
Edenwald Houses, Bronx
Downspout Disconnect
Type of green infrastructure
Construction Start: Spring 2015
Construction End: Spring 2017
12
Rain Garden
Porous Paving
13
Schoolyards with DOE and TPL
Before After
14
Private Property
Grant Projects
14
15
Brooklyn Navy Yard – Rooftop Farm
16
Bishop Loughlin – Green Roof
17
Queens College – Rain Garden and Pavers
17
18
Lenox Hill Neighborhood House- Green Roof
18
19
New York Restoration Project – Rain Garden/Pavers
19
20
Measuring Co-Benefits of
Green Infrastructure
20
21
Cost and Benefit Comparison Tool
22
Jamaica Bay/26W-003, CB 16 – Current Construction
22
23
Additional Benefits for Community Board 16
Public Health Benefits:
• Individual bioswales show
Temperatures can be 15% lower than
sidewalk and street.
• 63 lbs of ozone removed per year
• 46 lbs of PM10 removed per year
• 46 lbs of nitrogen dioxide removed
per year
• 25 lbs of sulfur dioxide removed
per year
Ecosystem Benefits:
• Improved ecosystem, greenspace,
and well being for residents and
desirability of neighborhoods.
Economic Benefits:
• 245 jobs supported over lifetime
For the 423 bioswales and stormwater greenstreets to be installed in CB16, the possible co-benefits per year could be:
24
Preliminary Analysis
24
1,200 Right-of-way Bioswales TotalTotal GI Footprint (ft²)* 90,000Total Net CO2 Produced (lb/yr) 181,200 Total CO2 Produced (lb/yr) 274,800
Total Carbon Sequestered (lb/yr) 86,400 Total Inferred CO2 Reduction (lb/yr) 7,836Total Ozone Removed (lb/yr) 180Total PM10 Removed (lb/yr) 132Total NO2 Removed (lb/yr) 132Total SO2 Removed (lb/yr) 72Total CO Removed (lb/yr) 24Total Jobs Supported 374Total Treatment Savings ($/yr) 408Urban Heat Island Reduction (%) 14
This table shows estimated additional benefits for first phases of construction in area-wide ROW contracts.
*ROWBs vary in size from 10’x5’ to 20’x5’ pending siting procedures. These estimates are based on 15’x5’**While Net CO2 Production for ROWB is positive, DEP assumes that this number is significantly less than what would be produced by gray infrastructure construction.
25
Thank You.
Margot Walker
Director, Capital Planning and Partnerships
Office of Green Infrastructure
25