Page 1: 1 Item 2.7 ECIP 2009-2013 developments Reference: Action Paper SCG/8/AP05 Flimsy SCG/8/FL06 Christian Coëffé ECIP Manager SCG/8 14 & 15 May 2008

1

Item 2.7Item 2.7

ECIP 2009-2013ECIP 2009-2013 developmentsdevelopments

Reference: Reference: ►►Action Paper SCG/8/AP05Action Paper SCG/8/AP05 ►►Flimsy SCG/8/FL06Flimsy SCG/8/FL06

Christian CoëfféChristian Coëffé

ECIP ManagerECIP Manager

SCG/8 14 & 15 May 2008

Page 2: 1 Item 2.7 ECIP 2009-2013 developments Reference: Action Paper SCG/8/AP05 Flimsy SCG/8/FL06 Christian Coëffé ECIP Manager SCG/8 14 & 15 May 2008

2

PCPC

SCGSCG

TeamsTeams& & PSGsPSGs

ECIP Approval process

strate

gic in

put

strate

gic in

put

Fin

al appro

val

ATM StrategicOrientations

Endorsement ofECIP amendments

Proposed list ofECIP amendments

Final list ofECIP amendments

ECIP Strategicdevelopments

Approval of final listof ECIP amendments

Analysis of proposedECIP amendments

SCG/8(May 2008)

Page 3: 1 Item 2.7 ECIP 2009-2013 developments Reference: Action Paper SCG/8/AP05 Flimsy SCG/8/FL06 Christian Coëffé ECIP Manager SCG/8 14 & 15 May 2008

3

ECIP amendments for 2009-2013

Reference remains the proposal made at the SCG/7 meeting, with the exception of :

8.33 kHz channel spacing below FL 195 COM10 ‘Tentative’ objective is not accepted COMd2 ‘Under development’ is introduced

Common ATS provision in the Upper Airspace of the Central European (CEATS) States

FAC01 objective is removed from ECIP A new FAB-related objective is expected for the next cycle

Centralised SSR Code Assignment & Management System (CCAMS) To be discussed under agenda item 4.4

A number of extensions of applicability areas confirmed by Stakeholders A-SMGCS with Antalya / Turkey Airport collaborative decision making with Roma-Fumicino / Italy European air traffic controller licence requirements & enhanced training of ATCOs

with Belgium ATS-Qsig digital signalling for ground telephone applications with Denmark

Page 4: 1 Item 2.7 ECIP 2009-2013 developments Reference: Action Paper SCG/8/AP05 Flimsy SCG/8/FL06 Christian Coëffé ECIP Manager SCG/8 14 & 15 May 2008

4

A first analysis led to a list of 10 SESAR OI/TI steps considered mature enough for integration into the ECIP process (see Annex 3 of Action Paper SCG/8/AP01)

A more in depth analysis reduced the initial list to 3 SESAR OI/TI steps (see Flimsy SCG/8/xxxx)

Both Airspace-related and Environment-related ECIP opportunities still need detailed technical discussions through normal working arrangements before being proposed for integration into ECIP

SESAR-related ECIP headlinesfor 2009-2013 (1/2)

Page 5: 1 Item 2.7 ECIP 2009-2013 developments Reference: Action Paper SCG/8/AP05 Flimsy SCG/8/FL06 Christian Coëffé ECIP Manager SCG/8 14 & 15 May 2008

5

Airport CDM extended to regional airports (SESAR OI step DCB-0304) Provide improved estimates of arrivals at regional airports Integrate improved estimates of arrivals at regional airports in ATFCM

Interactive network capacity planning (SESAR OI step DCB-0201) Develop interface to exchange capacity (planning) and demand (forecasted)

data with Airspace & Demand Data Repository (ADR & DDR) through CFMU portal

Harmonised EUROCONTROL ECAC area rules for OAT-IFR and GAT interface (SESAR OI step AOM-0301) Develop specifications for harmonised OAT rules under IFR

SESAR-related ECIP headlinesfor 2009-2013 (2/2)

Page 6: 1 Item 2.7 ECIP 2009-2013 developments Reference: Action Paper SCG/8/AP05 Flimsy SCG/8/FL06 Christian Coëffé ECIP Manager SCG/8 14 & 15 May 2008

6

ECIP 2009-2013 – Next Steps

TodayToday

SCG agreement on ECIP objectivesamendments for 2009-2013

+SESAR-relatedECIP headlines

JuneJune

ECIP Status Report 2007

JulyJuly

PC endorsementfor 2009-2013

SeptemberSeptember

•ATM implementation perspective•Detailed objectives description•Executive summary

Page 7: 1 Item 2.7 ECIP 2009-2013 developments Reference: Action Paper SCG/8/AP05 Flimsy SCG/8/FL06 Christian Coëffé ECIP Manager SCG/8 14 & 15 May 2008

7

2008 remains a transition year :

2009 should show the renewed ECIP/LCIP process

Proposal is to discuss with SCG members in October 2008 :

strategic orientations for the next cycle what has already been done to adapt ECIP/LCIP process during

the SESAR definition phase what is still to be done for the next cycle

Next cycle 2010-2014

Page 8: 1 Item 2.7 ECIP 2009-2013 developments Reference: Action Paper SCG/8/AP05 Flimsy SCG/8/FL06 Christian Coëffé ECIP Manager SCG/8 14 & 15 May 2008

8

ECIP 2009-2013 - Recommendations

Members of the SCG are invited to: Agree that

the new objectives and significant changes to existing ones set out in Annexes 1 & 2 of SCG/8 Action Paper 05;

the SESAR-related ECIP headlines as proposed in the Flimsy SCG/8/FL06

be submitted to the EUROCONTROL Provisional Council by correspondence for their endorsement and subsequent inclusions in the ECIP 2009-2013 document