1 iso tc184/sc4 wg3/t24 step manufacturing martin hardwick step tools, inc. june 11-15, 2001 san...
TRANSCRIPT
![Page 1: 1 ISO TC184/SC4 Wg3/T24 STEP Manufacturing Martin Hardwick STEP Tools, Inc. June 11-15, 2001 San Francisco, USA](https://reader036.vdocuments.site/reader036/viewer/2022082506/5697bfe31a28abf838cb4c38/html5/thumbnails/1.jpg)
1
ISO TC184/SC4 Wg3/T24STEP Manufacturing
Martin Hardwick
STEP Tools, Inc.
June 11-15, 2001
San Francisco, USA
![Page 2: 1 ISO TC184/SC4 Wg3/T24 STEP Manufacturing Martin Hardwick STEP Tools, Inc. June 11-15, 2001 San Francisco, USA](https://reader036.vdocuments.site/reader036/viewer/2022082506/5697bfe31a28abf838cb4c38/html5/thumbnails/2.jpg)
2
The Web Site
• Majordomo E-mail exploder– [email protected]
• Archive– http://www.steptools.com/manforum
• Send questions and additions to– [email protected]
![Page 3: 1 ISO TC184/SC4 Wg3/T24 STEP Manufacturing Martin Hardwick STEP Tools, Inc. June 11-15, 2001 San Francisco, USA](https://reader036.vdocuments.site/reader036/viewer/2022082506/5697bfe31a28abf838cb4c38/html5/thumbnails/3.jpg)
3
Wg3/ T24 San Francisco Agenda
AP-219 Harmonization with STEP-NC
Turning Model
USA STEP-NC Demonstration
Korean STEP-NC Demonstration
Interoperability Testing
Wire EDM Model
Status review of Tool Model ISO 13399
Review of results of ISO 14649 Ballot Resolution Workshop
AP-238 Mapping
![Page 4: 1 ISO TC184/SC4 Wg3/T24 STEP Manufacturing Martin Hardwick STEP Tools, Inc. June 11-15, 2001 San Francisco, USA](https://reader036.vdocuments.site/reader036/viewer/2022082506/5697bfe31a28abf838cb4c38/html5/thumbnails/4.jpg)
4
Results
• CMM machines AP-219 and STEP-NC– AP-219 to describe input and output data for CMM– STEP-NC to describe control of CMM machines
• Korea and ISW Turning models to be harmonized• Review of SC1 Frankfurt meeting
– Resolution of Units needs to be finalized in document– US will change vote on 14649-10 DIS from “NO” to “YES”
when acceptable text on units is in a draft of the document– Open issues remain on “In-process” features and machine
requirements