1 ISA&D 7 / 8 / 2013 The Analyst as a Project Manager

Upload: holly-joseph

Post on 29-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

1ISA&D7 /8/2013

The Analyst as a Project Manager

Page 2: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

2ISA&D7 /8/2013

Page 3: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

3ISA&D7 /8/2013

• IS Projects: Success and Failure • Role of the Project Manager• Project Management Tasks in SDLC• Project Initiation and Project Planning

Lecturer details

Page 4: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

4ISA&D7 /8/2013

• Project management is important for success of system development project

2000 Standish Group Study

Only 28% of system development projects successful

72% of projects cancelled, completed late, completed over budget, and/or limited in functionality

Thus, project requires careful planning, control, and execution

Why project management

Page 5: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

5ISA&D7 /8/2013

• Clear system requirement definitions• Substantial user involvement• Support from upper management• Thorough and detailed project plans•Realistic work schedules and milestones

http://www.durantlaw.info/research-contributions-and-value

Project success factors

Page 6: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

6ISA&D7 /8/2013

• Incomplete or changing requirements• Limited user involvement• Lack of executive support• Lack of technical support• Poor project planning• Unclear objectives• Lack of required resources

Project Failure factors

Page 7: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

7ISA&D7 /8/2013

Page 8: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

8ISA&D7 /8/2013

• Project management – organizing and directing people to achieve a planned result within budget and on schedule

• Project manager – a person has primary responsibility for the functioning of the team.

Success or failure of project depends on skills of the project manager

Beginning of project – plan and organize

During project – monitor and control

Responsibilities are both internal and external

Role of project manager

Page 9: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

9ISA&D7 /8/2013

• Identify project tasks and build a work breakdown structure• Define the milestones• Develop the project schedule• Recruit and train team members• Assign team members to tasks• Coordinate activities of team members and sub-teams• Assess project risks• Monitor and control project deliverables and milestones• Verify the quality of project deliverables

Internal responsibilities

Page 10: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

10ISA&D7 /8/2013

• Report the project’s status and progress• Establish good working relationships with those who identify the needed system requirements

The people who will use the system

• Work directly with the client (the project’s sponsor) and other stakeholders• Identify resource needs and obtain resources

External responsibilities

Page 11: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

11ISA&D7 /8/2013

Participants in a system development project

Page 12: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

12ISA&D7 /8/2013

Project management task in SDLC

Page 13: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

13ISA&D7 /8/2013

• Overlap with SDLC phases

• Beginning of project Overall project planning

• During project Project execution management

Project control management

Project closeout

• Project management approach differs for Predictive SDLC (linear, concurrently with SDLC activities)

Adaptive SDLC (in cycle, planning is distributed across the entire SDLC)

Project management task in SDLC

Page 14: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

14ISA&D7 /8/2013

Project management and SDLC tasks for predictive project

Page 15: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

15ISA&D7 /8/2013

Project management and SDLC tasks for adaptive project

Page 16: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

16ISA&D7 /8/2013

There are three ways to initiate a project

• Top-down projects- This method is through the long-term IS strategic plan• Bottom-up projects. Through Individual department managers or process managers are close to the daily work• Outside-forces project. Projects can be initiated to respond to outside forces

Project initiation

Page 17: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

17ISA&D7 /8/2013

Project planning

Page 18: 1 ISA&D7/8/2013. 2 ISA&D7/8/2013 3 ISA&D7/8/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC

18ISA&D7 /8/2013

End