1. introductionenvironmentclearance.nic.in/writereaddata/online/tor/0_0... · 2014. 12. 22. ·...
TRANSCRIPT
-
Pre-Feasibility Report Vijaya sri chemicals.
1
1. Introduction
M/s. Vijayasri Chemicals is located at Plot NO.42, in SVCIE, Jeedimetla,
Rangareddy District in Telangana. The unit was established in March
1998. Copy of sale deed is enclosed as Annexure I. The unit obtained
CFE of the Board and CFO vide letter no:
APPCB/10076/HYD/JDM/52/HO/CFO/2013-2274 dated 06.07.2013 to
manufacture Intermediates called Trimethyl Orthovalerate, Trimethyl
Orthobutyrate, Trimethyl Orthoproplonate & 2-Butyl 4-Chloro 5-
Formylimidazole with a capacity of 4.74 TPM. Copy of CFO of the Board is
enclosed at Annexure II. The unit obtained CFE for Change of product
mix in 2014. Copy of the same is enclosed as Annexure III.
As the unit is drug intermediate category and not covered under 1994 EIA
notification, EC requirement was not there and hence not taken.
In order to meet the market demand it is proposed to expand the
production Capacity from 4.74 TPM to 53.0 TPM
-
Pre-Feasibility Report Vijaya sri chemicals.
2
2. Introduction of the Project
The salient features of the project are described in table below
TABLE 1.0
Salient Features of the Project
Location Plot NO.42, SVCIE,
Jeedimetla, Rangareddy (D) Telangana.
Longitude and latitude
17031’12.3” N Latitude and 78027’33.9” E Longitude
Year of establishment 1998 Product category 5(f), Drug Intermediates Project category as per EIA
notification
A”( As the unit is located in 10 Km
radius of Bollaram & patancheru cluster which is notified under CEPI)
Proposed Activity Capacity expansion from 4.74 TPM to 53.0 TPM
Total investment on the plant Current - Rs. 10.7 Crores & Proposed – Rs.3.0
Total Investment on Environmental Infrastructure
Rs. 0.10 Crores (Current) Rs.1.5 Crore ( Proposed) – Total 1.6 Crores
Total area of the plant 4939.8 Sq meters
Total area of green belt 926.0 sq meters
Water requirement Total water requirement after expansion 69.9 KLD
Freshwater Requirement 30.6 KLD Recycled water is 39.3 KLD
Source of water
Purchased from outside tankers
Nearest habitation and distance from the site
Shapur nagar (V) at a distance of 1.0 Km from the site
Nearest surface water bodies Fox sagar-0.67 Km (NE) Nearest reserve forest Dulapalli reserve forest at a distance
of 1.31 Kms in North direction Environmentally sensitive areas within 10 km radius
None
Any national parks, wild life sanctuaries within 10 km radius
None
Nearest air port and distance Rajiv Gandhi International Airport, Shamshabad is nearly 31.18 Kms
from the plant site
Nearest railway station and
distance
Bharat nagar at distance of 10 Kms
from the site
-
Pre-Feasibility Report Vijaya sri chemicals.
3
i) About the Group & Promoters
M/s. Vijayasri Chemicals., is located Plot NO.42, in SVCIE, Jeedimetla,
Rangareddy District in Telangana to manufacture drug intermediate
The project proponent Mr. K.V.Ramarao, is a science graduate from
Andhra university and Has rich experience in the field of the fine
chemicals; intermediates and API’s. He is looking after the day to day
functioning’s in procurement of raw materials & creditors & debtor
Management. Vijayasri chemicals have highly profiled technical team
processing of post graduation and Doctorates level.
Our team is well Development of New molecules, polymorphic forms and
Stereo Isomers. Vijayasri has much experience in Catering of API’s
intermediates.
-
Pre-Feasibility Report Vijaya sri chemicals.
4
3. Project Description
3.1 Production Capacity
The Unit is currently manufacturing API & Drug Intermediates as detailed
below
TABLE 2.0
LIST OF EXISTING PRODUCTS
S.No Name of the Product Quantities in TPM
1. Trimethyl Orthovalerate 1.44
2. Trimethyl Orthobutyrate 1.20
3. Trimethyl Orthoproplonate 2.00
4. 2-Butyl 4-Chloro 5-Formylimidazole 0.1
Total 4.74
3.1.1 Proposed expansion:
It is now proposed to expand the production capacity by including 6 new
products along with 1 existing product. Below Table provides list of
products and proposed capacities.
TABLE 3.0
PROPOSED PRODUCTS & CAPACITY
S.No Name of the Product Qty. in TPM
Product Description
API/Intermediate/ Multipurpose chemicals
1 Valsartan 5.00 API
2 Ambroxol Hydrochloride 5.00 API
3 Pentaoperazol Sodium
5.00 API
4 Sertaline Hydrochloride 5.00 API
5 Losartan Potassium 20.00 API
6 Rabeprazol 5.00 API
7 2-Butyl-4-chloro-5-
formyl imidazol 8.00 Intermediate
Total 53.0
-
Pre-Feasibility Report Vijaya sri chemicals.
5
3.2 Manufacturing Process
Brief process description and process flow charts are given at Annexure
V
3.3 Raw Materials
List of raw material product wise is given at Annexure IV
3.4 Water Requirement
The water requirement will be met from private suppliers through
tankers. The requirement for water in this unit is for process and domestic
purposes. The water balance for daily consumption is presented below.
TABLE 4.0
Water Balance– Current & Proposed
S. No
Stream
Water requirement in
KLD
Waste Water discharge in
KLD
Proposed method of treatment &
disposal
Current After Expan
sion
Current After Expan
sion
1 Process
4.664
35.9
4.664
39.9
MEE followed by
ATFD. (Condensate to ETP & RO)
2 Washings 3.0 3.0
MEE followed by
ATFD. (Condensate to ETP & RO)
3 Cooling Towers 9.7
16.0 -- 1.5 ETP & RO (RO Reject to MEE)
4 Boiler 8.0 0.4 1.0 ETP & RO (RO
Reject to MEE)
5 DM/Softene
r
-- 2.0 -- 2.0 ETP & RO (RO
Reject to MEE)
6 Domestic 2.5 4.0 1.5 3.2 ETP & RO (RO
Reject to MEE)
7 Gardening -- 1.0 -- --
Total 16.864 69.9 6.564 50.6
-
Pre-Feasibility Report Vijaya sri chemicals.
6
3.5 Wastes generation and control systems
3.5.1 Liquid Effluents
As detailed in table 4.0 waste water generation after expansion would be
50.6 KLD. It is proposed to segregate effluents into high COD and High
TDS stream and Low COD and Low TDS streams
High TDS and High COD stream would be treated in stripper followed by
MEE and ATFD. The resultant sludge would be disposed to TSDF,
Hyderabad. The Low TDS stream would be treated along with MEE/ATFD
condensates in biological ETP followed by RO. The RO rejects would be fed
back to MEE. The Permeate from RO would be used for cooling tower
make up. Thus the treatment system proposed is based on “Zero Liquid
Discharge” (ZLD) Concept
The schematic diagrams of ETP proposed are given in Figure 1.1 and
Figure 1.2 below
-
Pre-Feasibility Report Vijaya sri chemicals.
7
Fig 1.1 Schematic treatment scheme of high TDS effluents
Effluent from Process and
Reactor and RO rejects Floor washings
Sludge to TSDF
Condensate to Biological Treatment Condensate to Biological Treatment
Sludge to TSDF
Equalization
Tank
MEE
ATFD
Neutralization
Tank
Setting
Tank
Stripper Aq. Distillate to
recovery/ Cement
industries/ TSDF
-
Pre-Feasibility Report Vijaya sri chemicals.
8
Fig 1.2 Low TDS Effluent Treatment System
Domestic
Effluents from utilities MEE condensate
Sludge to TSDF
Permeate for re-use
Rejects to MEE
Screen
Chamber
Sludge Holding Tank
Equalization
Tank
Neutralization
Tank
Clarifier
2
Holding
Tank
Filter Press Sludge Cake
Aeration
Tank1 Clarifier
1
Sand
filter
Carbon
Filter
Ultra
filtration RO
Screen
Chamber
-
Pre-Feasibility Report Vijaya sri chemicals.
9
3.5.2 Solid wastes management
Hazardous and non - hazardous wastes generated from the proposed
expansion project are detailed below. Mode of disposal are also identified
and listed. Adequate storage of hazardous waste is ensured at the site
TABLE 5.0
Solid Wastes and Disposal
S.No
Description
Quantity TPM Remarks
Current
After
Expansion
1 Spent Carbon 0.014 5.48 Sent to TSDF/ Cement plant
2 ETP sludge 13.50 25.0 Sent to TSDF Dundigal
3 MEE salts/ -- 74.0 Sent to TSDF Dundigal
4 Inorganic salt
from process
-- 77.69 Sent to TSDF Dundigal
5 Organic
residue
-- 25.17
6 Distillation bottom
residue
0.150 0.5 Sent to TSDF/ Cement plant
7 Process sludge
2.002 -- Sent to TSDF Dundigal
TOTAL 15.66 207.84
Non Hazardous Wastes
8 Ash from boilers
-- 4.75 TPD Sold to brick manufacturers
Wastes with recyclable options
9 Waste /Used
Oil
5 LPM 10 LPM Authorized Recyclers
10 De-toxified
container &
container liners
-- 100
Nos/month After detoxification, disposed
to outside agencies
-
Pre-Feasibility Report Vijaya sri chemicals.
10
TSDF facility is about 30 Kms from the site in RangaReddy District which
is created for catering the industries in this area. Transport of Hazardous
wastes to TSDF is done by Ramky. In case other hazardous wastes,
authorized recyclers will transport the wastes
4. Site Analysis 4.1 Plant Location
M/s. Vijayasri Chemicals is located at Plot NO.42, in SVCIE, Jeedimetla,
Rangareddy District in Telangana. The site is situated at 17031’12.3” N
Latitude and 78027’33.9” E Longitude. The land area of the plant is
4939.8 Sqmtrs. The nearest habitation from the site is Shapurnagar (V)
at a distance of 1.0 km. The nearest railway station is located at
Bharatnagar at a distance of 10 Kms from the site. There are no
ecologically sensitive areas like national parks, sanctuaries within 10 km
radius of the site.
The site is surrounded by other industries of IDA Jeedinetla. Following are
the surroundings of the site
North – Gampalabasti
South – Prince LaboratoresLtd.
East – Open plot followed by Gampalabasti
West – Approach Road followed by SteelGodown.
Following 7 reserve Forests are there within 10 KM radius of the site
Table 6.0
Reserve Forests in the study area
S.No Reserve Forest Direction from the
site
Distance from the
site
1 Dulapalli N 1.31
2 GajulaRamaram NW 4.07
3 Pochampalli N 5.41
4 Goudavalli N 7.21
5 Dundigal NW 9.94
6 Kajipalli NW 9.96
7 Kandalakoyya NE 9.44
-
Pre-Feasibility Report Vijaya sri chemicals.
11
Topo graphic features of the site and 10 KM study area is given at Fig 1.3
Plant Photographs are given at Fig. 1.4
Site lay out map is given at Fig 1.5
-
Pre-Feasibility Report Vijaya sri chemicals.
12
Fig 1.3
Topomap of the 10 KM study area
-
Pre-Feasibility Report Vijaya sri chemicals.
13
Base Map of the Study Area
-
Pre-Feasibility Report Vijaya sri chemicals.
14
Fig 1.4.
Plant Photographs
-
Pre-Feasibility Report Vijaya sri chemicals.
15
Fig 1.5
Site lay out plan
-
Pre-Feasibility Report Vijaya sri chemicals.
16
5.0 Planning in Brief
The project is envisaged to be completed by September 2015 and the
production shall be initiated thereon. Consultants are identified for
preparing the detailed project report.
6.0 Resource requirements 6.1 Power Requirement and Supply/Source
The total power requirement is 500 KVA. It shall be sourced from
TSCPDCL and D.G sets as alternative to Power failure.
6.2 Production facilities , Utilities and effluent handling facilities
There will not be any additions to production facilities for expansion as
existing infrastructure is sufficient. Utilities and ZLD facilities for proposed
expansion is given in the table below
TABLE 7.0
Utilities/ETP – Existing & Proposed
S.NO Details
Capacity/
No Current
Additions
After
expansion
Production facilities
1 Production Blocks- Nos 1 - 1
2 Clean rooms Nos 1 - 1
Utilities
3 Boiler ( coal Fired) TPH 2 TPH 5 TPH 5 TPH
4 DG sets KVA 1 X 125, 1X 250
1 X 500 500
5 Cooling tower TR 2X200, 1X125 -- 525
6 Softner/DM plant M3/hour 1 -- 1
Effluent handling & treatment facilities
7 collection tanks-
Storage
KL 8X 25 2X 25 250
8 Neutralisation tanks KL 1X 30, 1X 20 2X 30 110
9 Stripper, MEE, ATFD KLD 25 50 50
10 RO & Biological treatment
KLD -- 50 50
-
Pre-Feasibility Report Vijaya sri chemicals.
17
6.3 Land Requirement
The unit currently has 4939.8 Sq.mtrs of land and out of which 926
sq.mtrs of green belt is developed. Below table provides the land
statement. Detailed site lay out plan is given at Figure 1.5
Table 8.0
Land Statement
S.NO Purpose Units Extent
1 Built up area Sq.M 4013.8
2 Green belt Sq.M 926.0
Total Sq.M 4939.8
7.0 Air Pollution
The Sources of air emissions from the plant are 1x 5.0 TPH coal fired
boiler.
The process emissions from the second phase contain SO2, HCl, HBr and
CO2. HCl, SO2 & HBr emissions are scrubbed with caustic lye and
scrubbed waste is send to MEE. The other gases expected in the process
are carbon dioxide, which are let out into the atmosphere.
Below Table gives current & proposed emission sources from the plant.
-
Pre-Feasibility Report Vijaya sri chemicals.
18
Table 9.0
Emission Source – Current & Proposed
S.NO Source Capacity
Fuel Anticipated
emissions
Control
system
Current
1 Boiler 2 TPH Coal SPM, SO2
& NOx
Dust
collector
2 DG sets 1 X125,
1 X 250 KVA
Diesel SPM, SO2,
NOx
Acoustic
enclosure
3 Process emissions -- -- HCl Scrubber
Proposed additions
4 Boiler 5 TPH Coal SPM, SO2 & NOx
Multiclone,
bagfilter
5 DG sets 1X500 Diesel SPM, SO2, NOx
Acoustic enclosure
6 Process emissions -- -- HBr, HCl,SO2
Scrubber
8.0 Bulk Chemicals Storage
Following bulk chemical storage facilities are proposed for expansion
activity
Table No 10.0
Storage facilities of bulk chemicals
Sr
No
Capacity
(KL) Name of the solvent MOC
1 25 Acetone SS316
2 20 H2SO4 MS
3 20 Methanol SS316
4 20 Toluene SS316
5 20 Ethylacetate SS316
6 20 HCl PP/FRP
-
Pre-Feasibility Report Vijaya sri chemicals.
19
9.0 Project Financial
The estimated cost of the expansion project is approximately 3.0 Crores.
Out of this Rs. 1.5 Crores will be for effluents treatment facilities and rest
for other utilities
Project cost
Rs. In lakhs
Plant & machinery 100
Civil & structural 50
Roads/Drains/Dykes etc 10
Pipe lines & insulation
10% on plant &
machinery 25
Electricals & instrumentation 10% on plant & machinery 25
Erection & commissioning & painting
5% on plant &
machinery and structures 50
Safety & Environment 10
Furniture, fixtures, computers,
lighting etc 15
Contingencies & pre-operative
expenses 10
Project cost 295