Pre-Feasibility Report Vijaya sri chemicals. 1 1. Introduction M/s. Vijayasri Chemicals is located at Plot NO.42, in SVCIE, Jeedimetla, Rangareddy District in Telangana. The unit was established in March 1998. Copy of sale deed is enclosed as Annexure I. The unit obtained CFE of the Board and CFO vide letter no: APPCB/10076/HYD/JDM/52/HO/CFO/2013-2274 dated 06.07.2013 to manufacture Intermediates called Trimethyl Orthovalerate, Trimethyl Orthobutyrate, Trimethyl Orthoproplonate & 2-Butyl 4-Chloro 5- Formylimidazole with a capacity of 4.74 TPM. Copy of CFO of the Board is enclosed at Annexure II. The unit obtained CFE for Change of product mix in 2014. Copy of the same is enclosed as Annexure III. As the unit is drug intermediate category and not covered under 1994 EIA notification, EC requirement was not there and hence not taken. In order to meet the market demand it is proposed to expand the production Capacity from 4.74 TPM to 53.0 TPM

Upload: others

Post on 22-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

  • Pre-Feasibility Report Vijaya sri chemicals.

    1

    1. Introduction

    M/s. Vijayasri Chemicals is located at Plot NO.42, in SVCIE, Jeedimetla,

    Rangareddy District in Telangana. The unit was established in March

    1998. Copy of sale deed is enclosed as Annexure I. The unit obtained

    CFE of the Board and CFO vide letter no:

    APPCB/10076/HYD/JDM/52/HO/CFO/2013-2274 dated 06.07.2013 to

    manufacture Intermediates called Trimethyl Orthovalerate, Trimethyl

    Orthobutyrate, Trimethyl Orthoproplonate & 2-Butyl 4-Chloro 5-

    Formylimidazole with a capacity of 4.74 TPM. Copy of CFO of the Board is

    enclosed at Annexure II. The unit obtained CFE for Change of product

    mix in 2014. Copy of the same is enclosed as Annexure III.

    As the unit is drug intermediate category and not covered under 1994 EIA

    notification, EC requirement was not there and hence not taken.

    In order to meet the market demand it is proposed to expand the

    production Capacity from 4.74 TPM to 53.0 TPM

  • Pre-Feasibility Report Vijaya sri chemicals.

    2

    2. Introduction of the Project

    The salient features of the project are described in table below

    TABLE 1.0

    Salient Features of the Project

    Location Plot NO.42, SVCIE,

    Jeedimetla, Rangareddy (D) Telangana.

    Longitude and latitude

    17031’12.3” N Latitude and 78027’33.9” E Longitude

    Year of establishment 1998 Product category 5(f), Drug Intermediates Project category as per EIA

    notification

    A”( As the unit is located in 10 Km

    radius of Bollaram & patancheru cluster which is notified under CEPI)

    Proposed Activity Capacity expansion from 4.74 TPM to 53.0 TPM

    Total investment on the plant Current - Rs. 10.7 Crores & Proposed – Rs.3.0

    Total Investment on Environmental Infrastructure

    Rs. 0.10 Crores (Current) Rs.1.5 Crore ( Proposed) – Total 1.6 Crores

    Total area of the plant 4939.8 Sq meters

    Total area of green belt 926.0 sq meters

    Water requirement Total water requirement after expansion 69.9 KLD

    Freshwater Requirement 30.6 KLD Recycled water is 39.3 KLD

    Source of water

    Purchased from outside tankers

    Nearest habitation and distance from the site

    Shapur nagar (V) at a distance of 1.0 Km from the site

    Nearest surface water bodies Fox sagar-0.67 Km (NE) Nearest reserve forest Dulapalli reserve forest at a distance

    of 1.31 Kms in North direction Environmentally sensitive areas within 10 km radius

    None

    Any national parks, wild life sanctuaries within 10 km radius

    None

    Nearest air port and distance Rajiv Gandhi International Airport, Shamshabad is nearly 31.18 Kms

    from the plant site

    Nearest railway station and

    distance

    Bharat nagar at distance of 10 Kms

    from the site

  • Pre-Feasibility Report Vijaya sri chemicals.

    3

    i) About the Group & Promoters

    M/s. Vijayasri Chemicals., is located Plot NO.42, in SVCIE, Jeedimetla,

    Rangareddy District in Telangana to manufacture drug intermediate

    The project proponent Mr. K.V.Ramarao, is a science graduate from

    Andhra university and Has rich experience in the field of the fine

    chemicals; intermediates and API’s. He is looking after the day to day

    functioning’s in procurement of raw materials & creditors & debtor

    Management. Vijayasri chemicals have highly profiled technical team

    processing of post graduation and Doctorates level.

    Our team is well Development of New molecules, polymorphic forms and

    Stereo Isomers. Vijayasri has much experience in Catering of API’s

    intermediates.

  • Pre-Feasibility Report Vijaya sri chemicals.

    4

    3. Project Description

    3.1 Production Capacity

    The Unit is currently manufacturing API & Drug Intermediates as detailed

    below

    TABLE 2.0

    LIST OF EXISTING PRODUCTS

    S.No Name of the Product Quantities in TPM

    1. Trimethyl Orthovalerate 1.44

    2. Trimethyl Orthobutyrate 1.20

    3. Trimethyl Orthoproplonate 2.00

    4. 2-Butyl 4-Chloro 5-Formylimidazole 0.1

    Total 4.74

    3.1.1 Proposed expansion:

    It is now proposed to expand the production capacity by including 6 new

    products along with 1 existing product. Below Table provides list of

    products and proposed capacities.

    TABLE 3.0

    PROPOSED PRODUCTS & CAPACITY

    S.No Name of the Product Qty. in TPM

    Product Description

    API/Intermediate/ Multipurpose chemicals

    1 Valsartan 5.00 API

    2 Ambroxol Hydrochloride 5.00 API

    3 Pentaoperazol Sodium

    5.00 API

    4 Sertaline Hydrochloride 5.00 API

    5 Losartan Potassium 20.00 API

    6 Rabeprazol 5.00 API

    7 2-Butyl-4-chloro-5-

    formyl imidazol 8.00 Intermediate

    Total 53.0

  • Pre-Feasibility Report Vijaya sri chemicals.

    5

    3.2 Manufacturing Process

    Brief process description and process flow charts are given at Annexure

    V

    3.3 Raw Materials

    List of raw material product wise is given at Annexure IV

    3.4 Water Requirement

    The water requirement will be met from private suppliers through

    tankers. The requirement for water in this unit is for process and domestic

    purposes. The water balance for daily consumption is presented below.

    TABLE 4.0

    Water Balance– Current & Proposed

    S. No

    Stream

    Water requirement in

    KLD

    Waste Water discharge in

    KLD

    Proposed method of treatment &

    disposal

    Current After Expan

    sion

    Current After Expan

    sion

    1 Process

    4.664

    35.9

    4.664

    39.9

    MEE followed by

    ATFD. (Condensate to ETP & RO)

    2 Washings 3.0 3.0

    MEE followed by

    ATFD. (Condensate to ETP & RO)

    3 Cooling Towers 9.7

    16.0 -- 1.5 ETP & RO (RO Reject to MEE)

    4 Boiler 8.0 0.4 1.0 ETP & RO (RO

    Reject to MEE)

    5 DM/Softene

    r

    -- 2.0 -- 2.0 ETP & RO (RO

    Reject to MEE)

    6 Domestic 2.5 4.0 1.5 3.2 ETP & RO (RO

    Reject to MEE)

    7 Gardening -- 1.0 -- --

    Total 16.864 69.9 6.564 50.6

  • Pre-Feasibility Report Vijaya sri chemicals.

    6

    3.5 Wastes generation and control systems

    3.5.1 Liquid Effluents

    As detailed in table 4.0 waste water generation after expansion would be

    50.6 KLD. It is proposed to segregate effluents into high COD and High

    TDS stream and Low COD and Low TDS streams

    High TDS and High COD stream would be treated in stripper followed by

    MEE and ATFD. The resultant sludge would be disposed to TSDF,

    Hyderabad. The Low TDS stream would be treated along with MEE/ATFD

    condensates in biological ETP followed by RO. The RO rejects would be fed

    back to MEE. The Permeate from RO would be used for cooling tower

    make up. Thus the treatment system proposed is based on “Zero Liquid

    Discharge” (ZLD) Concept

    The schematic diagrams of ETP proposed are given in Figure 1.1 and

    Figure 1.2 below

  • Pre-Feasibility Report Vijaya sri chemicals.

    7

    Fig 1.1 Schematic treatment scheme of high TDS effluents

    Effluent from Process and

    Reactor and RO rejects Floor washings

    Sludge to TSDF

    Condensate to Biological Treatment Condensate to Biological Treatment

    Sludge to TSDF

    Equalization

    Tank

    MEE

    ATFD

    Neutralization

    Tank

    Setting

    Tank

    Stripper Aq. Distillate to

    recovery/ Cement

    industries/ TSDF

  • Pre-Feasibility Report Vijaya sri chemicals.

    8

    Fig 1.2 Low TDS Effluent Treatment System

    Domestic

    Effluents from utilities MEE condensate

    Sludge to TSDF

    Permeate for re-use

    Rejects to MEE

    Screen

    Chamber

    Sludge Holding Tank

    Equalization

    Tank

    Neutralization

    Tank

    Clarifier

    2

    Holding

    Tank

    Filter Press Sludge Cake

    Aeration

    Tank1 Clarifier

    1

    Sand

    filter

    Carbon

    Filter

    Ultra

    filtration RO

    Screen

    Chamber

  • Pre-Feasibility Report Vijaya sri chemicals.

    9

    3.5.2 Solid wastes management

    Hazardous and non - hazardous wastes generated from the proposed

    expansion project are detailed below. Mode of disposal are also identified

    and listed. Adequate storage of hazardous waste is ensured at the site

    TABLE 5.0

    Solid Wastes and Disposal

    S.No

    Description

    Quantity TPM Remarks

    Current

    After

    Expansion

    1 Spent Carbon 0.014 5.48 Sent to TSDF/ Cement plant

    2 ETP sludge 13.50 25.0 Sent to TSDF Dundigal

    3 MEE salts/ -- 74.0 Sent to TSDF Dundigal

    4 Inorganic salt

    from process

    -- 77.69 Sent to TSDF Dundigal

    5 Organic

    residue

    -- 25.17

    6 Distillation bottom

    residue

    0.150 0.5 Sent to TSDF/ Cement plant

    7 Process sludge

    2.002 -- Sent to TSDF Dundigal

    TOTAL 15.66 207.84

    Non Hazardous Wastes

    8 Ash from boilers

    -- 4.75 TPD Sold to brick manufacturers

    Wastes with recyclable options

    9 Waste /Used

    Oil

    5 LPM 10 LPM Authorized Recyclers

    10 De-toxified

    container &

    container liners

    -- 100

    Nos/month After detoxification, disposed

    to outside agencies

  • Pre-Feasibility Report Vijaya sri chemicals.

    10

    TSDF facility is about 30 Kms from the site in RangaReddy District which

    is created for catering the industries in this area. Transport of Hazardous

    wastes to TSDF is done by Ramky. In case other hazardous wastes,

    authorized recyclers will transport the wastes

    4. Site Analysis 4.1 Plant Location

    M/s. Vijayasri Chemicals is located at Plot NO.42, in SVCIE, Jeedimetla,

    Rangareddy District in Telangana. The site is situated at 17031’12.3” N

    Latitude and 78027’33.9” E Longitude. The land area of the plant is

    4939.8 Sqmtrs. The nearest habitation from the site is Shapurnagar (V)

    at a distance of 1.0 km. The nearest railway station is located at

    Bharatnagar at a distance of 10 Kms from the site. There are no

    ecologically sensitive areas like national parks, sanctuaries within 10 km

    radius of the site.

    The site is surrounded by other industries of IDA Jeedinetla. Following are

    the surroundings of the site

    North – Gampalabasti

    South – Prince LaboratoresLtd.

    East – Open plot followed by Gampalabasti

    West – Approach Road followed by SteelGodown.

    Following 7 reserve Forests are there within 10 KM radius of the site

    Table 6.0

    Reserve Forests in the study area

    S.No Reserve Forest Direction from the

    site

    Distance from the

    site

    1 Dulapalli N 1.31

    2 GajulaRamaram NW 4.07

    3 Pochampalli N 5.41

    4 Goudavalli N 7.21

    5 Dundigal NW 9.94

    6 Kajipalli NW 9.96

    7 Kandalakoyya NE 9.44

  • Pre-Feasibility Report Vijaya sri chemicals.

    11

    Topo graphic features of the site and 10 KM study area is given at Fig 1.3

    Plant Photographs are given at Fig. 1.4

    Site lay out map is given at Fig 1.5

  • Pre-Feasibility Report Vijaya sri chemicals.

    12

    Fig 1.3

    Topomap of the 10 KM study area

  • Pre-Feasibility Report Vijaya sri chemicals.

    13

    Base Map of the Study Area

  • Pre-Feasibility Report Vijaya sri chemicals.

    14

    Fig 1.4.

    Plant Photographs

  • Pre-Feasibility Report Vijaya sri chemicals.

    15

    Fig 1.5

    Site lay out plan

  • Pre-Feasibility Report Vijaya sri chemicals.

    16

    5.0 Planning in Brief

    The project is envisaged to be completed by September 2015 and the

    production shall be initiated thereon. Consultants are identified for

    preparing the detailed project report.

    6.0 Resource requirements 6.1 Power Requirement and Supply/Source

    The total power requirement is 500 KVA. It shall be sourced from

    TSCPDCL and D.G sets as alternative to Power failure.

    6.2 Production facilities , Utilities and effluent handling facilities

    There will not be any additions to production facilities for expansion as

    existing infrastructure is sufficient. Utilities and ZLD facilities for proposed

    expansion is given in the table below

    TABLE 7.0

    Utilities/ETP – Existing & Proposed

    S.NO Details

    Capacity/

    No Current

    Additions

    After

    expansion

    Production facilities

    1 Production Blocks- Nos 1 - 1

    2 Clean rooms Nos 1 - 1

    Utilities

    3 Boiler ( coal Fired) TPH 2 TPH 5 TPH 5 TPH

    4 DG sets KVA 1 X 125, 1X 250

    1 X 500 500

    5 Cooling tower TR 2X200, 1X125 -- 525

    6 Softner/DM plant M3/hour 1 -- 1

    Effluent handling & treatment facilities

    7 collection tanks-

    Storage

    KL 8X 25 2X 25 250

    8 Neutralisation tanks KL 1X 30, 1X 20 2X 30 110

    9 Stripper, MEE, ATFD KLD 25 50 50

    10 RO & Biological treatment

    KLD -- 50 50

  • Pre-Feasibility Report Vijaya sri chemicals.

    17

    6.3 Land Requirement

    The unit currently has 4939.8 Sq.mtrs of land and out of which 926

    sq.mtrs of green belt is developed. Below table provides the land

    statement. Detailed site lay out plan is given at Figure 1.5

    Table 8.0

    Land Statement

    S.NO Purpose Units Extent

    1 Built up area Sq.M 4013.8

    2 Green belt Sq.M 926.0

    Total Sq.M 4939.8

    7.0 Air Pollution

    The Sources of air emissions from the plant are 1x 5.0 TPH coal fired

    boiler.

    The process emissions from the second phase contain SO2, HCl, HBr and

    CO2. HCl, SO2 & HBr emissions are scrubbed with caustic lye and

    scrubbed waste is send to MEE. The other gases expected in the process

    are carbon dioxide, which are let out into the atmosphere.

    Below Table gives current & proposed emission sources from the plant.

  • Pre-Feasibility Report Vijaya sri chemicals.

    18

    Table 9.0

    Emission Source – Current & Proposed

    S.NO Source Capacity

    Fuel Anticipated

    emissions

    Control

    system

    Current

    1 Boiler 2 TPH Coal SPM, SO2

    & NOx

    Dust

    collector

    2 DG sets 1 X125,

    1 X 250 KVA

    Diesel SPM, SO2,

    NOx

    Acoustic

    enclosure

    3 Process emissions -- -- HCl Scrubber

    Proposed additions

    4 Boiler 5 TPH Coal SPM, SO2 & NOx

    Multiclone,

    bagfilter

    5 DG sets 1X500 Diesel SPM, SO2, NOx

    Acoustic enclosure

    6 Process emissions -- -- HBr, HCl,SO2

    Scrubber

    8.0 Bulk Chemicals Storage

    Following bulk chemical storage facilities are proposed for expansion

    activity

    Table No 10.0

    Storage facilities of bulk chemicals

    Sr

    No

    Capacity

    (KL) Name of the solvent MOC

    1 25 Acetone SS316

    2 20 H2SO4 MS

    3 20 Methanol SS316

    4 20 Toluene SS316

    5 20 Ethylacetate SS316

    6 20 HCl PP/FRP

  • Pre-Feasibility Report Vijaya sri chemicals.

    19

    9.0 Project Financial

    The estimated cost of the expansion project is approximately 3.0 Crores.

    Out of this Rs. 1.5 Crores will be for effluents treatment facilities and rest

    for other utilities

    Project cost

    Rs. In lakhs

    Plant & machinery 100

    Civil & structural 50

    Roads/Drains/Dykes etc 10

    Pipe lines & insulation

    10% on plant &

    machinery 25

    Electricals & instrumentation 10% on plant & machinery 25

    Erection & commissioning & painting

    5% on plant &

    machinery and structures 50

    Safety & Environment 10

    Furniture, fixtures, computers,

    lighting etc 15

    Contingencies & pre-operative

    expenses 10

    Project cost 295

    Say Rs. 3.0 Crores