1 hilda dimmock chief, decennial data collection branch field division february 23, 2010 nonresponse...

26
1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee Meeting

Upload: debra-burke

Post on 18-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

1

Hilda DimmockChief, Decennial Data Collection Branch

Field DivisionFebruary 23, 2010

Nonresponse Followup Discussion at the 2010 SDC Steering Committee Meeting

Page 2: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

2

The Nonresponse Followup Operation, or NRFU for short, is the largest field operation conducted during the decennial census. It is the operation that the public generally connects to the “Census Taker.”

NRFU is conducted in areas where questionnaires are mailed through the U.S. Postal Service, or hand-delivered by census employees during the Update Leave (UL) operation. In both situations, residents are asked to fill out the questionnaire and return it by mail. If we do not receive a questionnaire, we send enumerators to the address.

The Type of Enumeration Areas covered by NRFU are:

• Mailout/Mailback

• Update Leave

• Military regular housing (Mailout/Mailback areas that are part of military installations)

Nonresponse Followup (NRFU) Overview

Page 3: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

3

NRFU Overview

Questionnaires are delivered or mailed to all housing units in March 2010

• February 17-19 - Advance Letter for Update/Leave (U/L)

• March 1 - April 2 – Questionnaires delivered in U/L areas

• March 8-10 - Advance Letter for Mailout/Mailback areas

• March 15-17 - Questionnaires delivered in Mailout/MailBack areas

• March 22-24 - Reminder Postcard

• **March 23 – April 20, Questionnaires mailed in Late Mailing phase.

• APRIL 1, 2010 - CENSUS DAY

• April 1-3 – Blanket Replacement Questionnaire delivered

• April 6-10 – Targeted Replacement Questionnaire delivered

** A recent decision was made to add approximately 3 million addresses as a series of late mailings. These addresses consist of LUCA appeals and addresses that have been recently geocoded to census geography..

Page 4: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

4

NRFU Milestones

Key Milestones Start - End Census Day 4/01/10

Print Maps at Local Census Offices (LCOs) 1/19/10 - 03/31/10

Deploy Office Control System for NRFU, NRFU RI, and VDC 3/22/10

Cutoff for Initial NRFU Universe 4/07/10

Identify Initial NRFU Universe and Create Assignment Areas 4/08/10 - 4/17/10

Ingest Initial NRFU Universe into OCS, including automated removal of Late Mail Returns (LMRs)

4/12/10 - 4/21/10

Prepare Initial Assignments 4/22/10 - 4/26/10

Deploy NRFU Workload to LCOs 4/22/10

Train Enumerators for NRFU 4/27/10 – 4/30/10

Deploy and Maintain NRFU MaRCS application 4/26/10

Conduct NRFU Data Collection 5/01/10 - 7/10/10

Conduct NRFU RI Data Collection 5/07/10 - 7/27/10

Conduct VDC 7/24/10 – 8/25/10

Page 5: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

5

NRFU Workload and Staffing

• The Decennial Systems Processing Office (DSPO) starts creating the initial workload on April 8, 2010.

• The national workload estimate is approximately 49 million housing units (assumes 64% mail response rate, but we are currently assessing this.)

• The national staffing is approximately 635,000 field staff (including RI). Includes 6,000 Field Operations Supervisors (FOS’s), 51,000 Crew Leaders (CL’s), 103,000 Crew Leader Assistants (CLA’s), and 475,000 enumerators.

• There are 494 Local Census Offices (LCOs) in the US and Puerto Rico, and they report to the twelve regional census centers.

Page 6: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

6

NRFU Workload and Staffing

• LCOs conduct recruiting in all areas so that staffing reflects the community.

• LCOs will monitor the mail return rates daily after the data capture centers begin to report response shortly after March 17, 2010. These initial response rates are provided at the census tract level.

• The information is used to monitor staffing needs and to increase recruiting and/or community awareness.

Page 7: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

7

NRFU Preparation

• From 4/8 – 4/17, Assignment Areas (AAs) of approximately 40 addresses will be delineated by the Decennial Systems Processing Office and then sent to the Paper Based Operations Control System (PBOCS). PBOCS ingests the NRFU information between 4/12 – 4/21.

• We will remove Late Mail Returns (LMRs) received between April 7 and April 21, 2010 automatically from the workload before it is deployed to the LCOs.

• The NRFU workload is scheduled to be deployed to the LCOs on Thursday, April 22, 2010. Since this workload is received so close to enumerator training that begins April 27th, the LCO will be prepared to have staff available through the weekend to print and assemble all the materials needed to conduct the operation.

Page 8: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

8

NRFU Preparation

The operation control system provides the functionality to manage, monitor and control the various components of the operation. These include:

Employee Operations

Assignment Preparation

Manage Operations

Print Materials

View or Print Reports

Shipping

Page 9: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

9

NRFU Preparation

• Assignment preparation includes printing address list pages, labels and other forms, attaching address labels to questionnaires, and assembling all of the materials into AA Binders including census block maps.

• We will also print a listing of the mail returns that are received up to the time materials are ready to leave the LCO. These cases will be removed from the enumerator’s workload.

.

Page 10: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

10

NRFU Operation

A typical day for a NRFU Enumerator includes:

• Enumerators will carry a Census shoulder bag, Census ID badge and will be instructed to always provide contact information to confirm their identity.

• Preparing and planning work for that day. They are expected to work the most productive hours. In most cases, this will be afternoons, early evenings, and weekends when residents are likely to be home.

• Using Census block maps to plan an efficient travel route for that day.

• Assembling materials to ensure everything is available to do the job, including the labeled questionnaires sorted in the order of the planned visits to the addresses.

• Making a personal visit for the initial contact at each NRFU address.

Page 11: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

11

NRFU Operation

• Enumerators visit each address, verify that the address is located in the census block, determine its status as of census day (occupied, vacant, or did not exist as a housing unit and must be deleted), and complete a D-1(E), Enumerator Questionnaire. Questionnaires are also completed for additional housing units that enumerators discover while interviewing.

• The D-1(E), Enumerator Questionnaire, has space for up to 5 household members. Enumerators use a D-1(E) SUPP, Enumerator Continuation Questionnaire, for additional household members up to 49.

• Enumerators identify themselves to each respondent by displaying their Census ID badge and giving the respondent a D-1(F), Information Sheet, which contains the Confidentiality Notice.

Page 12: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

12

NRFU Operation

• Enumerators leave a D-26, Notice of Visit, if no one is home. Callbacks are often necessary in order to conduct an interview with an eligible household member. Enumerators must understand and abide by callback rules (up to 3 in-person and 3 by phone in most instances).

– If the housing unit appears to be vacant, they try to locate a respondent with knowledge of the Census Day status.

– If the housing unit appears to be occupied, they make the next visit at a different time of the day. If anyone is available, inquire what is the best time to catch the occupants at home.

• They meet daily with their Crew Leader or Crew Leader Assistant to report progress, discuss any problems, turn in completed work, and D-308s, Daily Pay Records.

Page 13: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

13

NRFU Processing

• Quality Assurance Checks:• When enumerators begin working they are observed by the Crew

Leader conducting actual work. If they don’t follow correct procedures, the Crew Leader will provide additional training. If they cannot correctly perform the duties, they will be released.

• When enumerators turn in completed work, the Crew Leader is required to review it for completeness before forwarding the materials to the LCO.

• When materials arrive at the LCO, staff will use checklists to ensure that completed work meets procedural standards. For any work that fails the office review, the Crew Leaders are notified and the work must be corrected. Work that passes the office review is checked into the control system and then shipped to a data capture center.

Page 14: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

14

NRFU Processing

• At Check in, we enter data items such as HU status and POP count into the control system.

• For questionnaires with POP count greater than five, we are able to align continuation forms to their parent form.

• We also select a sample of cases for Reinterview during the Check in process. Case IDs of questionnaires selected for Reinterview (RI) are made available in the separate operation control system for NRFU Reinterview. In 2010, we have a separate assistant manager for quality assurance in each LCO who supervises a separate staff of office and field employees to conduct the Nonresponse Followup Reinterview operation.

• After Check In, production questionnaires are ready to be Checked-Out for shipping to the data capture center.

Page 15: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

15

NRFU Close-Out

• Once a Crew Leader District has reached a 95% completion rate, the LCO will take steps to close it out. Outstanding cases are assessed and reassigned as necessary to efficiently close out the work.

• NRFU production is scheduled to end no later than July 10, 2010.

Page 16: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

16

NRFU Reinterview

Nonresponse Followup Reinterview is a separate field operation to ensure the data quality collected in NRFU by sampling approximately 5% of the eligible NRFU cases and conducting an independent interview.

There are several changes to the operation since Census 2000. These include:

• A separate operations control system.

• A separate enumerator reinterview questionnaire form.

• A separate operation supervised by the Assistant Manager for Quality Assurance in the LCO.

• The use of the Matching Review and Coding System (MaRCS).

Page 17: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

17

NRFU Reinterview Overview

• The Matching and Review Coding System (MaRCS) is an application that provides the ability to compare production against reinterview data to identify discrepancies.

• The MaRCS utilizes a computer matching and clerical matching of the RI and production case data.

Page 18: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

18

NRFU RI Overview

• The NRFU RI workload is approximately 5% of the NRFU workload selected from eligible production cases at the point of check in to the operations control system.

• Office staff or field enumerators attempt to contact the respondent and verify that the original enumerator contacted them.

Page 19: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

19

NRFU RI Overview

• If the original respondent confirms that he/she was interviewed by a NRFU enumerator, the RI enumerator collects only the household roster.

• If the original respondent does not confirm the original interview, the RI enumerator conducts an interview to collect complete data for all household members using the reinterview enumerator questionnaire.

Page 20: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

20

NRFU Vacant Delete Check

The NRFU Vacant Delete Check (VDC) operation begins within two weeks after the Nonresponse Followup operation is closed out. The latest it will begin is July 24, but it can start earlier in LCOs that complete their NRFU work ahead of the scheduled end date of July 10.

The purpose of the VDC operation is to conduct an independent interview at addresses coded as Vacants or Deletes during NRFU, and to contact addresses that were not included in the NRFU operation.

The universe for the NRFU Vacant/Delete Check (VDC) operation consists of three types of cases:

Page 21: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

21

NRFU Vacant Delete Check

• Eligible vacant and delete cases from NRFU.

• Questionnaires returned by mail to the data capture centers, but failed data capture because they were blank or contained inadequate information.

• New cases from New Construction, Count Review, Update/Leave adds that were not returned, and late adds from the U.S. Postal Service

Page 22: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

22

NRFU VDC Overview

• The estimated national workload for the NRFU VDC operation is estimated at 12.4 million.

• The scheduled dates are from July 24 – August 25, 2010. However, on an LCO-by-LCO basis, we expect to be able to start VDC within two weeks after completing NRFU.

• Just as they did in NRFU, enumerators will visit each address, determine its status as of Census Day (occupied, vacant, or delete), and complete a D-1(E), Enumerator Questionnaire.

Page 23: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

23

Summary of NRFU Operations

Staying on schedule and within budget are key elements of the NRFU strategy. There are ten weeks to complete an estimated 49,000,000 million cases in NRFU. There is very little time for recovery, so work must stay on schedule.

In addition to the NRFU work, the LCOs will be conducting the separate NRFU Reinterview Operation, and other operations that overlap with NRFU for some of the time. For example, the Update Enumerate Operation includes 1.3 million Housing Units and is conducted between 3/22 and 5/29/2010 in 88 LCOs. Also, as you heard, the Group Quarters operation will be conducted during some of the same time period.

Page 24: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

24

Summary of NRFU (continued)

The challenges of the NRFU Vacant Delete Check include having to complete a national workload of approximately 12,000,000 cases in less than a month. In addition, respondents may be more reluctant to cooperate in the followup operation.

Page 25: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

25

Summary of NRFU

Q and A

Page 26: 1 Hilda Dimmock Chief, Decennial Data Collection Branch Field Division February 23, 2010 Nonresponse Followup Discussion at the 2010 SDC Steering Committee

26

NRFU Overview

Contact Information:

[email protected]