1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

Upload: griffin-johnson

Post on 12-Jan-2016

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

1

Entergy Arkansas, Inc.

Proposed Transmission Reliability Projects

Entergy Transmission Planning Summit

New Orleans, LA

July 10, 2003

Page 2: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

2

2004/2005 EAI Transmission Projects

3.) Dell 500 / 161 kV Autotransformer Addition

37

8

Carryover from 2003

8.) Mohawk – New 345 / 115 kV Substation (ISD 2006)

10.) New 161 kV Line Osage Creek -Grandview Line (ISD 2006)

1

1.) Reconductoring of Lynch - Jacksonville North 115 kV Line

9

4

5

6

4.) Couch 115 kV Switch Riser Replacement

9.) Reconductoring of Corning - Texas Eastern #8 115 kV Line (ISD 2006)

6.) Gobel - New 230 / 115 kV Substation near Marvell (2005)

5.) New 115 kV Camden Maguire - Camden North Line

7.) Reconductoring of Trumann - Harrisburg Tap 161 kV Line

10

2.) Silver Hill: New Ring Bus at Intersection of EAI and SPA lines

2

2004 Projects

2005 Projects

Page 3: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

3

Lynch - Jacksonville North Area

Page 4: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

4

Lynch - Jacksonville North 115 kV Line Reconductoring

Scenario:

• The loss of the Jacksonville North - Sylvan Hills 115 kV line segment will cause loading in excess of 129% on the Lynch - McAlmont 115 kV line segment, and 108% on the McAlmont - Jacksonville South.

• Jacksonville South - Jacksonville North also overloads in future years.

• Line is constructed with 666 mcm conductor and limited to 800 Amps (159 MVA).

Proposed Solution:

• This project proposed to reconductor the three line segments with 1272 ASCR conductor to achieve a 261 MVA rating (64% increase).

Estimated Cost: $5,600,000

Page 5: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

5

Marshall Area

Page 6: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

6

Silver Hill 161 kV Ring BusBetween EAI and SPA Lines

Scenario:• The SPA Bull Shoals - Dardanelle transmission line crosses the

APL Harrison East - Quitman line near the Marshall substation. • The Summit - Harrison East line segment is constructed to a

different design specification, and transmission line sag has necessitated a line derating. The loss of the Eureka Springs - Osage Creek line segment causes the Summit - Harrison East line segment to overload to 139%.

• Opening the line to avoid the overload causes the contingency voltage at Harrison to drop from 0.9121 p.u. to 0.6487 p.u.

Proposed Solution:• Joining the existing lines enhances voltage support to Harrison,

especially following loss of Eureka Springs - Osage Creek.• This configuration redirects power flow out of Bull Shoals,

effectively unloading the Summit - Harrison East line segment. Estimated Cost: $3,350,000

Page 7: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

7

Dell Area

Page 8: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

8

Autotransformer Additionat Dell Substation

Scenario: • Dell 500/161 kV substation provides a high voltage source to

the northeastern area of Arkansas.• There are presently 4 single phase autos (3 in-service and 1

spare)• Each transformer has a rated capacity of 224 MVA.• The system was planned to accommodate the loss of a

single phase, since a spare can be quickly connected.• Loss of the entire autotransformer will cause depressed

voltages at Dell and the surrounding area.Proposed Solution:• Install a single 3 phase autotransformer.Estimated Cost: $8,000,000

Page 9: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

9

Couch Area

Page 10: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

10

Replace Switch Risers at Couch

Scenario:

• Loss of the Magnolia East - McNeil transmission line segment causes an overload on the Couch - Magnolia Dow line segment.

• The overload is projected to exceed 128% in 2004.

• Line is 666 mcm conductor, but is currently rated 120 MVA, due to switch risers at Couch.

Proposed Solution:

• Replace switch risers at Couch on the Magnolia Dow line to increase the rating on the line from Couch-Magnolia Dow.

Estimated Cost: $73,000

Page 11: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

11

Camden Area

Page 12: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

12

Scenario:

• Loss of the breaker-to-breaker segment from Camden Nth to McClellan leaves a very long line single-ended from Woodward. Also, if the McClellan plant is not generating, there is insufficient voltage support for the area.

• The Woodward - Rison transmission line segment is projected to overloaded under these scenarios in the year 2003.

• Low voltages also manifest in future years along the entire line, from Woodward to Camden Maguire, even with the McClellan plant operating.

Proposed Solution:

• Rebuild the existing Camden Nth substation to accommodate three lines. Two of the three lines will be the existing two lines at the substations (line to McClellan and to Fordyce). The third line will be a new 115kV line extending towards Camden Maguire.

Estimated Cost: $6,300,000

Camden Maguire to Camden North 115kV New Line Construction

Page 13: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

13

Marvell Area

Page 14: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

14

230 / 115 kV Substation Construction (Gobel) near Marvell

Scenario:• Loss of the Helena Industrial - Ritchie SES line segment causes

low single-contingency voltage (0.7222 p.u.) in the Helena area.

• Loss of the Helena Industrial - Ritchie SES line segment also causes overloads. The Almyra - Ricus line segment overloads to 114% and the Almyra - Dewitt line overloads to 108%.

• Zero-contingency voltages along the Stuttgart - Helena line are sufficiently high, precluding installation of the capacitor bank for use during normal operation.

Proposed Solution:• Solution involves tying the strong 230 kV source from Ritchie

to the 115 kV line segment near Marvell, reducing the exposure to single contingency voltage issues.

Estimated Cost: $6,950,000

Page 15: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

15

Jonesboro Area

Page 16: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

16

Trumann - Harrisburg Tap 161 kV Line Rebuild

Scenario:• Trumann Substation to Harrisburg Tap Switching Station is a 161 kV

transmission line segment in the northeastern corner of Arkansas, near the load center of Jonesboro. The line segment is approximately 10.6 miles, and is currently rated for 148 MVA.

• Loss of the Newport Industrial - Newport 161 kV transmission line segment causes an overload on the Trumann - Harrisburg Tap line segment.

• The overload is projected to exceed 110% in the year 2004. • Loss of the breaker-to-breaker line (Newport-Jonesboro) results in an

overload of approximately 104% on the Trumann - Harrisburg Tap. Proposed Solution:• Rebuild the Trumann - Harrisburg Tap 161 kV line segment with a 666

mcm conductor, to increase the line rating to 247 MVA. Replace 600 amp line switches B0604 and B0290 (in the Truman Substation) with 1200 amp equipment.

Estimated Cost: $3,900,000

Page 17: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

17

Emerson Area

Page 18: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

18

345 / 115 kV Substation Construction (Mohawk) near Emerson

Scenario:• The following single contingencies cause low voltage in the

extreme southwestern corner of the EAI service territory:– Loss of the Magnolia East - McNeil line segment, 0.7349 p.u.– Loss of the Magnolia Steel - Magnolia East line segment, 0.8469 p.u.– Loss of the Magnolia Steel - Kerlin S.S. line segment, 0.8690 p.u.

• Capacitor bank additions do not provide sufficient improvement to this region.

• The transmission grid performance can be improved by delivering a high voltage source into the Emerson area. Emerson resides very close to a 345 kV line from El Dorado to Longwood (SWEPCO).

Proposed Solution: • A new substation is proposed to be constructed as a new tie

between the two utilities.Estimated Cost: $9,700,000

Page 19: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

19

Datto - Jim Hill Area

Page 20: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

20

Texas Station #8 – Corning115kV Line Rebuild

Scenario:

• Previous construction has increased the conductor size on selected spans to 1590 mcm and 666 mcm, but a majority of the line is 336 mcm or smaller (e.g., 4/0 copper), and substation equipment limits the ampacity of the line.

• The voltage drop from TE #8 to Corning exceeds 22% under certain single contingency scenarios.

• Low voltage also causes greater current to flow and will cause a 190% overload on the Corning to TE #8 line segment.

Proposed Solution:

• Rebuild the line segment from TE #8 to Corning with 666 mcm, to increase the line rating to 176 MVA.

Estimated Cost: $7,600,000

Page 21: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

21

Osage Creek-Grandview

Page 22: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

22

Osage Creek-GrandviewScenario:• A single-contingency on the Eureka Springs - Osage Creek line

segment causes thermal overloads at Harrison East - Harrison South-Harrison West. This contingency leaves over 100MW of load at Osage Creek on a long radial feed from Harrison East.

• Loss of this line also causes Osage’s voltage drop to 0.8986 p.u.• Osage Creek will be rebuilt using breakers, switches and other

equipment to accommodate three transmission lines. Eureka Springs and Berryville are two existing lines to Osage Creek and the third line will be new. It will be a 161 kV line extending north.

Proposed Solution:• There will be a new substation constructed at a new tap

between Table Rock Dam-Beaver Dam on SPA’s line.Estimated Cost: $5,200,000

Page 23: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

23

2006-2008 EAI Transmission Projects

1Carryover

New Project

1.) Mohawk - New 345 / 115 kV Substation near Emerson (2005)

3.) New 161 kV Line Osage Creek -Grandview Line (2005)

2

2.) Reconductoring of Corning - Texas Eastern #8 115 kV Line (2005)

3

5.) Reconductoring of NLR Levy - NLR Westgate 115 kV Line

5

4.) New 161 kV Line Construction from Mountain View to Silver Hill

4

7.) Reconductoring of Mountain Pine South - Blakely Dam 115 kV Line

7

8.) New 115 kV Line Construction from Gum Springs - Murfreesboro South

8

9.) Reconductoring of Morrilton East - Conway West 161 kV Line

9

10.) Reconductoring of Mabelvale - LR South 115 kV Line to 230 kV

10

6.) Reconductoring of LR Pinnacle – Walton Heights 115kV Line

6

11.) Reconductoring of El Dorado East - El Dorado Jax 115 kV Line11

Page 24: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

24

Mountain View Area

Page 25: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

25

Mountain View - Silver Hill161 kV Line Construction

Scenario:• Mountain View is a served by a radial line from the Sage

Switching Station.• The Sage - Norfork Dam 161 kV Line segment is heavily loaded,

and prone to overload when N. Arkansas hydroelectric output is deficient.

• Load at Mountain View continues to grow, in an area where alternate power is insufficient to meet the demand.

Proposed Solution:• Constructing a new line from Silver Hill (near Marshall) to

Mountain View will provide a new source of power to Mountain View, and will alleviate thermal constraints on the Sage - Norfork line.

Estimated Cost: $12,000,000

Page 26: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

26

Greater Little Rock Area

Page 27: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

27

NLR Levy - NLR Westgate115 kV Line Rebuild

Scenario:• Loss of the LR Rock Creek - LR South 115 kV line segment

causes overload to the NLR Levy - NLR Westgate 115 kV line segment (105%)

Proposed Solution:• Line will be rebuild with 1272 ACSR conductor.Estimated Cost: $1,117,000

Page 28: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

28

Greater Little Rock Area

Page 29: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

29

LR Pinnacle - Walton Heights115 kV Line Rebuild

Scenario:• Loss of the Kanis - Markham 115 kV line segment causes

overload to the LR Pinnacle - Walton Heights 115 kV segment (103%).

Proposed Solution:• Line will be rebuilt with a larger conductor (e.g., 1272 mcm

ACSR).Estimated Cost: $2,160,000

Page 30: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

30

Mountain Pine Area

Page 31: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

31

Blakely Dam - Mountain Pine South115 kV Line Rebuild

Scenario:• Loss of the Carpenter Dam - Hot Springs South 115 kV Line

segment causes overload to the Mountain Pine - Blakely Dam segment.

• Line switches at the Blakely Dam prevent any greater throughput through the SPA substation.

• Conductor size will soon further limit power flow on this line segment (presently constructed with 666 mcm conductor)

Proposed Solution:• Line and switches should be upgraded to facilitate a

minimum of 1200 amps (e.g., 1272 ACSR)Estimated Cost: $1,500,000

Page 32: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

32

Curtis Area

Page 33: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

33

New Switching Station (Gum Springs) and New 115 kV Line Construction

Scenario:• The Woodward - Degray 115 kV transmission line crosses the

Friendship - Couch 115 kV transmission line near Curtis, between Arkadelphia and Richwoods

• Connecting the two lines at their intersection would provide additional operational flexibility in the region south of HS and LR

• The new switching station would reduce to the exposure to single contingency voltage problems for several substations along both existing transmission lines

Proposed Solution:• A new line constructed from Gum Springs to Murfreesboro

South will provide another source of power to the Murfreesboro South region, where it is difficult to maintain sufficient voltage levels under single contingency scenarios

Estimated Cost: $8,400,000

Page 34: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

34

Conway Area

Page 35: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

35

Morrilton East - Conway West161 kV Line Rebuild

Scenario:

• Loss of the Lake Conway - Mayflower 115 kV line segment causes overload to the Morrilton East - Gleason 161 kV line segment (111%) and the Gleason - Conway West 116 kV line segment (104%)

• Loss of the Conway West - Lake Conway line segment and the Conway West 161 / 115 kV line segment cause smaller overloads

Proposed Solution:

• Rebuild the Morrilton East - Conway West 161 kV line segment

Estimated Cost: $6,120,000

Page 36: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

36

Greater Little Rock Area

Page 37: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

37

Mabelvale - Mann Road - Chico -LR Ind. - LR South 115 kV Line Rebuild

Scenario:• Loss of the Mabelvale - Alexander 115 kV line segment

causes overload to the Mabelvale - Mann Road segment (109%) and the Mann Road - Chico segment (106%).

• Moving load from the existing 115 kV network in Little Rock to a future 230 kV loop will help facilitate greater power flow into and out of south Little Rock.

Proposed Solution:• Line will be rebuilt, using conductor and insulators sufficient

for future conversion to 230 kV.Estimated Cost: $4,000,000

Page 38: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

38

Greater Little Rock Area

Page 39: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

39

Mabelvale - Alexander - Hindman -LR South 115 kV Line Rebuild

Scenario:• Loss of the Mabelvale - Mann Road 115 kV line segment causes

overload to the Mabelvale - Alexander segment (108%).• Loss of the Mann Road - Chico 115 kV line segment also causes

overload to the Mabelvale - Alexander segment (107%).• Moving load from the existing 115 kV network in Little Rock to a

future 230 kV loop will help facilitate greater power flow into and out of south Little Rock.

Proposed Solution:• Line will be rebuilt, using conductor and insulators sufficient for

future conversion to 230 kV.Estimated Cost: $4,500,000

Page 40: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

40

El Dorado Area

Page 41: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

41

El Dorado East - El Dorado Jax115 kV Line Rebuild

Scenario:• Loss of the El Dorado EHV - Texas Eastern El Dorado 115 kV

line segment causes overload to the El Dorado East - El Dorado Jax segment (106%)

• Loss of the El Dorado Donan - Texas Eastern El Dorado 115 kV line segment also causes overload to the El Dorado East - El Dorado Jax segment (103%)

Proposed Solution:• Line will be rebuilt with 1272 ACSR conductor.Estimated Cost: $1,000,000

Page 42: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

42

2009 – 2013 Transmission Project Target Areas

2.) Little Rock Area

1.) Conway Area

1

Carryover

New Project

2

3

3.) Parkin - Gilmore Area

4

4.) Forrest City - Moses Area

5

5.) Sheridan South Interface

Page 43: 1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

43

Questions ????