1 eden network workshop clonakilty, 25th february 2009 eden network workshop
TRANSCRIPT
11
EDEN Network Workshop
Clonakilty, 25th February 2009
EDEN Network Workshop
22
EDEN Network Workshop
Context and historic Context and historic
Memorandum Of Understanding
Euromeeting Toscana – November 2007Euromeeting Toscana – November 2007
MOU approved and signed by 36 stakeholders, including 15 Regions
Agenda for a Sustainable and Competitive European Tourism
33
Memorandum
of understanding (MOU)
10 priority themes2 pillars
Regrouped in 5 bigger themes
One additional pillar
Cross-matching pillars / themes
EDEN Network Workshop
44
MOU PillarsMOU Pillars
Social Dialogue Measurability
2 pillars
Competitiveness
A third priority
EDEN Network Workshop
55
Thematic groups
Transport and mobility
Transport and mobility
Life quality of residents and workers
• Quality of life of residents and tourists• Quality of work
Active conservation of heritage and identities
• Active conservation of cultural heritage
• Active conservation of environmental heritage
• Active conservation of distinctive identities of destinations
EDEN Network Workshop
66
Thematic groups
Making tourism less seasonal
Widening the relations between
demand/supply (geographical and seasonal)
Environmental
Management
•Reduction and optimisation of use of natural resources with particular reference to water
• Reduction and optimisation of energy consumption
• Reduction of waste and better waste management
5 Themes EDEN Network Workshop
77
Cross matching pillars and themes
EnvironmentalManagement
Life quality of residents and workers
Active conservation of
heritage and identities
Making tourism less seasonal
Transport and mobility
Social Dialogue
Measurability
Competitiveness
EDEN Network Workshop
88
Objective
Creation of a common and harmonised set of Sustainable and Competitive Tourism Indicators to be applied by NECSTouR regions, to analyse situation and progress: MONITORING
Scope
Transversal-holistic point of view, considering:- 3 pillars of sustainability- 3 transversal pillars of NECSTouR- 5 thematic areas – implication of working groups
99
Methodology:
0. Identification of issues to be measured1. Analysis of existing and suggested indicators2. State of the art of Indicators in EU regions (stakeholders)3. Proposal for Indicators (methodology) and Monitoring System
consistence with other territorial levelscollaboration from all stakeholders (areas of competence)training and awareness
4. Establishment of a metholology for data compilation and testresearch centers and universities
5. Analysis and reports
1010
Methodology:
Complementarilly to... TASKS OF WORKING GROUPS!!!
Issues to be considered:
TRYING TO USE CONSISTENT EXISTING INDICATORS OR SOURCES
ADAPTABILITY TO DIFFERENT DESTINATIONS
EASY TO BE INCOPORPORATED IN MAKING DECISIONS
AGGREGATION – DESAGREGGATIONPrinciples: - Relevance
- Availability/potential availability- Comprehensibility and credibility- Comparability- Predictive ability
1111
EDEN Network Workshop
Bad practices to be avoided (risks):
- Another set of indicators - From up to down- Complexity, high cost- Weak social dialogue- Focus only in quantitative data- Forgetting important impacts – no indicators reflecting- No monitoring- No analysis - No dissemination and awareness- No translation into decisions- “Cosmetic use”- Ineficiency, duplicity, inconsistence,...- Not including exogenous information
INDICATORS AND METHODS APPLIED IN OTHER ACTIVITIES CAN BE USED FOR TOURISM AS WELL!!! (COMPETITIVITY)
1212
IndicatorsIndicators
• We think to start experimentations, suggesting, for each of the 10 issues identified by NECSTouR, the application of a series of indicators which could derive from a mixture of parameters taken from:
• TSG group report (document dated February 2007);• Additional indicators chosen within NECSTouR
working groups (some issues are not thoroughly investigated by TSG indicators) ;
• Additional indicators suggested by local panels.
EDEN Network Workshop
1313
IndicatorsIndicators : : practical implementationpractical implementation
We need to match indicators of sustainability with indicators of competitiveness
• We want therefore to develop a vision of the development levels the destination wishes to achieve in the future (2015, 2020,2030)
• We think to benefit from: a Swot analysis of the state-of-the-art, the vision of the future of the Destination on the basis of the programming tools adopted.
EDEN Network Workshop
1414
Step 1 : Share the principlesStep 1 : Share the principles
In order to proceed from theory to practice,
we need to select a number of Destinations
where to put into practice a set of pilot
actions which will later constitute “the
NECSTouR model”.
EDEN Network Workshop
1515
Destinations shall first agree upon the following common Destinations shall first agree upon the following common principlesprinciples::
•Take a holistic and integrated approach
•Plan for the long term
•Achieve an appropriate pace and rhythm of development
•Involve all stakeholders
EDEN Network Workshop
1616
Destinations shall first agree upon the following Destinations shall first agree upon the following common principles:common principles:
• Use best available knowledge
• Minimise and manage risk
• Reflect impacts in costs
• Set and respect limits, where appropriate
• Undertake continuous monitoring
EDEN Network Workshop
1717
Step 2 Put into practice adequate tools for social Step 2 Put into practice adequate tools for social dialogue and participatory processesdialogue and participatory processes
The commonly understood vision implies carrying out actions taking into account the two principles which are fundamental:
•Social dialogue (taking into account the various roles) •Measurement of phenomena connected to the heterogeneous activities connected to tourism
EDEN Network Workshop
1818
Step 2 – Put into practice adequate tools for social Step 2 – Put into practice adequate tools for social dialogue and participatory processesdialogue and participatory processes
Create the frameworks for empowerment of the local networks of tourism stakeholders
Work actively towards the promotion of participative tools for establishing social dialogue
Dedicate appropriate attention, each stakeholder according to his role, to the ten specific issues identified by NECSTouR
EDEN Network Workshop
1919
Local networkLocal network
• Persons responsible for each key issue
• They will suggest useful indicators
how to calculate and monitor them,
what to do when indicators tell us that behaviours are not aligned with sustainable aims .
EDEN Network Workshop
2020
Local networkLocal network
We as NECSTouR could give the necessary tools for each destination ( e.g. local authority )
1. logical framework for indicators 2. some obligatory indicators ( to be use even
for international and interregional comparison )3. some suggested voluntary indicators for the
type of destinations (chosen on the basis of the type of destination, such
as: seaside resorts, art cities, spas, and so forth)
EDEN Network Workshop
2121
Indicators: research networkIndicators: research network
ERNEST / ERANET project:
Research network on sustainable tourism (launched in September 2008 and led by
Tuscany Regional Authority)
EDEN Network Workshop
2222
Next stepsNext steps……
• NECSTouR General Assembly South West England June 2009
• Florence June 2009Research Convention devoted to cooperation between European Universities and research centres directed at sustainable and competitive tourism.
EDEN Network Workshop
2323
Next stepsNext steps……
• Final implementation Plan : Florence 5th – 6th November. Euromeeting (International forum on sustainable tourism )
A comparative analysis will be undertaken and presented on the action and Best Practice regarding tourism included in the regional Operational programmes financed by Structural Funds
2424
Thank you for your attention!Thank you for your attention!
Further information and updates:
Contact:
EDEN Network Workshop
http://http://www.necstour.euwww.necstour.eu