1 Department for Work and Pensions
The Work Programme ProspectusSupplier Briefing
8th December 2010
2 Department for Work and Pensions
Agenda
• Introduction – Alan Cave
• Work Programme Design and Payment Model – Adam Sharples
• Commercial Process – David Smith
• Close – Alan Cave
3 Department for Work and Pensions
Update on Work Programme Design
Adam Sharples
4 Department for Work and Pensions
Work Programme Principles
• More “Black Box “than before
• Longer contracts
• Greater outcome focus
• Wider range of customers
5 Department for Work and Pensions
Work Programme Participants
Mandatory
Mandatory
Mandatory
Mandatory or Voluntary
Voluntary
Mandatory
-
From 12 months
From 9 months
From 3 months
From 3 months
At any time
When expected to be fit for work within 3 months
-
1 - Aged 25+
2 - Aged 18-24
3 - Ex-Incapacity Benefit
4 - Seriously disadvantaged
5 - Volunteers (all groups)
6 - Flow*
7 - Ex- IB**
Referral TypeTime for referral JSA groups
ESA groups
*ESA (income related) customers placed into the Work related Activity Group **EX-IB group are treated as volunteer or Flow
6 Department for Work and Pensions
Payment Model: principles
• Payment should be exclusively or largely for delivering results and should be made after the results have been delivered
• The Government will seek to avoid paying for customers who would have moved off benefits without help
• The price paid for employment outcomes should be set to make it worthwhile for delivery partners to help each group of customers
• The price paid for job outcomes should not exceed the benefit savings that have been generated.
7 Department for Work and Pensions
Payment model structure
X weeks Y weeks
Payment(£)
Time on Programme(Weeks)
Start on Programme
Att
ach
men
t F
ee
Payment(£)
Time on Programme(Weeks)
Start on Programme
Sustainment paymentsJob
Ou
tco
me
Pay
men
t
Att
ach
men
t F
ee
Job Start Payment trigger point
8 Department for Work and Pensions
Attachment fee – paid once per person
Contract
£600
£500
£400
£300
£200
£100
£0Year 1 Year 2 Year 3 Year 4 Year 5
1. JSA 25+
2. JSA 18-24
3. JSA Ex-IB
4. JSA seriously disadvantaged
5. ESA volunteers
6. ESA Flow
7. ESA Ex-IB
9 Department for Work and Pensions
Job outcome payment
Year 1 Year 2 Year 3 Year 4 Year 5
Job
outc
ome
paym
ent
X% Discount
Y% Discount
Maximum price
10 Department for Work and Pensions
Job Outcome and Sustained payment by customer group
52 weeks
52 weeks
78 weeks
78 weeks
78 weeks
78 weeks
104 weeks
26 weeks
26 weeks
13 weeks
13 weeks
13 weeks
13 weeks
13 weeks
1 - Aged 25+
2 - Aged 18-24
3 - Ex- Incapacity Benefit
4- Seriously disadvantaged
5- Volunteers (all groups)
6 – Flow
7- Ex- IB
Maximum duration of sustained payments
Job outcome timing JSA groups
ESA groups
11 Department for Work and Pensions
Maximum payments
£400 £400 £400 £400 £600 £600 £400
£1,200 £1,200 £1,200 £1,200 £1,200 £3,500 £1,000
£2,994
£2,396
£5,327
£4,859 £4,405
£9,429
£2,007
£0
£1,000
£2,000
£3,000
£4,000
£5,000
£6,000
£7,000
£8,000
£9,000
£10,000
£11,000
£12,000
£13,000
£14,000
£15,000
1. JSA 25+ 2. JSA 18-24 4. JSAseriously
disadvantaged
3. JSA Ex-IB 6. ESA Flow 7. ESA Ex-IB 5. ESAvolunteers
Sustainmentpayments
Job outcomepayment
Attachmentfee
12 Department for Work and Pensions
Procurement Process
David SmithJohn Michalski
13 Department for Work and Pensions
Framework – Immediate Next Steps
• Set up Meetings with preferred bidders to:– Provide feedback – Agree the final Terms and Conditions
• Sign Framework Agreements by 20 January 2011• Issue a Draft Work Programme ITT on the 8 December 2010• Hold a provider event on the 16 December 2010• Issue the ITT on the 22 December 2010
14 Department for Work and Pensions
The Work Programme
Invitation to Tender will include:
• Instructions to bidders, including bid evaluation criteria
• ItT Questionnaire
• Specification
• Pricing schedules and supporting guidance
• Call off Terms and Conditions for the Work Programme
15 Department for Work and Pensions
Bidding for the Work Programme
• WP bids can only be accepted once the Framework Agreement is received
• Bidders will only be invited to bid for contracts in the lots where they were successful in the Framework competition
• 18 Contract Package Areas (CPA) & 2 or 3 providers in each CPA
• Separate Tender Form for each CPA
• Need to express a ranked preference order where bidding for multiple CPAs
16 Department for Work and Pensions
Bid Evaluation - Quality
• A majority of the combined total evaluation score will be allocated on the basis of the quality of the proposal.
• Bidders will receive details of the evaluation criteria in the draft ItT
• Some areas will be weighted more highly than others – eg. Service proposal, Supply chain management and Implementation will have higher weightings
• We will be looking at the diversity of supply chains
• Certain questions will be specific to the local area and we will be looking for evidence that local needs have been considered
• Tie-breakers will be used where there is no clear separation of scores in any CPA.
17 Department for Work and Pensions
Bid Evaluation - Financial
• An element of the combined total evaluation score will relate to the financial evaluation.
• The financial price evaluation will consist of the assessment of the job outcome element of the funding model.
•The DWP will also cross check the delivery proposal to the individual elements contained in the financial pricing proposal to ensure consistency.
• DWP will looking for assurance and evidence that bidder’s can secure the necessary internal financial and/or external financial resources to fund delivery.
18 Department for Work and Pensions
Proposed Timetable
• Draft ITT issued - 8 December 2010
• Bidder event - 16 December 2010
• ITT issued – 22 December 2010
• Tenders submitted - February 2011
• Preferred bidders announced - April 2011
• Contract Award - April - June 2011
• Implementation - May - end July 2011•
19 Department for Work and Pensions
Performance Management
Adam Sharples
20 Department for Work and Pensions
What are we trying to achieve?
• Increase average time in employment for Work Programme customer groups (longer sustained jobs); and
• Increase off flow rates for Work Programme customer groups (more people into work);
• Decrease average time on benefit for Work Programme customer groups (people into work sooner);
• Narrow the gap between off flow/time in employment rates for disadvantaged groups and everyone else (less parking of harder to help).
21 Department for Work and Pensions
Incentive payments
• Incentive payments will be paid to Providers who have high performance for the JSA 18 to 24 and 25+ client groups from year 4.
• Job outcome payments will be reduced by 10 per cent of the year 1 and 2 level each year from year 3 to fund the incentive payments
22 Department for Work and Pensions
Non-intervention performance profile
2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18
10
20
30
40
50
60
70
ESA
JSA 25+
JSA 18-24
+10% minimum performance standard
+50% Performance incentive level
•Incentive payments will be made for jobs delivered beyond a given performance level, defined as non-intervention level plus 50 per cent.
23 Department for Work and Pensions
Differential Pricing
The funding model builds in differential pricing in 4 ways, with each customer groups having different:
• Referral points
• Payment amounts
• Length of job outcome payment
• Length of sustainment payment period
24 Department for Work and Pensions
Ensuring ongoing competition
• We will shift market share (customer referrals) from poorer performing providers to the better performing provider in any given area.
• We will consider performance on an individual customer group basis• The first trigger point will be at month 18.
3%
Provider A
Provider BJob entries
18 Months 24 Months