1 creating an administrative draw request (hba) complete a checklist for administrative draw...
TRANSCRIPT
![Page 1: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/1.jpg)
1
CREATING AN ADMINISTRATIVE
DRAW REQUEST (HBA)
• Complete a Checklist for Administrative Draw Requests (Form 16.08).
• Draw Requests amount must agree with support documentation
• The HOME Program is a reimbursement program.
![Page 2: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/2.jpg)
2
TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS HOME Investment Partnerships Program
CHECKLIST ADMINISTRATIVE / OPERATING DRAW REQUEST
Administrator: __________________________________________________________________________________________________________________
Contract #: _______________________ CHDO Set-Aside? Yes No Draw Amount: $ _____________________
Contract Start Date: __________________ Contract End Date: ___________________ Service Date(s): __________________
Eligible Administrative Expenses Include:
Administrator TDHCA Review Review
Salaries - Must include support documentation (time sheets – refer to Form 15.1) indicating the hourly rate, including benefits, and the pro-rated hours that were worked directly on the HOME Program. Benefits include Social Security and Medicare.
Travel – Costs to/from HOME-related training workshops.
Goods and/or Services which are required for the administration of the HOME program (i.e. equipment, phone bills, inspections, etc.)
Consultants and Third Party Fees – A copy of the contract or agreement with the Contract Administrator must be submitted to the Department. Documentation must include detailed description of services performed by the third party.
Affirmative Marketing (i.e. publications, brochures, etc.) – Must include a copy of the invoice.
Environmental Review – Must include a copy of the invoice. (Environmental review expenses may be charged as EITHER project costs or administrative costs, but not both.)
For CHDO Operating Expenses Only:
Financial Statements and/or Accounting Records – Expenses reimbursed cannot exceed 5% of documented operating expenses, or $50,000, whichever is greater. Notes/Comments: _____________________________________________________________________________________________________________
__________________________________________________________________________________________ For TDHCA Use Only:
Confirm that the service dates are within the term of the contract
Confirm that Single Audit/Certification is current AND there are no outstanding monitoring issues
CSAS – Verify dates, budget amount, and drawn-to-date amount
Is monitoring visit recommended? No Yes (if yes, notify Monitoring supervisor)
Assign Risk Assessment score
Approved by ____________________________________________________ Date ______________________________
![Page 3: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/3.jpg)
3
Draw Request status:(Creating Admin. Draw Request)
• Save • Pending – not submitted to PM.• Submit for Approval without Saving –authorized individual;
submit the request to PM. • Pending PM Approval – ready for PM’s review. • Disapproved by PM – Refer to the Notes for explanation & further
instruction by PM. • Pending Processing – Draw Request approved by PM & submitted
to Acctg. Division for approval.• Pending Accounting Approval – Draw Request reviewed by
Acctg. Division & processed for a voucher number.• Approved
![Page 4: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/4.jpg)
4
Contract Summary Screen(Creating Admin. Draw Request)
• Select Draw Request in the lower right-hand corner of the Budget table.
![Page 5: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/5.jpg)
5
Draw List (Creating Admin. Draw Request)
• Select Create New Draw Request in the lower right-hand corner of the Draw List screen.
![Page 6: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/6.jpg)
6
Required Documentation(Creating Admin. Draw Request)
** Refer to current Checklist (available on website) for
required documentation**
• A new Administrative Draw Request is initiated.
• Enter the Services Rendered dates (These dates must fall within the contract term).
• Click Save to continue the Draw Request and go to the
next screen.
![Page 7: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/7.jpg)
7
(Creating Admin. Draw Request)
![Page 8: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/8.jpg)
8
Draws for Admin(Creating Admin. Draw Request)
• Enter draw amount in This Draw Amount column• Enter the exact amount, including cents.
![Page 9: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/9.jpg)
9
Approval Actions(Creating Admin. Draw Request)
• Save updates to Pending; OR • Submit for Approval without Saving (2 step approval)
updates to Pending PM Approval.
![Page 10: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/10.jpg)
10
Overview(Creating Admin. Draw Request)
• Pending PM Approval status, the CA cannot perform
any further action.
![Page 11: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/11.jpg)
11
Draw Request(Creating Admin. Draw Request)
• Disapproved by PM - refer to the comments entered in
the online in the Approval Action section (lower portion of the screen) for explanation and further instruction.
![Page 12: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/12.jpg)
12
HBA Draw Requests
• If all HBA funds are being requested on the first Draw Request, refer to Creating a Final Project Draw Request and proceed as instructed in that section.
• If more than one HBA Draw Request will be made for a project, proceed as follows:
![Page 13: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/13.jpg)
13
CREATING A PROJECT
DRAW REQUEST • The HOME Program is a reimbursement program.
• Complete a Checklist for HBA Draw Requests (Form 16.11).
• Match contribution is entered with project Draw Request.
• PM requires support documentation to include the following: – Description of expense– Date the expense was incurred– Draw Requests amount must agree with support documentation– Address of activity
![Page 14: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/14.jpg)
14
TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS HOME Investment Partnerships Program
Draw Request Checklist
Homebuyer Assistance (HBA)
Administrator:
Contract # Activity # Draw Amount $
Contract Start Date Contract End Date Service Date
ADMINISTRATOR TDHCA
Interim Draw Requests – submit the following documentation:
CERTIFIED copy of HUD-1 Settlement Statement
ORIGINAL Down Payment Assistance Note (Form 1.05)
CERTIFIED copy of Subordinate Deed of Trust (Form 1.06)
CERTIFIED copy of Transfer of Lien (Form 1.07)
Support documentation for eligible soft costs (not to exceed 10% of project costs) (i.e. housing counseling, etc.)
Support documentation for Match, as applicable
Final Draw Requests - ALSO submit the following documentation:
Final Inspection and Verification form for TMC Standards (Form 11.03)
Project Completion data entered into Contract System
REScheck Compliance Certificate (for new construction only)
Notes/Comments: ____________________________________________________________________________________________
____________________________________________________________________________________________________________
For TDHCA Use Only:
Approval Notification from Single Family
Delinquent Loan Docs 90 days old (T/cm/cmpm/HBA Delinquent Info/Delinquent Trailing Docs_HBA)
Approval Notes Section: “Reminder: All required homebuyer loan docs must be submitted within 90 days.”
Confirm that the Settlement Date is within the contract terms
Confirm: Single Audit Certification Expires:________________________
Confirm: No outstanding monitor issues (T/cm/cmpm/HOME/single audit_monitor issues)
CSAS / IDIS – Compare dates, budget amount, and drawn-to-date amount
Assign Risk Assessment score (1-5) ____________
Is TA recommended? No Yes (if yes, notify Supervisor)
Approved By: ________________________________________________ Date Approved: _____________
![Page 15: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/15.jpg)
15
Contract Summary Screen (Creating Project Draw Request)
• Select Activities at the upper right-hand corner of the screen.
![Page 16: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/16.jpg)
16
Contract Activity(Creating Project Draw Request)
• Select appropriate activity number in the left-hand column.
![Page 17: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/17.jpg)
17
Draw Balances(Creating Project Draw Request)
• Click on Draw Requests in the lower right-hand corner of the table.
![Page 18: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/18.jpg)
18
Draw List(Creating Project Draw Request)
• Click Create New Draw Request in the lower right-hand corner
![Page 19: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/19.jpg)
19
Required Documentation(Creating Project Draw Request)
** Refer to current Checklist (available on websites) for required documentation**
• A new Project Draw Request is initiated.
• Enter the Service Rendered dates (these dates must fall within the contract period).
• Select the box “Check this box if all required documents…”
![Page 20: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/20.jpg)
20
![Page 21: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/21.jpg)
21
Draws for Project (Creating Project Draw Request)
• Enter amount in This Draw Amount column.
• Entries to Miscellaneous should be minimal.
• All Miscellaneous entries should be identified and described
in detail in the online Notes section
![Page 22: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/22.jpg)
22
Approval Actions(Creating Project Draw Request)
• Save updates to Pending; OR• Submit for Approval without Saving (2 step approval)
updates to Pending PM Approval.
![Page 23: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/23.jpg)
23
Draw Request(Creating Admin. Draw Request)
• Disapproved by PM
• Approval Action section (lower portion of the screen) for explanation and further instruction.
![Page 24: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/24.jpg)
24
Modifying a Draw RequestContract Summary Screen
(Modifying Project Draw Request)
• Select Activities at the upper right-hand corner of the screen.
![Page 25: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/25.jpg)
25
Modifying a Draw RequestContract Activity(Modifying Project Draw Request)
• Select appropriate activity number in the left-hand column.
![Page 26: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/26.jpg)
26
MODIFYING A DRAW REQUESTDraw List
(Modifying Project Draw Request)
• Click the appropriate Draw Request number on the DRAW LIST screen and make the necessary changes.
• When the modified Draw Request is submitted to the Department (Submit approval without saving), it will be updated to Pending PM Approval
![Page 27: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/27.jpg)
27
Processing Time Frame
• The funded amount (budget) data will not be updated until the Draw Request is approved by PM and by Accounting, and a voucher is assigned and entered into the System.
• This process requires 7-10 business days.
![Page 28: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/28.jpg)
28
Creating a Final Draw RequestContract Summary Screen
(Creating Final Draw Request)
• Select Activities at the upper right-hand corner of the screen.
![Page 29: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/29.jpg)
29
Creating Final Draw RequestContract Activity
(Creating Final Draw Request)
• Select appropriate activity number in the left-hand column.
![Page 30: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/30.jpg)
30
Draw Balances Creating (Creating Final Draw Request)
• Select Draw Requests in the lower right-hand corner of the table.
![Page 31: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/31.jpg)
31
Draw List(Creating Final Draw Request)
• Click Create New FINAL Draw Request.
![Page 32: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/32.jpg)
32
Draw Request(Creating Final Draw Request)
• Confirm that the Final Draw box is checked and data is correct.
![Page 33: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/33.jpg)
33
Additional information for Final Draws(Creating Final Draw Request)
• Note: The final Draw Request will not be approved without entering Project Completion (PCR – activity level—Related section) data.
• All applicable Match for a project must also be reported before a final Draw Request will be approved by PM.
![Page 34: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/34.jpg)
34
REPORTING MATCH CONTRIBUTION(Creating Final Draw Request)
• Match data should be entered with a project Draw Request.
• Provide proper support documentation
![Page 35: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/35.jpg)
35
ENTERING A PROJECT COMPLETION REPORT (PCR) DATA
• PCR data is the final action• Completed & submitted with the final Draw Request
• Select Activities (to get list of activities)
![Page 36: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/36.jpg)
36
Contract Activity(Entering PCR)
• Select appropriate activity number in the left-hand column
• Then scroll down to the RELATED section of the activity screen.
![Page 37: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/37.jpg)
37
Related Section (Entering PCR)
• Click on Project Completion Report
![Page 38: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/38.jpg)
38
Project Completion Report. (Entering PCR)
• Scroll down the screen and enter data in each section, as applicable.
![Page 39: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/39.jpg)
39
Property Details (Entering PCR)
• Property Type – Confirm data entry is correct. • FHA Insured – Confirm data entry is correct.• Initial Purchase Price – Enter amount as shown on HUD-1 • After Rehabilitation Value – Do not enter anything in this field.• Accessible – Confirm data entry is correct• Activity Type – Confirm data entry is correct.
• Appraised Value – Do not enter anything in this field.
![Page 40: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/40.jpg)
40
Home Funds (Entering PCR)
• HBA activities are deferred loans. • Annual Interest Rate - Enter 0. • Amortization Period – Enter 10. • Enter amount of funds committed to the project.
![Page 41: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/41.jpg)
41
Public Funds (Entering PCR)
• Enter data if applicable (i.e. grant from city).
![Page 42: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/42.jpg)
42
Private Funds (Entering PCR)
• Enter data if applicable (i.e. conventional mortgage loan).
![Page 43: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/43.jpg)
43
Approval Actions (Entering PCR)
• Save updates to Pending; OR • Submit for Approval without Saving (2 step approval)
updates to Pending PCR Approval.
![Page 44: 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with](https://reader036.vdocuments.site/reader036/viewer/2022062511/5515571f55034674578b462a/html5/thumbnails/44.jpg)
44
Overview (Entering PCR)
• The PCR has now been processed.