1 clayton elementary relief for 2009-2010 community outreach meeting february 17, 2009 6:30 p.m

24
1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m.

Upload: anissa-garrison

Post on 19-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

1

Clayton Elementary Relief for 2009-2010

Community Outreach MeetingFebruary 17, 2009

6:30 p.m.

Page 2: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

2

Agenda6:30 Welcome and Introductions

Dr. Dru RobinettDr. Pat Forgione

6:35 Housekeeping and Format for MeetingLynda Rife

6:40 PresentationAriel CloudPaul Turner, Dr. Zoe Griffith, Kris Hafezi,

Joe Silva, Pam Hall7:00 Community Questions and Answers

Lynda Rife7:30 Community Comments

Lynda Rife8:25 Closure and Next Steps

Ariel Cloud

Page 3: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

3

Purpose of Tonight’s Meeting

To provide a rationale for relief need at Clayton

To provide information about Clayton’s relief options for the 2009-2010 school year

To gain input from the Clayton community about the options for relief

Page 4: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

4

Challenges to Consider

Clayton Elementary School is currently overcrowded.

The new SWES in the Meridian area will not be completed until fall of 2010, which will provide relief for Clayton.

Clayton site will not support the additional portables needed for the 2009-2010 school year.

Page 5: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

5

Clayton Previous Growth Rate

599

811

996

1079

0

200

400

600

800

1000

1200

2006-07 2007-08 2008-09 2009-10(Projected)

Page 6: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

6

Citizens’ Bond Oversight Committee

The Board of Trustees appointed local citizens to the Community Bond Oversight Committee (CBOC) to ensure that the bond projects remain faithful to the scope of work approved by Austin voters in September 2004 and May 2008.The 2004 Bond Program included funds for two elementary schools: Nan Clayton and an undesignated school.In 2008, the AISD Board of Trustees selected the Meridian site as the location of the undesignated elementary school.

Page 7: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

7

Capacity at ClaytonClayton’s permanent capacity is 880 students, which is 40 classrooms.

Currently, 986 students attend Clayton (113% capacity).

Enrollment projection for 2009-2010 is 1080 students. (126% capacity).

Growth requires approximately 5-6 additional classrooms.

Page 8: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

8

Factors Impacting Capacity

K-4th grade class size cap is 22 students per class.

5th grade class size target is 28 students per class.

5 portables are currently being used to provide 10 classrooms.

Traditionally, AISD has used portables for overcrowding relief.

Due to site limitations (impervious cover and fire lane requirements), AISD cannot bring additional portables to Clayton.

Page 9: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

9

If We Do Not Provide Short Term Relief to Clayton for 2009-2010

Projected enrollment of 1,080 will result in need for 5-6 extra classrooms.

With no additional classrooms available, classes and special areas would have to be held in any available space – hallways, pod areas, cafeteria, library – subject to space permissible by Fire Codes.

The overcrowding will cause increased stress on infrastructure (cafeteria/lunch, library, outdoor play areas).

The addition of 90+ students/families will have traffic implications for arrival and dismissal.

Page 10: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

10

Relief Options Previously Considered for Clayton

Attempt a satellite site with portables on the Meridian Site

Attempt a satellite site with portables on leased land adjacent to Kiker and the Circle C Child Development Center (CDC)

Attempt to lease land from the CCHOA on property adjacent to Clayton on the corner of Spruce Canyon and LaCrosse and place portables there

Page 11: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

11

Overview of Clayton’s First Relief Option Recommended and Not Selected

Alternative I—Opening with Grades 5 and 6 for one year only at new SWMS

Page 12: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

12

Need for Alternative Relief Options

AISD Board requested other options for Clayton Relief so that the SWMS could open as planned in 2009 with 6th, 7th, and 8th graders.

AISD Board wants community input on alternative options.

Page 13: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

13

Current Options Under Consideration for Clayton Relief

Option 1: All new Clayton Kindergarten students assigned to Kiker Elementary School

Option 2: All rising Clayton 5th graders assigned to Kiker Elementary School

Option 3: All new Clayton Kindergarten students without siblings at Clayton assigned to Kiker Elementary School

Page 14: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

14

Capacity at Kiker Elementary

Kiker ES 2008-2009 enrollment is 717 students or 88%

capacity.

Permanent capacity is 814 students.

Projected enrollment for 2009-2010 is 729 students.

Campus currently has 6 portables (12 classrooms) on site and can accommodate up to 7 additional portables (14 classrooms).

Page 15: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

15

Option 1: All new Clayton Kinder students assigned to Kiker ES

All 225 projected Kindergarten students at Clayton would be assigned to attend Kindergarten at Kiker for the 2009-10 school year.

This would free up approximately 11 classrooms at Clayton.

Estimated total cost for portables and transportation is $350K.

Page 16: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

16

Option 2: All rising Clayton 5th graders assigned to Kiker ES

All 135 projected 5th Graders at Clayton would be assigned to Kiker for the 2009-10 school year.

This would free up approximately 5 classrooms at Clayton.

Estimated total cost for portables and transportation is $150K.

Page 17: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

17

Option 3: All new Clayton Kinder students without siblings at Clayton assigned to Kiker ES

112 projected Kindergarten students at Clayton without siblings at Clayton would be assigned to Kindergarten at Kiker for the 2009-10 school year.

This would free up approximately 5 classrooms at Clayton.

Estimated total cost for portables and transportation is $175K.

Page 18: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

18

Projected Membership for 2009-2010

Clayton Membership Change

Clayton Projected Enrollmen

t

Kiker Projected Enrollmen

tOption 1: All new Clayton Kindergarten students assigned to Kiker Elementary School

-225 855 954

Option 2: All rising Clayton 5th graders assigned to Kiker Elementary School

-137 945 866

Option 3: All new Clayton Kindergarten students without siblings at Clayton assigned to Kiker Elementary School

-112*

* Based on current campus pattern

968 841

Page 19: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

19

Other Possible Options

Provide written input on comment cards

Contact the South Associate Superintendent’s Office at 414-1708

Page 20: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

20

What happens next?

Respond to survey at www.austinisd.org Survey will be available from February 18th through the 25th.

Presentation to Board, including community input, March 9, 2009 with projected action

Follow-up meeting with parents of students impacted by decision

Continue with the completion of SWES in the Meridian neighborhood

Page 21: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

21

Page 22: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

22

Page 23: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

23

Community Questions and Answers

-Lynda Rife

Page 24: 1 Clayton Elementary Relief for 2009-2010 Community Outreach Meeting February 17, 2009 6:30 p.m

24

Community Comments

-Lynda Rife