1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG OPEN HOUSE Thursday, November 20, 2014 Please sign in on the sheet provided. Feel free to walk around and view the display material. Project representatives are available to answer any questions. A brief project presentation will begin at 7:30 pm followed by a question and answer period.

Upload: tracy-scott

Post on 15-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

1

CITY OF VAUGHANWatermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road)

WELCOME TO THE KLEINBURG OPEN HOUSEThursday, November 20, 2014

• Please sign in on the sheet provided.

• Feel free to walk around and view the display material.

• Project representatives are available to answer any questions.

• A brief project presentation will begin at 7:30 pm followed by a question and answer period.

Page 2: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

2

PROJECT BACKGROUND

• In 2015, the City of Vaughan is proposing the replacement of watermain in the Kleinburg area:

– The existing 150mm diameter metallic watermain on Napier Street, John Street and Kellam Street and the existing 200mm diameter metallic watermain on Stegman’s Mill Road are aged, substandard and in need of replacement. As a result of their age, the existing metallic watermains are susceptible to cracks and corrosion which may lead to watermain breaks and service interruption.

www.climatetechwiki.org

Page 3: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

3

PROJECT BACKGROUND

• The project will also include roadworks:– The City’s Pavement Management Program has identified Napier

Street, John Street and Kellam Street as requiring reconstruction.These road sections are deficient as a result of poor road

surface conditions including cracks, potholes, areas of settlement and drainage issues.

– Stegman’s Mill Road requires rehabilitation with pavement modifications and traffic calming measures around the curved sections.

– Existing street lighting along Stegman’s Mill Road is substandard. Street lighting will be upgraded to address lighting deficiencies and improve visibility and safety.

Page 4: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

4

PROJECT DESCRIPTIONProposed Watermain Replacement

• The proposed watermain replacement will include:– New 150mm diameter PVC watermain on Napier Street, John

Street and Kellam Street.– New 200mm diameter PVC watermain on Stegman’s Mill Road

from Islington Avenue to Valley Road. – New 300mm diameter PVC watermain on Stegman’s Mill Road

from Windrush Road to Ravendale Gate.– New 25mm (1”) water services to streetline including new curb

stops.

Page 5: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

5

LOCATION PLANProposed Watermain Replacement

Page 6: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

6

COMMON QUESTIONS AND CONCERNSProposed Watermain Replacement

– Will there be any interruptions to my water during construction?Some water interruptions may occur during construction of

the new watermain. Residents will be given 24-48 hours notice prior to the interruption.

– Will temporary water be required?Temporary water may be required during the construction of

the new watermain. – How will the installation of the new water service to streetline

affect my landscaping?All disturbed boulevard areas will be restored in kind. Every

effort will be made to restore to original conditions.

Page 7: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

7

COMMON QUESTIONS AND CONCERNSProposed Watermain Replacement

– Will I have access to my driveway and property throughout construction? Driveway and property access will be maintained with the

exception of minor interruptions. Residents will be given 24-48 hours notice prior to the interruption.

– How long will construction take?Construction start is anticipated in spring 2015 pending

budget approval with completion anticipated by early fall.

Page 8: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

8

PROJECT DESCRIPTIONProposed Roadworks – Napier St. , John St. & Kellam St.

• The proposed roadworks on Napier Street, John Street and Kellam Street will include:– Full depth road reconstruction based on Geotechnical

recommendations.Removal of existing asphaltExcavation of road granular material to subgradeNew granular road base New roadway asphaltRestoration of all asphalt, interlock, concrete and gravel

driveways, private walkways and boulevard areas within the limits of construction disturbance.

Page 9: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

9

LOCATION PLANProposed Roadworks – Napier St. , John St. & Kellam St.

Page 10: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

10

COMMON QUESTIONS AND CONCERNSProposed Roadworks – Napier St. , John St. & Kellam St.

– Will I have access to my driveway and property throughout construction? Driveway and property access will be maintained with the

exception of minor interruptions. Residents will be given 24-48 hours notice prior to the interruption.

– Will there be any road closures?Existing roads may be reduced to one lane or full road

closure during construction. Acceptable signage and detours will be posted in advance of any closures.

– How long will construction take?Construction start is anticipated in spring 2015 pending

budget approval with completion anticipated by early fall.

Page 11: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

11

COMMON QUESTIONS AND CONCERNSProposed Roadworks – Napier St. , John St. & Kellam St.

– How will the roadworks affect my property and landscaping?All disturbed boulevard areas will be restored in kind. Every

effort will be made to restore to original conditions.

Page 12: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

12

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

As part of the design process, three cross-section alternatives were considered for the reconstruction of Napier Street, John Street and Kellam Street.

• Option 1 – Modified Rural Cross-Section– Reconstruction to a modified rural cross-section with minor

drainage improvements, including shallow swales and additional boulevard catchbasins.

Page 13: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

13

Option 1Typical Cross-Section for Napier Street, John Street and Kellam Street

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 14: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

14

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 15: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

15

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 16: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

16

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 17: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

17

Option 1 – Modified Rural Cross-Section• Advantages

– Minimize limits of driveway and boulevard restoration.

• Disadvantages– Higher construction costs compared to Option 3

Approximately $960 per metre of roadworks.– Increased maintenance costs.– Only minor improvements to existing surface drainage is achieved.– Shorter life span of road due to lack of drainage.– No clear definition of roadway versus boulevard.

Edge of asphalt limits will deteriorate over time. Snow removal and road maintenance may damage adjacent

boulevard areas.– Potential standing water due to existing grade conditions.

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 18: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

18

• Option 2 – Full Rural Cross-Section– Reconstruction to a rural cross-section with ditches and driveway

culverts.

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 19: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

19

Option 2 Typical Cross-Section for Napier Street, John Street and Kellam Street

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 20: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

20

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 21: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

21

Option 2 – Full Rural Cross-Section• Advantages

– Improved surface drainage and conveyance through ditches.

• Disadvantages– Higher construction costs as a result of ditch and driveway culvert

excavations. Approximately $1,100 per metre of roadworks.

– Increased maintenance costs.– Increased construction schedule.– Increased disruption of driveways and boulevards.– Likely encroachment onto private property to facilitate construction of

ditches.– Potential standing water in ditches.– Likely utility conflicts and relocations.– Possible tree/shrub removal and greater impact on landscaping.

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 22: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

22

• Option 3 – Modified Semi-Urban Cross-Section– Reconstruction to a modified semi-urban cross-section, including

semi-mountable curb and narrow gutter with additional catchbasins for improved drainage.

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 23: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

23

Option 3 Typical Cross-Section for Napier Street, John Street and Kellam Street

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 24: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

24

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 25: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

25

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 26: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

26

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 27: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

27

Option 3 – Modified Semi-Urban Cross-Section• Advantages

– Semi-mountable curb with narrow gutter offers a unique approach to an urban section.

– Lowest construction cost of all three options. Approximately $870 per metre of roadworks.

– Clear definition of roadway versus boulevard.– Lower maintenance costs.– Improved drainage for road base and surface runoff.– Maximize life span of road.– Minimize limits of driveway and boulevard restoration.– No standing water.

• Disadvantages– Potentially changes the character of the area.

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 28: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

28

Recommended Design• Option 3

– Reconstruction to a modified semi-urban cross-section including, semi-mountable curb and narrow gutter with additional catchbasins for improved drainage.

The recommended approach – Option 3 – is shown on the display plans around the room. The anticipated limits of disturbance have been identified for both driveways and boulevard areas.

Single plans for Options 1 and 2 are also displayed for illustration purposes.

PROPOSED DESIGN ALTERNATIVESProposed Roadworks – Napier St. , John St. & Kellam St.

Page 29: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

29

• The proposed roadworks on Stegman’s Mill Road will include:– Road rehabilitation from Islington Avenue to the end of the curb

west of Windrush Road.Full depth asphalt removal and replacementPartial depth asphalt removal and replacement across the

bridge deck.– Pavement modifications and traffic calming measures from east

of Ravendale Gate to west of Teston Road.Centreline rumble stripWhite edge line pavement markingsChevron road signage through the curves

PROJECT DESCRIPTIONProposed Roadworks – Stegman’s Mill Road

Page 30: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

30

– Street lighting upgraded to comply with City Standards from Islington Avenue to Ravendale Gate.New lighting proposed on the south and east side of

Stegman’s Mill Road.Existing hydro poles used where possible with new

luminaires.Addition of some new poles with luminaires.LED luminaires will be considered.

PROJECT DESCRIPTIONProposed Roadworks – Stegman’s Mill Road

Page 31: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

31

LOCATION PLANProposed Roadworks – Stegman’s Mill Road

Page 32: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

32

Stegman’s Mill Road - Photo Rendering

Traffic Calming Measures

PROJECT DESCRIPTIONProposed Roadworks – Stegman’s Mill Road

Page 33: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

33

PROJECT DESCRIPTIONProposed Roadworks – Stegman’s Mill Road

Page 34: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

34

PROJECT DESCRIPTIONProposed Roadworks – Stegman’s Mill Road

Page 35: 1 CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG

35

Questions or Comments?

Project Contact Information:

Mr. Pat Marcantonio, C.E.T.

Project ManagerCity of Vaughan, Engineering Services2141 Major Mackenzie DriveVaughan, ON L6A 1T1E-mail: [email protected]

Mr. Terry Hoehn, C.E.T.Project ManagerAinley Group550 Welham RoadBarrie, ON L4N 8Z7E-mail: [email protected]

QUESTIONS OR COMMENTS?