1 cerp-iot cluster book 2009 working session cerp-iot meeting nr.8 19.-20.05.2009 – aalborg,...

11
1 CERP-IoT Cluster Book 2009 Working Session CERP-IoT Meeting Nr.8 19.-20.05.2009 – Aalborg, Denmark Harald Sundmaeker ATB Institute for Applied Systems Technology Bremen GmbH CuteLoop CuteLoop Project – www.cuteloop.eu

Upload: luke-barton

Post on 27-Mar-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 CERP-IoT Cluster Book 2009 Working Session CERP-IoT Meeting Nr.8 19.-20.05.2009 – Aalborg, Denmark Harald Sundmaeker ATB Institute for Applied Systems

1

CERP-IoT Cluster Book 2009 Working Session CERP-IoT Meeting Nr.8

19.-20.05.2009 – Aalborg, Denmark

Harald SundmaekerATB Institute for Applied Systems Technology Bremen GmbH CuteLoop

CuteLoop Project – www.cuteloop.eu

Page 2: 1 CERP-IoT Cluster Book 2009 Working Session CERP-IoT Meeting Nr.8 19.-20.05.2009 – Aalborg, Denmark Harald Sundmaeker ATB Institute for Applied Systems

2

Cluster Book Working SessionIntroduction (2)

Objective of the Working Session is to agree:

– Basic schedule and target audience addressed

– General format, layout, printing, costs

– Overall contents and structure

– Foreword preparation

– Cluster description

– Articles to be included and review procedure

– Style and contents of the project profiles

– Resulting schedule and envisaged milestones

Page 3: 1 CERP-IoT Cluster Book 2009 Working Session CERP-IoT Meeting Nr.8 19.-20.05.2009 – Aalborg, Denmark Harald Sundmaeker ATB Institute for Applied Systems

3

Basic Schedule & Target Audience

Finalisation of the CERP-IoT Cluster Book 2009:– End of 2009– After CASAGRAS Conference in beginning of October, enabling to reflect an

updated SRA– Presenting selected Book Articles at CASAGRAS Conference?– Distribution of the Cluster Book 2009 at the FIA Stockholm event? (23.-

24.11.09)? only as pdf version– print of the book requires 3-4 months– short document of 30-40 pages could be printed in 3-4 weeks.– possibly a WIKI for preparing and publishing

Target Audience and how to reach them:– Research (i.e. including industrial Research) and Academia – EC Channels,

Conferences

Page 4: 1 CERP-IoT Cluster Book 2009 Working Session CERP-IoT Meeting Nr.8 19.-20.05.2009 – Aalborg, Denmark Harald Sundmaeker ATB Institute for Applied Systems

4

General Format, Layout, Printing, Costs

General Format:– A4, A5?– Hardcover?– Pages? – Currently around 160 pages– Electronic Version yes– to be clarified with the publisher

Layout responsibility to be clarified – Ian Smith volunteered to assist in the preparation of the layout to be clarified

about costs Patrick Guillemin will clarify– Pictures available from projects? – If pictures available, please check IPR

Printing – EC offers to print the book, based on pdf (other formats possible?) – requires finalised layout

Costs to be clarified based on final decision of book printing– Layout?– Distribution?

Page 5: 1 CERP-IoT Cluster Book 2009 Working Session CERP-IoT Meeting Nr.8 19.-20.05.2009 – Aalborg, Denmark Harald Sundmaeker ATB Institute for Applied Systems

5

Overall Contents and Structure

Table of Contents: sequence of articles & SRA to be decided later

– Editors and Contributors

– Table of Contents

– Foreword

– CERP-IoT Cluster Description – also adding an overview list with project names and contact details

– Strategic Research Agenda

– Articles

– Project Profiles

Page 6: 1 CERP-IoT Cluster Book 2009 Working Session CERP-IoT Meeting Nr.8 19.-20.05.2009 – Aalborg, Denmark Harald Sundmaeker ATB Institute for Applied Systems

6

Foreword Preparation

Author Gerald Santucci

Page 7: 1 CERP-IoT Cluster Book 2009 Working Session CERP-IoT Meeting Nr.8 19.-20.05.2009 – Aalborg, Denmark Harald Sundmaeker ATB Institute for Applied Systems

7

Cluster Description

To be included in the SRA

Reuse of the cluster description as separate chapter in the book

Page 8: 1 CERP-IoT Cluster Book 2009 Working Session CERP-IoT Meeting Nr.8 19.-20.05.2009 – Aalborg, Denmark Harald Sundmaeker ATB Institute for Applied Systems

8

Articles to be Included and Review Procedure (1)

CASAGRAS, GRIFS – Standardisation issues & challenges on RFID (for a future IoT?) RACE Network RFID – Stimulating the Take-up of RFID in Europe BRIDGE – Specific solutions for RFID and outlook towards a future IoT CuteLoop – Challenges for Usage of Intelligent Networked Devices INDISPUTABLE KEY – Usage of RFID in the Wood Products Industry and

Contribution to Environmental Protection SMART, TRASER – Usage of RFID in Tracking and Tracing - Lessons Learnt and

Outlook towards IoT STOP – Anti-counterfeiting in the Internet of Things STOLPAN – NFC technology and its application scenarios in a future IoT ASPIRE, HYDRA – Open source Middleware for networked embedded systems

towards future Internet of Things ETP EPoSS – Outlook on future IoT applications

Page 9: 1 CERP-IoT Cluster Book 2009 Working Session CERP-IoT Meeting Nr.8 19.-20.05.2009 – Aalborg, Denmark Harald Sundmaeker ATB Institute for Applied Systems

9

Articles to be Included and Review Procedure (2)

The Articles shall be based on their findings/outcomes, while specifically outlining their view towards an Internet of Things.

Article template distributed

Chapter compiles all the individual articles

Review Procedure

– Cluster internal review procedure

– A request will be send to all of the Projects, enabling an article review by at least 2 reviewers.

Page 10: 1 CERP-IoT Cluster Book 2009 Working Session CERP-IoT Meeting Nr.8 19.-20.05.2009 – Aalborg, Denmark Harald Sundmaeker ATB Institute for Applied Systems

10

Style and Contents of the Project ProfilesA template will be prepared

?

Page 11: 1 CERP-IoT Cluster Book 2009 Working Session CERP-IoT Meeting Nr.8 19.-20.05.2009 – Aalborg, Denmark Harald Sundmaeker ATB Institute for Applied Systems

11

Resulting Schedule and Envisaged Milestones

Due Dates for Finalising Book:

– Distribution: Early 2010

– Printing: Delivery for printing End November 2009

– Input for FIA USB Stick Deadline?

– SRA Final: 15. October 09

– Article Final: 15. October 09

– Foreword: 15. October 09

– Cluster Description: to be defined – based on SRA

– Project Profile: 14. August 09

– Review Feedback: 15. September 09

– Article for Review: 14. August 09

– Article Abstract: 05. June 09