Page 1: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

1

BARRY DUNGEY

General Manager Engineering & Maintenance

June 2008

Loy Yang Power Station Control

System Upgrade.

Page 2: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

2

Key Project Objectives:

• Original control system is of mid 1970’s design with circuit board, relay and wire wrap technology.

• The main driver for the project is the difficulty in supporting obsolete control equipment.( Our policy is to run for approx 5 years following withdrawal of support by our equipment supplier)

• The opportunity is also being taken to gain improvements in system performance and reduce business risk exposure.

• ( i.e. Alternative control room)• Plant trip rates were increasing with a significant number due to

control system faults.• Upgrade will include the installation of a separate plant safety

system.• Complete unit cut over to be achieved in 35-40 day outage

duration

Page 3: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

3

Number of Trips & Trip Rate.

0

5

10

15

20

25

30

1998 2000 2002 2004 2006 2008

Rate / 1kHr

No. of Trips

Page 4: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

4

Project Timeline

01/01/2006 31/12/2013

Jan-07 Jan-08 Jan-09 Jan-10 Jan-11 Jan-12 Jan-13

Contract Signed with Yokogawa

Coal Handling

Plant Cut Over

Unit 2 Controls Cut Over“Major

Outage”

Unit 1 ControlsCut Over“Major

Outage”

Unit 4 Controls Cut Over “On Line”

Design Basis Manual Agreed

Unit 3 ControlsCut Over“On Line”

Unit Simulator To Be Delivered For Training And Control

SAT

Emergency Control Room Commissioned

Optimised Sootblower

Systems Installed On

All Four Units

Page 5: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

5

Loy Yang Power Expectations

• The current control system is fairly tight as it is already being run on a digital platform, hence LYP are not expecting significant direct improvements in efficiency as a result. (Some studies indicate that up to 2% improvement is possible from older systems)

• The system will deliver flexibility to do things smarter, fault find easier, and implement future plant logic change easier.

• The supplier has provided a guarantee that they will support the new control system for 35 years, hence no further significant upgrades are expected in the remaining life of the plant.

Page 6: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

6

Yokogawa Site Observations

•Site surveys noted that the current control strategies are sound.•Boiler thermocouple dynamic response suitably fast to allow for quick movement in loads.•Existing spray valves and actuators not significantly limiting performance•Existing controls have some issues when limits are reached – wind-up, excess output pull-back, etc

Page 7: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

7

Benefits from Yokogawa control design

• Integration between steam temperature and combustion controls minimises interaction

• “Over-firing” minimised by using transient contribution of superheater sprays to main steam pressure control

• Contributes to wider operating range from milling plant

• Boiler thermal stress reduced• Flexibility on turbine ramp rates possible• On line efficiency tools improved.

Page 8: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

8

Benefits (Continued)

In summary, the current process is about achieving incremental improvements, particularly with:•Start up and shutdown sequences•Better trim controls associated with excess air (oxygen). •Maximising future flexibility with an open system which can accept third party products.•Improved Operator information and diagnostics

Page 9: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

9

Original Coal Handling Plant

Page 10: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

10

Coal Handling Plant (Part)

Page 11: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

11

Coal Handling Plant (Overview Screen)

Page 12: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

12

Major Plant Drive Graphic

Page 13: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

13

Future Control Room Layout

Page 14: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

14

Simulation For Engineering and Training

Page 15: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

15

Optimised Sootblowing

• Loy Yang Power has four superheater elements, 2 reheater elements and an economiser within each furnace convection path.

• To manage boiler fouling, 74 sootblowers are used to clean the elements using high pressure steam from the Reheat Steam System.

• The original design used a time based operation system with two cleaning cycles per day.

Page 16: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

16

Original Sootblower Control Panel

Page 17: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

17

Optimised Sootblowing - NGISB

• An optimised sootblowing system (NGISB - Next Generation Intelligent Sootblowing System) has been installed on one unit as a trial. It uses a Synengco supplied NGISB system interfaced to PLC based sootblower controls supplied by Siemens.

• The NGISB gathers data from the plant historian at near real time and continuously calculates the ideal sootblower schedule using a thermal boiler model within business rule constraints.

Page 18: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

18

Sootblower Optimisation System Aims

• Reduce sootblowing frequency• Maintain boiler attemporator spray flows

within the ideal valve control range• Minimise Reheat Spray Flow• Maintain Steam and Metal Temperatures

close to target and minimise alarm conditions to maximise thermal efficiency.

• “Set and Forget” operation.

Page 19: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

19

Siemens/Synengco Sootblower Control System

Page 20: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

20

Optimised Sootblowing Results

• Sootblowing frequency reduced to 32.5% of the original time based schedule.

• Annualised Savings per Unit– 24.7 TJ of energy– 8.1 Ml of Cold Reheat Steam

– 4,900 Tonnes of CO2

Page 21: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

21

Unit 3 Optimised Sootblowing 17-12-07 to 29-04-08

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

16-Dec-07 05-Jan-08 25-Jan-08 14-Feb-08 05-Mar-08 25-Mar-08 14-Apr-08

% (c

f sta

ndar

d)

level 13

level 14

level 15

level 17

level 18

level 19

total

Page 22: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

22

Optimised Sootblowing Results (Continued)

• Reducing RH Spray Flow to a minimum has a positive impact on overall steam cycle efficiency – estimated to be 0.3%

• Reduced thermal excursions in the boiler due to sootblowing leading to a more stable boiler.

• Better than 12 month payback on current costs.

Page 23: 1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade

23

QUESTIONS