1-app-nmp public consultation&disclosure plan
TRANSCRIPT
-
8/2/2019 1-App-NMP Public Consultation&Disclosure Plan
1/6
Namibian Marine Phosphate (Pty) Ltd Appendix 1 Page 1 of 6S C O P I N G R E P O R T M A R I N E C O M P O N E N T
November 2011P U B L I C C O N S U L T A T I O N A N D D I S C L O S U R E P L A N
Appendix 1
Public consultation and disclosure plan
-
8/2/2019 1-App-NMP Public Consultation&Disclosure Plan
2/6
Namibian Marine Phosphate (Pty) Ltd Appendix 1 Page 2 of 6S C O P I N G R E P O R T M A R I N E C O M P O N E N T
November 2011P U B L I C C O N S U L T A T I O N A N D D I S C L O S U R E P L A N
Public Consultation and Disclosure Plan
1. The Stakeholders
Item
Level
Description Methodology for Communication
Stakeholder
Database
National
Ministry of Mines and Energy (MME)
Ministry of Environment and Tourism
(MET)
Ministry of Agriculture, Water and
Forestry (MAWF)
Ministry of Trade and Industry (MTI)
Ministry of Fisheries and Marine
Resources (MFMR)
Ministry of Works Transport and
Communication (MWTC)
Institutional Stakeholders and providers of
support and infrastructure services.
Consult via telecommunications or meetings
at national or regional level. All reports are
circulated to them for comment.
National Planning Commission
Benguela Current Commission
Potential interested and affected parties.
Consult via telecommunications or meetings
at national or regional level. All reports are
circulated to them for comment.
Media Potential interested party.
Assist with awareness raising.
Consult via telecommunications or meetingsat national or local level. All reports are
circulated to registered I&AP members from
the media for comment.
Region
al
Ministry of Fisheries and Marine
Resources
Ministry of Environment and Tourism
Ministry of Works Transport and
Communication
Institutional Stakeholders and providers of
support and infrastructure services.
Consult via telecommunications or meetings
at national or regional level. All reports are
circulated to them for comment.
Erongo Regional Council Is the formal representative institution of the
recipient communities.Consult via telecommunications and regular
reports and meetings. Assist with
community consultation.
Marine Neighbors to EPLs
Chamber of Mines
Walvis Bay Salt Works
Potential interested and affected parties.
Consult via telecommunications or meetings
at national or regional level. All reports are
circulated to registered I&APs representing
these organizations for comment.
-
8/2/2019 1-App-NMP Public Consultation&Disclosure Plan
3/6
Namibian Marine Phosphate (Pty) Ltd Appendix 1 Page 3 of 6S C O P I N G R E P O R T M A R I N E C O M P O N E N T
November 2011P U B L I C C O N S U L T A T I O N A N D D I S C L O S U R E P L A N
Item
Level
Description Methodology for Communication
Erongo RED Provider of support and infrastructureservices.
Consult via telecommunications or meetings
at regional level. All reports are circulated to
registered I&APs from this party for
comment.
Local
Walvis Bay Municipality
Swakopmund Municipality
NamPort
TransNamib
Providers of support and infrastructure
services.
Consult via telecommunications or meetings
at local level. All reports are circulated to
registered I&APs representing these
organizations for comment.
Fishing Associations and Industry
Tourism Operators
Walvis Bay Chamber of Commerce
Potential affected parties.
Consult via telecommunications or meetings
at local level. All reports are circulated to
registered I&APs representing these
organizations for comment.
NGOs
Specialists
Other Consultancies
Media
Potential interested parties.
Consult via telecommunications or meetings
at national or local level. All reports are
circulated to registered I&APs representingthese organizations for comment.
-
8/2/2019 1-App-NMP Public Consultation&Disclosure Plan
4/6
Namibian Marine Phosphate (Pty) Ltd Appendix 1 Page 4 of 6S C O P I N G R E P O R T M A R I N E C O M P O N E N T
November 2011P U B L I C C O N S U L T A T I O N A N D D I S C L O S U R E P L A N
2. The Process
Item
L
evel
Description Purpose of Meeting/ Report
PublicParticipationProcess
NationalandR
egional
High Level Initiation Meeting:
Windhoek and Walvis BayRaise awareness/share project information
Engage with the key marine and terrestrial
authorities regarding the proposed project in
order to solicit their ideas and concerns
about strategic matters and concepts about
the project. This is expected to assist the
consultant in defining the parameters for the
study in terms of issues to explore in the full
EIA phase.
Authorities Initiation Meeting:
Windhoek and Walvis BayRaise awareness/share project information
Consult with the organs of state which have
jurisdiction over the areas where the
proposed project will be implemented.
Since aspects of the proposed project will
be implemented at both sea and on land,
the concerns and ideas of the marine and
terrestrial authorities are to be solicited.Possible solutions to challenges faced with
regards to the proposed project can also be
provided.
Assist the consultant in defining the
parameters for the study in terms of issues
to explore in the full EIA phase.
Focal Group Meeting:
Ministry of Fisheries and MarineResources
Since a large component of this proposed
project will take place at sea with possibleaffects on the marine life, a separate
meeting is to be conducted with MFMR.
Obtain their specialized input and have in-
depth discussions on the project
information. Issues raised will further assist
in defining the parameters for the study as
well as ensuring that the terms of reference
for the specialists encompasses specialized
issues that needs to be explored.
-
8/2/2019 1-App-NMP Public Consultation&Disclosure Plan
5/6
Namibian Marine Phosphate (Pty) Ltd Appendix 1 Page 5 of 6S C O P I N G R E P O R T M A R I N E C O M P O N E N T
November 2011P U B L I C C O N S U L T A T I O N A N D D I S C L O S U R E P L A N
Item
Level
Description Purpose of Meeting/ Report
Initiation Feedback:Scoping Report
Feedback in the form of a scoping report onthe public consultation to date, the meetings
conducted and issues raised.
Outline issues that further need
investigation. Identify specialists and final
terms of reference.
Allow for comments over a period of two
weeks.
Feedback Meeting on EIA Report on issues investigated, the findings
as well as mitigation or enhancement
measures identified.
Share information, facilitate mutual
understanding of findings.
Close-out Feedback:
Draft Environmental Impact
Assessment Report
Circulate report to all I&APs. Report on
issues investigated, the findings as well as
mitigation or enhancement measures
identified.
Allow for comments over a period of two
weeks.
Incorporate comments in the final report
before submitting it to the DEA for approval.
Local
Public Initiation Meeting:
Windhoek and Walvis BayRaise awareness/share project information.
Facilitate public participation, creating a
platform whereby the concerns of
individuals, groups or local communities
could be conveyed and the parameters for
the study in terms of issues to explore in the
full EIA phase can be developed.
Facilitate transparency with the public which
aids in building good rapport, while
identifying potential challenges brought
about by the proposed project, along with
possible solutions.
-
8/2/2019 1-App-NMP Public Consultation&Disclosure Plan
6/6
Namibian Marine Phosphate (Pty) Ltd Appendix 1 Page 6 of 6S C O P I N G R E P O R T M A R I N E C O M P O N E N T
November 2011P U B L I C C O N S U L T A T I O N A N D D I S C L O S U R E P L A N
Item
Level
Description Purpose of Meeting/ Report
Initiation Feedback:Scoping Report
Feedback in the form of a scoping report onthe public consultation to date, the meetings
conducted and issues raised.
Outline issues that further need
investigation. Identify specialists and final
terms of reference.
Allow for comments over a period of two
weeks.
Feedback Meeting on EIA Report on issues investigated, the findings
as well as mitigation or enhancement
measures identified.
Share information, facilitate mutual
understanding of findings.
Close-out Feedback:
Draft Environmental Impact
Assessment Report
Circulate report to all I&APs. Report on
issues investigated, the findings as well as
mitigation or enhancement measures
identified.
Allow for comments over a period of two
weeks.
Incorporate comments in the final report
before submitting it to the DEA for approval.