1 albq-599.ppt utility substation demonstration initiative project presentation albuquerque, new...
TRANSCRIPT
1Albq-599.ppt
Utility Substation Demonstration InitiativeProject Presentation
Albuquerque, New MexicoMay 13 - 14, 1999
KEMA Consulting
Jack Robinson
2Albq-599.ppt
UCA Substation Communications Research Project Status/Objectives
• Extend Open Real-Time UCA into Substations
• Tasks Completed–Survey–Requirements Specification (Draft 1.0 - 12/20/96)–Benchmark/Performance Analysis–Initial Demonstration Sow–GOMSFE Models–Initial Testing of Conformant Devices
• Ongoing Coordination Efforts: UCA Forum; - IEEE; TC57/WG10,11,12
• Contacts: EPRI - Jerry Melcher (650)855-2299;
AEP - John Burger (614)883-7220; KEMA- Jack Robinson (408)792-0960
• Documents: FTP. Sisconet/EPRI/Subdemo
3Albq-599.ppt
EPRI Substation Automation
ConceptConcept 3599 Survey, 3599 Survey, Workshops, Workshops, Req. StudyReq. Study
AEP Utility Substation InitiativeAEP Utility Substation Initiative
GOMSFEGOMSFE
UCA AdderUCA Adder
IEC TC57 WG 10, 11, 12IEC TC57 WG 10, 11, 12
1994 1995 1996 1997 1998 1999 20001994 1995 1996 1997 1998 1999 2000
UCA 2.0UCA 2.0
.81 Test.81 Test
8 Vend Interop Demo8 Vend Interop Demo
.82 IEEE SCC36 .82 IEEE SCC36
IEC 61850 CDIEC 61850 CD
UCA2 UCA2 BenchmarkBenchmark
1.0 1.0
UpdatedUpdatedDocs Docs
Field DemosField Demos
TestingTesting
4Albq-599.ppt
Demonstration Project Goals
1. To evaluate and recommend a suitable Utility Communications Architecture (UCATM) compliant substation LAN.
2. To demonstrate the use of this substation LAN technology in one or more pilot projects at one or more designated utility sites.
3. To demonstrate interoperability between IED equipment from different vendors.
5Albq-599.ppt
Participating Utilities
1. AEP
2. AEPCO
3 Ameren
4. BE
5. BG&E
6. BPA
7. Cinergy
8. ComED
17. NUON - TB
18. OH
19. PEPCO
20. PP&L
21. SCE
22. TE
23. TU
24. TVA
PENDING: Entergy, ENED, ENEL, VEW, ATEL, TriState, ESKOM, CFE, BCH
9. Coned
10. Duke
11. Duquesne
12. FPC
13. GPU
14. IP&L
15. Nat’l Grid
16. NSP
6Albq-599.ppt
Participating Vendors
1. ABB
2. Basler
3. Beckwith
4. Bitronics
5. Cooper
6. Doble
7. Dranetz/BMI
8. Alstom (GEC)
9. GE/Multilin
10. GE/Harris
11. Telegyr
12. Modicon/Square D
13. SEL
14. Siemens
15. Tasnet
7Albq-599.ppt
Vendor Utilities
GE/Multilin (Relay) IP&L, AEP, OH, ComED, Cinergy, BG&E, TE, GPU
Basler AEP, NSP, TE, BG&E
Cooper AEP, NSP, IP&L, BG&E
GEC ComEd, NUON, BE, BG&E
Beckwith FPC, Cinergy, TE, NSP, GPU, IP&L, BG&E
Tasnet BE, ComEd, BG&E
SEL OH, NSP, TE, IP&L, BG&E, FPC, Duke, TVA, Entergy
GE/Harris TE, OH, Cinergy, IP&L,FPC, Ameren, Entergy
Siemens(Relays) OH, NUON
Siemens(HMI) NSP, OH, NUON
Bitronics NSP, BG&E, BE, Ameren, AEP
ABB Cinergy, TU, SCE, BE, GPU, BG&E, NSP, Duke, TVA
L&G TVA, BG&E
Doble GPU,BG&E, ComED, FPC
Dranetz/BMI NSP, SCE, TVA, BG& E
Modicon/Square D NSP, TVA, BG&E, OH
GE (HMI) GPU, BG&E, NSP, ComED, IP&L, BE
Vendor/Utility Teams
8Albq-599.ppt
1. BE Distribution TBD 1999
2. TVA Lab Staging May, 1999
3. NSP Transmission June, 1999
4. AEP INEZ Project July, 1999
5. ComED Lab Staging 2Q, 1999
6/7. AEP Tran/Dist. July, 1999
8. Duke Power Transmission TBD 1999
9. GPU Distribution TBD 1999
10. NSP Distribution TBD 1999
11. ETS(SCE) Lab Staging TBD 1999
12. OH Lab Staging December, 1999
Tentative Dates for 12 Demonstration Sites
9Albq-599.ppt
Major Project Milestones - Through 1998
1. Initial Planning Meeting (at AEP) 7/10/96
2. Scope/Demo Meeting in Detroit 11/19-20/96
3. Complete Benchmark Test/Analysis 3/97
4. Start Implementation (based on LOI’s /Draft SOW) 2/28/97
5. Initial Unit Testing (GE, Cooper, Modicon, Telegyr) 3/01/97-9/98
6. Vendor Development 3/07/97-
10/98(Design Reviews/Progress Meetings)
7. Freeze Product Designs (Requirements) 10/30/97
8. Interoperability Demo in Asheville (8 Vendors) 9/17/98
9. INEZ Startup at AEP 10/98
10. Complete CPS Acceptance Test (GOMSFE 0.81) 11/98
11. Draft IEC 61850 Documents 12/98
10Albq-599.ppt
Preliminary Schedule - 1999
1. Project Meeting (Las Vegas) January 14-15, 1999
2. Updated UCA/IEC Documents January, September 1999
3. Industry/Workshops March, April, June 1999
4. IEC Meetings (3) March, July (26-29), December 1999
5. SCC 36 Meetings (2) April, August 1999
6. Project Meeting/industry May 13-14, 1999Demonstration (Albuquerque)
7. GOMSFE .9/1.0 May, July 1999
8. Test Plan Update June 1999
9. AEP Demonstration (INEZ/Tran/Dist) July 1999
10. Project Coordination Meeting September 1999
11. Test Devices/Complete Reports TBD (6 devices ?)
11Albq-599.ppt
PowerserveNetwork
Transducer
Bitronics
DSA
UCAP 600UCA-2
RTU/FEP
TAMARACK
HMI/BROWSER
PC
5700SubstationSupervisor
Telegyr
Quantum PLC
Square D/Modicon
Albuquerque Interoperability DemonstrationUCA-2 Substation LAN
Siemens
Relay
E-PRO 100Relay
Cooper
GE
F60/L90Relays
SISCO
HMI/BROWSER
PC
KEMA
UCA-2UnICA
ANALYZER
UCA-2/MMS/OSI/ [XYLAN Switch]
PQDevice
Electrotek