Page 1: 1 Albq-599.ppt Utility Substation Demonstration Initiative Project Presentation Albuquerque, New Mexico May 13 - 14, 1999 KEMA Consulting Jack Robinson

1Albq-599.ppt

Utility Substation Demonstration InitiativeProject Presentation

Albuquerque, New MexicoMay 13 - 14, 1999

KEMA Consulting

Jack Robinson

Page 2: 1 Albq-599.ppt Utility Substation Demonstration Initiative Project Presentation Albuquerque, New Mexico May 13 - 14, 1999 KEMA Consulting Jack Robinson

2Albq-599.ppt

UCA Substation Communications Research Project Status/Objectives

• Extend Open Real-Time UCA into Substations

• Tasks Completed–Survey–Requirements Specification (Draft 1.0 - 12/20/96)–Benchmark/Performance Analysis–Initial Demonstration Sow–GOMSFE Models–Initial Testing of Conformant Devices

• Ongoing Coordination Efforts: UCA Forum; - IEEE; TC57/WG10,11,12

• Contacts: EPRI - Jerry Melcher (650)855-2299;

AEP - John Burger (614)883-7220; KEMA- Jack Robinson (408)792-0960

• Documents: FTP. Sisconet/EPRI/Subdemo

Page 3: 1 Albq-599.ppt Utility Substation Demonstration Initiative Project Presentation Albuquerque, New Mexico May 13 - 14, 1999 KEMA Consulting Jack Robinson

3Albq-599.ppt

EPRI Substation Automation

ConceptConcept 3599 Survey, 3599 Survey, Workshops, Workshops, Req. StudyReq. Study

AEP Utility Substation InitiativeAEP Utility Substation Initiative

GOMSFEGOMSFE

UCA AdderUCA Adder

IEC TC57 WG 10, 11, 12IEC TC57 WG 10, 11, 12

1994 1995 1996 1997 1998 1999 20001994 1995 1996 1997 1998 1999 2000

UCA 2.0UCA 2.0

.81 Test.81 Test

8 Vend Interop Demo8 Vend Interop Demo

.82 IEEE SCC36 .82 IEEE SCC36

IEC 61850 CDIEC 61850 CD

UCA2 UCA2 BenchmarkBenchmark

1.0 1.0

UpdatedUpdatedDocs Docs

Field DemosField Demos

TestingTesting

Page 4: 1 Albq-599.ppt Utility Substation Demonstration Initiative Project Presentation Albuquerque, New Mexico May 13 - 14, 1999 KEMA Consulting Jack Robinson

4Albq-599.ppt

Demonstration Project Goals

1. To evaluate and recommend a suitable Utility Communications Architecture (UCATM) compliant substation LAN.

2. To demonstrate the use of this substation LAN technology in one or more pilot projects at one or more designated utility sites.

3. To demonstrate interoperability between IED equipment from different vendors.

Page 5: 1 Albq-599.ppt Utility Substation Demonstration Initiative Project Presentation Albuquerque, New Mexico May 13 - 14, 1999 KEMA Consulting Jack Robinson

5Albq-599.ppt

Participating Utilities

1. AEP

2. AEPCO

3 Ameren

4. BE

5. BG&E

6. BPA

7. Cinergy

8. ComED

17. NUON - TB

18. OH

19. PEPCO

20. PP&L

21. SCE

22. TE

23. TU

24. TVA

PENDING: Entergy, ENED, ENEL, VEW, ATEL, TriState, ESKOM, CFE, BCH

9. Coned

10. Duke

11. Duquesne

12. FPC

13. GPU

14. IP&L

15. Nat’l Grid

16. NSP

Page 6: 1 Albq-599.ppt Utility Substation Demonstration Initiative Project Presentation Albuquerque, New Mexico May 13 - 14, 1999 KEMA Consulting Jack Robinson

6Albq-599.ppt

Participating Vendors

1. ABB

2. Basler

3. Beckwith

4. Bitronics

5. Cooper

6. Doble

7. Dranetz/BMI

8. Alstom (GEC)

9. GE/Multilin

10. GE/Harris

11. Telegyr

12. Modicon/Square D

13. SEL

14. Siemens

15. Tasnet

Page 7: 1 Albq-599.ppt Utility Substation Demonstration Initiative Project Presentation Albuquerque, New Mexico May 13 - 14, 1999 KEMA Consulting Jack Robinson

7Albq-599.ppt

Vendor Utilities

GE/Multilin (Relay) IP&L, AEP, OH, ComED, Cinergy, BG&E, TE, GPU

Basler AEP, NSP, TE, BG&E

Cooper AEP, NSP, IP&L, BG&E

GEC ComEd, NUON, BE, BG&E

Beckwith FPC, Cinergy, TE, NSP, GPU, IP&L, BG&E

Tasnet BE, ComEd, BG&E

SEL OH, NSP, TE, IP&L, BG&E, FPC, Duke, TVA, Entergy

GE/Harris TE, OH, Cinergy, IP&L,FPC, Ameren, Entergy

Siemens(Relays) OH, NUON

Siemens(HMI) NSP, OH, NUON

Bitronics NSP, BG&E, BE, Ameren, AEP

ABB Cinergy, TU, SCE, BE, GPU, BG&E, NSP, Duke, TVA

L&G TVA, BG&E

Doble GPU,BG&E, ComED, FPC

Dranetz/BMI NSP, SCE, TVA, BG& E

Modicon/Square D NSP, TVA, BG&E, OH

GE (HMI) GPU, BG&E, NSP, ComED, IP&L, BE

Vendor/Utility Teams

Page 8: 1 Albq-599.ppt Utility Substation Demonstration Initiative Project Presentation Albuquerque, New Mexico May 13 - 14, 1999 KEMA Consulting Jack Robinson

8Albq-599.ppt

1. BE Distribution TBD 1999

2. TVA Lab Staging May, 1999

3. NSP Transmission June, 1999

4. AEP INEZ Project July, 1999

5. ComED Lab Staging 2Q, 1999

6/7. AEP Tran/Dist. July, 1999

8. Duke Power Transmission TBD 1999

9. GPU Distribution TBD 1999

10. NSP Distribution TBD 1999

11. ETS(SCE) Lab Staging TBD 1999

12. OH Lab Staging December, 1999

Tentative Dates for 12 Demonstration Sites

Page 9: 1 Albq-599.ppt Utility Substation Demonstration Initiative Project Presentation Albuquerque, New Mexico May 13 - 14, 1999 KEMA Consulting Jack Robinson

9Albq-599.ppt

Major Project Milestones - Through 1998

1. Initial Planning Meeting (at AEP) 7/10/96

2. Scope/Demo Meeting in Detroit 11/19-20/96

3. Complete Benchmark Test/Analysis 3/97

4. Start Implementation (based on LOI’s /Draft SOW) 2/28/97

5. Initial Unit Testing (GE, Cooper, Modicon, Telegyr) 3/01/97-9/98

6. Vendor Development 3/07/97-

10/98(Design Reviews/Progress Meetings)

7. Freeze Product Designs (Requirements) 10/30/97

8. Interoperability Demo in Asheville (8 Vendors) 9/17/98

9. INEZ Startup at AEP 10/98

10. Complete CPS Acceptance Test (GOMSFE 0.81) 11/98

11. Draft IEC 61850 Documents 12/98

Page 10: 1 Albq-599.ppt Utility Substation Demonstration Initiative Project Presentation Albuquerque, New Mexico May 13 - 14, 1999 KEMA Consulting Jack Robinson

10Albq-599.ppt

Preliminary Schedule - 1999

1. Project Meeting (Las Vegas) January 14-15, 1999

2. Updated UCA/IEC Documents January, September 1999

3. Industry/Workshops March, April, June 1999

4. IEC Meetings (3) March, July (26-29), December 1999

5. SCC 36 Meetings (2) April, August 1999

6. Project Meeting/industry May 13-14, 1999Demonstration (Albuquerque)

7. GOMSFE .9/1.0 May, July 1999

8. Test Plan Update June 1999

9. AEP Demonstration (INEZ/Tran/Dist) July 1999

10. Project Coordination Meeting September 1999

11. Test Devices/Complete Reports TBD (6 devices ?)

Page 11: 1 Albq-599.ppt Utility Substation Demonstration Initiative Project Presentation Albuquerque, New Mexico May 13 - 14, 1999 KEMA Consulting Jack Robinson

11Albq-599.ppt

PowerserveNetwork

Transducer

Bitronics

DSA

UCAP 600UCA-2

RTU/FEP

TAMARACK

HMI/BROWSER

PC

5700SubstationSupervisor

Telegyr

Quantum PLC

Square D/Modicon

Albuquerque Interoperability DemonstrationUCA-2 Substation LAN

Siemens

Relay

E-PRO 100Relay

Cooper

GE

F60/L90Relays

SISCO

HMI/BROWSER

PC

KEMA

UCA-2UnICA

ANALYZER

UCA-2/MMS/OSI/ [XYLAN Switch]

PQDevice

Electrotek