1 48/96 work schedule presented by: engineer todd marty firefighter/operator tim swaner...

34
1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

Upload: diego-ryan

Post on 26-Mar-2015

222 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

1

48/96 Work Schedule

Presented by:

Engineer Todd Marty

Firefighter/Operator Tim Swaner

Firefighter/Operator Micah Rader

Page 2: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

2

What is the 48/96?

48 hours on/96 hours off Something different Something progressive

Page 3: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

3

The 48/96 and the Fire Service

Utilized by professional fire departments since the early 1990’s Widespread and rapidly gaining in popularity Over two dozen departments switching to the 48/96 in the last

five years This schedule is not a theoretical experiment in the fire service

but a proven and valid schedule option Departments using the schedule are diverse in their

demographics, management structure, and overall philosophies

Page 4: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

4

Fire Departments working the 48/96

Albuquerque Fire – Responds on over 50,000 calls a year– Six of Albuquerque’s 21 stations run between 350 and 500

calls a month – 12 to 17 calls per day– 36 to 51 calls per tour– Perform ALS– Has been working the 48/96 for nine years

Page 5: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

5

Fire Departments working the 48/96 Cont…

City of San Bernardino Fire Department– 11 stations– Three stations run 350 to 500 calls per month– 12 to 17 calls per day– 36 to 51 call per tour

Page 6: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

6

Interesting findings

All of the departments working the 48/96 share an overwhelming level of satisfaction with the schedule

None of the agencies chose to return to their previous schedule

Page 7: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

7

Comparisons of the 48/96 vs. the Kelly Schedule

No differences for administration

3 Platoons, ABC shifts 56 hours per week 112 hours per pay period 121 shifts per year

Page 8: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

8

Specifics to each schedule

Number of four-days per year Mornings at home not traveling to or from

work per year Weekend rotations Number of complete weekends off Other weekend statistics

Page 9: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

9

Number of four-days per year

Kelly– 40 per year

48/96– 60 per year

20 more per year (50% increase)

Page 10: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

10

Mornings at home not traveling to or from work

Kelly– 3 of every 9– 33% of mornings at home– 120 per year

48/96– 3 of every 6– 50% of mornings at home– 180 per year

60 more (50% increase)

Page 11: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

11

Weekend rotations

Kelly 48/96 Sat / Sun. Sat / Sun. X O O X X O X X X O X O O O O O O O O O O X O O O X O O O X Repeat Repeat

X = 24 hour shift on duty, 0 = 24 hours off duty.

Page 12: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

12

Complete Weekends Off

Kelly– 33% of weekends off per year– 17 per year

48/96– 50% of weekends off– 26 per year

9 more (50% increase)

Page 13: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

13

Work One Weekend Day (Sat or Sun)

Kelly– 35 per year

48/96– 17 per year

18 less (50% reduction)

Page 14: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

14

Short-term fatigue

One of the biggest advantages of the 48/96 is that it allows employee more opportunity to recover from sleep deprivation/ long-term fatigue.

Page 15: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

15

Fatigue and the 48/96

Departments found that after the schedule change, the issues of increased fatigue were not realized

Departments found that over time the schedule can significantly reduce fatigue

No increases in injuries or disabilities resulting from the schedule change

Departments have seen a reduction in sick leave use

Page 16: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

16

Short-term fatigue

During busy periods short-term fatigue would be expected to increase for some individuals working our current schedule, the 48/96, or with any schedule.

It’s the nature of the beast. Employees working extended shifts, 48s &

72s, is not new to ERFPD.

Page 17: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

17

The 48/96 decreases long term fatigue in many ways

The 48/96 increases rest periods (4-days) by 50%, increasing the number from 40 to 60 a year.

– the frequency of “4-days” increases to a “4-day” every 6 days as opposed to every 9 days with the Kelly schedule

Page 18: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

18

The 48/96 decreases long term fatigue in many ways

The 48/96 increases the number of “sleep in days” (days waking up at home and not going to work) by 60%, increasing the number from 9 to 15 per month.

Page 19: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

19

The 48/96 decreases long term fatigue in many ways

The 48/96 reduces the number of days/hours an employee spends getting ready for work and time in the commute by 50%.

Page 20: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

20

Sick Leave and the 48/96 Schedule

Many departments that have switched from the 3/4 schedule (Kelly schedule) to the 48/96 have reported significant reductions in sick leave use after switching to the 48/96.

Page 21: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

21

Some true examples

Pacifica Fire Department had a 20% reduction sick leave use after switching to the 48/96 schedule

Minneapolis Fire Department switched to a modified 48/96 schedule and saw an overall reduction in sick leave use by 34%

Manhattan Beach Fire Department had an 80% reduction in sick leave use after switching to the 48/96 schedule

Half Moon Bay Fire Department had a 10% reduction in sick leave use after switching to the 48/96 schedule

Page 22: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

22

Additional Findings

What were departments motivation for a schedule change? – An increase in rest periods– Able to live further away resulting in a home to

live in– More time at home with family

Page 23: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

23

Additional Findings

Why did other departments seek to change to this schedule?– A means of attracting and maintaining employees– They saw the positive benefits and improvements

in morale in surrounding departments who had switched to the 48/96

Page 24: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

24

Member Voting results

All departments voted on the 48/96 issue in one way or another before contacting their departments. Generally there were two votes: one to initiate a trial period and one to make it official at the end of the trial period. In EVERY case the number of “yes” votes increased significantly once the trial period was over.

Page 25: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

25

What are the benefits that the departments experienced?

Improved morale was a comment heard over and over. – Employees are well rested after “4 days off” and

are eager to come to work. – Employees felt more productive and better

organized on and off duty. – Fewer transitions between shifts made for less

duplication, better communication and more operational continuity.

Page 26: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

26

What are the benefits that the departments experienced?

Increased productivity and project follow through on duty– Employees found the schedule allowed for

more flexibility in scheduling daily work over two days.

– Members with program responsibilities can leave paperwork on their desk to work on for two days.

– Follow-up meetings and phone calls are easier to follow up on the second day.

Page 27: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

27

What are the benefits that the departments experienced?

Better communication between shifts – Reduction of lost information at shift exchanges

Less duplication of work– Shopping for food can be done once on the first

shift for both days– This leaves more time for training, cleaning and

maintenance.

Page 28: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

28

What are the benefits that the departments experienced?

This schedule has already been adopted by Shift Calendars, Inc. This is the company that we currently use for our shift calendars.

Page 29: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

29

Telestaff

Telestaff can easily be adapted to the 48/96 schedule. Other departments on the 48/96 use Telestaff, including ERFPD.

Page 30: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

30

Conclusion

At this time the response to this schedule is overwhelmingly positive. – Progressive change supported 100% by the

Union and the student-residents.

Page 31: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

31

Conclusion

48/96: A Simple Solution– We are very fortunate to have a group of young,

hard working, dedicated employees which should make transition easy and favorable for all.

Page 32: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

32

Conclusion

No change to the number days worked or hours worked.

Eagle River Fire does not see the consistent call volumes that these bigger departments see.

Page 33: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

33

Conclusion

Propose a trial period of one year at which time we can sit down and discuss implementation.– Once a department has switched to the 48/96

schedule, none have returned to their prior schedule.

Page 34: 1 48/96 Work Schedule Presented by: Engineer Todd Marty Firefighter/Operator Tim Swaner Firefighter/Operator Micah Rader

34

Questions/Concerns/Comments