1 40th infantry division (mech) warfighter 2003 ramp-up plan initial planning conference 4 jan 02...

23
1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02

Upload: bernard-stevens

Post on 27-Dec-2015

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

1

40th Infantry Division (Mech)40th Infantry Division (Mech)

Warfighter 2003 Ramp-up Plan

Initial Planning Conference 4 Jan 02

Warfighter 2003 Ramp-up Plan

Initial Planning Conference 4 Jan 02

Page 2: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

2

40 Infantry Division (M)40ID (M) INITIAL RAMP-UP PLANNING

CONFERENCE AGENDA• Introduction by CG and BCTP• Unit Mission/Organization Briefing

– ADC-M planning guidance for ramp-up– Division WARFIGHTER overview

• Scenario• Task Organization/Troop List• Seminar training objectives/schedule• WARFIGHTER training objectives

– Proposed Ramp-up events

• BCTP Overview• Battle Command Seminar Overview• WFX Discussion• Battle Simulation Center Discussion• MOA Approval

Page 3: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

3

40 Infantry Division (M)Assistant Division Commander – Maneuver Ramp-up

Planning Guidance (Key Tasks)• SUSTAIN new Staff’s knowledge of the MDMP • INTEGRATE and SYNCHRONIZE Division and MSC ramp-up plans to

insure a coordinated effort that minimizes impact on OPTEMPO• IMPROVE the Division’s war-fighting ability by

– Improving knowledge of I Corps SOPs– Upgrading the Division TACSOP and developing knowledge of its use

throughout the Division– Developing Division PLANSOP and TOCSOP– Improving knowledge and use of PHOENIX and TACLAN/C2PC

systems for intelligence and operations common picture to Battalion level– Train all personnel on Enemy OB, capabilities and doctrine– Train all personnel on Division/Corps organization and capabilities

• INTEGRATE and SYNCHRONIZE Division operations by using Decision Support Templates (DST) & execution matrixes to fight and sustain

• Use simulations to test operational and logistical plans, report formats and flow

• Conduct MAN/FS/CSS REHEARSALS at all levels• DEVELOP branch & sequels into a CONPLAN Playbook

Page 4: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

4

FSB

FSB

KS

640 MI40 MP

40 BAND

40 HHC

1 18

4 40

ROC

240

160

DSAB

1-188 NDCADRE

CADRE

140

TASKORG

2 40

29 SIB(L)

MSB

40

DSDS

DS

DSDS

DS

3 40

DS

210 MET

FSB

81 WA

CA

Embedded enhancedWA/CA brigade

1004 AL

Page 5: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

5

40 Infantry Division (M)Commanding GeneralMG Peter J. Gravett

(29 months)

ADC-MBG Jeffrey L. Gidley

(14 months)

ADC-SBG John S. Gong

(14 months)

Chief of Staff COL Jacob A. vanGoor

(21 months)

81st eSIB CDRBG Richard D. Read

(27 months)

AVN BDE CDRCOL Daniel J. Nelan

(20 months)

2nd BDE CDRCOL John Harrel

(17 months)

3rd BDE CDRCOL Keith D. Jones

(13 months)

ENG BDE CDRCOL Scott Johnson

(10 month)

DIVARTY CDRCOL Gary Landrith

(16 months)

DISCOM CDRCOL Rod Barham

(11 months)

Command Sergeant MajorCSM William J. Urquhart

(33 months)

Page 6: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

6

Long Beach

San Diego

GlendalePasadena

Vallejo

Los Alamitos

MSC Locations

Los Angeles

Fresno

Modesto

Riverside

• Engineer Brigade

• Third Brigade

1-184 IN(AASLT)/29 SIB(L)• Aviation Brigade• Division Artillery• First Brigade

DISCOM• Division Troops• 1-185 AR/81st SIB• Second Brigade

• Engineer Brigade

• Third Brigade

1-184 IN(AASLT)/29 SIB(L)• Aviation Brigade• Division Artillery• First Brigade

DISCOM• Division Troops• 1-185 AR/81st SIB• Second Brigade

Page 7: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

7

Out-of-State Units

• Out of state units answer to their State Governor• Receive training guidance and support from CDR 40th ID(M)• Command relationship with 81st BDE is not yet defined

1-188 CADRE

1004

81

1-635211

Page 8: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

8

40 Infantry Division (M)

40th ID(M) conducts essential pre-mobilization training; on order, mobilizes, conducts post-mobilization training, deploys to a theater of operations, conducts military operations and re-deploys.

Division Mission

Page 9: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

9

40 Infantry Division (M)

Division METLI. MOBILIZE

– Meet USR Standards

– PLT & Battlestaff Proficiency

– Maintain Unit Mob Plan

– STRAC Requirements

– CS/CSS Company Proficiency

– Conduct Family Support Operations

II. CONDUCT DECISIVE OPERATIONS – Prepare For Combat

– Attack (2001 & 2003)

– Defend (2002)

– Shape the Battlefield

– Conduct Recon &

Security Operations

III. PROTECT THE FORCE– Operational Security

– Safety

– Rear Area Operations & Security

IV. SUSTAIN THE FORCE

– Maintain Personnel Readiness

– Coordinate, Perform & Monitor CSS

Operations

Page 10: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

10

40 Infantry Division (M)AREA OF OPERATION

PACIFICA(Philippines)

• Builds on 35 CRC & Brigade BCBST Experience• Builds on 2 ID(M) WFX, I CORPS WFX 02, & Yama Sakura• Avenues of Approach Support Brigade Operations• Requires extensive IO/CMO operations per CG’s Intent• Good Host Nation Support Play• OPFOR Contemporary Operational Environment (COE)

Page 11: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

11

40 Infantry Division (M)

Seminar Scenario

• Role of Division: 40 ID(M) is part of a CORPS, and is fighting as the supporting effort• Higher Headquarters: I CORPS (USARPAC - HHQ)• Theater of Operations: Pacifica (Philippines)• Time of the Year: Winter • Missions: Attack, transition, Defend

Page 12: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

12

40 Infantry Division (M)40ID (M) WFX SEMINAR TRAINING

OBJECTIVES• IMPROVE WARFIGHTING SKILLS: The Division Commander assembles, integrates,

and focuses his subordinate Commanders and Division Staff together on battle command tasks• TEAMBUILDING: Integrate Commanders and Staff together into a cohesive team, able to

plan, coordinate, develop, and synchronize their actions to support the Division Command Group’s decisions throughout the MDMP

• KNOW THE COMMANDER’S INTENT: Improve Staff coordination, decision making, and C2 procedures to fully support the Command Group’s decisions

• UNDERSTAND HOW TO FIGHT FULL SPECTRUM OPERATIONS: Develop an appreciation of the range of Army operations, to include offensive, defensive, stability, and support operations. Gain an understanding on how to successfully integrate all combat multipliers, e.g. Information Operations (IO), Civil Military Operations (CMO), and Force Protection

• KNOW THE ENEMY: Commanders and Battle Staff understand the capabilities and limitations of Warfighting in the Contemporary Operational Environment

• FIX SOMETHING DAILY: End State is positive learning, competent warfighting skills, and an aggressive team of Commanders and Battle Staff 

Page 13: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

13

NOTES

BCTP = BLUE, UNIT = RED

TimeS-3

FRI -19 JUL 02S-2

SAT -20 JUL 02S-1

SUN -21 JUL 02

0800

0830

1200

1300

1500

1700

INTRODUCTIONAND OVERVIEW

BATTLE STAFFMISSION ANALYSIS

BATTLE STAFFMISSION ANALYSIS

BATTLE STAFFMISSION ANALYSIS

LUNCH

O/C SUPPORT

O/C SUPPORT O/C SUPPORTWORKSHOP: DECISION MAKING

WORKSHOP: THREAT

0930 BREAK

0945

1100

WORK ASREQUIRED

SUNDAY

40ID (M)SEMINAR

SCHEDULE

LUNCH LUNCH

1 of 3

MAIN BODY MVMT

Page 14: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

14

40ID (M)SEMINAR SCHEDULE

DAY 1MON-22 JUL 02

DAY 2TUES- 23 JUL 02

DAY 3 WED-24 JUL 02

COMMANDERS BFAST O’CLUB

(0700-0800)

LUNCH (1200-1330)

SEMINAR INTRO(0830-0900)

WORKSHOP: HOW THE CDR DRIVES INTEL

(1600-1730)

WORKSHOP: WCOPFORDOCTRINAL OVERVIEW

(1030-1200))

MISSION ANALYSIS BRIEF: (UNIT)

(1330-1500)

CDR’S GUIDANCE (1500-1600)

WORKSHOP:R&S

(0830-1000)

LUNCH (1130-1230)

WORKSHOP: OFFENSE

(1430-1630)

WORKSHOP: DEEP OPERATIONS

(1230-1430)

WORKSHOP: TARGETING(1000-1130)

COA BRIEFING/CDR GUIDANCE

(1630-1800)

LUNCH (1200-1330)

WORKSHOP:REAR OPS(1330-1500)

COA DECISION BRIEF(1500-1700)

MDMP (C) (1330-1500)

WORKSHOP: MDMP

(0900-1030)

LUNCH 1200-1330

WORKSHOP:BATTLECOMMAND

COL THOMPSON(0800-1100)

WORKSHOP: WFX PREP

(0830-0930)

AAR- INTERNAL(0930-1100)

DAY 4 THU-25 JUL 02

DAY 5 FRI-26 JUL 02

BCTP= BLUE UNIT= RED DTG:

WORKSHOP: TRANSITIONS

(0800-1000)

WORKSHOP: INFO OPS

(1100-1200)

2 of 3

LUNCH 1130-1300

BDE MISSIONANALYSIS

MAIN BODY DEPARTS

WORKSHOP: DEFEND

(1000-1200)

INFORMAL AAR ON UNIT MDMP/ BOS

ONE ON ONE(1530-1700)

Page 15: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

15

40ID (M)SEMINAR SCHEDULE

DAY 1SAT-27 JUL 02

DAY 2SUN- 28 JUL 02

DAY 3MON-29 JUL 02

LUNCH (1200-1330)

LUNCH (1130-1230) LUNCH

(1200-1330)

DAY 4 TUE-30 JUL 02

DAY 5 WED-31 JUL 02

BCTP= BLUE UNIT= RED DTG:

3 of 3

MISSION ANALYSIS BRIEF: (BDE)(0800-0900)

BDE CDR’S GUIDANCE (0900-0930)

COA BRIEFING/CDR GUIDANCE

(1430-1600)

LUNCH (1200-1330)

COA DECISION BRIEF(1030-1130)

BDE OPORDDEVELOPMENT

BDE OPORDDEVELOPMENT

BDE OPORDDEVELOPMENT

BDE OPORDDEVELOPMENT

BDE OPORDBRIEF TO CG

BDE OPORDFINAL REVISION

Page 16: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

16

40 Infantry Division (M)Division Troop List

2nd BCT1-160 IN(M) (M2A2)2-185 AR (M1A1)1-635 AR (KSARNG) (M1A1)G/18 CAV (1025/M1026)1-144 FA (DS) (M109A5)578 EN BN (DS) (M113A3)A/640 MI BN (Cadre)2/40 MP CO B/1-188 ADA (DS) (Cadre)40 FSB (DS)

3rd BCT1-185 IN(M) (M2A2)3-160 IN(M) (M2A2)1-149 AR (M1A1) 1-143 FA (DS) (M109A5) H/18 CAV (M1025/M1026)C/1-188 ADA (DS) (Cadre)579 EN BN (DS) (M113A3)B/640 MI (DS) (Cadre)3/40 MP CO (DS)340 FSB (DS)

81st SIB (WAARNG)(“embedded”) 1-161 IN(M) (M2A2) 1-185 AR (CAARNG) (M1A1) 1-303 AR (M1A1) 2-146 FA (M109A6) 898 EN BN (M113A3) 181 SPT E/303 CAV (M1A1/M3) D/216 ADA (MNARNG)(Stinger) 281 MI CO

40th AVN BDE211 AHB (AH64) (UTARNG)1-140 GSAB (UH-60A/UH-1H/OH58C)640 DASB (DS)

40th DIVARTYD/144 FA (GS) (M109A5)

F/144 FA (TA) (Q-36/Q-37 V8)

153 FA BDE (R to 40 DARTY)1-201 FA (PALADIN)2-222 FA (PALADIN)1-158 FA (MLRS)

40th DIVENG132 EN CO (M113A3)

40th DISCOM540 MSB

DIV TROOPS1-18 CAV (M1A1/M3A2/AH-1F)

1-188 ADA (-)(Stinger) (Cadre) (NDARNG) 140 CM CO HHC/40 ID(M)40 IN Det (ROC)640 MI(-) (Cadre) 160 IN DET (LRS)40 MP CO (-)40 Band1004 EN DET (TOPO) (ALARNG)1302 EN DET (TOPO) (ALARNG)

210 WX FLIGHT (DS) (CAANG) 1-184 IN (AASLT) (TCF)

FSE/HHB/1-487 FA A/1-487 FA (105mm) (T)(DS)

MST/B/29 SPT 670 MP Co 321 CA SOCCE/19 SF 7 POG

Page 17: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

17

40 Infantry Division (M)

Scenario: Pacifica (Philippines), HIC/H-L - Defend, transition, Attack

TRAINING OBJECTIVES (Focus on Execution)BCTP( A) , 22-26JUL02

• SYNCHRONIZE SHAPING OPERATIONS – 22-8/7-CS05• SYNCHRONIZE DECISIVE OPERATIONS – 22-8/7-DCG5• CONDUCT DEFENSIVE INFORMATION OPERATIONS – 71-8/7-

G308• SUSTAIN THE FORCE – 22-8/7-CG04• LEARN FROM THE CHALLENGE. Develop professionally against

the World Class OPFOR• GROW LEADERS. Build and sustain Battlestaff proficiency• FIX SOMETHIN DAILY. Improve the Division TACSOP

FULL LIST TBP

Page 18: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

18

OCT-NOV 2002SUNMON TUE WED THU FRI SAT

31

2019

4 5

8 9

6

7 10 11

1817

12 13

14

OCT

21 27

EQUIPMENTARRIVES

FINAL ADJUSTMENTS0800-1200DB MAINT

W/C LOCKOUT 1200

STARTEX 0001+ OR- 6HRS

NOV 26

40th INFANTRY DIVISION (MECH) WARFIGHTER SCHEDULE

SIMULATIONS CENTER SET-UP

BRIEF I CORPS

SIMULATIONREADY 1800

I CORPS/40ID(M) DIVISION WARFIGHTER

W/S READY

SIM CENTER SET-UP

SIM CENTER SET-UP

1615

2322 2524

TRAINING VIGNETTES

40ID MAINBODY

ARRIVES

0800-2200

OIC INBRIEF

RAMP UP CPX

W/S SET UP1300-1700

2

KEYO TRAINING

28 3NOV 23029 131

OPORD BRIEF

SYNC DRILL& COMEX

MINI-EX

Page 19: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

19

I CORPS WFXI CORPS WFX

SIMULATION SUPPORTED, MULTI-ECHELON, FULLY INTEGRATED TACTICAL COMMAND POST TRAINING EXERCISE

7 DAYS 24 HOUR CONTINUOUS OPERATIONS

REALISTIC, STRESSFUL TRAINING FOR I CORPS AND MSC COMMANDERS AND STAFFS

CERTIFIED OBSERVER CONTROLLERS/TRAINERS PROVIDE AAR FEEDBACK AND FINAL EXERCISE REPORT TO FACILITATE SUSTAINMENT TRAINING

Page 20: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

20

IMPROVE WARFIGHTING SKILLS

ASSIST THE COMMANDER IN BUILDING HIS COMMAND AND STAFF TEAM

PROMOTE UNDERSTANDING OF THE COMMANDER’S BATTLE STYLE AND UNIT SOPs

STANDARDIZE OPERATIONS, BETTER UNDERSTANDING OF CURRENT DOCTRINE AND ITS APPLICATION

PROMOTE INSIGHTS ABOUT THE COMPLEXITYOF WAR

WFX OBJECTIVESWFX OBJECTIVES

Page 21: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

21

MARCH

JAN 02 JULY

AUGUST

SEPTEMBER

FEBRUARY

I CORPS WFX 03-01I CORPS WFX 03-01 Planning TimelinePlanning Timeline

JUNE

BCTP/HICONSTARTEX Conf

13-15 Feb

BCTP Seminar16-22

CASCADE PEAK WFX28 Oct-3 Nov

CASCADE MISTRAMP-UP EX

24-26 Oct

BCTP IPC27-29 Nov

MPC WFX Units3-6 Apr

CASCADE CMD CPX

FEB 02

MAR 02

NOV 01

DEC 01

JUL 02

AUG 02

OCT 02

JUN 02 SEP 02

OCT 01 APR 02

MAY 02 NOV 02

DEC 02

CASCADE PEAK WFX28 Oct-3 Nov

I Corps BCTP Sem17-21

CASCADE CMDTOC/STAFF CPX

16-22

I Corps TREXConf 19 Oct

BCTP SS13-14 Nov

I Corps SLTC17 Nov

YS 41

CG

40 ID BCTP Sem22-26 Jul

YS STAFFEX

MC

UFL

3/2 IBCT WFX

N40 ID BCTP IPC4-6 Jan

I Corps SLTC19-20 Apr

Page 22: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

22

SUNDAY MONDAY

TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY

20

8

19

21

27

26

25 23 22

28

24

1 31 29 2 30

3 4 5 6 7

OCTOBER/NOVEMBER 2002

8 9

181716151413

I CORPS WFX I CORPS WFX CALENDARCALENDAR

6 7 9 10 11 12

BSC SITE SET-UP & PREPARATION

WARFIGHTER CPXWARFIGHTER CPX

WFXWFX

AAR

SIMULATIONS TRAINING

SIMULATIONS TRAINING

BSC SITE SET-UP & PREPARATION

COMMEX

SYNCH DRILLSYNCH DRILLREHEARSAL

OPORDBRIEF

MSC BRIEFINGS

RAMP UP CPXRAMP UP CPX

Re-Set

MINI-EX

Page 23: 1 40th Infantry Division (Mech) Warfighter 2003 Ramp-up Plan Initial Planning Conference 4 Jan 02 Warfighter 2003 Ramp-up Plan Initial Planning Conference

23

40 Infantry Division (M)

17 Oct- 2 Nov 03 I Corps WFX 03-01 20-22 Sep 02 Rear/CSS Rock Drill

13-15 Sep 02 Deep Fires EX 23-26 Aug 02 Combined Arms Rock Drill 27-31 Jul 02 40ID(M) Bde OPORD development 22-26 Jul 02 40ID(M) WFX Seminar 29 Jun 02 Receive I CORPS’ OPORD

17-21 Jun 02 I Corps WFX Seminar 1-3 Mar 02 CDRC, Staff Estimates,Mission Analysis

13-15 Feb 02 STARTEX Conf, USARPAC 4 Jan 02 40ID(M) IPC (VTC)

3-17 Dec 01 2ID WFX (2/40 BCT) 24-28 Nov 01 2ID WFX Seminar

17-19 Aug 01 81st eSIB BCBST 3-5 Aug 01 2nd Bde BCBST

27-29 Jul 01 3rd Bde BCBST

Warfighter