1 3 august 2011 2011 active army/army reserve dodaac training

17
1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training Contractor DODAACs 03 August 2011 Mrs. Jaimie Barbé Watts

Upload: lawrence-baldwin

Post on 18-Dec-2015

229 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

1

3 August

20112011 Active Army/Army Reserve DoDAAC Training

Contractor DODAACs

03 August 2011

Mrs. Jaimie Barbé Watts

Page 2: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

2

3 August

20112011 Active Army/Army Reserve DoDAAC Training

Contractor DODAACsRequest and Approval Flow

MACOM/COR LETS CONTRACT

COMMERCIAL ACTIVITY/

CONTRACTOR

Army Network Station

Coordinator receives, reviews

and submits request to ACSP

LOGSAArmy Central Service Point

(ACSP)

Automated requests submitted to LOGSA via

the Army Enterprise Systems Integration

Program (AESIP)

Page 3: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

3

3 August

20112011 Active Army/Army Reserve DoDAAC Training3

Contractor DODAACsInitial Coordination

COMMERCIAL ACTIVITYCOMMERCIAL ACTIVITY MACOM CORMACOM COR

• Responsible for registering company with Central Contractor Registration (CCR) database and obtaining a valid Commercial and Government Entity (CAGE) code. Vendor is responsible for keeping CAGE data updated. •The CAGE address applicable to the contractor for whose contract the DODAAC is being requested must match the shipping address in the DODAAC request.

• COR determines and identifies requirement for a Contractor DODAAC.

•Receives location CAGE from Contractor. • Provides ANS with:

-Contract number -Contract effective date -Contract expiration date -Valid CAGE code

Page 4: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

4

3 August

20112011 Active Army/Army Reserve DoDAAC Training4

Contractor DODAACs

Reviews submitted new or change requests from the COR to ensure all necessary information is provided including: Contract Number, Contract Expiration Date, SPLC address, FSN, etc.

Ensures submission of Valid Cage Code/Sub Cage Code by cross referencing with CCR/BINCS.

Finalizes Contractor DoDAAC request and submits to ACSP via AESIP for approval.

Army Network Station (ANS) Coordinator

Page 5: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

5

3 August

20112011 Active Army/Army Reserve DoDAAC Training5

Contractor DODAACsContractor DODAAC Maintenance

Menu

• Create New Contractor DODAAC

• Change Contractor DODAAC

• Extend Contractor DODAAC

• Reinstate Contractor DODAAC

• Inactivate (Delete) Contractor DODAAC

Page 6: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

6

3 August

20112011 Active Army/Army Reserve DoDAAC Training6

Contractor DODAACs

Required Elements Include:

Contract number

Contract expiration date

Valid CAGE code registered in CCR (Central Contractor

Registration)

SUBCAGE (if applicable)

FSN

Create New Contractor DODAAC

Page 7: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

7

3 August

20112011 Active Army/Army Reserve DoDAAC Training7

Contractor DODAACsCreate New Contractor DODAAC

Central Contractor Registration (CCR) file

The TAC 1 and TAC 2 Addresses are auto-populated based on

the CAGE/SUBCAGE code entered.

Page 8: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

8

3 August

20112011 Active Army/Army Reserve DoDAAC Training8

Contractor DODAACsRequest DODAAC Change

Page 9: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

9

3 August

20112011 Active Army/Army Reserve DoDAAC Training9

Contractor DODAACs

The ANS Coordinator receives a notification email 90 and 30 days prior to the expiration date. If the contractor DODAAC expires, the ANS Coordinator has 30 days after the expiration date to reinstate the DODAAC.

Contracts that have been expired more than 30 days cannot be reinstated or extended. If more work is to be done, a new contract with a new DODAAC must be used.

Extend Contractor DODAAC

Page 10: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

10

3 August

20112011 Active Army/Army Reserve DoDAAC Training10

Contractor DODAACsRequest DODAAC Reinstatement

Enter the DODAAC to be reinstated and click ‘Submit’.

Page 11: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

11

3 August

20112011 Active Army/Army Reserve DoDAAC Training11

Contractor DODAACs

Enter the DODAAC to be deleted and click ‘Submit’.

Request DODAAC Deletion

Page 12: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

12

3 August

20112011 Active Army/Army Reserve DoDAAC Training12

Contractor DODAACs

Allows Army Performance Based Logistics (PBL) contractors who participate in reset, rebuild, and sustainment work on Army equipment, to requisition CFM/CFE through Government Sources of Supply under a PBL contract.

Past issuing of contractor DODAACs by the Army has been strictly limited to Government Furnished Materiel (GFM), but due to changes in DOD business environment under Total Life Cycle Management, the PBL Contractor DODAAC has become necessary in the requisition process and established partnerships.

PBL Contractor DODAACs

Page 13: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

13

3 August

20112011 Active Army/Army Reserve DoDAAC Training13

Contractor DODAACs

COR must insert an authorization clause into Section H or I of the contract prior to any request for a CFM DODAAC.

Example: Contractor is authorized to use DLA as a source of supply for CFM

Once an authorization clause is inserted into the contract, the Army COR will coordinate with their Army Network Station (ANS) POC who will assist in requesting a FSN for the PBL DODAAC.

PBL Contractor DODAACs

Page 14: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

14

3 August

20112011 Active Army/Army Reserve DoDAAC Training14

Contractor DODAACs The ANS will email DFAS the following information in requesting a PBL CFE/CFM FSN:

FSN request is for PBL CFE/CFM

Name and billing address of the Contractor

Name and number of the COR, ANS, LOGSA ACSP POC

Name and number of the approving official

PBL Contractor DODAACs

Page 15: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

15

3 August

20112011 Active Army/Army Reserve DoDAAC Training15

Contractor DODAACsPBL Contractor DODAACs

Page 16: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

16

3 August

20112011 Active Army/Army Reserve DoDAAC Training16

Contractor DODAACs

Questions?

Page 17: 1 3 August 2011 2011 Active Army/Army Reserve DoDAAC Training

17

3 August

20112011 Active Army/Army Reserve DoDAAC Training